SOI - South Park District Office Rehab.pdf

PDF 78 KB Posted

Attached to
South Park District Office Rehabilitation Project
Solicitation number
1240LT24R0049_0
Issued by

About this file

This document is a Schedule of Items for the Fairplay Office Rehabilitation project, which includes the following base items: Mobilization, Roof Replacement, Snow/Ice Melt System, Interior/Exterior Modifications, and Communications. There is also an optional item for Chain Link Fencing. The overall project cost is stated, with the base items totaling $______________ and the optional item total of $______________.

The related federal contract opportunity is for the South Park District Office Rehabilitation Project, which involves the rehabilitation of the South Park Ranger District Office. The project is being solicited as a 100% Total Small Business set-aside, with the intent to award a Firm-Fixed Price contract. The scope of work includes mobilization, quality control, roof replacement, snow/ice melt system installation, interior and exterior modifications, and the installation of additional communication outlets. An optional item for a chain link fence is also included. The period of performance is 60 days after Notice to Proceed, and construction must be completed by October 31, 2025. The estimated cost range for the project is between $100,000 and $260,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSICC NFs AND NGs

FAIRPLAY OFFICE REHAB

Schedule of Items

FAIRPLAY OFFICE REHAB SCHEDULE OF ITEMS

PSICC NFs AND NGs

Item No. Description

Method of Measurement Total

BASE ITEMS

BI 1 Mobilization Lump Sum $_________

BI 2 Roof Replacement Lump Sum $_________

BI 3 Snow/Ice Melt System Lump Sum $_________

BI 4 Interior/Exterior Modifications Lump Sum $_________

BI 5 Communications Lump Sum $_________

$______________ BASE TOTAL:

OPTIONAL ITEMS

OI 1 Chain Link Fencing Lump Sum

OPTIONAL ITEM TOTAL:

TOTAL PROJECT COST (BASE PLUS OPTIONAL):