About this file
This is Addendum 02 for the Lansing School District's Hill Center Summer 2025 Renovations Bid Package 1, issued on February 27, 2025. The renovation project includes base bid work for demolition and new construction in the entry, corridor 100K, Kitchen B104E, and Welcome Suite 200-204 areas, as well as roof repairs above the entry, exterior metal panel installation, and site rework. Additional alternate work includes renovations to second floor classrooms C210, C211, C211B, Teachers Lounge D209, D210, D215 and D216. The bid date remains unchanged from the original documents dated February 7, 2025.
The addendum provides clarifications including that this is not a prevailing wage project, 12" planting soil is required near the entry, and all proposals must be hand delivered. It confirms electrical contractor responsibilities for access control cabling, telecommunications cabling, and tamper-proof receptacles. Mechanical clarifications address HVAC scope for alternates, food service specifications, and kitchen exhaust controls. The addendum includes updated project manual sections WC23A, WC26A, and WC31A, with WC31A clarified to include all excavation, prep work, concrete walk/curb/gutter installation, frost blocks, and asphalt paving as shown on plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lansing School District Hill Center Summer 2025 Renovations Bid Package 1
Pre-Bid Addendum 02
Addendum 02
February 27, 2025
This document is to serve as Addendum No. 02 with the purpose of providing clarifications or modifications to the original bid documents dated February 07, 2025 and shall take precedence over them. All incidental items required for the following changes are to be included even if not specifically described.
Receipt of this addendum is to be noted on the bid form.
ATTACHMENTS: -2025_02_26 Hill Center_ADD 01 Write-up
-2025_02_26_Hill Center_ADD 01 Drawings -WC23A project manual section -WC26A project manual section -WC 31A project manual section
BID DATE: Bid date remains UNCHANGED.
BID FORM: Bid form remains UNCHANGED
DRAWINGS: Drawings reissued by Kingscott, see attached
TECH SPECS: Not Applicable
RFI RESPONSES: Q: Is this project prevailing wages? Will the landscaping scope include the 12" planting soil near the entry? The RFP says proposals have to be hand delivered?
A: Project is NOT prevailing wage, please see Addendum 1. Yes include 12” planting soil near entry. Yes all proposals need to be hand delivered per the project manual.
Q: Will the current receptacles in all classroom areas need to be upgraded to Tamper Proof as per NEC? IF so, will the plans be updated showing qtys? Is the EC responsible for the Access Control cabling or Conduit/Raceways only? Is the EC responsible for the Telecommunications cabling?
A: Plans have been updated to indicate tamper proof. EC is responsible for access control cabling and conduits/raceways. EC is responsible for telecommunications cabling.
Q: Line Item 10 under work category 31A states that the excavation and prep for new concrete walk/curb/gutter, new frost blocks, and asphalt is going to be done by WC 03A. There is not a WC 03A category listed for this project. Is this work all supposed to be included in WC 31A? Please advise A: WC31A Clarified in project manual. Please include all excavation and prep for new concrete and asphalt. Please provide and install all concrete walk/curb/gutter, frost blocks, and asphalt paving as shown on the plans.
Q: Clarify food service specs for mechanical vendor to supply A: WC 23A clarified in project manual, see updated WC23A section in project manual.
Q: What is HVAC scope in regard to Alternate #1A, #1B, #1c?
A: HVAC Alternate 1A, 1B, 1C refers to the demo and new work as shown in the 2nd floor classrooms and teachers' lounge. Per the plans it is replacement of diffusers in new ceilings in C210, C211B, and C211, and cleaning of existing diffusers in D216, D215, D210, and D209
Q: WC 31A: I don't see anything in there regarding installing concrete paving. It mentions asphalt paving.
A: WC 31A clarified in project manual, see updated WC31A section in project manual.
Q: Could you clarify whether a bid bond is still required for this scope of work?
A: The Bid form states "Bid security (bid bond or cashier’s check) in the amount of 5% of the bid amount will be required with all bid submission."
Q: Please clarify who is providing Mechanical vs FoodService ducts/hoods/etc.
A: WC 23A clarified in project manual, see updated WC23A section in project manual
Q: Door 100A is currently a pair of doors with a fixed mullion – you are showing a single door and frame going back in but do not show any wall being rebuilt – Please Clarify?
Doors 100B & 100C show up on finish hardware set #6 but not on the floor plan – Please clarify? Please verify that BL-1 are hollow metal frames?
A: 100A is replacing the existing cafeteria entrance only, the double doors will remain.
Please see updated drawings for answer to remaining questions.
Q: The MAU calls out for the controls to be by the TCC, The Food Service Drawings (Captive Aire) have the controls Included. Please confirm the responsibility of the TCC regarding the MAU and EF’s. If the controls are to be by Manufacture, please confirm that the controls are BACnet and to be configured by the manufacture, and TCC has the responsibility of Integrating only.
A. Please see updated drawings.
Q: Is there any additional information for insulated glass, other than drawing notes that state 1” INSUL or 1” Insulated Glazing? Should we assume 1” Clear, Low-e Glass for lack of a specification?
A: Glass specifications added to updated drawings
PROJECT MANUAL: WC 23A, Note 31: Please review Section 114000 – FOODSERVICE EQUIPMENT: Item 10
Ventilation Hood: Provide and install Items noted N.I.F.E.C. including items 28-31 noted.
WC 26a, Note 25: Provide and install all access control conduit, wiring, and devices.
Existing equipment manufacturer is EPS
WC 31A, Note 10: WC 31A will excavate and prep for new concrete walk/curb/gutter, new frost block (3) at out swinging entry doors, and asphalt.
WC31A, Note 11: Subbase will be furnished, installed, and graded to within +/-.10’ by this WC. This WC to perform any fine grading required prior to installation of their work.
WC 31A, Note 17: Provide and install all concrete paving, sidewalks, frost walls noted in the plans. Provide and install all landscaping noted in the plans.
END OF ADDENDUM 02
Date: 02/26/2025
Project: Hill Center Summer 2025 Renovations
Owner: Lansing School District
Location: Lansing, MI
A/E #: 2612.03
ADDENDUM NO. 01
SPECIAL NOTE:
The Notice to Bidders, Instructions to Bidders, General Conditions of the Contract for Construction, Supplementary Conditions of the Contract for Construction, and all modifications and previously issued
Contract Documentation are a part of this Addendum.
SCOPE OF WORK:
The following items are changes, additions, deletions, clarifications and/or errors and omissions in plans & specifications and shall be considered by each Bidder in making up and submitting their proposal. All items shall be considered a part of the Contract Documents.
NOTICE TO ALL BIDDERS:
All Bidders shall take note of all items covered by this Addendum. Each Bidder shall review the total scope of his responsibilities with respect to his contract work and his interface with the work of others, as well as his required interface with their work.
DRAWINGS:
G0.1 (reissued)
• Sheet list modified to include new sheets D1.2B, D2.12B, A1.2B, A2.2B, A8.2B, MD1.2B, M1.2B, ED1.2B, EP1.2B, EL1.2B.
L1.0 (reissued)
• Updated shrubs at entry.
A0.1 (reissued)
• Added additional scope.
D1.2 (reissued)
• Modified door to match existing size.
D1.2B (issued)
• New scope in Room 150.
D1.3 (reissued)
• Modified door to match existing size.
D2.12B (issued)
• New scope in Room 150/151.
A1.2 (reissued)
• Modified door 100D to match existing size.
A1.2B (issued)
A1.3 (reissued)
• Modified door 100D to match existing size.
A2.2B (issued)
A6.1 (reissued)
• Changed door 100D to match existing size (double door) with frame type 4.
• Added hollow metal frames, wood door, and glazing spec.
A8.2B (issued)
M0.0 (re-issued):
• Sheet list modified to include MD1.2B and M1.2B.
MD1.2B (issued):
• Added sheet to drawing set for additional scope.
FP1.0 (re-issued):
• Added scope as indicated
P4.0 (re-issued):
• Revised Plumbing Fixture Schedule to include SK-2.
M1.2B (issued):
M6.0 (re-issued):
• Added diffuser types as indicated.
M8.0 (re-issued):
• Revised sequence as indicated.
M9.1 (re-issued):
• Revised specifications as indicated.
E0.0(not issued):
• Updated sheet index.
ED1.2 (not issued):
• Added Electrical Demo Key Note D7 – not applicable to sheet.
ED1.2B (issued):
• Added sheet to drawing set for additional scope in classroom 150/151.
ED1.3 (not issued):
ED1.11 (not issued):
ED1.14 (not issued):
EP1.2 (not issued)
• Added Electrical General Note #6.
EP1.2B (issued):
EP1.3 (not issued):
EP1.3R (not issued):
EP1.11 (not issued):
EP1.4 (not issued):
EL1.2 (not issued):
• Added Lighting Keynote #L2 and #L3
EL1.2B (issued):
EL1.3 (not issued):
EL1.11 (not issued):
EL1.14 (not issued):
END OF ADDENDUM
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
N D
C
O P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
E S
A
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
W
IT
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
CLIENT:
LANSING SCHOOL DISTRICT
519 WEST KALAMAZOO ST.
LANSING, MI
TEL. (517) 755-1000
ARCHITECT:
KINGSCOTT ASSOCIATES INC.
259 E MICHIGAN AVE, SUITE 308
KALAMAZOO, MI 49007
TEL. (800) 632-7815
MEP ENGINEER:
SES ENGINEERING
4000 WEST 11 MILE ROAD
BERKLEY, MI 48072
TEL. (248) 399-1900
DIRECTORY
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
STRUCTURAL ENGINEER:
ROBERT DARVAS ASSOCIATES
440 S MAIN ST.
ANN ARBOR, MI
TEL. (734) 761-8713
CIVIL ENGINEER:
SPALDING DEDECKER
905 SOUTH BLVD EAST
ROCHESTER HILLS, MI 48307
TEL: (248) 844-5400
FOOD SERVICE:
BAKERGROUP
2220 EAST PARIS AVE. SE
GRAND RAPIDS, MI 49546
TEL. 1(800) 968-4011
/2
/2
:5 :0
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
TITLE SHEET
G0.1
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
Lansing School District
Hill Center Summer 2025 Renovations
SHEET INDEX:
CONSTRUCTION DOCUMENTS - ADDENDUM 01
FEBRUARY 26, 2025
NO. NAME
GENERAL
G0.1 TITLE SHEET
G0.2 DATA SHEET
CIVIL
C1.0 TOPOGRAPHICAL SURVEY
C1.1 DEMOLITION PLAN
C1.2 SOIL EROSION AND SEDIMENTATION CONTROL PLAN
C2.1 PAVING AND LAYOUT PLAN
C3.1 GRADING PLAN
L1.0 LANDSCAPE PLAN
STRUCTURAL
S0.1 STRUCTURAL NOTES
S1.0 FRAMING PLANS, SECTIONS, AND DETAILS
ARCHITECTURAL
A0.1 FIRST FLOOR COMPOSITE PLAN
A0.2 SECOND FLOOR COMPOSITE PLAN
A0.3 FIRST FLOOR CODE COMPLIANCE PLAN
A0.4 SECOND FLOOR CODE COMPLIANCE PLAN
A0.5 PARTIAL ROOF PLAN
D1.1 FIRST FLOOR DEMOLITION PLAN - UNIT 100
D1.2 FIRST FLOOR DEMOLITION PLAN - UNIT 200
D1.2B FIRST FLOOR DEMOLITION PLAN - UNIT 200B
D1.3 FIRST FLOOR DEMOLITION PLAN - UNIT 300
D1.11 ADD ALT - SECOND FLOOR DEMOLITION PLAN - UNIT 100
D1.14 ADD ALT - SECOND FLOOR DEMOLITION PLAN - UNIT 400
D2.11 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - UNIT 100
D2.12B FIRST FLOOR REFLECTED CELING DEMOLITION PLAN - UNIT
200B
D2.12 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - UNIT
D2.13 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - UNIT 300
D2.21 ADD ALT - SECOND FLOOR REFLECTED CEILING DEMOLITION
PLAN - UNIT 100
D2.24 ADD ALT - SECOND FLOOR REFLECTED CEILING DEMOLITION
PLAN - UNIT 400
A1.1 FIRST FLOOR PLAN - UNIT 100
A1.2 FIRST FLOOR PLAN - UNIT 200
A1.2B FIRST FLOOR PLAN - UNIT 200B
A1.3 FIRST FLOOR PLAN - UNIT 300
A1.11 ADD ALT - SECOND FLOOR PLAN - UNIT 100
A1.14 ADD ALT - SECOND FLOOR PLAN - UNIT 400
A1.22 FIRST FLOOR EQUIPMENT PLAN - UNIT 200
A1.31 SECOND FLOOR EQUIPMENT PLAN - UNIT 100
BASE BID: DEMOLITON AND NEW WORK AS SHOWN ON FIRST FLOOR:
1. ENTRY
2. CORRIDOR 100K
3. KITCHEN B104E
4. WELCOME SUITE 200-204
ROOF REPAIR AS SHOWN ABOVE ENTRY USING EXISTING ROOF DRAINS.
EXTERIOR METAL PANEL INSTALLATION ON FACADE WITH CANOPY ABOVE DOOR 200.
SITE RE-WORK AT ENTRY AS SHOWN ON DRAWINGS.
ADD ALTERNATE 1: DEMOLITION AND NEW WORK AS SHOWN ON SECOND FLOOR ROOMS:
1A. CLASSROOM C210, CLASSROOM C211& OFFICE C211B
1B. TEACHERS LOUNGE D209 & CLASSROOM D210
1C. CLASSROOM D215 & CLASSROOM D216
ADD ALTERNATE 2: REPLACE EXISTING ROOF DRAINS WITH NEW ROOF DRAINS WITH OVERFLOWS AT
AREA OF WORK ABOVE ENTRY.
NO. NAME
A1.34 SECOND FLOOR EQUIPMENT PLAN - UNIT 400
A1.35 EQUIPMENT DETAILS
A1.36 CASEWORK SCHEDULE AND SPECIFICATIONS
A2.1 FIRST FLOOR REFLECTED CEILING PLAN - UNIT 100
A2.2 FIRST FLOOR REFLECTED CEILING PLAN - UNIT 200
A2.2B FIRST FLOOR REFLECTED CEILING PLAN - UNIT 200B
A2.3 FIRST FLOOR REFLECTED CEILING PLAN - UNIT 300
A2.11 SECOND FLOOR REFLECTED CEILING PLAN - UNIT 100
A2.14 SECOND FLOOR REFLECTED CEILING PLAN - UNIT 400
A2.30 INTERIOR PARTITION TYPES
A3.1 EXTERIOR ELEVATIONS
A3.3 BUILDING SECTIONS
A5.1 BUILDING DETAILS
A5.2 BUILDING DETAILS
A6.1 DOOR SCHEDULE
A6.2 DOOR & WINDOW DETAILS
A6.3 DOOR HARDWARE SCHEDULE
A8.1 FIRST FLOOR COLOR LAYOUT PLAN - UNIT 100
A8.2 FIRST FLOOR COLOR LAYOUT PLAN - UNIT 200
A8.2B FIRST FLOOR COLOR LAYOUT PLAN - UNIT 200B
A8.3 FIRST FLOOR COLOR LAYOUT PLAN - UNIT 300
A8.11 ADD ALT - SECOND FLOOR COLOR LAYOUT PLAN - UNIT 100
A8.14 ADD ALT - SECOND FLOOR COLOR LAYOUT PLAN - UNIT 400
A9.1 INTERIOR ELEVATIONS
A9.2 INTERIOR ELEVATIONS & DETAILS
A9.3 INTERIOR RENDERINGS
FOOD SERVICE
FS1.1 FOODSERVICE EQUIPMENT PLAN
FS2.1 FOODSERVICE PLUMBING/MECHANICAL PLAN
FS3.1 FOODSERVICE ELECTRICAL PLAN
FS6.1 VENTILATION HOOD SHEETS
FS6.2 VENTILATION HOOD SHEETS
FS6.3 VENTILATION HOOD SHEETS
FS6.4 VENTILATION HOOD SHEETS
FS6.5 VENTILATION HOOD SHEETS
FS6.6 VENTILATION HOOD SHEETS
MECHANICAL
M0.0 MECHANICAL GENERAL INFORMATION
PD1.3 FIRST FLOOR PLUMBING DEMOLITION PLAN - UNIT 300
MD1.2 FIRST FLOOR COMB. MECH./PLUMB. DEMOLITION PLAN - UNIT
MD1.2B FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT 200B
NO. NAME
MD1.3 FIRST FLOOR MECHANICAL DEMOLITION PLAN - UNIT 300
MD1.11 SECOND FLOOR COMBO. MECH./PLUMB. DEMOLITION PLAN -
UNIT 100
MD1.12 SECOND FLOOR COMB. MECH./PLUMB. DEMOLITION PLAN - UNIT
MD1.14 SECOND FLOOR COMBO. MECH./PLUMB. DEMOLITION PLAN -
UNIT 400
FP1.0 FIRE PROTECTION PLANS
P1.3UG UNDERGROUND PLUMBING PLAN - UNIT 300
P1.3 FIRST FLOOR PLUMBING PLAN - UNIT 300
P4.0 ENLARGED PLUMBING PLANS
M1.1 FIRST FLOOR MECHANICAL PLAN - UNIT 100
M1.2 FIRST FLOOR MECHANICAL PLAN - UNIT 200
M1.2B FIRST FLOOR COMB. MECH./PLUMB. PLAN - UNIT 200B
M1.3 FIRST FLOOR MECHANICAL PLAN - UNIT 300
M1.11 SECOND FLOOR COMB. MECH./PLUMB. PLAN - UNIT 100
M1.12 SECOND FLOOR COMBO. MECH./PLUMB. PLAN - UNIT 200
M1.14 SECOND FLOOR COMB. MECH./PLUMB. PLAN - UNIT 400
M1.R ROOF COMBO. MECH.LPLUMB. PARTIAL PLAN - UNIT 200/300
M5.0 MECHANICAL DETAILS & DIAGRAMS
M6.0 MECHANICAL SCHEDULES
M8.0 TEMPERATURE CONTROLS
M9.0 MECHANICAL SPECIFICATIONS
M9.1 MECHANICAL SPECIFICATIONS
ELECTRICAL
E0.0 ELECTRICAL GENERAL INFORMATION
E0.1 ELECTRICAL SCHEDULES & DETAILS
ED1.2 FIRST FLOOR ELECTRICAL DEMOLITION PLAN - UNIT 200
ED1.2B FIRST FLOOR ELECTRICAL DEMOLITION PLAN - UNIT 200B
ED1.3 FIRST FLOOR ELECTRICAL DEMOLITION PLAN - UNIT 300
ED1.11 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - UNIT 100
ED1.14 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - UNIT 400
EP1.2 FIRST FLOOR POWER PLAN - UNIT 200
EP1.2B FIRST FLOOR POWER PLAN - UNIT 200B
EP1.3 FIRST FLOOR POWER PLAN - UNIT 300
EP1.11 SECOND FLOOR POWER PLAN - UNIT 100
EP1.14 SECOND FLOOR POWER PLAN - UNIT 400
EP1.3R PARTIAL ROOF POWER PLAN
EL1.2 FIRST FLOOR LIGHTING PLAN - UNIT 200
EL1.2B FIRST FLOOR LIGHTING PLAN - UNIT 200B
EL1.3 FIRST FLOOR LIGHTING PLAN - UNIT 300
EL1.11 SECOND FLOOR LIGHTING PLAN - UNIT 100
EL1.14 SECOND FLOOR LIGHTING PLAN - UNIT 400
E9.0 ELECTRICAL SPECIFICATIONS
E9.1 ELECTRICAL SPECIFICATIONS
CONSTRUCTION DOCUMENTS 02/07/2025
ADDENDUM 01 02/26/2025
TAX PARCEL No.
33-01-05-06-401-003
HILL CENTER
LANSING PUBLIC SCHOOLS
HILL CENTER
#5815 WISE RD.
1 STORY BRICK BLDG.
JOB NO.
SHEET TITLE
SHEET NO.
REVISIONS/REVIEW
KEY PLAN
DATE
NORTH
R en o va tio ns
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
La ns in g
Sc ho ol D ist ric t
KEY PLAN
TH
ES
E D
R
AW
IN
G
S
AN
D T
H E
W O
R K
R
EP
R
ES
EN
TE
D T
H
ER
EI
N
A R
E
TH
E
PR
O
PE
R
TY
O F
AN
D
C O
PY
R
IG
H
T
KI
N G
SC
O
TT
A
SS
O
C
IA
TE
S
A N
D M
AY
N
O T
BE
U
SE
D
O R
R
EP
R O
D U
C
ED
W
IT
H O
U T
PE
R
M
IS
SI
O
N
LA
ST
P R
IN
TE
D
W ise
R d.
L an sin g, M I 4
H ill
C en te r
Su m m er
CONSTRUCTION DOCUMENTS 02/07/2025
ADDENDUM 01 02/26/2025
GRAPHIC SCALE
L1.0
LANDSCAPE PLAN
LANDSCAPE NOTES:
SEEDING NOTES:
PLANT SCHEDULE
LEGEND
DETAILDETAIL
SHRUB PLANTING L1.0
SHRDETAILDETAIL
PERENNIAL / ORNAMENTAL GRASS PLANTINGL1.0
PER
AutoCAD SHX Text
ELEC. SIGN
AutoCAD SHX Text
10"ST
AutoCAD SHX Text
10"ST
AutoCAD SHX Text
12"ST
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
OVHG
AutoCAD SHX Text
OVHG
AutoCAD SHX Text
OVHG
AutoCAD SHX Text
PLANTER
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONC
AutoCAD SHX Text
6" CONC. CURB
AutoCAD SHX Text
6" CONC. CURB
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
2' MIN. DIA. BOULDER TYP.
AutoCAD SHX Text
MULCHED PLANTING BED
AutoCAD SHX Text
MULCHED PLANTING BED
AutoCAD SHX Text
LIMITS OF 12" PLANTING MIX
AutoCAD SHX Text
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGAN
AutoCAD SHX Text C
AutoCAD SHX Text 2612.03
AutoCAD SHX Text C
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text 1 inch = 30 ft.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1. INSTALL 3" X 12 GA. EDGING TO SEPARATE LAWN FROM PLANTING BED. INSTALL 3" X 12 GA. EDGING TO SEPARATE LAWN FROM PLANTING BED. 2. INSTALL 3" DEEP SHREDDED BARK MULCH TO ALL PLANTING AREAS / BEDS INSTALL 3" DEEP SHREDDED BARK MULCH TO ALL PLANTING AREAS / BEDS 2.1. MULCH SHALL BE COLORIZED WITH MULCH MAGIC-ESPRESSO COLOR, AVAILABLE FROM SUPERIOR GROUNDCOVER OR MULCH SHALL BE COLORIZED WITH MULCH MAGIC-ESPRESSO COLOR, AVAILABLE FROM SUPERIOR GROUNDCOVER OR APPROVED EQUAL. 3. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES, PIPES AND STRUCTURES, AS WELL AS THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES, PIPES AND STRUCTURES, AS WELL AS THE LOCATION OF EXISTING TREES AND VEGETATION. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COST INCURRED DUE TO DAMAGE/REMOVAL OF SAID ELEMENTS. 4. ANY DISCREPANCIES BETWEEN PLANS, NOTES, DETAILS AND EXISTING CONDITIONS SHALL BE IMMEDIATELY REPORTED TO THE ANY DISCREPANCIES BETWEEN PLANS, NOTES, DETAILS AND EXISTING CONDITIONS SHALL BE IMMEDIATELY REPORTED TO THE OWNER'S AUTHORIZED REPRESENTATIVE FOR REVIEW AND DECISION. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL REVISIONS DUE TO FAILURE TO GIVE SUCH NOTIFICATION. 5. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING MATERIALS/IMPROVEMENTS, DAMAGED DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING MATERIALS/IMPROVEMENTS, DAMAGED DURING CONSTRUCTION. 6. SITE BOUNDARY, TOPOGRAPHY, UTILITIES AND OTHER BASE INFORMATION PROVIDED BY OTHERS. SITE BOUNDARY, TOPOGRAPHY, UTILITIES AND OTHER BASE INFORMATION PROVIDED BY OTHERS. 7. CONTRACTOR SHALL VERIFY QUANTITIES SHOWN ON PLANT SCHEDULES AND THOSE INDICATED ON PLANS. CONTRACTOR IS CONTRACTOR SHALL VERIFY QUANTITIES SHOWN ON PLANT SCHEDULES AND THOSE INDICATED ON PLANS. CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF QUANTITIES DRAWN. 8. CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS TO PLANT MATERIAL LOCATIONS IN FIELD, AS NECESSARY. THE LOCATION OF CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS TO PLANT MATERIAL LOCATIONS IN FIELD, AS NECESSARY. THE LOCATION OF ALL PLANT MATERIAL SHALL BE SUBJECT TO APPROVAL BY THE OWNER'S AUTHORIZED REPRESENTATIVE. 9. ALL PLANT MATERIAL SHALL BE OF THE SIZES CALLED FOR IN THE PLANT SCHEDULES. ANY PLANT MATERIAL NOT MEETING THE ALL PLANT MATERIAL SHALL BE OF THE SIZES CALLED FOR IN THE PLANT SCHEDULES. ANY PLANT MATERIAL NOT MEETING THE SIZED AND/OR QUALITY AS CALLED FOR SHALL BE REMOVED FROM SITE. ALL TREES SHALL BE INSPECTED AND APPROVED BY THE OWNER'S AUTHORIZED REPRESENTATIVE. NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE MADE WITHOUT APPROVAL FROM THE OWNER'S AUTHORIZED REPRESENTATIVE. 10. CONTRACTOR SHALL DETERMINE APPROPRIATE PLANTING BACKFILL MIXES (BASED ON SOILS/SUBSURFACE CONDITIONS) AND CONTRACTOR SHALL DETERMINE APPROPRIATE PLANTING BACKFILL MIXES (BASED ON SOILS/SUBSURFACE CONDITIONS) AND REVIEW ALTERNATIVES WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO INSTALLATION. 11. CONTRACTORTO INCLUDE COST OF ALL MULCH IN THE COST OF THE PLANT MATERIAL. CONTRACTORTO INCLUDE COST OF ALL MULCH IN THE COST OF THE PLANT MATERIAL.
AutoCAD SHX Text
1. SEED ALL NON NATIVE DISTURBED AREAS UNLESS OTHERWISE NOTED WITH: EARTH CARPET QUICK TO GROW LAWN SEED MIXTURE 25% PERENNIAL RYEGRASS 25% KENTUCKY BLUEGRASS 25% ANNUAL RYEGRASS 25% CREEPING RED FESCUE APPLY AT THE RATE OF 5-6 POUNDS PER 1,000SF 2. MULCH BLANKETS SHALL BE USED IN ALL AREAS WITH 10% OR GREATER SLOPE.
AutoCAD SHX Text Qty.
AutoCAD SHX Text
ID
AutoCAD SHX Text Botanical Name
AutoCAD SHX Text Common Name
AutoCAD SHX Text Size
AutoCAD SHX Text Description
AutoCAD SHX Text
AutoCAD SHX Text
CA
AutoCAD SHX Text
CALAMAGROSTIS × ACUTIFLORA 'KARL FOERSTER'ACUTIFLORA 'KARL FOERSTER'
AutoCAD SHX Text
FEATHER READ GRASS
AutoCAD SHX Text
NO 1 CONT.
AutoCAD SHX Text
AutoCAD SHX Text
LM
AutoCAD SHX Text
LIRIOPE MUSCARI 'SILVERY SUNPROOF'
AutoCAD SHX Text
SILVERY SUNPROOF LILYTURF
AutoCAD SHX Text
NO 1 CONT.
AutoCAD SHX Text
AutoCAD SHX Text
PA
AutoCAD SHX Text
PENNISETUM ALOPECUROIDES 'HAMELN'
AutoCAD SHX Text
DWARF FOUNTAIN GRASS
AutoCAD SHX Text
NO 1 CONT.
AutoCAD SHX Text
AutoCAD SHX Text
VC
AutoCAD SHX Text
VIBURNUM CARLESII
AutoCAD SHX Text
KOREAN SPICE VIBURNUM
AutoCAD SHX Text
NO 5 CONT.
AutoCAD SHX Text
AutoCAD SHX Text
WF
AutoCAD SHX Text
WEIGELA FLORIDA 'FINE WINE'
AutoCAD SHX Text
FINE WINE WEIGELA
AutoCAD SHX Text
NO 5 CONT.
AutoCAD SHX Text
AutoCAD SHX Text
2' MINIMUM DIAMETER BOULDERS
AutoCAD SHX Text
PLANT TYPE
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text BEFORE BACKFILLING AROUND PLANT REMOVE ALL PLASTIC BALLING MATERIAL AND METAL CONTAINERS. PUNCH HOLES IN FIBER POTS TO PROVIDE DRAINAGE
AutoCAD SHX Text
UNDISTURBED SUBGRADE: SCARIFY TO 1'' DEPTH
AutoCAD SHX Text
FINISH GRADE
AutoCAD SHX Text
6'' MINIMUM PLANTING MIXTURE BETWEEN BALL AND PIT WALL
AutoCAD SHX Text
IN SODDED AREAS PLACE SOD TO BOTTOM OF EARTH SAUCER
AutoCAD SHX Text
SAUCER 3'' DEEP
AutoCAD SHX Text
REMOVE BURLAP, ROPES AND WIRE FROM TOP 1/3 OF BALL
AutoCAD SHX Text
MULCH 3'' DEEP INSIDE SAUCER, SEE NOTE 2.1 FOR COLOR
AutoCAD SHX Text
12" DEEP BED WITH SPECIFIED PLANTING MIX.
AutoCAD SHX Text
MULCH, 3" DEEP SEE NOTE 2.1 FOR COLOR
AutoCAD SHX Text
TURF GRASS
AutoCAD SHX Text REMOVE PLANT FROM POT (EVEN FIBER POTS) AND BREAK UP ANY ROOT KNOTS THAT MAY BE AT THE BOTTOM OF THE ROOT BALL
AutoCAD SHX Text
ADD-01
T ie r
SHOP
CLASSROOM
C136A
SHOP
CLASSROOM
C136B
UNIT 100UNIT 200
UNIT 300 UNIT 400
VEST
TOILET
C103
NURSE
PRINCIPAL
NURSE
WELCOME
KITCHEN
B104E
CORRIDOR
100K
CLASSROOM
150OFFICE
UNIT 200B
REMODELED AREA
UNAFFECTED EXISTING AREA
* SHOWN FOR GENERAL ORIENTATION / REFERENCE ONLY
INDICATES CONSTRUCTION DOCUMENT ROOM NUMBERS.
REFER TO CODE COMPLIANCE SHEETS FOR BUILDING CODE REQUIREMENTS.
NAME
COMPOSITE PLAN GENERAL NOTES
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
/2
/2
:5 :0
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
FIRST FLOOR COMPOSITE PLAN
A0.1
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
1/16" = 1'-0"
FIRST FLOOR COMPOSITE PLANFIRST FLOOR COMPOSITE PLAN
UP
DEMOLITION PLAN GENERAL NOTES
1. CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH ALL OTHER DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL AREAS THAT WILL REQUIRE DEMOLITION NOT INDICATED
ON THESE SHEETS.
2. THE DEMOLITION PLANS GENERALLY INDICATE AREAS OF EXTENSIVE REMOVALS AND DO
NOT INDICATE ALL OF THE WORK. CONTRACTOR SHALL PERFORM ALL DEMOLITION WHICH
IS NECESSARY FOR THE PROPER EXECUTION OF THE PROJECT WHETHER OR NOT SAID
DEMOLITION IS SPECIFICALLY INDICATED WITHIN THE DOCUMENTS.
3. CONTRACTOR IS RESPONSIBLE TO INFILL, PATCH AND/ OR REPAIR, EXISTING WALL, FLOORS
AND CEILINGS TO MATCH EXISTING WHERE DEMOLITION OCCURS OTHER THAN AS DESCRIBED
IN THESE DOCUMENTS.
4. IT IS THE INTENTION OF THESE DOCUMENTS THAT THE DEMOLITION OF PORTIONS OF
MASONRY WALLS (BOTH INTERIOR AND EXTERIOR) ARE GENERALLY TO BE DONE ALONG
JOINT AND COURSING LINES.
5. PATCH AND REPAIR REMAINING ADJACENT SURFACES AT AREAS OF REMOVAL AND/ OR
ALTERATION TO MATCH EXISTING. PROVIDE A SOUND AND PROPER SUBSTRATE FOR NEW
FINISH. COORDINATE WITH COLOR PLANS. WHERE A NEW FINISH IS NOT INDICATED, MATCH
EXISTING ADJACENT FINISHES.
6. ALL DEMOLITION IS TO BE DONE WITH REASONABLE CARE AS TO MINIMIZE DAMAGE TO
EXISTING REMAINING SURFACES. CONTRACTOR IS RESPONSIBLE TO PROPERLY DISPOSE OF
ALL DEMOLISHED ITEMS NOT INDICATED TO BE RELOCATED OR TURNED OVER TO OWNER.
7. REMOVE AND TURN OVER TO OWNER ALL FIRE EXTINGUISHERS AND CABINETS AT AREAS TO
BE DEMOLISHED, IF NOT OTHERWISE INDICATED TO BE RELOCATED.
8. CLEAN AND PREPARE ALL EXISTING SURFACES WHICH ARE TO BE PAINTED/ PATCHED.
PREPARATION TO INCLUDE MINOR PATCHING.
9. COORDINATE WITH MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR FURTHER
DEMOLITION NOTES.
DEMOLITION PLAN KEYNOTES
FLOORS
A. PREP EXISTING CONCRETE FLOOR FOR NEW FLOOR.
B. REMOVE AND DISPOSE OF ALL FLOORING AND BASE. PREP REMAINING SURFACES TO
RECEIVE NEW FINISH. VERIFY EXISTING FLOORING EXTENTS IN FIELD.
C. REMOVE AND DISPOSE OF WALK-OFF CARPET.
D. REMOVE AND DISPOSE OF CONCRETE CURB.
WALLS
A. REMOVE STORE FRONT WALL CONSTRUCTION, FRAMING, AND ALL ANCHORS AND
SUPPORTS. PREP REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
B. REMOVE AND DISPOSE MASONRY WALL CONSTRUCTION AND ALL RELATED
BRACING/SUPPORTS. PREP REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR
CONSTRUCTION. REFER TO STRUCTURAL FOR LINTEL.
C. REMOVE WINDOW WITHIN WALL, FRAMING, AND ALL ANCHORS AND SUPPORTS. PREP
REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
D. REMOVE GYPSUM BOARD WALL CONSTRUCTION, FRAMING, AND ALL ANCHORS AND
SUPPORTS. PREP REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION
E. REMOVE AND DISPOSE OF MASONRY CURB. PREP SURFACES TO RECEIVE NEW FINISHES
AND/OR CONSTRUCTION.
DOORS
A. REMOVE AND DISPOSE OF EXTERIOR DOOR, INCLUDING FRAME, SIDELIGHTS, TRANSOMS
AND ALL RELATED ANCHORS AND SUPPORTS. SAWCUT ALL FRAME ANCHORS - PRYING
ANCHORS FROM SUBSTRATES IS UNACCEPTABLE. SALVAGE HARDWARE & RETURN TO
OWNER.
B. REMOVE AND DISPOSE OF INTERIOR DOOR, INCLUDING FRAME, SIDELIGHTS AND ALL
RELATED ANCHORS AND SUPPORTS. SAWCUT ALL FRAME ANCHORS - PRYING ANCHORS
FROM SUBSTRATES IS UNACCEPTABLE. SALVAGE HARDWARE & RETURN TO OWNER.
C. REMOVE AND DISPOSE OF PARTITION WALL AND DOOR. PREP REMAINING SURFACES TO
RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
D. REMOVE DOOR KNOB, RETURN TO OWNER.
CASEWORK
A. REMOVE AND DISPOSE OF COUNTERTOP. PREP REMAINING SURFACES TO RECEIVE NEW
FINISHES AND/OR CONSTRUCTION.
B. REMOVE AND SALVAGE BENCH. RETURN TO OWNER. PREP REMAINING SURFACES TO
RECEIVE NEW FINISHES AND/OR CONSTRUCTION
C. REMOVE AND DISPOSE OF COUNTERTOP AND ALL UPPER/BASE CABINETS. PREP REMAINING
SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
D. REMOVE METAL LOCKERS AND ALL RELATED ANCHORS, SUPPORTS, HARDWARE AND
ADHESIVES. RETURN TO OWNER.
TOILETS/PLUMBING
A. REMOVE AND DISPOSE OF PLUMBING FIXTURE - REFER TO PLUMBING DEMOLITION PLANS.
PREP REMAINING SURFACES TO RECEIVE NEW CONSTRUCTION AND/OR FINISHES.
B. REMOVE ACCESSORIES INCLUDING HAND DRYERS, PAPER TOWEL DISPENSERS, TOILET
PAPER DISPENSERS, SOAP DISPENSERS AND ALL RELATED ANCHORS, SUPPORTS,
HARDWARE AND ADHESIVES. RETURN TO OWNER.
MISCELLANEOUS
A. REMOVE AND DISPOSE OF MECHANICAL EQUIPMENT. REFER TO MECHANICAL DEMOLITION
PLANS.
B. REMOVE AND DISPOSE OF APPROXIMATELY 2,060 SQ. FT. OF EXISTING ROOF SYSTEM
DOWN TO CONCRETE ROOF DECK, ROOF DRAINS TO REMAIN.
C. REMOVE AND DISPOSE OF KITCHEN EQUIPMENT. REFER TO FOOD SERVICE DEMOLITION
PLANS.
3A 3A2A
4B
4B
3B3B3B 3C 2C
2A
2A
2A
2A
2A
2A
3C
3C2B
5A
4A
6A
1A
1A
1C
3D
2E 5B
3B
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
/2
/2
:5 :0
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
FIRST FLOOR DEMOLITION PLAN -
UNIT 200
D1.2
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
1/8" = 1'-0"1
FIRST FLOOR DEMOLITION PLAN - UNIT 200FIRST FLOOR DEMOLITION PLAN - UNIT 200
1. CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH ALL OTHER DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL AREAS THAT WILL REQUIRE DEMOLITION NOT INDICATED
ON THESE SHEETS.
2. THE DEMOLITION PLANS GENERALLY INDICATE AREAS OF EXTENSIVE REMOVALS AND DO
NOT INDICATE ALL OF THE WORK. CONTRACTOR SHALL PERFORM ALL DEMOLITION WHICH
IS NECESSARY FOR THE PROPER EXECUTION OF THE PROJECT WHETHER OR NOT SAID
DEMOLITION IS SPECIFICALLY INDICATED WITHIN THE DOCUMENTS.
3. CONTRACTOR IS RESPONSIBLE TO INFILL, PATCH AND/ OR REPAIR, EXISTING WALL, FLOORS
AND CEILINGS TO MATCH EXISTING WHERE DEMOLITION OCCURS OTHER THAN AS DESCRIBED
IN THESE DOCUMENTS.
4. IT IS THE INTENTION OF THESE DOCUMENTS THAT THE DEMOLITION OF PORTIONS OF
MASONRY WALLS (BOTH INTERIOR AND EXTERIOR) ARE GENERALLY TO BE DONE ALONG
JOINT AND COURSING LINES.
5. PATCH AND REPAIR REMAINING ADJACENT SURFACES AT AREAS OF REMOVAL AND/ OR
ALTERATION TO MATCH EXISTING. PROVIDE A SOUND AND PROPER SUBSTRATE FOR NEW
FINISH. COORDINATE WITH COLOR PLANS. WHERE A NEW FINISH IS NOT INDICATED, MATCH
EXISTING ADJACENT FINISHES.
6. ALL DEMOLITION IS TO BE DONE WITH REASONABLE CARE AS TO MINIMIZE DAMAGE TO
EXISTING REMAINING SURFACES. CONTRACTOR IS RESPONSIBLE TO PROPERLY DISPOSE OF
ALL DEMOLISHED ITEMS NOT INDICATED TO BE RELOCATED OR TURNED OVER TO OWNER.
7. REMOVE AND TURN OVER TO OWNER ALL FIRE EXTINGUISHERS AND CABINETS AT AREAS TO
BE DEMOLISHED, IF NOT OTHERWISE INDICATED TO BE RELOCATED.
8. CLEAN AND PREPARE ALL EXISTING SURFACES WHICH ARE TO BE PAINTED/ PATCHED.
PREPARATION TO INCLUDE MINOR PATCHING.
9. COORDINATE WITH MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR FURTHER
DEMOLITION NOTES.
DEMOLITION PLAN KEYNOTES
FLOORS
A. PREP EXISTING CONCRETE FLOOR FOR NEW FLOOR.
B. REMOVE AND DISPOSE OF ALL FLOORING AND BASE. PREP REMAINING SURFACES TO
RECEIVE NEW FINISH. VERIFY EXISTING FLOORING EXTENTS IN FIELD.
C. REMOVE AND DISPOSE OF WALK-OFF CARPET.
D. REMOVE AND DISPOSE OF CONCRETE CURB.
WALLS
A. REMOVE STORE FRONT WALL CONSTRUCTION, FRAMING, AND ALL ANCHORS AND
SUPPORTS. PREP REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
B. REMOVE AND DISPOSE MASONRY WALL CONSTRUCTION AND ALL RELATED
BRACING/SUPPORTS. PREP REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR
CONSTRUCTION. REFER TO STRUCTURAL FOR LINTEL.
C. REMOVE WINDOW WITHIN WALL, FRAMING, AND ALL ANCHORS AND SUPPORTS. PREP
REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
D. REMOVE GYPSUM BOARD WALL CONSTRUCTION, FRAMING, AND ALL ANCHORS AND
SUPPORTS. PREP REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION
E. REMOVE AND DISPOSE OF MASONRY CURB. PREP SURFACES TO RECEIVE NEW FINISHES
AND/OR CONSTRUCTION.
DOORS
A. REMOVE AND DISPOSE OF EXTERIOR DOOR, INCLUDING FRAME, SIDELIGHTS, TRANSOMS
AND ALL RELATED ANCHORS AND SUPPORTS. SAWCUT ALL FRAME ANCHORS - PRYING
ANCHORS FROM SUBSTRATES IS UNACCEPTABLE. SALVAGE HARDWARE & RETURN TO
OWNER.
B. REMOVE AND DISPOSE OF INTERIOR DOOR, INCLUDING FRAME, SIDELIGHTS AND ALL
RELATED ANCHORS AND SUPPORTS. SAWCUT ALL FRAME ANCHORS - PRYING ANCHORS
FROM SUBSTRATES IS UNACCEPTABLE. SALVAGE HARDWARE & RETURN TO OWNER.
C. REMOVE AND DISPOSE OF PARTITION WALL AND DOOR. PREP REMAINING SURFACES TO
RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
D. REMOVE DOOR KNOB, RETURN TO OWNER.
CASEWORK
A. REMOVE AND DISPOSE OF COUNTERTOP. PREP REMAINING SURFACES TO RECEIVE NEW
FINISHES AND/OR CONSTRUCTION.
B. REMOVE AND SALVAGE BENCH. RETURN TO OWNER. PREP REMAINING SURFACES TO
RECEIVE NEW FINISHES AND/OR CONSTRUCTION
C. REMOVE AND DISPOSE OF COUNTERTOP AND ALL UPPER/BASE CABINETS. PREP REMAINING
SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
D. REMOVE METAL LOCKERS AND ALL RELATED ANCHORS, SUPPORTS, HARDWARE AND
ADHESIVES. RETURN TO OWNER.
TOILETS/PLUMBING
A. REMOVE AND DISPOSE OF PLUMBING FIXTURE - REFER TO PLUMBING DEMOLITION PLANS.
PREP REMAINING SURFACES TO RECEIVE NEW CONSTRUCTION AND/OR FINISHES.
B. REMOVE ACCESSORIES INCLUDING HAND DRYERS, PAPER TOWEL DISPENSERS, TOILET
PAPER DISPENSERS, SOAP DISPENSERS AND ALL RELATED ANCHORS, SUPPORTS,
HARDWARE AND ADHESIVES. RETURN TO OWNER.
MISCELLANEOUS
A. REMOVE AND DISPOSE OF MECHANICAL EQUIPMENT. REFER TO MECHANICAL DEMOLITION
PLANS.
B. REMOVE AND DISPOSE OF APPROXIMATELY 2,060 SQ. FT. OF EXISTING ROOF SYSTEM
DOWN TO CONCRETE ROOF DECK, ROOF DRAINS TO REMAIN.
C. REMOVE AND DISPOSE OF KITCHEN EQUIPMENT. REFER TO FOOD SERVICE DEMOLITION
PLANS.
CLASSROOM
3C
4C
4C
4C
5A
2D
2D
B
UL
K H
EA
D
2D
3D 3D
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
/2
/2
:5 :1
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
FIRST FLOOR DEMOLITION PLAN -
UNIT 200B
D1.2B
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
ADDENDUM 01 02/26/2025
1/8" = 1'-0"1
FIRST FLOOR DEMOLITION PLAN - UNIT 200BFIRST FLOOR DEMOLITION PLAN - UNIT 200B
1. CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH ALL OTHER DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL AREAS THAT WILL REQUIRE DEMOLITION NOT INDICATED
ON THESE SHEETS.
2. THE DEMOLITION PLANS GENERALLY INDICATE AREAS OF EXTENSIVE REMOVALS AND DO
NOT INDICATE ALL OF THE WORK. CONTRACTOR SHALL PERFORM ALL DEMOLITION WHICH
IS NECESSARY FOR THE PROPER EXECUTION OF THE PROJECT WHETHER OR NOT SAID
DEMOLITION IS SPECIFICALLY INDICATED WITHIN THE DOCUMENTS.
3. CONTRACTOR IS RESPONSIBLE TO INFILL, PATCH AND/ OR REPAIR, EXISTING WALL, FLOORS
AND CEILINGS TO MATCH EXISTING WHERE DEMOLITION OCCURS OTHER THAN AS DESCRIBED
IN THESE DOCUMENTS.
4. IT IS THE INTENTION OF THESE DOCUMENTS THAT THE DEMOLITION OF PORTIONS OF
MASONRY WALLS (BOTH INTERIOR AND EXTERIOR) ARE GENERALLY TO BE DONE ALONG
JOINT AND COURSING LINES.
5. PATCH AND REPAIR REMAINING ADJACENT SURFACES AT AREAS OF REMOVAL AND/ OR
ALTERATION TO MATCH EXISTING. PROVIDE A SOUND AND PROPER SUBSTRATE FOR NEW
FINISH. COORDINATE WITH COLOR PLANS. WHERE A NEW FINISH IS NOT INDICATED, MATCH
EXISTING ADJACENT FINISHES.
6. ALL DEMOLITION IS TO BE DONE WITH REASONABLE CARE AS TO MINIMIZE DAMAGE TO
EXISTING REMAINING SURFACES. CONTRACTOR IS RESPONSIBLE TO PROPERLY DISPOSE OF
ALL DEMOLISHED ITEMS NOT INDICATED TO BE RELOCATED OR TURNED OVER TO OWNER.
7. REMOVE AND TURN OVER TO OWNER ALL FIRE EXTINGUISHERS AND CABINETS AT AREAS TO
BE DEMOLISHED, IF NOT OTHERWISE INDICATED TO BE RELOCATED.
8. CLEAN AND PREPARE ALL EXISTING SURFACES WHICH ARE TO BE PAINTED/ PATCHED.
PREPARATION TO INCLUDE MINOR PATCHING.
9. COORDINATE WITH MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR FURTHER
DEMOLITION NOTES.
DEMOLITION PLAN KEYNOTES
FLOORS
A. PREP EXISTING CONCRETE FLOOR FOR NEW FLOOR.
B. REMOVE AND DISPOSE OF ALL FLOORING AND BASE. PREP REMAINING SURFACES TO
RECEIVE NEW FINISH. VERIFY EXISTING FLOORING EXTENTS IN FIELD.
C. REMOVE AND DISPOSE OF WALK-OFF CARPET.
D. REMOVE AND DISPOSE OF CONCRETE CURB.
WALLS
A. REMOVE STORE FRONT WALL CONSTRUCTION, FRAMING, AND ALL ANCHORS AND
SUPPORTS. PREP REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
B. REMOVE AND DISPOSE MASONRY WALL CONSTRUCTION AND ALL RELATED
BRACING/SUPPORTS. PREP REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR
CONSTRUCTION. REFER TO STRUCTURAL FOR LINTEL.
C. REMOVE WINDOW WITHIN WALL, FRAMING, AND ALL ANCHORS AND SUPPORTS. PREP
REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
D. REMOVE GYPSUM BOARD WALL CONSTRUCTION, FRAMING, AND ALL ANCHORS AND
SUPPORTS. PREP REMAINING SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION
E. REMOVE AND DISPOSE OF MASONRY CURB. PREP SURFACES TO RECEIVE NEW FINISHES
AND/OR CONSTRUCTION.
DOORS
A. REMOVE AND DISPOSE OF EXTERIOR DOOR, INCLUDING FRAME, SIDELIGHTS, TRANSOMS
AND ALL RELATED ANCHORS AND SUPPORTS. SAWCUT ALL FRAME ANCHORS - PRYING
ANCHORS FROM SUBSTRATES IS UNACCEPTABLE. SALVAGE HARDWARE & RETURN TO
OWNER.
B. REMOVE AND DISPOSE OF INTERIOR DOOR, INCLUDING FRAME, SIDELIGHTS AND ALL
RELATED ANCHORS AND SUPPORTS. SAWCUT ALL FRAME ANCHORS - PRYING ANCHORS
FROM SUBSTRATES IS UNACCEPTABLE. SALVAGE HARDWARE & RETURN TO OWNER.
C. REMOVE AND DISPOSE OF PARTITION WALL AND DOOR. PREP REMAINING SURFACES TO
RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
D. REMOVE DOOR KNOB, RETURN TO OWNER.
CASEWORK
A. REMOVE AND DISPOSE OF COUNTERTOP. PREP REMAINING SURFACES TO RECEIVE NEW
FINISHES AND/OR CONSTRUCTION.
B. REMOVE AND SALVAGE BENCH. RETURN TO OWNER. PREP REMAINING SURFACES TO
RECEIVE NEW FINISHES AND/OR CONSTRUCTION
C. REMOVE AND DISPOSE OF COUNTERTOP AND ALL UPPER/BASE CABINETS. PREP REMAINING
SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
D. REMOVE METAL LOCKERS AND ALL RELATED ANCHORS, SUPPORTS, HARDWARE AND
ADHESIVES. RETURN TO OWNER.
TOILETS/PLUMBING
A. REMOVE AND DISPOSE OF PLUMBING FIXTURE - REFER TO PLUMBING DEMOLITION PLANS.
PREP REMAINING SURFACES TO RECEIVE NEW CONSTRUCTION AND/OR FINISHES.
B. REMOVE ACCESSORIES INCLUDING HAND DRYERS, PAPER TOWEL DISPENSERS, TOILET
PAPER DISPENSERS, SOAP DISPENSERS AND ALL RELATED ANCHORS, SUPPORTS,
HARDWARE AND ADHESIVES. RETURN TO OWNER.
MISCELLANEOUS
A. REMOVE AND DISPOSE OF MECHANICAL EQUIPMENT. REFER TO MECHANICAL DEMOLITION
PLANS.
B. REMOVE AND DISPOSE OF APPROXIMATELY 2,060 SQ. FT. OF EXISTING ROOF SYSTEM
DOWN TO CONCRETE ROOF DECK, ROOF DRAINS TO REMAIN.
C. REMOVE AND DISPOSE OF KITCHEN EQUIPMENT. REFER TO FOOD SERVICE DEMOLITION
PLANS.
6KITCHEN
B104E
3B3B3B 3C 2C
1B
4C
1B
3B 4C
2D
1D
6C
3B
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
/2
/2
:5 :1
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
FIRST FLOOR DEMOLITION PLAN -
UNIT 300
D1.3
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
1/8" = 1'-0"1
FIRST FLOOR DEMOLITION PLAN - UNIT 300FIRST FLOOR DEMOLITION PLAN - UNIT 300
CLASSROOM
OFFICE
CEILING DEMO LEGEND
REMOVE AND DISPOSE OF ACOUSTICAL PANEL CEILING
AND GRID AS REQUIRED FOR NEW CONSTRUCTION.
COORDINATE ALL NECESSARY ELECTRICAL AND
MECHANICAL REMOVALS AND REPLACEMENT WITH
ELECTRICAL AND MECHANICAL CONTRACTORS.
REMOVE AND DISPOSE OF GYPSUM BOARD CEILING, FURRING,
ANCHORS, SUPPORTS AND ATTACHMENTS AS REQUIRED FOR NEW
CONSTRUCTION, MECHANICAL OR ELECTRICAL WORK. COORDINATE ALL
NECESSARY ELECTRICAL AND MECHANICAL REMOVAL AND
REPLACEMENT WITH ELECTRICAL AND MECHANICAL CONTRACTORS.
REFLECTED CEILING PLAN DEMO KEYNOTES
1 REMOVE AND DISPOSE OF PARTITION WALL TRACK AT CEILING. PREP REMAINING
SURFACES TO RECEIVE NEW FINISHES AND/OR CONSTRUCTION.
EXISTING CEILING TO REMAIN.
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
/2
/2
:5 :2
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
FIRST FLOOR REFLECTED CELING
DEMOLITION PLAN - UNIT 200B
D2.12B
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
ADDENDUM 01 02/26/2025
FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - UNIT 200BFIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - UNIT 200B
ARCHITECTURAL PLAN KEYNOTES
1 PATCH EXISTING FLOOR DUE TO WALL REMOVAL. MATCH ADJACENT MATERIALS AND
FINISHES.
PATCH EXISTING WALL CONSTRUCTION DUE TO WALL REMOVAL OR OTHER ASSOCIATED
DEMOLITION. MATCH ADJACENT MATERIALS AND FINISHES.
NEW 6-LITER CLASS K WET CHEMICAL FIRE EXTINGUISHER, BRACKET MOUNTED AT 48"
AFF.
NEW DOOR LEVER ON EXISTING CLASSROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2002.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
INSIDE INDICATOR: CORBIN RUSSWIN ML190 V01
FINISH: 626
CYLINDER: LESS CYL BOTH SIDES
NEW DOOR LEVER ON EXISTING TOILET ROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2060.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
OUTSIDE INDICATIOR: CORBIN RUSSWIN ML190 V21
FINISH: 626
NEW DOOR LEVER ON EXISTING STOREROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2057.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
FINISH: 626
NEW DOOR LEVER ON EXISTING OFFICE/CLASSROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2055.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
FINISH: 626
NEW GRAB BARS IN EXISTING TOILET ROOM.
GRAB BAR - BOBRICK #6806x42
GRAB BAR - BOBRICK #6806x36 (AMBULATORY)
GRAB BAR - BOBRICK #B-6806.99 - 18" VERTICAL
NEW 3-5/8" MTL STUD WALL UP TO EXISTING CEILING WITH 5/8" GYP EACH SIDE. REFER
TO DETAIL 2/A2.30.
NEW 3-5/8" MTL STUD CHASE WALL WITH 5/8" GYP ON ONE SIDE. FINISH WITH FRP
PANEL. REFER TO DETAIL 3/A2.30.
PATCH EXISTING OPENING WITH METAL STUD AND GYP. FINISH WITH FRP PANEL. WALL TO
ALIGN WITH ADJACENT SURFACE.
PATCH OPENING TO MATCH ADJACENT BRICK MASONRY.
NEW 3-5/8" MTL STUD WALL UP TO DECK WITH 5/8" GYP EACH SIDE. REFER TO DETAIL
1/A2.30.
PATCH OPENING TO MATCH ADJACENT METAL STUD WALL WITH GYP ON EACH SIDE.
1. INDICATES CONSTRUCTION DOCUMENT ROOM NUMBERS.
2. REFER TO EQUIPMENT PLANS FOR CASEWORK, VISUAL DISPLAY BOARDS, LOCKERS,
SHELVING, ETC.
3. REFER TO COLOR LAYOUT PLANS FOR FLOOR FINISH PATTERNS AND COLORS.
4. MASONRY CONTRACTOR TO INSTALL LOOSE LINTELS FOR MISCELLANEOUS OPENINGS NOT
INDICATED ON DRAWINGS BUT REQUIRED FOR MECHANICAL, ELECTRICAL, FOOD SERVICE
EQUIPMENT OR OTHER ITEMS THAT PASS THROUGH A WALL. STEEL LINTELS SHALL BE
SUPPLIED BY THE STEEL CONTRACTOR.
5. DIMENSIONS SHOWN ARE TO FACE OF WALL.
XX
ARCHITECTURAL GENERAL NOTES
TOILET
C103
NURSE
VEST
7' -4
PRINCIPAL
WELCOME
201 10
15'-0"
A9.1
A9.1
A3.1
A3.1 32
CORRIDOR
100K
LOW ROOF ABOVE
A3.1
17'-8"
A9.1
A9.1
A9.1
A3.3 _______________________1
A3.3
200A
B
D
C
B
A
D
C
B
A
A
BL-1 BL1
SS-1 SS-1
S S -2
B S S -2
A S S -2
A S S -3
S S -7
S S -4
42A
42B45B
45A
7 1/2"
7 1/2"
7 1/2"
7 1/2"
7 1/2"
100D
8'-6"
SS-5
S S -6
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
/2
/2
:5 :2
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
FIRST FLOOR PLAN - UNIT 200
A1.2
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
1/8" = 1'-0"1
FIRST FLOOR PLAN - UNIT 200FIRST FLOOR PLAN - UNIT 200
A3.1
CLASSROOM
OFFICE
4 4
A
LI
G N
ARCHITECTURAL PLAN KEYNOTES
1 PATCH EXISTING FLOOR DUE TO WALL REMOVAL. MATCH ADJACENT MATERIALS AND
FINISHES.
PATCH EXISTING WALL CONSTRUCTION DUE TO WALL REMOVAL OR OTHER ASSOCIATED
DEMOLITION. MATCH ADJACENT MATERIALS AND FINISHES.
NEW 6-LITER CLASS K WET CHEMICAL FIRE EXTINGUISHER, BRACKET MOUNTED AT 48"
AFF.
NEW DOOR LEVER ON EXISTING CLASSROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2002.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
INSIDE INDICATOR: CORBIN RUSSWIN ML190 V01
FINISH: 626
CYLINDER: LESS CYL BOTH SIDES
NEW DOOR LEVER ON EXISTING TOILET ROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2060.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
OUTSIDE INDICATIOR: CORBIN RUSSWIN ML190 V21
FINISH: 626
NEW DOOR LEVER ON EXISTING STOREROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2057.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
FINISH: 626
NEW DOOR LEVER ON EXISTING OFFICE/CLASSROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2055.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
FINISH: 626
NEW GRAB BARS IN EXISTING TOILET ROOM.
GRAB BAR - BOBRICK #6806x42
GRAB BAR - BOBRICK #6806x36 (AMBULATORY)
GRAB BAR - BOBRICK #B-6806.99 - 18" VERTICAL
NEW 3-5/8" MTL STUD WALL UP TO EXISTING CEILING WITH 5/8" GYP EACH SIDE. REFER
TO DETAIL 2/A2.30.
NEW 3-5/8" MTL STUD CHASE WALL WITH 5/8" GYP ON ONE SIDE. FINISH WITH FRP
PANEL. REFER TO DETAIL 3/A2.30.
PATCH EXISTING OPENING WITH METAL STUD AND GYP. FINISH WITH FRP PANEL. WALL TO
ALIGN WITH ADJACENT SURFACE.
PATCH OPENING TO MATCH ADJACENT BRICK MASONRY.
NEW 3-5/8" MTL STUD WALL UP TO DECK WITH 5/8" GYP EACH SIDE. REFER TO DETAIL
1/A2.30.
PATCH OPENING TO MATCH ADJACENT METAL STUD WALL WITH GYP ON EACH SIDE.
1. INDICATES CONSTRUCTION DOCUMENT ROOM NUMBERS.
2. REFER TO EQUIPMENT PLANS FOR CASEWORK, VISUAL DISPLAY BOARDS, LOCKERS,
SHELVING, ETC.
3. REFER TO COLOR LAYOUT PLANS FOR FLOOR FINISH PATTERNS AND COLORS.
4. MASONRY CONTRACTOR TO INSTALL LOOSE LINTELS FOR MISCELLANEOUS OPENINGS NOT
INDICATED ON DRAWINGS BUT REQUIRED FOR MECHANICAL, ELECTRICAL, FOOD SERVICE
EQUIPMENT OR OTHER ITEMS THAT PASS THROUGH A WALL. STEEL LINTELS SHALL BE
SUPPLIED BY THE STEEL CONTRACTOR.
5. DIMENSIONS SHOWN ARE TO FACE OF WALL.
XX
ARCHITECTURAL GENERAL NOTES
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
/2
/2
:5 :2
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
FIRST FLOOR PLAN - UNIT 200B
A1.2B
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
ADDENDUM 01 02/26/2025
FIRST FLOOR PLAN - UNIT 200BFIRST FLOOR PLAN - UNIT 200B
ARCHITECTURAL PLAN KEYNOTES
1 PATCH EXISTING FLOOR DUE TO WALL REMOVAL. MATCH ADJACENT MATERIALS AND
FINISHES.
PATCH EXISTING WALL CONSTRUCTION DUE TO WALL REMOVAL OR OTHER ASSOCIATED
DEMOLITION. MATCH ADJACENT MATERIALS AND FINISHES.
NEW 6-LITER CLASS K WET CHEMICAL FIRE EXTINGUISHER, BRACKET MOUNTED AT 48"
AFF.
NEW DOOR LEVER ON EXISTING CLASSROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2002.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
INSIDE INDICATOR: CORBIN RUSSWIN ML190 V01
FINISH: 626
CYLINDER: LESS CYL BOTH SIDES
NEW DOOR LEVER ON EXISTING TOILET ROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2060.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
OUTSIDE INDICATIOR: CORBIN RUSSWIN ML190 V21
FINISH: 626
NEW DOOR LEVER ON EXISTING STOREROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2057.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
FINISH: 626
NEW DOOR LEVER ON EXISTING OFFICE/CLASSROOM DOOR.
PRODUCT: CORBIN RUSSWIN ML2055.
TRIM DESIGN: CORBIN RUSSWIN LUSTRA LWA
FINISH: 626
NEW GRAB BARS IN EXISTING TOILET ROOM.
GRAB BAR - BOBRICK #6806x42
GRAB BAR - BOBRICK #6806x36 (AMBULATORY)
GRAB BAR - BOBRICK #B-6806.99 - 18" VERTICAL
NEW 3-5/8" MTL STUD WALL UP TO EXISTING CEILING WITH 5/8" GYP EACH SIDE. REFER
TO DETAIL 2/A2.30.
NEW 3-5/8" MTL STUD CHASE WALL WITH 5/8" GYP ON ONE SIDE. FINISH WITH FRP
PANEL. REFER TO DETAIL 3/A2.30.
PATCH EXISTING OPENING WITH METAL STUD AND GYP. FINISH WITH FRP PANEL. WALL TO
ALIGN WITH ADJACENT SURFACE.
PATCH OPENING TO MATCH ADJACENT BRICK MASONRY.
NEW 3-5/8" MTL STUD WALL UP TO DECK WITH 5/8" GYP EACH SIDE. REFER TO DETAIL
1/A2.30.
PATCH OPENING TO MATCH ADJACENT METAL STUD WALL WITH GYP ON EACH SIDE.
1. INDICATES CONSTRUCTION DOCUMENT ROOM NUMBERS.
2. REFER TO EQUIPMENT PLANS FOR CASEWORK, VISUAL DISPLAY BOARDS, LOCKERS,
SHELVING, ETC.
3. REFER TO COLOR LAYOUT PLANS FOR FLOOR FINISH PATTERNS AND COLORS.
4. MASONRY CONTRACTOR TO INSTALL LOOSE LINTELS FOR MISCELLANEOUS OPENINGS NOT
INDICATED ON DRAWINGS BUT REQUIRED FOR MECHANICAL, ELECTRICAL, FOOD SERVICE
EQUIPMENT OR OTHER ITEMS THAT PASS THROUGH A WALL. STEEL LINTELS SHALL BE
SUPPLIED BY THE STEEL CONTRACTOR.
5. DIMENSIONS SHOWN ARE TO FACE OF WALL.
XX
ARCHITECTURAL GENERAL NOTES
KITCHEN
B104E
CORRIDOR
100K
A
BL-1 BL1
/4
100D
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
/2
/2
:5 :3
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
FIRST FLOOR PLAN - UNIT 300
A1.3
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
1/8" = 1'-0"1
FIRST FLOOR PLAN - UNIT 300FIRST FLOOR PLAN - UNIT 300
CLASSROOM
OFFICE
9'-2
9'-2
ACT-1
ACT-1 3
REFLECTED CEILING PLAN GENERAL NOTES
1. REFER TO CODE COMPLIANCE PLANS FOR VERTICAL FIRE RESISTANT RATINGS AT WALLS AND
HORIZONTAL FIRE RESISTANT RATINGS AT CEILINGS.
2. PROVIDE RATED SEALANT AND/ OR STOPPING AT ALL PENETRATIONS AND OPENING THROUGH
ALL EXISTING AND NEW CORRIDOR WALLS AND FIRE RATED PARTITIONS.
3. PROVIDE ACOUSTICAL SEALANT AND/ OR STOPPING AT ALL PENETRATIONS THROUGH NON-
FIRE RATED WALLS.
4. REFER TO COLOR LAYOUT PLANS FOR COLOR INFORMATION.
5. FACTORY FINISH ALL EXPOSED GRID ON ALL SURFACE.
6. IF CONTROL JOINTS ARE NOT INDICATED IN GYPSUM BOARD CEILINGS, PROVIDE AS
RECOMMENDED.
7. ACOUSTICAL PANEL CEILINGS SHALL BE APC-1, U.N.O.
REFLECTED CEILING PLAN KEYNOTES
1 EXISTING CEILING TO REMAIN.
PATCH EXISTING CEILING WHERE LIGHT FIXTURES WERE REMOVED.
PROVIDE NEW CELING TILES AND GRID.
PROVIDE NEW GYP BOARD CEILING.
PROVIDE NEW ACOUSTICAL CEILING BAFFLES.
NEW CEILING BULKHEAD. REFER TO DETAIL 4/A2.30.
REFLECTED CEILING LEGEND
C M
2'x4' SURFACE MOUNTED LIGHT FIXTURE
1'x4' SURFACE MOUTNED LIGHT FIXTURE
2'x4' RECESSED LIGHT FIXTURE
1'x4' RECESSED LIGHT FIXTURE
CEILING MOUNTED EXIT SIGN
SPRINKLER HEAD
SUPPLY DIFFUSER
SUPPLY DIFFUSER
RETURN / EXHAUST GRILLE
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
KEY PLAN
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
/2
/2
:5 :3
P
M
C
U s e rs
\r s in g h \D o c u m e n ts
\L S
D H ill C e n te r S u m m e r
R e m o d e l_
A rc h r2 rs in g h P
P C
T
.r v t
2612.03
FIRST FLOOR REFLECTED CEILING
PLAN - UNIT 200B
A2.2B
W ise
R d.
L an sin g, M I 4
La ns in g
S ch o o l D is tr ic t
H il l C e n te r S u m m e r
R e n o v a ti o n s
ADDENDUM 01 02/26/2025
FIRST FLOOR REFLECTED CEILING PLAN - UNIT 200BFIRST FLOOR REFLECTED CEILING PLAN - UNIT 200B
DOOR TYPES
FIELD VERIFY OPENING SIZE PRIOR TO MANUFACTURING
F
TYP.
SEE SCHEDULE 4" 5"
2' -0
4'
-2
TY
P
SE
E
SC
HE
D
UL
E
NL FG2
5"5"
5" 1'-
4" 1'-
6" 5"
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .