250417 Tierney Park Improvements - Addendum No. 1.pdf
PDF 28 MB Posted
- Attached to
- Lexington Tierney Park Improvement Project
- Solicitation number
- 2025-23
- Issued by
- Sanilac County, Michigan
About this file
This document is an Addendum #1 for the Tierney Park Improvements Project issued by the Village of Lexington, Michigan, prepared by Edgewater Resources. The addendum provides comprehensive updates to the project's bid documents, including revised drawings, specifications, and responses to bidder questions. The project involves a complete renovation of Tierney Park at the Lexington Harbor waterfront, with a bid due date of April 30, 2025 at 1:00 PM. Key project components include improved roadways, parking, a new restroom facility, pavilion, concrete pathways, site utilities, native plantings, site furniture, and a marine fuel system replacement. The project has two alternate bid items: a timber boardwalk and a play zone with trees. Construction is scheduled to commence after Labor Day 2025, with substantial completion targeted for June 30, 2026.
The bid form includes a detailed unit price schedule with 70+ line items covering mobilization, demolition, concrete work, electrical, plumbing, landscaping, and accessory installations. The total base bid will be determined by actual quantities, with a $75,000 contingency allowance. Notable specifications include tax-exempt status, no prevailing wage requirements, and the Village covering testing fees while the contractor manages material testing scheduling. The project will require specific permits from Sanilac County, with land use fees waived by the Village. Bidders must provide performance and payment bonds, with the bond amount based on the submitted bid price. The project includes specific environmental considerations, particularly for fuel tank removal and soil testing, with potential change orders for contamination disposal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
518 Broad Street, Suite 200
St Joseph, Michigan 49085
269 932 4502
Waterfronts Worldwide.
www.edgewaterresources.com
ADDENDUM #1
Date: April 17, 2025
Project: Tierney Park Improvements Project
Owner: Village of Lexington, Michigan
Bid Due Date: April 30, 2025, 1:00PM NOTE BID DUE DATE EXTENSION
The following are changes, eliminations, and clarifications to project plans and specifications, and shall be considered by the contractor in their estimate. All these items shall be considered as part of the contract documents. ALL BIDDERS MUST ACKNOWLEDGE
RECIEPT OF THIS ADDENDUM ON BID FORMS.
Addendum #1 Includes the Following:
Revised Drawings:
1. GP-1.02 Construction Sequencing Plan
a. Date for Marina Access extended to 10/15/25
2. UD-1.01 Utility Demolition Plan
a. Fuel line label clarification
3. U-1.01 Utility Plan
a. Label removed regarding hydrant (no hydrant in contract)
4. LS-1.01, LS-1.02, LS-1.03 Site Plan and Control Points Plans
a. Width of drive aisle between parking bays increased by 2’
b. Striping for handicap parking spaces added in southwest parking bay
c. Regulatory sign locations added
5. LS-5.01 Site Plan Details
a. Asphalt mix clarified
6. LS-5.02 Site Plan Details
a. Allowable walkway cross-slope note added
7. LS-5.04 Site Plan Details
a. Revised to show boardwalk plan view. Structural details moved, see New Drawings.
8. E1.1 Electrical Plan
a. Conduit added to parking areas for potential future parking lot gates (gates NIC)
9. LP-5.01 Planting Details
a. Updated bioswale detail title for clarity
10. P-1.00 Restroom Underground Plumbing Plan
a. Modified notes about the underground depth and sleeve requirements for the following underground pipes leaving the building: 6” Sanitary, 1-1/2” Cold Water to foot showers and 2” Cold Water for the new building service.
11. P-1.01 Restroom Mechanical Plan (Not Reissued)
a. Add “WINTERIZATION NOTE: 4. INSULATE H&CW PIPING ROUTED WITHIN
INTERIOR WALLS BETWEEN STORAGE AND CONCESSIONS AND INDIVIDUAL
RESTROOMS.”
12. M-1.01 Restroom Mechanical Plan (Not Reissued)
a. Add “WINTERIZATION NOTE: 4. INSULATE H&CW PIPING ROUTED WITHIN
INTERIOR WALLS BETWEEN STORAGE AND CONCESSIONS AND INDIVIDUAL
RESTROOMS.”
b. Add “WINTERIZATION NOTE: 4. INSULATE H&CW PIPING ROUTED WITHIN
INTERIOR WALLS BETWEEN STORAGE AND CONCESSIONS AND INDIVIDUAL
RESTROOMS.”
13. F0.1, F1.1, FE1.1 Fuel Sheets
a. Fuel Tank Sizes Revised, Notes and Schedule Revised
New Drawings:
1. SM-5.01, SM-5.02, SM-5.03 Structural Marine Details
a. Boardwalk structural details moved to these sheets and information added
Revised Specifications:
1. Section 000400 Bid Form
a. Changes highlighted in yellow and underlined
New Specifications:
1. Section 081113 Hollow Metal Doors and Frames Specification from DNR Boater’s Building
2. Section 087100 Hardware Specification from DNR Boater’s Building
3. Section 074113 Sheet Metal Roofing Specification from DNR Boaters Building
4. Section 102800 Toilet Bath Accessories Specification
5. Section 230700 HVAC Insulation
Questions, Clarifications and Responses:
General
1. Q: What are allowable hours for active construction work?
A: 7AM-7PM, M-F. Requests for operations outside of allowed hours must be submitted in writing for Village approval.
2. Q: What is the tax status for this project?
A: The Village is tax exempt, per Invitation to Bid, Item #18. Note that in General
Requirements, Item #4, the tax statement is a broad statement covering all project types.
3. Q: Shall Contractor include the cost of all testing in bid, or will the Village cover that cost?
A: Project Engineer will hire third-party testing agency and will cover testing fees. Scheduling of material testing at appropriate milestones during work completion is the responsibility of the
Contractor, as is providing documentation of testing results to meet requirements of specifications. The one exception is soil contamination testing at existing fuel tank, see
Question/Answer 4, below.
4. Q: Do costs for soil contamination testing and removal need to be included in the bid or will this be by change order.
A: Soil must be tested for contamination per fuel system demolition specification. This testing is to be paid for by Contractor and included in bid. If contamination is found, disposal cost shall be submitted as project Change Order.
5. Q: Are prevailing wages or Davis Bacon wages required?
A: No prevailing wage or Davis Bacon wages required.
6. Q: Is there an estimated project cost? For bonding purposes.
A: No estimated project cost is being released at this time. Bond shall be based on bid price.
7. Q: Can any work take place before September 15, 2025.
A: A Notice to Proceed with project planning, submittals, materials ordering,etc may be issued after contract award. Construction must not commence until after Labor Day 2025, due to demands of park and marina use.
8. Q: Does Contractor pay permit fees, or will fees be covered by Village.
A: Securing required permits will be responsibility of the Contractor. Permit fees may be submitted as a reimbursable expense, which the Owner will pay. Land Use fees will be waived by Village. Sanilac County provides permitting and inspection services.
Fuel Tank
1. Q: Is the new fuel tanks excavation soils to be considered clean soils for disposal?
A: Yes, the proposed location of the fuel tanks is to be considered clean soils.
2. Q: Where will be dumping the ground water to that the dewatering company will be generating?
A: Allowable dewatering discharge areas will be dependent upon the Contractor’s dewatering permit from EGLE. We anticipate this either being in a temporary upland location and allowed to infiltrate or directly into the marina basin but will be dependent upon the dewatering permit conditions.
3. Q: Will there be a source of water on site that can be used for well pointing or do we need to haul water into the site?
A: It would be up to the Contractor to either import well point jetting water or use lake water from the adjacent marina basin.
4. Q: Is there a source for power to run 110 current pumps or do we need to supply a generator?
A: The adjacent building is not staffed in the off season and continuous power cannot be guaranteed, the Contractor would need to provide their own temporary power supply.
5. Q: Soils from around the existing tanks, will that be used as backfill or does the soils need to be removed and replaced?
A: This material would be considered clean and to be used for backfill. If this material deemed to be contaminated following the required environmental testing during removal, a contract change order would be pursued to remove and replace this material.
6. Q: Does the city have an environmental company that will be on site to take soil samples during the tank removal?
A: The Contractor is responsible for retaining an independent environmental firm to perform the required testing during removal per Specification Section 33 20 00.
7. Q: Will the city be responsible for getting landfill approval through our environmental company or do we need to apply for that approval?
A: Approval from any landfills to accept the demolished fuel materials will be the responsibility of the Contractor.
8. Q: Will the city pay directly to the landfill, or will it be on the contractor to pay up front for the tipping fees?
A: Any associated disposal fees shall be included in the Marine Fuel System Demolition pay item.
9. Q: Who will be responsible for pumping out the existing tanks and disposing of any remaining fuels?
A: The Contractor will be responsible for the removal of any existing fuel from the tanks per the specifications.
10. Q: Plans call for underground gasoline and diesel fuel tanks. The Modern Welding Co.
Fireguard tanks specified are above ground fuel tanks. Are the fuel tanks above ground or below ground? Is there a different specified tank model?
A: The tanks are below ground and drawing sheet F0.1 has been updated to clarify this.
11. Q: Single compartment tank cross section notes 6 (deadmans anchors see structural) and 16
(overburden slab see structural) on F.01 are not shown on the structural pages. Provide clarification on what these need to be.
A: Tank deadman anchors shall be precast reinforced concrete or cast-in-place reinforced concrete slabs, sized to anchor the tank during groundwater elevations up to 582.6’ NAVD88.
Anchors shall extend beyond the outer limits of the tank by a minimum of 2’, be constructed from 4,000 psi concrete at minimum, have a minimum thickness of 18”, and contain #4 rebar at 12” c-c spacing at minimum. Overburden slabs must have a minimum thickness of 6”, be constructed with 4,000 psi concrete at minimum, include #4 rebar at 12” c-c spacing at minimum, and have a broomed finish with rounded edges.
Utilities
1. Q: On the Utility Plan sheet 1.01 it shows us putting in a new hydrant, but it doesn't clearly show us what we are tying it into.
A: No new hydrant is proposed. Label will be removed from sheet.
2. Q: Will EV chargers be added to the parking lot?
A: No, if EV charging parking spaces are added in the Village, they will be near downtown area, not in Tierney Park.
Sitework
1. Q: Sheet LS-5.06 calls for grate infill panel for the dumpster enclosure. Provide specifications for this panel.
A: The panel from the existing dumpster enclosure is to be salvaged and reused for the new dumpster enclosure.
2. Q: Sheet LS-5.04 shows the timber piles 30' in length (boardwalk section and elevation) and
10' in length (boardwalk plan). Provide clarification on timber pile length.
A: See new Sheets SM-5.01, 5.02, 5.03 for clarification.
3. Q: We need some guidelines to assume what that length / depth of the water is at the location of the boardwalk. Please advise.
A: See new Sheets SM-5.01, 5.02, 5.03 for clarification.
4. Q: What should be assumed for the estimated pier length for boardwalk?
A: See modification on Sheet LS-5.04 for clarification.
5. Q: The limited boardwalk information in the drawings is for the timber piles. If the project changes to helical piers, would it be acceptable to use an “L” bracket type cap to receive the beams? What would the width of the beam be?
A: The boardwalk shall be constructed with timber piles. See new Sheet SM-5.01, 5.02, and
5.03 for drawings. See Specification 31 62 29 which pertains to these piles.
6. Q: We need working loads to be able to determine the capacity required for the helicals.
Helical engineering is not done until contract award. Does the EOR believe the boardwalk will require either battered piers or cross-bracing? Can lateral load values be provided as well for consideration?
A: The foundation system for the boardwalk is fully designed and is not delegated. Helical piers are not part of the boardwalk design. Lateral loads have already been accounted for in the structural drawings and details, and no additional lateral load information will be issued.
For the staircase, the foundation system is delegated to the contractor’s Engineer of Record, and may include helicals or cast-in-place options. Working load values for helical piles in the staircase scope shall be determined by the contractor's design engineer as part of the design-build submission.
7. Q: Should the project carry an allowance for any of these undefined components to be reconciled once engineered?
A: The project has an allowance, listed at the bottom of bid form.
8. Q: Is a load test required onsite? If so, can that be done on a production pier?
A: No load test is required under the contract documents for the timber boardwalk. The boardwalk foundation system is fully designed and is not delegated. The staircase section
(Section 06 91 00), which is design-build, includes helical piers as an option and may require testing per the Engineer of Record for that scope. The load test requirement, if any, would be defined by the contractor’s delegated design engineer for the staircase, not for the boardwalk.
9. Q: Should all material be galvanized?
A: See new Sheets SM-5.01, 5.02, 5.03 for clarification. Boardwalk fasteners to be hot-dipped galvanized. Boardwalk steel sections such as channel members to be bare steel.
10. Q: We are trying to navigate the recent tariffs and still in a holding pattern to see the impacts.
When does the project team foresee this boardwalk being installed, if it moves forward?
A: The current plan is to install boardwalk with Tierney Park improvements, fall 2025-spring
2026. If item is deducted as an alternate, the construction would be delayed to 2026-2027, to be installed with marina improvement project.
11. Q: Timber staircase - Is there a section cut showing the footings/ foundations required?
A: See Specification Section 069100, Contractor shall provide engineered foundation systems to be submitted to Engineer for shop drawing approval.
12. Q: Timber staircase - Is there a section cut showing the framing and handrail?
A: Similar to above question, see Specification Section 069100, Contractor shall provide handrails at stairs as required by Michigan Building Code and/or local ordinance, to be submitted to Engineer for shop drawing approval.
13. Q: There are three curbs on this project. Type F3 curb. Type D1 curb. Flush curb. F3 and D1 are on the bid form, but there is no spot on the bid form for the flush curb. Where would you like the cost of this curb on the bid form?
A: Flush curb and adjacent stone should be included in unit price for bioswale. See updated bid form.
14. Q: Please clarify items to include with unit price for bioswale and rain garden. Are plants included?
A: Plants have separate line items on bid form, and are not included in the unit price for bioswale and rain garden. Bioswale unit price shall include flush curb, riprap stone, planting mix and subbase, per drawings and detail. Rain garden unit price shall include riprap stone and planting mix, per drawings.
15. Q: Should the cost of plugs be included in that line item or will a separate line item be added to the bid form?
A: Container plants are revised to item #329300.041 and quantity has been revised on bid form. Plugs are now item #329300.042 with quantity as shown on revised bid form.
16. Q: Detail 6 on sheet LS-5.01 shows HMA 36A and HMA 13A, however the bid form shows 5E and 3E (would it be 3E1/5E1, 3EL/5EL or 3EML/5EML). Can you clarify which mix is to be used along with the preferred asphalt binder?
A: Detail will be revised to match bid form. 3EL/5EL is the correct mix.
17. Q: Please clarify paint color for parking lot striping.
A: Striping to be white paint, typical, with Handicap Parking striping to be blue.
18. Q: Is there a tree to be saved located at the base of the south staircase?
A: Yes, the tree symbol did not print on sheet GP-1.01, but tree protection fencing is correct on this sheet. The tree removals shown on sheet SD-1.01 are also correct, as are the tree removal quantities in the bid form. If it is determined prior to construction that it will be impossible to avoid severe damage during construction operations, pending Owner and
Engineer review and approval, then additional tree removals may be added via Change Order.
19. Q: There are exterior trench drains, shown on sheet U-1.01 and detailed on LS-5.01 but no size is specified. What is the width of the exterior trench drains?
A: Trench drains to be 8” internal width.
20. Q: What diameter is the stainless steel tubing at the concrete steps and concrete ramp on LS-
5.02.
A: Steel tubing to be 2” outside diameter.
Architecture
1. Q: Window type F is not on the window schedule for the bathroom building but is called out for the two windows at the concession room.
A: Window F is CMU with LP Smart Side trim wrapped opening (plan #1/Sheet A-1.102) with a metal roll down, locking shutter mounted on the inside (Note 1/Special Equipment /Sheet A-
1.01).
2. Q: No hollow metal door specifications are provided.
A: Sheet A-3.01, noted under Door and Frame color swatch: “Hollow Metal Doors and Frames to Match DNR Boater’s Building in Standard Blue”. Newly added Section 081113 Hollow
Metal Doors and Frames Specification from the DNR Boater’s Building Attached.
3. Q: No door hardware sets or schedule are provided.
A: Sheet A-1.01 Hardware Notes and Sheet A-1.02, Door Schedule note “Hardware: ADA compliant, Match owner locking system w/ satin stainless finish”. Hardware sets to match existing restroom and storage room keyed locks. Newly added Section 087100 Hardware
Specification from DNR Boater’s Building attached.
4. Q: No standing seam metal roof specifications are provided.
A: Sheet A-3.01, noted under Metal Roof color Swatch “Pac-Clad, Kynar 500 standing seam metal roof in Slate Blue to match Boaters Building. Newly added: Section 074113 Sheet Metal
Roofing Specification from DNR Boaters Building attached.
5. Q: No toilet accessory specifications are provided.
A: Sheet A-1.01 Accessories for each Restroom are noted. Newly added Section 102800
Toilet, Bath Accessories Specification Attached.
6. Q: Are masonry corners and stub walls to be bullnose block?
A: Exterior building masonry corners, no. Interior masonry walls, yes, include bullnose CMU corners.
7. Q: What is the insulation value for the pre-insulated masonry?
A: Sheet A-1.00, R-Value noted for “Mass Wall” under Michigan Energy Efficiency as R-13.3 c.i. for Zone 6.
8. Q: Is the sign on the restroom perspective view on A-2.00 to be included in our bid? If yes, can details on this sign be provided.
A: No, the sign in the perspective is (NIC) not in this contract and not included in the bid.
9. Q: Are the beverage coolers installed by owner or contractor?
A: Beverage coolers are Owner supplied, and Owner installed.
10. Q: It has come to our attention that there isn’t a specification for the coiling shutters in the concession area, will one be issued in the addendum? Or are we to select a shutter system on our own?
A: Sheet A-1.01, Roll up Shutter specification is Note #1 under Special Equipment.
11. Q: Is there going to be a specification issued for doors, frames lockset and hardware?
A: Yes, see answers to Questions 2 and 3 and Attachments #1 and #2
12. Q: Will architectural-related product alternates be accepted?
A: Yes, as follows:
Add Zurn to list of acceptable plumbing fixtures, faucets, drains, cleanouts, and shock absorbers.
Add Wilkins to list of acceptable backflow preventers.
Add Calefactio to list of acceptable expansion tanks.
Add World Dryer products to the list of acceptable hand dryers.
Note: All fixture alternates are dependent on final approval via construction submittal.
Attachments:
1. Prebid Meeting Agenda
2. Prebid Meeting Attendance List
END OF ADDENDUM #1
EDGEWATER RESOURCES, LLC
518 BROAD ST, STE. 200.
ST. JOSEPH, MI 49085
CONTACT:
SUZANNE FROMSON, PLA., PROJECT MANAGER
(269) 408-6387
MISS DIG
CALL 811 AT LEAST 3 FULL WORKING DAYS (72 HRS)
BEFORE YOU DIG
UTILITY CONTACTS
UTILITY AGENCY CONTACT
WATER & SEWER Village of Lexington Water Department Chris Heiden
(810) 359-5901
ELECTRIC DTE Energy Joseph Burghardt
(734) 347-1189
GAS SEMCo Energy Gas Company Colleen Starring
(800) 624-2019
TELE-
COMMUNICATIONS
ATT (phone) Agri-Valley Services (fiber and internet)
(800) 331-0500
(888) 282-4932
ROADS Village of Lexington Department of Public Works
Jerry Scott
(810) 359-8536
FIRE DEPT Village of Lexington Fire Department Keefe Radke
(810) 359-5221
PERMIT & REVIEWS
PERMIT SCOPE AGENCY PERMIT NO. DATE
AUTHORIZED EXPIRATION DATE
BOARDWALK EGLE PENDING PENDING
SANITARY EGLE PENDING PENDING
BREAKWATER
CONNECTION WALK USACE REVIEW 11/26/24 PENDING
PLAN REVIEW LAND USE 11/13/24 NONE
PLAN REVIEW FIRE 12/12/24 NONE
BUILDING
INSPECTION
SANILAC
COUNTY BY CONTRACTOR
SOIL EROSION &
SEDIMENTATION
CONTROL
SANILAC
COUNTY BY CONTRACTOR
SANITARY REVIEW SANILAC
COUNTY BY CONTRACTOR
FUEL TANK LARA, EGLE BY CONTRACTOR
SANILAC COUNTY, MICHIGAN
VILLAGE OF LEXINGTON
7227 HURON AVE., STE. 100
LEXINGTON, MI 48450
CONTACT:
LORI FISHER, VILLAGE MANAGER
(810) 359 - 8631
IM
PR
OV
EM
EN
TS
P
RO
JE
CT -
DA
TE
: 3/
/2
ED
GE
W
AT
ER
R
ES
OU
RC
ES
P
RO
JE
CT
-0
P:\2023\23-028 LXUP\CAD\SHEETS\G-0.01 COVER SHEET.DWG
DATE:
I CERTIFY THAT THESE DRAWINGS WERE PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION AND CONTROL.
3/25/25
LANDSCAPE ARCHITECTURE
DATE:
Daryl Veldman, PE
I CERTIFY THAT THESE DRAWINGS WERE PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION AND CONTROL.
NAME:
3/25/25
CIVIL ENGINEERING
SEAL
LAKE HURON
TIERNEY PARK
IMPROVEMENTS PROJECT
5451 Dallas Street, Lexington, MI 48450
DRAWING SET FOR BIDDING ADDENDUM #1, 4/16/25
DATE:
Michelle Rumsa, RA
I CERTIFY THAT THESE DRAWINGS WERE PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION AND CONTROL.
NAME:
3/25/25
ARCHITECTURE
SEAL
DATE:
Eric Schippers, PE
I CERTIFY THAT THESE DRAWINGS WERE PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION AND CONTROL.
NAME:
3/25/25
ARCHITECTURE: MECHANICAL/ELECTRIAL/PLUMBING
SEAL
Suzanne M. Fromson, PLA
NAME:SEAL
Sheet List Table Sheet Number Sheet Title
G-0.01 COVER SHEET
G-0.02 GENERAL NOTES
V-1.01 EXISTING CONDITIONS
GP-1.01 SESC & SITE PREP PLAN
GP-1.02 CONSTRUCTION SEQUENCING PLAN
SD-1.01 SITE DEMOLITION PLAN
UD-1.01 UTILITY DEMOLITION PLAN
U-1.01 UTILITY PLAN
LG-1.01 GRADING PLAN
LS-1.01 SITE PLAN
LS-1.02 SITE PLAN - CONTROL POINTS
LS-1.03 CONTROL POINTS
LS-3.01 SITE SECTIONS
LS-3.02 SITE SECTIONS
LS-3.03 SITE SECTIONS
LS-4.01 SITE PLAN ENLARGEMENTS
LS-4.02 SITE PLAN ENLARGEMENTS
LS-4.03 SITE PLAN ENLARGEMENTS
LS-5.01 SITE PLAN DETAILS
LS-5.02 SITE PLAN DETAILS
LS-5.03 SITE PLAN DETAILS
LS-5.04 SITE PLAN DETAILS
LS-5.05 SITE PLAN DETAILS
LS-5.06 SITE PLAN DETAILS
LS-5.07 SITE PLAN DETAILS
LS-5.08 SITE PLAN DETAILS
SM-5.01 STRUCTURAL MARINE DETAILS
SM-5.02 STRUCTURAL MARINE DETAILS
SM-5.03 STRUCTURAL MARINE DETAILS
U-5.01 UTILITY DETAILS
U-5.02 UTILITY DETAILS
E0.1 SITE ELECTRICAL NOTES & LEGENDS
E1.1 SITE ELECTRICAL PLAN
E2.1 SITE ELECTRICAL PHOTOMETRIC PLAN
LP-1.01 PLANTING PLAN
LP-5.01 PLANTING DETAILS
A-1.01 RESTROOM BUILDING DATA & NOTES
A-1.02 RESTROOM FLOOR PLAN & SCHEDULES
A-2.00 RESTROOM EXTERIOR ELEVATIONS
A-3.00 RESTROOM BUILDING SECTIONS AND DETAILS
A-3.01 RESTROOM INTERIOR ELEVATIONS & FINISHES
A-1.01pav PAVILION BUILDING DATA AND NOTES A-1.02pav PAVILION FLOOR PLANS & SCHEDULES A-2.00pav PAVILION EXTERIOR ELEVATIONS A-3.00pav PAVILION BUILDING SECTIONS AND DETAILS
P-1.00 RESTROOM UNDERGROUND PLUMBING PLAN
P-1.01 RESTROOM PLUMBING PLAN
M-1.01 RESTROOM & PAVILION MECHANICAL PLAN
E-1.00 RESTROOM ELECTRICAL PLAN
E-1.01 RESTROOM LIGHTING PLAN
E-10.00 ARCHITECTURE - ELECRICAL SCHEDULE
E-2.00 PAVILION ELECTRICAL PLAN
E-2.01 PAVILION LIGHTING PLAN
E-10.01 ELECTRICAL SCHEDULES & DETAILS
S001 STRUCTURAL NOTES
S101 RESTROOM FOUNDATION PLAN
S102 RESTROOM FRAMING PLAN
S301 RESTROOM FOUNDATION DETAILS
S401 RESTROOM FRAMING DETAILS
S103 PAVILION FOUNDATION PLAN
S104 PAVILION FRAMING PLAN
S302 PAVILION FOUNDATION DETAILS
S402 PAVILION FRAMING DETAILS
F0.1 FUEL-NOTES, SCHEDULES, & DETAILS
F1.1 FUEL-SITE PLAN
FE0.1 FUEL-ELECTRICAL NOTES & LEGENDS
FE0.2 FUEL-ELECTRICAL DETAILS
FE0.3 FUEL-ELECTRICAL DETAILS
FE1.1 FUEL-ELECTRICAL PLAN
TENNIS
COURTS
PUBLIC
PARKING
TO
REMAIN
SIMONS STREET
HURON
AVENUE
MDNR
BOATER
SERVICE
NORTH
80400
SCALE: 1" = (AT 24"x36")
P:\2023\23-028 LXUP\CAD\SHEETS\GP-1.02 SEQUENCING PLAN.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
NOTES:
1. SITE ACCESS PLAN TO BE REVIEWED AND FINALIZED
WITH OWNER, OWNER'S REPRESENTATIVE,
REPRESENTATIVE OF WINDJAMMER PROPERTY,
MDNR, AND CONTRACTOR AT PRE-CONSTRUCTION
MEETING ESTIMATED TO BE SEPTEMBER 2, 2026 ON
SITE.
2. OWNER TO COORDINATE WITH RESIDENTIAL
NEIGHBOR'S TO THE NORTH OF PROJECT SITE.
C O
N
ST
R U
C
TI
O N
S
EQ
U
EN
C
IN
G P
LA
N
VI
LL
AG
E
O F
LE
XI
N G
TO
N
, M I
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T
TI
ER
N
EY
P A
R K
GP-1.02
DV
SF
SF
23-028
3/25/25
BIDDING
MAINTAIN PRIVATE
MARINA ACCESS
THROUGH 10/15/2025
MAINTAIN PRIVATE
MARINA ACCESS
THROUGH
10/15/2025
MAINTAIN PARKING
ACCESS THROUGH
9/30/2025
PUBLIC VEHICULAR TRAFFIC
ALLOWED THROUGH 9/30/25
MAINTAIN BUILDING
ACCESS THROUGH
9/30/2025
PUBLIC PEDESTRIAN
TRAFFIC ALLOWED
THROUGH 10/15/2025
DASHED SECTION OF FENCE TO BE
INSTALLED PRIOR TO CONSTRUCTION,
REMOVED AFTER 9/30/2025
HATCHED SECTION OF FENCE
TO BE ADDED AFTER 9/30/2025
ADJACENT NEIGHBOR ACCESS ALLOWED
UPON DIRECT REQUEST TO CONTRACTOR,
THROUGH PROJECT DURATION.
BLACK-OUT DATES TO BE SUBMITTED BY
CONTRACTOR WITH PROJECT SCHEDULE.
MAINTAIN PEDESTRIAN ACCESS TO
WINDJAMMER FROM 10/1/25 THROUGH
DURATION OF CONSTRUCTION
MAINTAIN WINDJAMMER
PARKING ACCESS IN MDNR
BOAT LAUNCH PARKING
LOT FROM 10/1/25
THROUGH DURATION OF
CONSTRUCTION
POST TRAFFIC CONTROL SIGN UNTIL 10/1/25:
"NO PARK ACCESS. MARINA AND RESTAURANT ACCESS ONLY"
FROM 10/1/25 THROUGH DURATION OF CONSTRUCTION:
"ROAD CLOSED. WINDJAMMER PARKING AT BOAT LAUNCH
PARKING LOT, ONE BLOCK SOUTH"
CONSTRUCTION FENCE FOR
DURATION OF PROJECT
CONSTRUCTION FENCE FOR
DURATION OF PROJECT
4/16/25 1. ADD. 1
X
X X
X
X
X
X
X X
X X
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
U E
U E
U E
ST
ST
ST
ST
ST
ST
ST
ST ST ST ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST ST ST ST ST ST ST ST ST ST ST ST
ST
ST
ST
ST
ST
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS
SS
UE
UE
UE
UE
UE
W W
W W
W W
W W
W W
W W
W W
W W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W W W W W W W W W W
W W
W W
W W
W W
W W
W W
W
W
W
W
SS
SS
W
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
OH ELEC
C O
M C
O M
C O
M C
O M
C O
M
COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM
SS
SS
SS
SS
SS
SS
SS
SS
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
G
AS
G
AS
G
AS
G
AS G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS
0 59
595 590
5 585
FW
S
S
P
P
P
TENNIS
COURTS
PUBLIC
PARKING
TO
REMAIN
SIMONS
STREET
HURON
AVENUE
MDNR
BOATER
SERVICE
UTILITY REMOVALS
LEGEND
PROPERTY LINE
EASEMENT
OHWM
STORM LINE - REMOVE
SANITARY LINE
(ABANDON)
WATER LINE
(ABANDON)
ELECTRIC LINE
(ABANDON)
IRRIGATION ZONE
LIGHT: PARKING LOT
FIXTURE (REMOVAL BY
DTE)
LIGHT: PEDESTRIAN
LIGHT
LIGHT: BOLLARD
UE
NORTH
60300
SCALE: 1" = (AT 24"x36")
P:\2023\23-028 LXUP\CAD\SHEETS\D-1.XX DEMO PLAN.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
EXISTING MANHOLE, PROTECT IN PLACE
ADJUST RIM AS NEEDED
EXISTING MANHOLE, PROTECT IN PLACE
ADJUST RIM AS NEEDED
STORMWATER CATCH BASIN, PROTECT IN PLACE
STORMWATER CATCH BASIN, PROTECT IN PLACE
STORMWATER PIPE, ABANDON
STORMWATER INLET, REMOVE
EXISTING SANITARY LIFT STATION, TO BE REMOVED BY OTHERS
PROPOSED SANITARY LIFT STATION, TO BE INSTALLED BY OTHERS
SANITARY SEWER, ABANDON IN PLACE
FILL PIPE WITH FLOWABLE FILL
18 LFT WATERMAIN REMOVE
27 LFT WATERMAIN REMOVE
U
TI
LI
TY
D
EM
O
LI
TI
O
N P
LA
N
VI
LL
AG
E
O F
LE
XI
N G
TO
N
, M I
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T
TI
ER
N
EY
P A
R K
UD-1.01
DV
CJ
SF
23-028
3/25/25
BIDDING
PROTECT UTILITY POLE AND GUY WIRES
PROTECT HYDRANT
FUEL TANK SYSTEM TO BE REMOVED
AFTER NEW TEMPORARY LINE
CONNECTION IN PLACE
STORMWATER PIPE, PROTECT IN PLACE
STORMWATER INLET, REMOVE
EXISTING SANITARY FORCEMAIN, PROTECT IN PLACE
EXISTING COMMUNICATIONS LINE, PROTECT IN PLACE
ABANDON ELECTRICAL LINES
REMOVE ELECTRICAL BOX
UPDATED ELECTRICAL RISER,
SEE SHEET E1.1
APPROXIMATE LOCATION OF PROPOSED
FUEL TANKS
CUT AND CAP 1-1/2" WATERMAIN
231 LFT WATERMAIN REMOVE
STORMWATER PIPE, ABANDON
CUT FUEL LINES, FLUSH, AND
CAP FOR FULL REMOVAL IN FUTURE
TO PRESERVE CONCRETE WALK
REMOVE FUEL LINES
AND REMOTE FILL
NOTES:
1. IRRIGATION DEMO TO BE REMOVED DURING SITE
EXCAVATION, NO SALVAGE REQUIRED.
2. ALL PARKING LOT LIGHT FIXTURES AND
FOUNDATIONS TO BE REMOVED BY OTHERS (DTE).
4/16/25 1. ADD. 1
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text S
ST
ST ST ST ST ST ST ST ST ST ST ST ST
ST
ST
W W W W
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
O
H
ELEC
O H
ELEC
OH ELEC
0 59
595 590
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
TENNIS
COURTS
PUBLIC
PARKING
TO
REMAIN
SIMONS
STREET
HURON
AVENUE
MDNR
BOATER
SERVICE
FUTURE MDNR MARINA
FUTURE MDNR MARINA
FUTURE MDNR MARINA
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
U E
U E
U E
ST
ST
ST
ST
ST
ST
ST
ST ST ST ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST ST ST ST ST ST ST ST ST ST ST ST
ST
ST
ST
ST
ST
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS
SS
UE
UE
UE
UE
UE
W W
W W
W W
W W
W W
W W
W W
W W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W W W W W W W W W W
W W
W W
W W
W W
W W
W W
W
W
W
W
SS
SS
W
C O
M C
O M
C O
M C
O M
C O
M
COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM
SS
SS
SS
SS
SS
SS
SS
SS
UTILITIES PLAN LEGEND
PROPERTY LINE
EASEMENT
OHWM
PROPOSED WATER LINE
PROPOSED SANITARY
SEWER LINE
ABANDONED SANITARY
SEWER LINE
REMOVED STORM
SEWER LINE
PROPOSED CATCH BASIN
IRRIGATION MAIN LINE
IRRIGATION SLEEVE
IRRIGATION METER IN
RESTROOM UTILITY
ROOM
6" POP-UP DRAIN
W
SS
SS
ST
NORTH
60300
SCALE: 1" = (AT 24"x36")
P:\2023\23-028 LXUP\CAD\SHEETS\U-1.XX UTILITY PLAN.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
U
TI
LI
TY
P
LA
N
VI
LL
AG
E
O F
LE
XI
N G
TO
N
, M I
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T
TI
ER
N
EY
P A
R K
U-1.01
CJ
SF
23-028
3/25/25
BIDDING
53' OF 2" WATERMAIN, PVC
2 EA 1" - 45 DEGREE BEND
45' OF 1" WATERMAIN
SEE BUILDING MEP FOR MORE INFORMATION
59' OF 1" WATERMAIN
45' OF 1" WATERMAIN
1 EA 1"x1" TEE
1 EA 1" GATE VALVE AND BOX
1 EA FOOTWASH STATION
1 EA BACKFLOW PREVENTER
IN BUILDING
364' OF 8" HDPE SANITARY SEWER @0.60%
4' SANITARY SEWER MANHOLE
RIM:586.97
INV:579.97 S 8"
INV:580.07 E 8"
57' OF 8" HDPE SANITARY SEWER @0.60%
EXISTING 4' SANITARY MANHOLE
RIM:587.35
INV: 577.79 N 8" (PROPOSED)
INV: 577.69 E 12" (EXISTING)
2 EA 2" - 45 DEGREE BENDS
FUEL TANK, SEE SHEET F1.1
12' OF TRENCH DRAIN
12' OF TRENCH DRAIN
12' OF TRENCH DRAIN
10' OF TRENCH DRAIN
8' OF TRENCH DRAIN
12' OF TRENCH DRAIN
12' OF TRENCH DRAIN
8' OF TRENCH DRAIN
12' OF TRENCH DRAIN
321' OF 2" WATERMAIN, PVC
1 EA FIRE HYDRANT ASSEMBLY
1 EA GATE VALVE AND BOX
1 EA 1" GATE VALVE AND BOX
1 EA FOOTWASH STATION
61' OF 1" WATERMAIN
1 EA 2" TAP AND SLEEVE
1 EA 2" GATE VALVE
CONTRACTOR TO FIELD LOCATE
AND VERIFY CONDITION OF EXISTING
WATERMAIN
2 EA 2" - 45 DEGREE BENDS
12' OF 2" WATERMAIN, PVC
NOTES:
1. IRRIGATION TO BE COMPLETED AS DESIGN-BUILD.
2. FOR SITE ELECTRICAL, SEE SHEET E1.1.
1 EA 6" POP-UP DRAIN
1 EA 6" POP-UP DRAIN
4/16/25 1. ADD. 1
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
S
X X
XX
TENNIS
COURTS
PUBLIC
PARKING
TO
REMAIN
SIMONS
STREET
HURON
AVENUE
FUTURE
MDNR
MARINA
D
AL
LA
S
ST
R
EE
T
MDNR
BOATER
SERVICE
USACE
BREAKWATER
580.5
0.
FUTURE
MDNR
MARINA
SITE PLAN LEGEND
OF PROPOSED FEATURES
PROPERTY LINE
EASEMENT
OHWM
4" CONCRETE, TYP.
6" CONCRETE, TYP.
6" CONCRETE, W/ COLOR
& EXPOSED AGGREGATE
TYPE F3 CURB
TYPE D1 CURB
FLUSH CURB
ASPHALT PAVING
CRUSHED STONE
PAVING
REINFORCED TURF
RINGS
ENGINEERED WOOD
FIBER MULCH
BENCH
RELOCATED BENCH
FIXED PICNIC TABLE/ADA
FREE-STANDING PICNIC
TABLE/ADA
GRILL
SWING BENCH
DUMPSTER ENCLOSURE
FOOTWASH
FOOTWASH WITH
SHOWER
BIKE RACKS
LITTER RECEPTACLE
ASH URN / DOG BAG
DISPENSER
RELOCATED SCULPTURE
RELOCATED TIERNEY
BUST
LIGHT POLE (NIC: UNDER
SEPARATE DTE
CONTRACT)
BOLLARD LIGHT:
SEE SHEET E1.1
BOLLARD AT CIRCLE
DRIVE
RELOCATED LANDSCAPE
BOULDERS
TRENCH DRAIN
IN SIDEWALKS
REGULATORY SIGN
NORTH
60300
SCALE: 1" = (AT 24"x36")
P:\2023\23-028 LXUP\CAD\SHEETS\LS-1.XX SITE PLAN.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
SI
TE
P
LA
N
VI
LL
AG
E
O F
LE
XI
N G
TO
N
, M I
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T
TI
ER
N
EY
P A
R K
LS-1.01
DV
CJ
SF
23-028
3/25/25
30'
BIDDING
ENLARGEMENT
LS-4.01
ENLARGEMENT
LS-4.02
ENLARGEMENT
LS-4.03
TIMBER
STAIRCASELS-5.03
LS-3.01
LS-3.02
LS-3.03
SEE SHEETS: A-1.01 THROUGH A-3.01
FOR RESTROOM BUILDING DETAILS
LS-3.02
LS-3.03
LS-3.01
FUTURE WORK: NOT IN CONTRACT,
PENDING USACE REVIEW
BOARDWALK PLAN
VIEW DETAILLS-5.04
4/16/25 1. ADD. 1
X X
XX
32 52 82 105 121
72 86
94 103
49 64
63 80
23 34
69 87
122114
1 4
5 18 27
60 74
2 20
111 124
10251019
10131011
10871067
1073 1085
1023 1098
TENNIS
COURTS
PUBLIC
PARKING
TO
REMAIN
SIMONS
STREET
HURON
AVENUE
FUTURE
MDNR
MARINA
D
AL
LA
S
ST
R
EE
T
MDNR
BOATER
SERVICE
USACE
BREAKWATER
580.5
0.
FUTURE
MDNR
MARINA
NORTH
60300
SCALE: 1" = (AT 24"x36")
P:\2023\23-028 LXUP\CAD\SHEETS\LS-1.XX SITE PLAN.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
SI
TE
P
LA
N
C O
N
TR
O L
PO
IN
TS
VI
LL
AG
E
O F
LE
XI
N G
TO
N
, M I
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T
TI
ER
N
EY
P A
R K
LS-1.02
DV
CJ
SF
23-028
3/25/25
BIDDING
NOTES:
1. SEE SHEET LS-1.03 FOR POINT TABLE.
4/16/25 1. ADD. 1
Point #
Northing
650028.2095
649973.2634
650080.1013
650086.1136
650041.1663
650007.1371
649991.1688
650144.3199
650042.9352
650003.7895
649939.0345
650004.6108
650036.2015
650262.6694
649906.3113
650215.1243
650185.7068
649863.6697
649908.7555
649995.1858
649931.6466
649923.2880
649870.2581
649864.3193
649985.8956
Easting
13613276.1922
13613284.3515
13613338.9303
13613339.1170
13613348.1535
13613351.6698
13613354.2501
13613355.7312
13613355.8482
13613356.4594
13613366.9846
13613369.2607
13613369.8187
13613370.0739
13613370.2837
13613370.5717
13613374.9885
13613377.0700
13613377.9069
13613378.0827
13613383.3764
13613384.3255
13613384.5302
13613385.0433
13613392.9517
Elevation
586.80
586.77
586.44
586.41
585.96
585.67
585.61
586.57
585.79
585.54
586.70
585.28
585.47
586.05
587.22
586.50
586.42
586.69
587.06
585.24
586.29
586.20
586.60
586.53
585.42
Point #
Northing
650144.8241
650315.7837
649901.1577
650296.2442
650211.7897
649943.6212
650195.6390
649917.5995
649953.1808
649913.0425
649940.5421
650393.0625
649926.3694
650370.0721
650139.4545
650389.3426
650382.0837
649958.6334
650216.4350
650200.3780
650266.3572
650234.5109
649931.9849
649855.4835
649923.9697
Easting
13613398.1591
13613409.4458
13613410.7373
13613411.9574
13613412.5244
13613414.0343
13613414.6608
13613420.2496
13613422.1039
13613424.2559
13613431.2977
13613431.5619
13613436.1370
13613437.8568
13613440.1885
13613442.1742
13613445.3285
13613446.4427
13613448.2095
13613450.3476
13613461.0643
13613463.0936
13613464.7239
13613464.9021
13613464.9207
Elevation
583.82
585.60
585.03
585.50
585.94
585.63
585.94
585.22
585.59
585.10
585.29
584.42
585.06
584.32
583.73
584.31
584.29
585.47
585.94
585.94
585.87
585.43
585.35
582.66
585.06
Point #
Northing
649946.0940
650297.6657
650400.7331
650231.3557
650002.0238
650155.5297
650306.8267
650269.2473
649963.3244
650238.2142
650426.2893
650299.2974
650213.9386
650326.9439
649925.1060
649951.8329
650311.9041
650407.2586
650199.9440
649966.9220
650318.7810
649915.4868
650373.6545
649960.1360
650332.5595
Easting
13613465.2662
13613467.2357
13613474.4120
13613474.9924
13613475.3402
13613479.3918
13613480.6754
13613481.3824
13613481.6863
13613482.7483
13613487.6993
13613489.2509
13613490.7200
13613491.1722
13613496.6032
13613501.7701
13613505.2126
13613507.9745
13613508.5564
13613509.0342
13613510.3157
13613512.3559
13613519.1116
13613519.7066
13613524.0768
Elevation
585.06
585.30
584.01
584.98
587.21
583.70
584.50
584.85
585.18
584.79
587.00
584.50
584.43
584.27
585.20
585.00
584.10
583.71
583.90
584.53
583.96
585.05
587.00
584.58
583.64
Point #
Northing
649890.2885
650354.8258
650169.6158
649831.9505
650015.8949
650342.9457
649855.6490
650397.0277
649915.0302
650050.2465
649951.0543
650017.8660
650111.1018
649921.1389
650006.8997
649848.3264
649971.6718
650021.6156
650002.0907
649953.9187
649954.2356
649921.4253
650114.7944
649925.6130
649852.1738
Easting
13613526.2143
13613528.9822
13613530.1769
13613531.3623
13613532.3240
13613534.8517
13613535.4066
13613535.4334
13613539.3653
13613543.8847
13613542.3770
13613546.3375
13613547.2243
13613548.8368
13613554.4725
13613555.2368
13613556.6879
13613560.3867
13613561.6795
13613563.3847
13613568.3746
13613570.4394
13613584.2473
13613632.0270
13613633.0368
Elevation
584.92
583.85
583.66
584.89
584.28
583.61
584.73
583.47
584.31
584.25
584.48
584.21
583.58
584.50
583.69
584.54
583.99
583.67
583.76
584.12
584.23
584.05
581.00
584.00
584.06
Point #
Northing
649921.7711
649905.3270
649867.1330
649838.9109
Easting
13613649.7944
13613651.0633
13613654.0103
13613656.1355
Elevation
583.84
583.79
583.75
584.06
Point #
Northing
650393.2772
650349.5626
650305.8479
650394.4449
650415.1695
650400.3699
650307.0156
650300.6070
650287.2709
649848.9212
650079.8892
650093.8923
649827.4979
650031.6868
650144.4102
649983.7552
649969.9412
650417.9478
650359.3962
650348.1176
650194.3539
649925.5626
650239.2992
650086.3252
650210.7705
Easting
13613168.7698
13613172.3016
13613175.8333
13613183.2227
13613187.0663
13613188.2619
13613190.2862
13613196.3219
13613197.3993
13613210.5300
13613211.3825
13613211.7972
13613212.1691
13613212.5738
13613216.1569
13613217.8135
13613220.0880
13613221.4542
13613223.1749
13613224.0861
13613224.9676
13613229.7815
13613231.4196
13613230.5386
13613232.2783
Elevation
585.10
585.39
586.30
585.22
585.11
585.23
586.26
586.36
586.14
596.77
590.79
590.79
596.70
590.81
590.53
590.84
591.10
584.89
585.05
585.24
590.30
591.24
589.34
590.68
589.74
Point #
Northing
649979.9276
650419.4026
650290.8085
649882.0913
650201.3160
649851.5914
649830.2254
650085.7926
650240.0024
649982.8523
649886.0742
650192.9464
650185.2536
649878.3769
650092.1613
650078.1877
650035.5247
650216.0010
650137.0083
649993.0976
649979.2835
649887.6648
650181.6780
650077.8626
650091.9224
Easting
13613237.6537
13613239.4609
13613241.1862
13613242.9600
13613243.3138
13613245.4280
13613247.0627
13613248.5307
13613252.7219
13613255.4170
13613254.3673
13613261.8250
13613265.2141
13613264.5593
13613269.2755
13613268.8621
13613269.9456
13613270.2764
13613273.1623
13613274.5543
13613276.8288
13613280.3113
13613281.0534
13613279.8425
13613278.7539
Elevation
590.65
584.93
585.95
591.38
589.77
594.18
593.88
590.31
588.58
590.30
592.36
590.28
589.28
592.54
590.11
590.11
590.11
588.87
589.76
590.10
590.11
591.31
589.41
586.95
588.75
Point #
Northing
650036.2594
649832.9528
649896.7046
650307.2153
650135.9757
650294.3461
649994.8848
649939.8072
649866.5759
649981.0708
650256.7380
650316.2689
650179.5776
650077.4645
650226.4398
649942.9903
649901.1306
649997.0686
650308.9609
650294.1297
650286.1050
649856.2055
650084.2309
649983.2547
650365.9174
Easting
13613280.9210
13613281.9563
13613284.5564
13613283.8251
13613282.5406
13613284.9730
13613285.4093
13613285.4898
13613287.7391
13613287.6837
13613288.4224
13613290.8757
13613290.2600
13613293.2923
13613295.3486
13613296.0277
13613297.2168
13613298.6730
13613299.7229
13613300.9211
13613300.9376
13613302.1261
13613300.4974
13613300.9480
13613303.8923
Elevation
586.78
592.42
590.70
585.57
588.82
585.73
586.81
590.37
591.00
586.47
587.10
585.41
588.90
587.91
588.00
587.04
590.42
587.91
585.47
585.70
585.96
589.94
587.78
587.95
584.78
Point #
Northing
649914.9359
650354.6420
650424.7778
649991.2989
650182.2048
650187.7336
649835.6803
650262.3311
650083.7216
649919.0287
649857.3325
650310.3953
650229.5562
650296.0622
650284.0339
649994.2233
649914.7992
650177.6331
650169.2028
650076.1608
650090.1545
650040.0953
649884.3977
650298.6849
650128.5779
Easting
13613304.2642
13613304.8426
13613305.9941
13613306.7173
13613313.5628
13613315.0119
13613316.8498
13613317.6666
13613318.4902
13613316.8121
13613319.6881
13613321.6920
13613323.0020
13613322.8363
13613322.8419
13613324.4781
13613325.5461
13613330.9292
13613336.1994
13613337.3332
13613337.7498
13613338.2782
13613337.1022
13613338.6769
13613341.1599
Elevation
587.39
584.88
585.09
587.60
587.83
587.60
589.98
587.10
587.42
588.39
588.58
585.29
587.34
585.45
585.57
587.28
588.54
586.90
586.62
585.92
585.94
585.63
588.50
585.32
586.07
Point #
Northing
650004.2232
649990.4093
650166.5648
649902.7362
649838.4077
649911.5261
649952.7861
649872.8850
649916.0321
650430.1531
649860.8505
650420.7784
650311.7298
650414.8025
650302.0268
650388.9862
650372.3210
650361.0522
650318.1799
650344.3773
649839.9691
650413.4153
650395.5422
649862.4149
650339.3349
Easting
13613342.1253
13613344.4007
13613347.8661
13613349.3612
13613351.7434
13613352.4956
13613352.9164
13613359.1152
13613364.6281
13613372.5273
13613372.9936
13613373.2847
13613379.2794
13613379.6707
13613380.0422
13613381.8072
13613383.1536
13613384.1856
13613384.9755
13613385.4112
13613386.6609
13613390.5141
13613390.7065
13613393.4396
13613395.2475
Elevation
585.36
585.29
586.45
587.52
587.32
587.11
586.06
586.71
586.83
585.19
586.83
585.13
585.23
585.07
585.30
584.56
584.52
584.54
585.17
584.58
586.40
585.00
584.59
586.09
584.64
Point #
Northing
650321.6628
650368.8441
649829.3464
650388.7081
649881.0189
650349.9213
649853.5878
649903.4835
649885.4835
649825.5810
649810.5610
649855.4835
649885.8496
649855.4835
Easting
13613397.9269
13613410.3747
13613419.7202
13613421.9940
13613424.2580
13613424.6250
13613434.9621
13613464.9021
13613464.9021
13613467.3842
13613481.8128
13613494.9021
13613502.0760
13613512.9021
Elevation
585.60
584.47
584.99
584.56
584.61
584.73
583.94
584.43
583.94
583.94
584.37
583.94
584.43
584.43
EDGE OF PAVEMENT
MISC. POINTS
EDGE OF PAVEMENT EDGE OF PAVEMENT EDGE OF PAVEMENT EDGE OF PAVEMENT EDGE OF PAVEMENT
MISC. POINTS MISC. POINTS MISC. POINTS MISC. POINTS
NORTH
60300
SCALE: 1" = (AT 24"x36")
P:\2023\23-028 LXUP\CAD\SHEETS\LS-1.XX SITE PLAN.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
C O
N
TR
O L
PO
IN
TS
VI
LL
AG
E
O F
LE
XI
N G
TO
N
, M I
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T
TI
ER
N
EY
P A
R K
LS-1.03
DV
CJ
SF
23-028
3/25/25
BIDDING
SEE SHEET LS-1.02 FOR POINTS
THAT HAVE CHANGED
SCALE:
ROADWAY CURBS
1 1/2"=1'-0" DT-ROAD CURBS
A: RAISED TYPE F3 CURB B: FLUSH ROADWAY TYPE D1
CURB
EPOXY COATED #4 BAR
OMIT WHEN TIED TO OR CAST
INTEGRAL WITH PAVEMENT
41 2" 9"
4"4"
6"
2" 13
4"
R2
R2"
9" 1'-
2"
2'-0"
EPOXY COATED #4 BAR
OMIT WHEN TIED TO OR CAST
INTEGRAL WITH PAVEMENT
1'- 2"
7"
4"
R6
R1 '-0
4" 10" 2'-6"
4"
9" 41 2"
4"
DE
PT
H
1/
SL
AB
T
HI
CK
NE
SS
1/4"
PREMOLDED BITUMINOUS
JOINT FILLER
CAULKING SEALANT - COLOR
TO MATCH ADJACENT PAVING
1/2"
5/ 8"
SCALE:
CONCRETE CONTROL & EXPANSION JOINTS
3"=1'-0" DT-CJ and EJ
CONTROL JOINT EXPANSION JOINT
R 1/ 2"
SCALE:
6" REINFORCED CONCRETE
1 1/2"=1'-0" DT-CONC VEHIC
3"
2"
NO. 5 REBAR, 12" O.C.
6" 6"
COMPACTED AGGREGATE BASE
COMPACTED SUBGRADE
R12"
FINISH GRADE 1"
BELOW ADJACENT
PAVING WHERE
ADJACENT TO
PLANTING AREA
6"
NOTES
1. NO. 5 REBAR TO HAVE 3" CLEAR COVER
2. REBAR TO GRADE 60 STEEL
3. DOWEL ADJACENT POURS OF CONCRETE
4. SEE SPECIFICATIONS FOR CONCRETE TINT AND FINISH
4,000 PSI MIN. 28 DAY COMPRESSIVE
STRENGTH CONCRETE
SCALE:
4" CONCRETE
1 1/2"=1'-0" DT-CONC WALK
4" 6"
COMPACTED
AGGREGATE
BASE
COMPACTED
SUBGRADE
6"
4,000 PSI MIN. 28 DAY
COMPRESSIVE
STRENGTH CONCRETE,
FIBER MESH REINFORCED
R12"
FINISH GRADE 1"
BELOW ADJACENT
PAVING WHERE ADJACENT
TO PLANTING AREA
SCALE:
CRUSHED STONE PAVING
1 1/2"=1'-0" DT-CRUSHED STONE WALK
6" 4"
1% MIN
CRUSHED STONE WITH
SURFACE BINDER
ADJACENT PAVING
COMPACTED
AGGREGATE BASE
SCALE:
ASPHALT PAVING
1 1/2"=1'-0" DT-ASPHALT TYP
112"
HMA 5EL
MDOT 22A
AGGREGATE
BASE
8"
212"
HMA 3EL
ADJACENT
CURB, SEE
PLANS
SCALE:
REINFORCED TURF
1 1/2"=1'-0" DT-TURF GRID
COMPACTED
AGGREATE
REINFORCED
TURF RINGS
8"
CONTRACTION JOINTS MUST BE PLACED EVERY 10' . EXPANSION JOINTS
MUST BE PLACED A MINIMUM OF 350' APART AND AT ALL RADIUS POINTS
ON CURVES.
SCALE:
BIOSWALE: UPSLOPE EDGE TREATEMENT
1 1/2"=1'-0" DT-FLUSH CURB
6"
8" OF COMPACTED NO. 57 AGGREGATE
ON COMPACTED SUBGRADE
EXTEND COMPACTED AGGREGATE 6"
PAST EDGE OF CURB
ASPHALT PAVEMENT
8"
6"
3-4" DIA. RIP RAP
SEE RAIN GARDEN DETAIL - LP-5.01
CONCRETE CURB
SCALE:
TRENCH DRAIN IN CONCRETE
1"=1'-0" DT-TRENCH DRAIN
4" 4"
TRENCH DRAIN
CONCRETE, MATCH ADJACENT
EXPANSION JOINT
CONCRETE, PER PLANS
SLOPE SLOPE
NOTE:
1. HARDSCAPE CONDITION
VARIES, SEE PLANS
4"
SCALE: 1" = (AT 24"x36")
P:\2023\23-028 LXUP\CAD\SHEETS\LS-5.XX SITE DETAILS.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
SI
TE
P
LA
N D
ET
AI
LS
VI
LL
AG
E
O F
LE
XI
N G
TO
N
, M I
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T
TI
ER
N
EY
P A
R K
LS-5.01
DV
SA
SF
23-028
3/25/25
BIDDING
1 2
6 7 8 9
4/16/25 1. ADD. 14/16/25 1. ADD. 1
TYP. CROSSWALK
1/2"=1'-0" DT-CROSSWALK
2'-0" 1'-0"1'-0"
SEE TYPICAL
RAMP DETAIL,
#2/LS-5.02
W
ID
TH
T
O M
AT
CH
W
ID
TH
O
F
SI
DE
W
AL
K
WIDTH VARIES
CURB
ASPHALT ROADWAY
NOTE: ALL ROADWAY STRIPING/MARKINGS TO MEET MDOT STANDARD
SCALE:
CONCRETE STAIRS AT PAVILION
1"=1'-0" HARDSCAPE/DT-CONC STAIRS
6"
NOTE: ALL RISER
HEIGHTS TO BE EQUAL
6"
78"
12"
3'- 6"
SCALE: 3"=1'
BOTTOM TREAD- STAIR CONDITION
1"1"
SCALE: 3"=1'
6" 6"
R 14 "
R1 12 "
REINFORCING : SUBMIT SHOP
DRAWINGS TO VERIFY REINFORCING
RECOMPACT SUBGRADE
EXPANSION JOINT AND SEALANT - CONT.
2" DIA X 12" DOWEL @
24" OC - SLEEVE ONE
SIDE ONLY
MED BROOM FINISH ON ALL
EXPOSED SURFACES
STAINLESS STEEL
TUBE RAILING
1" DETECTABLE STRIP
ROUT 18" DEEP EPOXY IN
PLACE BOTTOM TREAD
OF STAIR CONDITION
ONLY. COLOR TO BE 70%
DARKER THAN TREAD
EJ AND SEALANT
CONCRETE SURFACE
SCALE:
CONCRETE RAMP AT PAVILION
1/2"=1'-0" DT-RAMP AT PAVILION
1:12 SLOPE
PER PLANS
LANDINGS AT
RAIL TERMINUS,
2% SLOPE
PER PLANS
EQUALLY SPACE INTERMEDIATE RAILS,
MAX. SPACING PER MANUFACTURER
RECOMMENDATION
1'-0"
LANDING: 6'-0" TYP., 2% SLOPE
LANDING: 6'-0" TYP., 2% SLOPE
LANDINGS AT
RAIL TERMINUS,
2% SLOPE
PER PLANS
" M
IN
" M
AX
GA
P
SP
AC
IN
G
PE
R
CO
DE
RAMP: 24' LENGTH
1'-0"
STAINLESS STEEL
TUBE RAILING
SCALE:
SIDEWALK RAMP DETAIL
NTS DT-RAMP
CONCRETE SIDEWALK
DETECTABLE WARNING SURFACE,
ACROSS FULL WIDTH, TYP.
BLEND RAMP WITH EXISTING CURB
A
A
RAMP SLOPE 1:12 MAX. (TYP)
ROADWAY RAMP: 6'-0" TYP. SIDEWALK
SECTION A-A
CONCRETE CURB RAMP
24"
VARIES
RETURN CURB
RETURN CURB
NOTE: CROSS-SLOPE OF ALL WALKWAYS AND SIDEWALK RAMPS TO BE 1.5% TYPICAL, 2% MAX.
SCALE:
ADA RAMP SECTION
1"=1'-0" DT-ADA RAMP SECTION3
COMPACTED AGGREGATE
SUBBASE
2" CLEAR
EPOXY COATED NO. 5
REBAR, CONTINUOUS
2" C
LE
AR
1/2" RADIUS, TYP.
FIBER-REINFORCED CONCRETE
PAVING, 2% CROSS-SLOPE, TYP.
MDOT CLASS II SAND BASE
6"
3" C
LE
AR
1'-0"
4"
6"
1'- 0"
8"
1'-0"
2" CLEAR
2" C
LE
AR
3" C
LE
AR 8"
1:1 1:1
6'-0"
STAINLESS STEEL
HANDRAILS, MUST MEET
LOCAL BUILDING CODE
REQUIREMENTSPOSTS TO BE CORE DRILLED OR
PLACED IN SLEEVES, SET WITH EPOXY
COVER PLATE. FOUR (4) 1
2" DIA.
EXPANSION ANCHORS INSTALLED PER
MANUFACTURERS INSTRUCTIONS
SCALE: 1" = (AT 24"x36")
P:\2023\23-028 LXUP\CAD\SHEETS\LS-5.XX SITE DETAILS.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
SI
TE
P
LA
N D
ET
AI
LS
VI
LL
AG
E
O F
LE
XI
N G
TO
N
, M I
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T
TI
ER
N
EY
P A
R K
LS-5.02
DV
SA
SF
23-028
3/25/25
BIDDING
4/16/25 1. ADD. 1
2%
BOARDWALK PLAN VIEW DETAIL
NOT TO SCALE DT-BOARDWALK PLAN
108'-2"
136'-8"
40'-0"
14'-2" 5'-9"
10'-0"
4'-0"
10'-0"CL
NOTE: DIMENSIONS ARE APPROXIMATE
FOR REFERENCE, SUBJECT TO FINAL
SHOP DRAWINGS.
BOARDWALK
DETAILS
1-4
SM-5.01
NORTH
CL
CL
CL
BOARDWALK-
EXISTING SEA
ATTACHMENT
SM-5.02
BOARDWALK
RAILING
SM-5.03
SCALE: 1" = (AT 24"x36")
P:\2023\23-028 LXUP\CAD\SHEETS\LS-5.XX SITE DETAILS.DWG
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
DATE
SI
TE
P
LA
N D
ET
AI
LS
VI
LL
AG
E
O F
LE
XI
N G
TO
N
, M I
IM
PR
O
VE
M
EN
TS
P
R O
JE
C
T
TI
ER
N
EY
P A
R K
LS-5.04
DV
CJ
SF
23-028
3/25/25
BIDDING
berm A approx. 207
CY
berm C approx. 91 CY
S
U
U
T
U
D
D
FP
FP
FP
B1
B1
B1
B2
B1
B1
B1
B2
B2
B1
B1
B1
B2
B1
B1
B1
B1 B1
B2
B1 B2
B1
E1.1
NEW RESTROOM
BUILDING
EXISTING BOATER
SERVICE BUILDING
1 / E0.1
3 / E0.1
1 / E0.1
1 / E0.1
C
C
C
C
EXISTING METER
EXISTING PANEL
RV PEDESTALS63 / E1.1
FRONT BACK
EXISTING
PANEL
EXISTING MOUNTING
STRUCTURE
EXISTING
METER
TO EXISTING UTILITY TRANSFORMER
RV
PED
RV
PED
RV
PED
RV
PED
(1) 50A 240V & (1) 30A 120V
UNMETERED RV RECEPTACLES
- 120V GFCI MAINTENANCE
OUTLET
N/A 9W LED W/
INTEGRAL
PHOTOCELL
N/A POST MOUNTED HYPOWER
ENERGYMATE RV
OR APPROVED
EQUAL
RV PEDESTAL LEGEND
OTHER NOTES:
• PEDESTALS SHALL HAVE A CLEAR LENS.
• PEDESTALS SHALL HAVE (1) INTEGRAL kWH METER.
SYMBOL SIDE 1 SIDE 2 LIGHTING
OTHER
UTILITIES MOUNTING MODEL #
OFTIS
AFFETTAFFETT
1 S JEFFERSON AVE, STE 101
COOKEVILLE, TN 38501
TEL: (931) 526-5143
www.maffett-loftis.com
ENGINEERING, LLC
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
P R
O J E
C T
T
IT
L E
S H
E E
T T
IT
L E
DATE REVISION
ISSUED FOR:
DATE:
PROJ NO.:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING
OR OTHER USE OF THIS DRAWING
WITHOUT WRITTEN CONSENT IS
PROHIBITED. © 2020 EDGEWATER
RESOURCES, LLC.
MLE PROJ NO.:
20-040
L E
X
IN
G T
O N
H A
R B
O R
P A
R K
U P
G R
A D
E S
L E
X
IN
G T
O N
M
I
NORTH
4/16/25 1. Add. 1
24060
E1.1
03/24/25
E L E
C T
R
IC
A L P
L A
N
P A
R K
S
IT
E
AJG
AJG
AJG
SCALE: 1" = 30'-0" (WHEN PRINTED FULL SCALE ON 24"X36")E1.1
1 ELECTRICAL PLAN - PARK SITE
NORTH0' 15' 30' 60' 120'
SCALE: 1/8" = 1'-0" (WHEN PRINTED FULL SCALE ON 24"X36")E1.1
2 ENLARGED ELECTRICAL PLAN - RV PEDESTAL
0' 15' 30' 60' 120'
NORTH
ELECTRICAL NOTES
NUMBERED NOTES
1 LIGHTING SHALL BE FED FROM PANEL LOCATED INSIDE NEW RESTROOM BUILDING. CONTRACTOR SHALL COORDINATE EXACT LOCATION AND CONTROLS WITH RESTROOM BUILDING ELECTRICAL DESIGNER. INSTALL 120V 'A30' CIRCUITRY FOR LIGHTING BRANCH CIRCUIT.
2 TYPICAL, UNDERGROUND BRANCH CIRCUITS FOR PARK LIGHTING. SEE REFERENCED DITCH DETAIL FOR ADDITIONAL INFORMATION.
3 TYPICAL, SEE REFERENCED LIGHT BOLLARD DETAIL FOR ADDITIONAL INFORMATION.
4 CONNECT FLAG POLE LIGHTING TO NEW PARK LIGHTING CIRCUIT. DESIGN INTENT IS FOR THE EXISTING CONDUIT AND CIRCUITRY TO BE REUSED AS PRACTICAL. COORDINATE WITH EXISTING CONDITIONS. CONTRACTOR SHALL PERFORM A VISUAL INSPECTION OF THE CONDUCTORS AND CONDUIT THAT IS INTENDED TO BE REUSED. CONTRACTOR SHALL PERFORM INSULATION INTEGRITY TESTING (I.E. MEGGER TESTING) OF THE CONDUCTORS THAT ARE INTENDED TO BE REUSED. CONTRACTOR SHALL REPORT ALL FINDINGS TO THE ENGINEER FOR APPROVAL TO REUSE THE
EXISTING CONDUCTORS AND CONDUIT.
5 NEW FLAG POLE LIGHT MOUNTED TO RELOCATED FLAG POLE. REWORK EXISTING CIRCUITRY TO NEW POLES AS PRACTICAL. COORDINATE EXACT
LOCATIONS AND MOUNTING HEIGHTS WITH SITE DESIGNER AND EXISTING FLAG POLES.
6 INSTALL NEW WALL-MOUNT RV POWER PEDESTALS TO THE BACKSIDE OF EXISTING MOUNTING STRUCTURE. INSTALL NEW 'B50' CIRCUITRY FROM EXISTING PANEL TO EACH PEDESTAL. CONTRACTOR SHALL REPLACE ALL EXISTING BRANCH BREAKERS WITH NEW 50A, 2-POLE GFCI BREAKERS.
COORDINATE WITH EXISTING PANELBOARD. SEE REFERENCED DETAIL FOR ADDITIONAL INFORMATION.
7 EXISTING EQUIPMENT TO REMAIN.
8 TYPICAL, RECEPTACLES INTEGRAL TO LIGHT BOLLARD 'B2'. RECEPTACLES SHALL BE FED SEPARATE FROM BOLLARD LIGHTING CIRCUIT.
COORDINATE LOCATIONS WITH SITE DESIGNER.
9 RECEPTACLES SHALL BE FED FROM PANEL LOCATED INSIDE NEW RESTROOM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .