Sol_140D0426Q0030.pdf

PDF 1 MB Posted

Attached to
NPS - Fire & Intrusion Monitoring Services, George
Solicitation number
140D0426Q0030
Issued by

About this file

This is a Request for Quote (RFQ) issued by the U.S. Department of the Interior's Interior Business Center on behalf of the National Park Service's George Washington Memorial Parkway. The solicitation seeks a contractor to maintain existing fire alarm and intrusion detection systems across multiple locations. The contract is a 100% small business set-aside with a firm-fixed-price structure, spanning one base year and four optional one-year renewal periods.

Key requirements include maintaining fire alarm and intrusion detection systems to be free from general alarm, trouble, supervisory, or system error signals, and rectifying existing fire alarm deficiencies. The contractor must provide all personnel, labor, equipment, and services necessary to perform the work. Technicians working on the fire alarm system must be minimum NICET Level II certified, and those working on the intrusion detection system must have a valid state license. The solicitation covers 34 different delivery locations, primarily in the Washington, D.C. metropolitan area. The RFQ was issued on November 14, 2025, with quotes due by November 24, 2025, and anticipates an award under NAICS code 561621 for Security Systems Services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

D55

See Schedule

CODE 16. ADMINISTERED BYCODE

X

X

X

561621

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED ORD55

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

11/24/2025 1200 ES

11/14/2025

2082077391Robert Staats (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140D0426Q0030

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 49 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

15. DELIVER TO

Herndon VA 20170 Suite 2000A 381 Elden Street Acquisition Services Directorate

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$25

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

Interior Business Center, AQD

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

ADMINISTERED BY:

Interior Business Center, AQD Acquisition Services Directorate 381 Elden Street Suite 2000A Herndon VA 20170 USA

This is a Request for Quotes (RFQ) on behalf of the National Park Service (NPS) George Washington Memorial Parkway to maintain the existing fire

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

Morgan Schickler

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

alarm (FA) and intrusion detection (ID) systems to be free from general alarm, trouble, supervisory, or any other signal indicative of a system error or malfunction.

00001 Base Year 1 EA

Product/Service Code: 6350

Product/Service Description: MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS

00002 Option Year 1 1 EA

(Option Line Item)

Anticipated Exercise Date

Product/Service Code: 6350

Product/Service Description: MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS

00003 Option Year 2 1 EA

(Option Line Item)

Anticipated Exercise Date

Product/Service Code: 6350

Product/Service Description: MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS

00004 Option Year 3 1 EA

(Option Line Item)

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

49 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 49

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140D0426Q0030

Anticipated Exercise Date

Product/Service Code: 6350

Product/Service Description: MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS

00005 Option Year 4 1 EA

(Option Line Item)

Anticipated Exercise Date

Product/Service Code: 6350

Product/Service Description: MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

United States Department of the Interior

INTERIOR BUSINESS CENTER

Washington, DC 20240

SECTION 1 – INTRODUCTION

General This requirement is being issued by the United States Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD), on behalf of the DOI National Park Services (NPS), George Washington Memorial Parkway (GWMP). AQD is issuing this Request for Quote (RFQ) for the purpose of entering into a Contract under Federal Acquisition Regulation (FAR) Part 12 - Acquisition of Commercial Products and Commercial Services and FAR Part 13 - Simplified Acquisition Procedures., for Maintenance of the existing fire alarm (FA) and intrusion detection (ID) system.

Award Type

• North American Industry Classification System (NAICS): 561621 - “Security Systems Services

(except Locksmiths)”

• Product Service Code (PSC): PSC: 6350 - “Miscellaneous Alarm, Signal, and Security Detection

Systems Includes Anti-Intrusion Alarm Systems; Foghorns; Gongs; Chimes; Bells; Burglar Alarm Systems; Fire Alarms; Police Alarm Systems; Sounding Devices; Manual Gas Alarms; Landing Wands. Excludes Loran; Radar; Sonar; Engine Oil and Fuel Warning Devices; Aircraft Oxygen Warning Devices.”

• Type of Contract/Order: Firm-Fixed-Price (FFP)

Period of Performance One-year from the date of award, plus four subsequent one-year Option Periods for a total period of performance of five years.

Services Required Requirement details are provided in the Statement of Work (SOW), Section “2.0 General Conditions”

Set-Aside Information This solicitation is a 100% Small Business Set-Aside, under FAR 19.502-2(b).

Contract Administration Government Administration:

Morgan Schickler, Contracting Officer (CO) Acquisition Services Directorate U.S. Department of the Interior Email: morgan_schickler@ibc.doi.gov

Contracting Officer’s Representative (COR): Details will be provided at time of award.

[END OF SECTION 1]

mailto:morgan_schickler@ibc.doi.gov

Solicitation 140D0426Q0030

SECTION 2 – STATEMENT OF WORK

Fire & Intrusion Monitoring Services

NATIONAL PARK SERVICE

George Memorial Parkway (GWMP) Arlington, Virginia

1.0 Description of Work

a. The contractor shall maintain the existing fire alarm (FA) and intrusion detection (ID) systems to be free from general alarm, trouble, supervisory or any other signal Indicative of a system error or malfunction.

b. The contractor shall rectify all existing FA deficiencies as outlined in the attached annual inspection report.

2.0 General Conditions

a. Safety: Personal protective equipment ln accordance with industry standards is always mandatory while on-site.

b. Services: The contractor shall provide all personnel, labor, equipment, materials, supplies, tools, transportation, hauling, permits, supervision, rental equipment and other items and non-personal services necessary to perform this PWS, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

c. Codes and Licenses: The contractor shall accomplish all items listed above while adhering to local, state, and federal regulations for construction and safety. Contractor and sub-contractors shall be licensed as required by their respective trade(s) and certified in the product(s) that are determined to be installed.

d. Quality Assurance: The government shall evaluate the contractor's performance under this contract in accordance with current local, State, and Federal codes, standards, and regulations.

e. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to Identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is how he assures himself that his work complies with the requirement of the contract. The contractor shall develop and submit a Quality Control Plan for review and approval 30 days after the contract award, or 10 days before Notice to Proceed - whichever is earlier.

Any modifications must be submitted, reviewed, and approved. After acceptance of the quality control plan the contractor shall receive the contracting officer's acceptance in writing of any proposed change to his QC system.

f. Hours of Operation: The contractor Is responsible for conducting business, between the hours of 6:00 am and 4:00 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. In emergency situations the contractor will be expected to work beyond these normal working hours, at the discretion of the Government.

Recognized Holidays: Contractor shall not perform services on Federal holidays. Exemptions from these requirements may be requested of the CO five (5) days prior to the scheduled change and must be approved by the Park Superintendent. Below is the list of Federal holidays:

New Years Day

Martin Luther King Jr's. Birthday

Presidents Day

Memorial Day

Independence Day

Juneteenth, Labor Day

Columbus Day

Veteran’s Day

Thanksgiving Day

Christmas Day

h. Place of Performance: Please see Section 8.0

i. Type of Contract: Firm Fixed-Price (FFP)

j. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured. The contractor equipment, materials and staging areas shall also be secured to prevent theft and trespassing by park visitors.

k. Cleanliness Requirements: The Contractor shall, always, keep the work area free from accumulation of waste and construction materials and comply with all federal, state, and local regulations pertaining to the storage, transport and disposal of waste.

l. Work Site Protection: Upon completing any maintenance activity, the Contractor shall be responsible for repair of any damage to Government property.

m. Workforce: The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW. When hiring personnel, the contractor must keep in mind that the stability and continuity of the workforce are essential. Any acceleration of the schedule, overtime, and premium time shall be the responsibility of the contractor to satisfy the requirements of this SOW. If the contractor is not able to satisfy the requirements of this SOW, the Government may supplement with an outside service provider and the bill for these services will be passed along to the contractor.

1. Technicians working on the FA system shall be at minimum NICET Level II certified.

2. Technicians working on the ID system shall have a valid state license to work on security systems.

n. Identification of Contractor/Subcontractor Employees: All contract personnel attending meetings and working in other situations where their contractor status ls not obvious to third parties are required to identify themselves by wearing badges to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

o. Site Visit: The contractor shall visit the site and verify the conditions of the existing FA and ID systems. This means the Contractor shall visually inspect the space and investigate to determine any problem to perform the job. Discuss with the CO to ensure no other information useful for the assessment is missing. The Contractor Is required to verify all approximated measurements provided under Tasks and Deliverables. Provide written recommendations for any required additional work, or better alternatives.

p. Labeling: All submittals, correspondence, and billing invoices shall reference GWMP Fire Alarm and Intrusion Detection Service Contract, and the project contract number

q. Confirmation Notices: The Contractor shall provide a record of all conferences, meetings, discussions, verbal directions, telephone conversations, etc., that the Contractor and/or their representative(s) participates In on both project and contractual matters related to assignments under this Scope of Work. These records shall be referred to as "Confirmation Notices" and each shall fully identify personnel, subjects discussed, and conclusions reached. The Contractor shall forward each Confirmation Notice to the COR and GWMP/NPS Point of Contact not later than S working days after the event. Not lees may be in Contractor format.

r. Access: The Contractor shall not have access to or be admitted into any structure outside the areas designated for the project.

s. Permits and Inspections: The Contractor shall, without additional expense to the Government, be responsible for obtaining any licenses, fees, inspections, permits, and for complying with any federal and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence and shall take proper safety and health precautions to protect the work, workers, the public, and the property of others. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

t. Installation Fire Safety: Contractor shall be responsible for all requirements associated with protecting facilities, safety of crew, staff, and visitors, including protecting the structure from heat or flame (i.e.: fire watch) during system outage and during the repair. A maximum of 2 people is required for each fire watch event.

u. Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

3.0 Specific Tasks and Deliverables

a. Fire Alarm Systems

i. In the event of a General Alarm on the FA system, the contractor must report to the site of the event within 24 hours. Upon arriving at the site of the General Alarm, the contractor has 24 hours to restore the system to Normal operation.

ii. In the event of a trouble or supervisory signal on the FA system, the contractor must report to the site of the event within 48 hours. Upon arrival at the site of the general alarm, the contractor has 72 hours to restore the system to Normal operation.

iii. This contract considers minor repairs such as, but not limited to control units or control boards, communicators, switches, and detectors within scope.

iv. If a Contractor is called back in to make repairs to equipment that has already been repaired with-in the same 24-hour period, the callback work shall be performed at the contractor's own cost and is not considered as reimbursable by the Government.

v. Contractor may be asked to provide price quotes for additional work which may be added to this contract. These quotes may Include the replacement of existing equipment with more modern equipment, or the addition of equipment at other facilities owned and operated by George Washington Memorial Parkway.

vi. The contractor shall rectify all existing FA deficiencies as outlined in the attached annual Inspection report.

vii. Included in this fire alarm system maintenance contract are all the interfacing modules/ hardware/software which connects to fire suppression systems.

viii. The contractor shall be responsible for all drain downs and re-charging of the fire suppression system in the event a sensor or device on the fire suppression system needs to be replaced.

ix. The Contractor shall be responsible for 24hr fire monitoring.

b. Intrusion Detection Systems

i. DSC PC4020

ii. DMP XR150/XRSS0

4.0 Contract Administration

a. The Contractor shall not conduct any work that is beyond this Statement of Work and accompanying specifications unless directed in writing by the Contracting Officer (CO). Any work done by the Contractor beyond this SOW and accompanying specifications and drawings without direction from the CO will be at the Contractor's own risk and at no cost to the Government.

b. The CO may designate more than one individual to serve as the Contracting Officer's Representative (COR). The Contractor will be furnished evidence of COR appointments, including explicit authority delegated to each COR and their responsibilities,

c. The Government does not make representations or warranties of whatsoever kind or nature, either expressed or Implied, as to the quality, level of completion, accuracy, extent of compliance with the standards, codes and requirements described or referred to in the saw, or the extent of coordination between or among the documents provided to the Contractor.

5.0 Definitions

a. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

b. CONTRACTING OFFICER. A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

c. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such an appointment shall be in writing and shall state the scope of authority and limitations. This individual has the authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have the authority to change the terms and conditions of the contract.

d. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

e. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

f. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed In the SOW.

When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

g. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

h. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

i. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

j. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

k. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

I. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

m. WORK WEEK. Monday through Friday, unless specified otherwise.

6.0 ACRONYMS:

ACOR Alternate Contracting Officer's Representative

COR Contracting Officer Representative

COTS Commercial-Off-the-Shelf

DIAR Department of Interior Acquisition Regulation

DOI Department of Interior

FAR Federal Acquisition Regulation

CO Contracting Officer

NPS National Park Service

OCI Organizational Conflict of Interest

PM Project Manager

POC Point of Contact

QA Quality Assurance

QAP Quality Assurance Program

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Program

SOW Statement of Work

TE Technical Exhibit

7.0 Government Furnished Items

a. Services: The Government will provide hot work permits and review and approval of submittals.

b. Facilities: The Government will provide a parking space for the contractor and subcontractors.

The contractor and subcontractors are prohibited from utilizing NPS bathrooms and lavatories.

c. Utilities: The Government will provide water and electrical power. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves and not leaving equipment running overnight.

d. Equipment: The Government will not be providing any equipment under this contract.

e. Materials: The Government will not be providing any materials under this contract.

8.0 Delivery Locations

1. Parkway Maintenance HQ 18. AHRO Bunker

2. BLDG #4 Grounds Operation Storage 19. AHRO South Slave Quarters

3. BLDG#5-6 Grounds Operation BLDG 20. ARHO North Slave Quarters

4. BLDG#8 B&U Signs 21. ARHO Building # 313 5.BLDG#9 President Park/ White House 22. ARHO Comfort Sation/ Book Store 6.Turkey Run HQ 23. ARHO Adim Building

7. USPP D-2 Station Turkey Run 24. ARHO Building # 314

8. Clara Barton House 25. ARHO Lee Mansion 9.Fort Hunt Maintenance Building 26. ARHO Exhibit Building

10. USPP H-2 Station Fort Hunt 28. Jones Point Lighthouse

11. USPP H-2 Horse Stable Fort Hunt 28. Jones Point Lighthouse 12.Great Falls Visitor Center 29. Turkey Run IRRM Building

13. Great Falls Maintenance Building 30. Glen Echo Candy Corner

14. Great Falls Fee Booth 31. Glen Echo Carousel

15. Great Falls Concession 32. Glen Echo Ranger Station

16. Great Falls Ranger Building 33. Glen Echo Shooting Gallery

17. Columbia Island Building 34. Glen Echo Yellow Barn

{END OF SOW}

[END OF SECTION 2]

SECTION 3 – QUOTATION PREPARATION & SUBMISSION INSTRUCTIONS

The following instructions to the Quoter are included in lieu of FAR provision 52.212-1. The Quoter shall reply to this request as follows:

QUOTATION PREPARATION INSTRUCTIONS

In order to participate under this acquisition, you must submit a Technical and Price quote related to the requirements identified herein. The Technical, and Price must each be submitted as a separate volume. Quoters shall not include pricing information in their technical quote.

AQD will conduct this acquisition in accordance with FAR 13 for the purpose of entering into a Contract.

Quoters are required to be registered in the SAM website as of the date the quotation is submitted. The SAM website can be accessed via www.sam.gov. The quoter’s SAM registration shall be in active status.

You shall submit an electronic copy of your quote containing the following:

• Technical (Volume I)

• Price (Volume II)

The following information shall be submitted in order to be considered for award:

1. Company Size Status

2. Tax Identification Number (TIN)

3. Unique Entity Identifier (UEI) *UEI replaced DUNS on April 4, 2022

4. Complete Business Mailing Address

5. Contact Name

6. Contact Phone

7. Contact Email Address

8. Quotation Date

9. Quotation Expiration date (90 days)

The Government anticipates awarding a single Contract as a result of this RFQ to the responsible Quoter whose quote, conforming to the solicitation, will be most advantageous to the Government, price and other non-price factors considered. The failure to submit any information as specifically requested by this solicitation and its attachments may lead to the rejection of your quote.

PERIOD FOR ACCEPTANCE OF QUOTATIONS

The Quoter agrees to hold the pricing shown on its quotation firm for 90 calendar days from the date specified for receipt of quotations, unless another time period is specified in an addendum to the solicitation.

TECHNICAL SUBMISSION

The Technical Submission is limited in length to twenty (20) pages, exclusive of the qualifications of key personnel (resumes), cover letter, and table of contents. Any pages in excess of 20, exclusive of the qualifications of all key personnel (resumes), cover letter, and table of contents will not be evaluated.

Your submission will use 12-point font size (any style), single spaced, single sided, 8.5x11 paper.

Graphics and tables will use no smaller than 8-point font size (any style).

In addition to the topics specified herein, the technical submission may address any other topics considered to be pertinent to demonstration of the knowledge, competence, and capability to complete this requirement. The quote package should be in the form of a detailed written quote describing how the work will be performed and who will perform the work.

Contractors shall provide a technical quote that addresses the following:

• TECHNICAL APPROACH, CAPABILITIES & UNDERSTANDING

The Government will evaluate quotes for the following:

1. The need to which the George Washington Memorial Parkway (GWMP) requires a fire and intrusion alarm monitoring contract to ensure 24 hours a day, 7 days a week protection for its facilities, maintenance yards, visitor contact stations, and historic structures. Quoter will be required to maintain existing fire alarm (FA) and intrusion detection (ID) systems to be free from general alarm, trouble, supervisory, or any other signal indicative of a system error or malfunction. The contractor shall rectify all existing FA deficiencies as outlined in the attached annual inspection report. The contractor shall provide all personnel, labor, equipment, materials, supplies, tools, transportation, hauling, permits, supervision, rental equipment and other items and non-personal services necessary to perform this Statement of Work (SOW), except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

2. The quoter’s organizational structure, proposed team, experience and certifications.

3. Proposed project schedule and quality control measures.

PRICE SUBMISSION

• GENERAL REQUIREMENTS: Your price portion shall be a separate volume from the technical portion. The Contractor shall propose a pricing structure in accordance with their proposed technical solution.

The price quote shall provide a separate price for the base year and each option year, along with a total price for all five years (base plus four option years).

• SPECIFIC REQUIREMENTS: Your price quote shall be submitted as a separate document. Price quote is to be submitted as a Firm-Fixed Price Quote.

You are encouraged to discount your offer. If a discount is provided please indicate the non-discounted rates, the proposed percentage of discount and the discounted rate.

• ASSUMPTIONS, CONDITIONS, OR EXCEPTIONS: Quoters must submit all (if any) assumptions, conditions, or exceptions with any of the contractual, technical, and/or cost/price terms and conditions of this RFQ. These assumptions, conditions or exceptions shall be included in the Technical Quote portion, however, do not count toward the page limit of the technical quote. If not noted in this section of your quote, it will be assumed that the Quoter proposes no assumptions for award and agrees to comply with all of the terms and conditions as set forth herein. It is not the responsibility of the Government to seek out and identify assumptions, conditions, or exceptions buried within the Quoter’s submission.

• METHODS OF QUOTE DELIVERY: All Quotes shall be submitted via email. Late quotes will not be accepted.

Please be advised that it is the Quoter’s responsibility to assure the Government receives your submission on or before the specified due date.

• QUESTIONS: All questions concerning this solicitation in writing by e-mail to the Contracting Officer, morgan_schickler@ibc.doi.gov. No telephonic or facsimile submission of questions will be accepted. All questions must be received no later than on or before 12:00 PM Eastern Standard Time, November 18, 2025. The Acquisition Services Directorate will answer questions, which may affect offers in an amendment to the solicitation.

• QUOTE DUE DATE & TIME: Quotes submitted in response this RFQ shall be received by the due date and time established herein. Quotes shall be received no later than 12:00 P.M. current Eastern Time, November 24, 2025, in order to be considered for award. Any submissions received after the date and time specified herein will NOT be considered for award.

• OTHER GENERAL INFORMATION: The Government reserves the right to contact a Quoter regarding their quote including to request additional discounts.

[END OF SECTION 3]

[THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]

mailto:morgan_schickler@ibc.doi.gov

SECTION 4 – EVALUATION OF QUOTATIONS

GENERAL INSTRUCTIONS: Quotes shall be prepared in accordance with and comply with the instructions in Section 3. The technical submission will be evaluated separately from the price. Each submission will be evaluated against the evaluation factors listed below.

EVALUATION FACTORS FOR AWARD: The contractor must receive a satisfactory rating or above for all Non-Price Factors A and B to be considered for an award.

FACTOR A – TECHNICAL

The Government will evaluate quotes for the following:

1. Understanding of the work, including creativity and thoroughness shown in understanding the objectives of the SOW and specific tasks, and planned execution of the project.

2. The Ability to address anticipated potential problem areas, and creativity and feasibility of solutions to problems and future integration of new processes and technology enhancements.

3. Degree to which the offeror’s quote demonstrates an understanding of logistics, schedule, and any other miscellaneous issues of which the Government should be aware.

FACTOR B – PAST PERFORMANCE

A review will be conducted of the offeror’s information in the Contractor Performance Assessment Reporting Systems (CPARS)and other performance evaluation methods available to the Government.

Based on this review of the offeror’s past performance information, the Contracting Officer will determine if the offeror poses past performance risk to the Government. Offerors that pose past performance risk to the Government will not be considered. Past performance is determined on an Acceptable/Unacceptable basis.

Offerors with no prior similar past performance will not be evaluated favorably or unfavorably and will receive a rating of neutral

FACTOR C – PRICE

An evaluation of all the technically acceptable quoter’s pricing will be evaluated to determine if it is reasonable for the work to be performed.

The Price Factor will not receive an adjectival rating. Price will be evaluated based on the Quoter’s price assumptions, an analysis of the overall price and components of the overall price, an analysis of discounts provided, and for reasonableness. The price quote will be evaluated separately from the technical quote.

BASIS FOR AWARD: Best Value-Trade Off - Overall, when combined, the Government considers non-price factors significantly more important than price. The Government will make award for the quote that represents the best value to the Government after conducting a tradeoff between price and non-price factors, where non-price factors are significantly more important than price.

Between quotes that the government determines are essentially technical equivalent, price shall become the determining factor.

The Government will reserve the right to make award to other than the lowest priced offeror should a better technical solution be proposed. In order to be considered for award, an offeror must receive a minimum rating of satisfactory on all non-price factors. The total quoted price will be evaluated separately, but in conjunction with the non-price elements to ensure that the Government is awarding based on best value. The Government reserves the right to award based on initial submissions, but reserves the right to request additional information, such as revisions to correct minor clerical errors, or to request additional discounts if it is in the Government’s best interest to do so.

The Offeror should recognize that its initial written price and non-price quotes may be used as the sole and final basis of award and should quote accordingly.

The Government intends to make a single award for the requirement. Submission of a quote implies the Contractor agrees to the terms and conditions in this document. Upon determining the quote that represents the best value to the Government, the Gov't will notify the quoter of the order and will request the quoter submit a written acceptance of the order.

The Government reserves the right to not issue an award from this RFQ. This is an RFQ only and in no way obligates the Government to award a Contract or to reimburse the Contractor for any costs incurred in preparing the response to this RFQ.

[END OF SECTION 4]

[THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]

SECTION 5 - CONTRACT TERMS AND CONDITIONS

CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://acquisition.gov/far/index.html;

The following clauses are hereby incorporated by reference:

Clause Title Date 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-18 Commercial and Government Entity Code Maintenance Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications Dec 2014 52.204-21 Basic Safeguarding of Covered Contractor Information Systems Nov 2021 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services Nov 2023 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts May 2024 52.233-1 Disputes Mar 2014 52.245-1 Government Property Sep 2021

(End of clause)

FAR 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services. (OCT 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31

U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and

108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting

Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.] __ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I

(Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

http://acquisition.gov/far/index.html

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

__ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct

2016) (Pub. L. 111-117, section 743 of Div. C).

_X (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of

Division R of Pub. L. 117-328).

__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply

Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L.

115–390, title II).

_X (11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).

__ (ii) Alternate I (Dec 2023) of 52.204-30.

__ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors

Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025) ( 31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C.

657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct

2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (17) [Reserved] _X (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-6.

__ (19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and (3)).

__ (21) (i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Jun 2020) of 52.219-9.

__ (v) Alternate IV (Jan 2025) of 52.219-9.

__ (22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C.

637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-

Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).

_X (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (Jan 2025) (15 U.S.C.

632(a)(2)).

__ (ii) Alternate I (Mar 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged

Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business

Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C.

644(r)).

__ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).

_X (31) 52.222-3, Convict Labor (Jun 2003) (E.O. 11755).

__ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O.

13126).

__ (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

__ (34) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

__ (ii) Alternate I (Feb 1999) of 52.222-26.

__ (35) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (Jul 2014) of 52.222-35.

X (36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

__ (ii) Alternate I (Jul 2014) of 52.222-36.

__ (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec

2010) (E.O. 13496).

X (39) (i) 52.222-50, Combating Trafficking in Persons (Oct 2025) (22 U.S.C. chapter 78 and E.O.

13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (40) 52.222-54, Employment Eligibility Verification (Jan 2025) ( Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ (41) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (46) 52.223-23, Sustainable Products and Services (May 2024) ( E.O. 14057, 7 U.S.C. 8102, 42

U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__ (47) (i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).

__ (ii) Alternate I (Jan 2017) of 52.224-3.

X (48) (i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

__ (ii) Alternate I (Oct 2022) of 52.225-1.

__ (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19

U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109- 283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I [Reserved].

__ (iii) Alternate II (Jan 2025) of 52.225-3.

__ (iv) Alternate III (Feb 2024) of 52.225-3.

__ (v) Alternate IV (Oct 2022) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

__ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct

2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)

(42 U.S.C. 5150).

X (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024)

( E.O. 13513).

__ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

__ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial

Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov

2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

X (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct2018)

( 31 U.S.C. 3332).

__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management

(Jul 2013) (31 U.S.C. 3332).

__ (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) ( 5 U.S.C. 552a).

X (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by

American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub. L. 118- 31, 41 U.S.C. 3901 note prec.).

__ (64) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

__ (65) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (

46 U.S.C. 55305 and 10 U.S.C. 2631).

__ (ii) Alternate I (Apr 2003) of 52.247-64.

__ (iii) Alternate II (Nov 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.] X (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).

X (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41

U.S.C. chapter 67).

X (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment

(Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment

(May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).

__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C.

chapter 67).

__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

X (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).

X (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C.

1792).

__ (10) 52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to Prevent

Human Trafficking (Jan 2025) ( 49 U.S.C. 40118(g)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.

Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .