These structural marine details sheets (SM-5.01 through SM-5.03) are technical drawings prepared by Edgewater Resources for the Village of Lexington, Michigan's Tierney Park Improvements Project. The documents provide detailed engineering specifications for a boardwalk, including plan, section, elevation, and connection details. Key technical elements include 2x12 Southern Pine No. 2 joists, 10" diameter Southern Pine timber piles, 2x6 Kebony timber decking, steel cross beams, and a timber handrail system. The drawings specify precise construction requirements such as joist spacing (10'-0"), pile length (30'), embedment depths, and connection methods using stainless steel fasteners.

The technical specifications emphasize material quality and environmental durability, with requirements for timber treatment (Use Category UC4A for superstructure elements, UC4C for pile elements), stainless steel hardware, and specific installation guidelines. The boardwalk is designed with multiple elevation references, including top of deck at 584.0', USACE Ordinary High Water Mark at 581.5', and lowest water datum at 577.5'. Bidding notes stress the importance of field verification of existing conditions, submission of shop drawings for engineer approval, and adherence to precise fastener spacing and installation methodologies. The project appears to be in the bidding phase, with the documents dated 3/25/25 and marked for bidding purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1'- 0"

M

AX

2x12 SOUTHERN PINE NO. 2 JOISTS

C12x20.7 A992 (Fy = 50 KSI) CROSS BEAMS

10" DIA. SP TIMBER PILES

2x12 SOUTHERN PINE NO. 2 FULL DEPTH

BLOCKING @ 3'-3" MAXIMUM O.C. SPACING

13'-0" MAXIMUM (TO FIT)

'-0

SCALE:

BOARDWALK PLAN

3/4"=1'-0" DT-BOARDWALK PLAN

2x6 KEBONY TIMBER DECKING

(OR APPROVED EQUAL)

HOLD DOWN CONNECTION 4

SM-5.01

'-6

" M

IN

IM

UM

E M

BE

DM

EN

T

2x12 SOUTHERN PINE NO. 2 JOISTS

C12x20.7 A992 (Fy = 50 KSI) CROSS BEAMS

13'-0" MAXIMUM (TO FIT)

10" DIA. SP TIMBER PILES - 30' LENGTH

2x6 KEBONY TIMBER DECKING

(OR APPROVED EQUAL)

SCALE:

BOARDWALK ELEVATION

3/4"=1'-0" DT-BOARDWALK ELE

10" DIAMETER SOUTHERN PINE TIMBER PILES - 30' LENGTH GRADE

SCALE:

BOARDWALK SECTION

3/4"=1'-0" DT-BOARDWALK SECT

10'-0"

2x12 SOUTHERN PINE NO. 2

JOISTS @ 12" O.C. SPACING

C12x20.7 A992 (Fy = 50 KSI) CROSS BEAMS

10" DIAMETER SOUTHERN PINE TIMBER PILES - 30' LENGTH

2x6 KEBONY TIMBER DECKINGDOUBLE 2x12 SOUTHERN PINE NO. 2 RIM JOISTS

TOP OF DECK: 584.0'

USACE OHWM: 581.5'

EGLE OHWM: 580.5'

LWD: 577.5'

GRADE

'-6

" M

IN

IM

UM

EM

BE

DM

EN

T

HOLD DOWN CONNECTION 4

SM-5.01

3" 6"

3"

34 DIA. F1554 GR. 36 H.D.G. TREADED ROD

AND ASSOCIATED H.D.G. HARDWARE

SCALE:

HOLD DOWN CONNECTION

HALF (6"=1'-0") DT-HOLD DWN

L3x3x14 A992 STEEL ANGLE, 8" IN LENGTH

8"

2" 6"

1" 2"

2" 1"

(3) #10 STAINLESS STEEL

TRIM-DECK SCREWS WITH

WASHER, WOOD

PENETRATION 11

2"

P:\2023\23-028 LXUP\CAD\SHEETS\SM-5.XX STRUCTURAL MARINE DETAILS.DWG

DATE:

DESIGNED BY:

DRAWN BY:

REVIEWED BY:

SHEET NUMBER:

THE REPRODUCTION, COPYING OR

OTHER USE OF THIS DRAWING WITHOUT

WRITTEN CONSENT IS PROHIBITED.

© 2022 EDGEWATER RESOURCES, LLC.

ISSUED FOR:

REVISION

PR

O

JE

C

T

TI

TL

E:

SH

EE

T

TI

TL

E:

518 Broad Street, Suite 200 Saint Joseph, MI 49085

P: 269.932.4502 edgewaterresources.com

PROJ NO.:

DATE

ST

R

U C

TU

R

AL

M

AR

IN

E D

ET

AI

LS

VI

LL

AG

E

O F

LE

XI

N G

TO

N

, M I

IM

PR

O

VE

M

EN

TS

P

R O

JE

C

T

TI

ER

N

EY

P A

R K

SM-5.01

NC

NC

23-028

3/25/25

BIDDING

NOTES (APPLY TO ALL DETAILS ON THIS SHEET):

1. PROVIDE PERPENDICULAR FULL DEPTH BLOCKING BETWEEN

JOISTS AT THE MAXIMUM SPACING SHOWN. BLOCKING SHALL BE

INSTALLED WITH TIGHT BEARING AND FACE-NAILED USING (3) 10d

STAINLESS STEEL COMMON NAILS PER END. ALL NAILS SHALL BE

TYPE 316 STAINLESS STEEL, FULL ROUND HEAD, RING-SHANK,

MINIMUM 3" LONG. INSTALL BLOCKING FLUSH WITH TOP OF

JOISTS. ALTERNATE BLOCKING SIDE TO SIDE FOR EASE OF

NAILING.

2. ATTACH DECKING USING #10 STAINLESS STEEL TRIM-DECK

SCREWS THROUGH NAILERS, WITH A MINIMUM OF TWO SCREWS

PER BOARD-TO-NAILER INTERFACE. ALL SCREWS SHALL BE

INSTALLED IN PREDRILLED HOLES. FASTENER SPACING SHALL

FOLLOW MANUFACTURER’S RECOMMENDATIONS AND SHALL BE

NO LESS THAN THE FOLLOWING MINIMUMS (BASED ON SCREW

SHANK DIAMETER OF 0.190 INCHES):

· EDGE DISTANCE: 12 INCH

· END DISTANCE: 1 INCH

· SPACING BETWEEN FASTENERS IN A ROW (PARALLEL TO

GRAIN): 2 INCHES

· SPACING BETWEEN FASTENERS IN A ROW (PERPENDICULAR

TO GRAIN): 1 INCH

· SPACING BETWEEN ROWS OF FASTENERS (IN-LINE): 11

16 INCH

3. ALL WELDS TO BE 70 KSI FILLER MATERIAL.

4. ALL CONNECTIONS TO BE DETAILED IN SHOP DRAWINGS. SHOP

DRAWINGS AND FASTENER PRODUCT INFORMATION TO BE

SUBMITTED TO ENGINEER FOR REVIEW AND APPROVAL PRIOR TO

PROCUREMENT.

5. SUBMIT FOR ENGINEER APPROVAL: SHOP DRAWINGS; STEEL MILL

CERTIFICATES; AWS CERTIFICATIONS; WELDING METHODOLOGY;

AND FASTENER/HARDWARE PRODUCT INFORMATION.

6. ALL MEMBERS SHOWN ARE CONTINUOUS.

7. ALL SUPERSTRUCTURE TIMBER ELEMENTS TO BE SOUTHERN

PINE NO. 2 CONFORMING TO SPIB & AWC NDS REQUIREMENTS.

THEY SHALL MEET TREATMENT REQUIREMENTS OF USE

CATEGORY UC4A OR BETTER.

8. PILE TIMBER ELEMENTS TO BE SOUTHERN PINE AND CONFORM

TO ASTM D25. PILES SHALL MEET TREATMENT REQUIRES OF USE

CATEGORY UC4C.

4/16/25 1. ADD. 1

SCALE:

BOARDWALK-EXISTING SEAWALL ATTACHMENT PLAN

3/4"=1'-0" DT-BOARDWALK PLAN

P L 12 x3x0'-6" A572 GR. 50

STEEL BEARING PLATE

P L 12 x3x0'-6" A572 GR. 50

STEEL BEARING PLATE

P L 12 x112x0'-6" A572 GR. 50

STEEL BEARING PLATE

EXISTING SHEET PILE WALL,

CONTRACTOR TO FIELD VERIFY

TIMBER BOARDWALK

LEDGER BEAM, FIELD FIT LENGTH TO SPAN TO

NEAREST OUTER FACE OF SHEET PILE

BEYOND EDGE OF BOARDWALK

SM-5.02

SCALE:

BOARDWALK-EXISTING SEAWALL ATTACHMENT SECTION

1 1/2"=1'-0" DT-BOARDWALK PIER ATTACH SECT

EXISTING SHEET

PILE WALL,

CONTRACTOR TO

FIELD VERIFY

C15x33.9 LEDGER BEAM

EXISTING CONCRETE SIDEWALK,

CONTRACTOR TO FIELD VERIFY

EXISTING SSP WALL CAP,

CONTRACTOR TO FIELD VERIFY

DECKING

EACH SHEET 4 @ 12

4 @ 12

TIMBER JOISTS

BEARING PLATES AT

EACH JOIST

INTERSECTION

SM-5.02

ADA ACCESSIBLE TRANSITION

PLATE, SEE NOTE 10

SCALE:

HOLD DOWN NEAR BOARDWALK-EXISTING SEAWALL

3"=1'-0" DT-HOLD DWN PIER ATTACH

L3x3x14 A992 STEEL ANGLE, 8" IN LENGTH

1'-

6"

1" 2"

2" 1"

(3) #10 STAINLESS STEEL TRIM-DECK SCREWS

WITH WASHER, WOOD PENETRATION 11

2"

STEEL CROSS BEAM

P:\2023\23-028 LXUP\CAD\SHEETS\SM-5.XX STRUCTURAL MARINE DETAILS.DWG

DATE:

DESIGNED BY:

DRAWN BY:

REVIEWED BY:

SHEET NUMBER:

THE REPRODUCTION, COPYING OR

OTHER USE OF THIS DRAWING WITHOUT

WRITTEN CONSENT IS PROHIBITED.

© 2022 EDGEWATER RESOURCES, LLC.

ISSUED FOR:

REVISION

PR

O

JE

C

T

TI

TL

E:

SH

EE

T

TI

TL

E:

518 Broad Street, Suite 200 Saint Joseph, MI 49085

P: 269.932.4502 edgewaterresources.com

PROJ NO.:

DATE

ST

R

U C

TU

R

AL

M

AR

IN

E D

ET

AI

LS

VI

LL

AG

E

O F

LE

XI

N G

TO

N

, M I

IM

PR

O

VE

M

EN

TS

P

R O

JE

C

T

TI

ER

N

EY

P A

R K

SM-5.02

NC

NC

23-028

3/25/25

BIDDING

NOTES (APPLY TO ALL DETAILS ON THIS SHEET):

1. PROVIDE PERPENDICULAR FULL DEPTH BLOCKING BETWEEN JOISTS AT THE MAXIMUM SPACING SHOWN. BLOCKING SHALL BE INSTALLED

WITH TIGHT BEARING AND FACE-NAILED USING (3) 10d STAINLESS STEEL COMMON NAILS PER END. ALL NAILS SHALL BE TYPE 316 STAINLESS STEEL, FULL ROUND HEAD, RING-SHANK, MINIMUM 3" LONG. INSTALL BLOCKING FLUSH WITH TOP OF JOISTS. ALTERNATE

BLOCKING SIDE TO SIDE FOR EASE OF NAILING.

2. ATTACH DECKING USING #10 STAINLESS STEEL TRIM-DECK SCREWS THROUGH NAILERS, WITH A MINIMUM OF TWO SCREWS PER BOARD-TO-NAILER INTERFACE. ALL SCREWS SHALL BE INSTALLED IN PREDRILLED HOLES. FASTENER SPACING SHALL FOLLOW MANUFACTURER’S RECOMMENDATIONS AND SHALL BE NO LESS THAN THE FOLLOWING MINIMUMS (BASED ON SCREW SHANK DIAMETER OF

0.190 INCHES):

· EDGE DISTANCE: 12 INCH

· END DISTANCE: 1 INCH

· SPACING BETWEEN FASTENERS IN A ROW (PARALLEL TO GRAIN): 2 INCHES

· SPACING BETWEEN FASTENERS IN A ROW (PERPENDICULAR TO GRAIN): 1 INCH

· SPACING BETWEEN ROWS OF FASTENERS (IN-LINE): 11

16 INCH

3. ALL WELDS TO BE 70 KSI FILLER MATERIAL.

4. ALL CONNECTIONS TO BE DETAILED IN SHOP DRAWINGS. SHOP DRAWINGS AND FASTENER PRODUCT INFORMATION TO BE SUBMITTED TO

ENGINEER FOR REVIEW AND APPROVAL PRIOR TO PROCUREMENT.

5. SUBMIT FOR ENGINEER APPROVAL: SHOP DRAWINGS; STEEL MILL CERTIFICATES; AWS CERTIFICATIONS; WELDING METHODOLOGY; AND

FASTENER/HARDWARE PRODUCT INFORMATION.

6. ALL MEMBERS SHOWN ARE CONTINUOUS.

7. ALL SUPERSTRUCTURE TIMBER ELEMENTS TO BE SOUTHERN PINE NO. 2 CONFORMING TO SPIB & AWC NDS REQUIREMENTS. THEY SHALL

MEET TREATMENT REQUIREMENTS OF USE CATEGORY UC4A OR BETTER.

8. PILE TIMBER ELEMENTS TO BE SOUTHERN PINE AND CONFORM TO ASTM D25. PILES SHALL MEET TREATMENT REQUIRES OF USE

CATEGORY UC4C.

9. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO FABRICATION OR INSTALLATION. THIS INCLUDES, BUT IS NOT

LIMITED TO, DIMENSIONS AND ELEVATION OF EXISTING SHEET PILE WALL AND CONCRETE SIDEWALK, GEOMETRY AND CONDITION OF THE EXISTING STEEL SHEET PILE CAP, CLEARANCE AND ALIGNMENT FOR LEDGER BEAM CONNECTION, AND PRESENCE OF ANY CONFLICTING ANCHORAGES, EMBEDDED ITEMS, OR DETERIORATED MATERIALS. ANY DISCREPANCIES OR UNCERTAIN CONDITIONS SHALL BE REPORTED TO THE ENGINEER. CONTRACTOR SHALL NOT CUT OR MODIFY STRUCTURAL STEEL MEMBERS WITHOUT PRIOR APPROVAL FROM THE

ENGINEER.

10. INSTALL A PREMANUFACTURED TRANSITION PLATE SUITABLE FOR MARINE ENVIRONMENTS AND ADA COMPLIANT. CONTRACTOR SHALL SUBMIT MANUFACTURER’S PRODUCT INFORMATION AND INSTALLATION REQUIREMENTS TO THE ENGINEER FOR REVIEW PRIOR TO PROCUREMENT. INSTALL PER MANUFACTURER’S INSTRUCTIONS OR AS DIRECTED BY THE ENGINEER.

SCALE:

BOARDWALK RAILING

3/4"=1'-0" DT-BOARDWALK RAIL

VARIES

2'- 2"

2'- 71 2"

2x6 TIMBER HANDRAIL4x4 TIMBER POST 8' ON CENTER 2x2 TIMBER POST

5.5" ON CENTER

2x4 TIMBER BASE

MOUNTING BRACKET

P:\2023\23-028 LXUP\CAD\SHEETS\SM-5.XX STRUCTURAL MARINE DETAILS.DWG

DATE:

DESIGNED BY:

DRAWN BY:

REVIEWED BY:

SHEET NUMBER:

THE REPRODUCTION, COPYING OR

OTHER USE OF THIS DRAWING WITHOUT

WRITTEN CONSENT IS PROHIBITED.

© 2022 EDGEWATER RESOURCES, LLC.

ISSUED FOR:

REVISION

PR

O

JE

C

T

TI

TL

E:

SH

EE

T

TI

TL

E:

518 Broad Street, Suite 200 Saint Joseph, MI 49085

P: 269.932.4502 edgewaterresources.com

PROJ NO.:

DATE

ST

R

U C

TU

R

AL

M

AR

IN

E D

ET

AI

LS

VI

LL

AG

E

O F

LE

XI

N G

TO

N

, M I

IM

PR

O

VE

M

EN

TS

P

R O

JE

C

T

TI

ER

N

EY

P A

R K

SM-5.03

NC

NC

23-028

3/25/25

BIDDING

NOTES (APPLY TO ALL DETAILS ON THIS SHEET):

1. PROVIDE PERPENDICULAR FULL DEPTH BLOCKING BETWEEN JOISTS AT THE MAXIMUM SPACING SHOWN. BLOCKING SHALL BE INSTALLED

WITH TIGHT BEARING AND FACE-NAILED USING (3) 10d STAINLESS STEEL COMMON NAILS PER END. ALL NAILS SHALL BE TYPE 316 STAINLESS STEEL, FULL ROUND HEAD, RING-SHANK, MINIMUM 3" LONG. INSTALL BLOCKING FLUSH WITH TOP OF JOISTS. ALTERNATE

BLOCKING SIDE TO SIDE FOR EASE OF NAILING.

2. ATTACH DECKING USING #10 STAINLESS STEEL TRIM-DECK SCREWS THROUGH NAILERS, WITH A MINIMUM OF TWO SCREWS PER BOARD-TO-NAILER INTERFACE. ALL SCREWS SHALL BE INSTALLED IN PREDRILLED HOLES. FASTENER SPACING SHALL FOLLOW MANUFACTURER’S RECOMMENDATIONS AND SHALL BE NO LESS THAN THE FOLLOWING MINIMUMS (BASED ON SCREW SHANK DIAMETER OF

0.190 INCHES):

· EDGE DISTANCE: 12 INCH

· END DISTANCE: 1 INCH

· SPACING BETWEEN FASTENERS IN A ROW (PARALLEL TO GRAIN): 2 INCHES

· SPACING BETWEEN FASTENERS IN A ROW (PERPENDICULAR TO GRAIN): 1 INCH

· SPACING BETWEEN ROWS OF FASTENERS (IN-LINE): 11

16 INCH

3. ALL WELDS TO BE 70 KSI FILLER MATERIAL.

4. ALL CONNECTIONS TO BE DETAILED IN SHOP DRAWINGS. SHOP DRAWINGS AND FASTENER PRODUCT INFORMATION TO BE SUBMITTED TO

ENGINEER FOR REVIEW AND APPROVAL PRIOR TO PROCUREMENT.

5. SUBMIT FOR ENGINEER APPROVAL: SHOP DRAWINGS; STEEL MILL CERTIFICATES; AWS CERTIFICATIONS; WELDING METHODOLOGY; AND

FASTENER/HARDWARE PRODUCT INFORMATION.

6. ALL MEMBERS SHOWN ARE CONTINUOUS.

7. ALL SUPERSTRUCTURE TIMBER ELEMENTS TO BE SOUTHERN PINE NO. 2 CONFORMING TO SPIB & AWC NDS REQUIREMENTS. THEY SHALL

MEET TREATMENT REQUIREMENTS OF USE CATEGORY UC4A OR BETTER.

8. PILE TIMBER ELEMENTS TO BE SOUTHERN PINE AND CONFORM TO ASTM D25. PILES SHALL MEET TREATMENT REQUIRES OF USE

CATEGORY UC4C.