SLRPBid_Table.xlsx
XLSX spreadsheet 44 KB Posted
- Attached to
- Sewer Lateral Replacement Project
- Solicitation number
- IFB197641
- Issued by
- Santa Clara County, California
About this file
This is a bid table for a Sewer Lateral Replacement Project in California, a capital improvement initiative designed to enhance the City's wastewater collection system by replacing 210 deteriorated public sewer laterals identified through maintenance records review. The project encompasses three years of construction, with approximately 70 sewer laterals scheduled for replacement annually. Bid items include design, installation, and removal of excavation supports; removal and replacement of 4" or 6" sewer lateral pipes using open-cut or pipe-bursting methods at varying invert depths; abandonment of existing laterals; pre- and post-construction cleaning with CCTV inspection; asphalt concrete pavement (ACP) storage and disposal; GPS surveying; and unforeseen site condition and landscaping restoration allowances. The bid structure contains 12 base bid items (Items 001-012) applicable to all three years and seven supplemental bid items (Items 013-019) covering soil disposal, sewer lateral relocation in paved and unpaved areas, and deep-depth lateral work exceeding 12-foot invert depths. Each year's section is structured identically with the same quantities and line items.
Pricing for the bid is inclusive of all applicable taxes, with two fixed allowances of $25,000 each for unforeseen site conditions and landscaping/hardscaping restoration in each year. Base bid items require unit pricing in both numeric and written formats for all line items except the two fixed allowances. The bid table totals are currently shown as $0, indicating this is a blank bid form awaiting contractor submission. The project's scope reflects site condition variability, as indicated by the inclusion of multiple installation methods and depth-specific pricing categories. All 19 bid items are repeated identically across the three contract years, with quantities remaining constant, suggesting consistent annual work distribution throughout the contract term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sewer_Lateral_Replacement_Project.pdf | ||
| Performance_Bond.docx | DOCX document | |
| SLRP_Index_&_Certification_Page.pdf | ||
| utility-map-request-form.pdf | ||
| Payment_Bond.docx | DOCX document | |
| SLRP_-_Appendices.pdf | ||
| Bid_Bond_Form.docx | DOCX document | |
| SLRP-_Spec_Prov.docx | DOCX document | |
| SLRP_-_Tech_Spec.pdf | ||
| SLRP_Maps.pdf | ||
| Construction_Contract,_General_Conditions,_and_Change_Orders.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Itmes 001-012- Yr 1
| BID ITEM | APPROX.QTY. | UNIT | DESCRIPTION, WITH UNIT PRICE IN WORDS | UNIT PRICE | TOTAL ITEM PRICE |
| (PRICE IS INCLUSIVE OF ALL APPLICABLE TAXES) | |||||
| 1 | 1 | LS | Design, Install, and Remove Sheeting, Shoring, Bracing & other excavation supports | ||
| (Unit Price in words: _____________________________________ | |||||
| 2 | 5 | Each | Remove and Replace 4" or 6" Sewer Lateral Pipe (≥8’ and ≤12’ invert depth) by Open Cut Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 3 | 5 | Each | Replace 4" or 6" Sewer Lateral Pipe (≥8’ and ≤12’ invert depth) by Pipe Bursting Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 4 | 15 | Each | Remove and Replace 4" or 6" Sewer Lateral Pipe (< 8' invert depth) by Open Cut Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 5 | 45 | Each | Replace 4" or 6" Sewer Lateral Pipe (< 8’ invert depth) by Pipe Bursting Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 6 | 5 | Each | Abandon 4" or 6" Sewer Lateral Pipe (≥8’ and ≤12’ invert depth) | ||
| (Unit Price in words: _____________________________________ | |||||
| 7 | 5 | Each | Abandon 4" or 6" Sewer Lateral Pipe (> 8' invert depth) | ||
| (Unit Price in words: _____________________________________ | |||||
| 8 | 1 | LS | Allowance: Unforeseen Site Condition | $ 25,000.00 | $ 25,000.00 |
| (Unit Price in words: _____________________________________ | |||||
| 9 | 1 | LS | Allowance: Landscaping/Hardscaping Restoration | $ 25,000.00 | $ 25,000.00 |
| (Unit Price in words: _____________________________________ | |||||
| 10 | 70 | Each | Perform Pre- and Post-Construction Cleaning and CCTV Sewer Lateral Inspection | ||
| (Unit Price in words: _____________________________________ | |||||
| 11 | 10 | CY | ACP Storage and Disposal | ||
| (Unit Price in words: _____________________________________ | |||||
| 12 | 1 | LS | Perform GPS Survey for all installed laterals | ||
| (Unit Price in words: _____________________________________ | |||||
| Section A - Base Bid Total (items 001 through 012, with all applicable taxes included) | $ - 0 |
Itmes 001-012- Yr 2
| BID ITEM | APPROX.QTY. | UNIT | DESCRIPTION, WITH UNIT PRICE IN WORDS | UNIT PRICE | TOTAL ITEM PRICE |
| (PRICE IS INCLUSIVE OF ALL APPLICABLE TAXES) | |||||
| 1 | 1 | LS | Design, Install, and Remove Sheeting, Shoring, Bracing & other excavation supports | ||
| (Unit Price in words: _____________________________________ | |||||
| 2 | 5 | Each | Remove and Replace 4" or 6" Sewer Lateral Pipe (≥8’ and ≤12’ invert depth) by Open Cut Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 3 | 5 | Each | Replace 4" or 6" Sewer Lateral Pipe (≥8’ and ≤12’ invert depth) by Pipe Bursting Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 4 | 15 | Each | Remove and Replace 4" or 6" Sewer Lateral Pipe (< 8' invert depth) by Open Cut Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 5 | 45 | Each | Replace 4" or 6" Sewer Lateral Pipe (< 8’ invert depth) by Pipe Bursting Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 6 | 5 | Each | Abandon 4" or 6" Sewer Lateral Pipe (≥8’ and ≤12’ invert depth) | ||
| (Unit Price in words: _____________________________________ | |||||
| 7 | 5 | Each | Abandon 4" or 6" Sewer Lateral Pipe (> 8' invert depth) | ||
| (Unit Price in words: _____________________________________ | |||||
| 8 | 1 | LS | Allowance: Unforeseen Site Condition | $ 25,000.00 | $ 25,000.00 |
| (Unit Price in words: _____________________________________ | |||||
| 9 | 1 | LS | Allowance: Landscaping/Hardscaping Restoration | $ 25,000.00 | $ 25,000.00 |
| (Unit Price in words: _____________________________________ | |||||
| 10 | 70 | Each | Perform Pre- and Post-Construction Cleaning and CCTV Sewer Lateral Inspection | ||
| (Unit Price in words: _____________________________________ | |||||
| 11 | 10 | CY | ACP Storage and Disposal | ||
| (Unit Price in words: _____________________________________ | |||||
| 12 | 1 | LS | Perform GPS Survey for all installed laterals | ||
| (Unit Price in words: _____________________________________ | |||||
| Section A - Base Bid Total (items 001 through 012, with all applicable taxes included) | $ - 0 |
Itmes 001-012- Yr 3
| BID ITEM | APPROX.QTY. | UNIT | DESCRIPTION, WITH UNIT PRICE IN WORDS | UNIT PRICE | TOTAL ITEM PRICE |
| (PRICE IS INCLUSIVE OF ALL APPLICABLE TAXES) | |||||
| 1 | 1 | LS | Design, Install, and Remove Sheeting, Shoring, Bracing & other excavation supports | ||
| (Unit Price in words: _____________________________________ | |||||
| 2 | 5 | Each | Remove and Replace 4" or 6" Sewer Lateral Pipe (≥8’ and ≤12’ invert depth) by Open Cut Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 3 | 5 | Each | Replace 4" or 6" Sewer Lateral Pipe (≥8’ and ≤12’ invert depth) by Pipe Bursting Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 4 | 15 | Each | Remove and Replace 4" or 6" Sewer Lateral Pipe (< 8' invert depth) by Open Cut Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 5 | 45 | Each | Replace 4" or 6" Sewer Lateral Pipe (< 8’ invert depth) by Pipe Bursting Method | ||
| (Unit Price in words: _____________________________________ | |||||
| 6 | 5 | Each | Abandon 4" or 6" Sewer Lateral Pipe (≥8’ and ≤12’ invert depth) | ||
| (Unit Price in words: _____________________________________ | |||||
| 7 | 5 | Each | Abandon 4" or 6" Sewer Lateral Pipe (> 8' invert depth) | ||
| (Unit Price in words: _____________________________________ | |||||
| 8 | 1 | LS | Allowance: Unforeseen Site Condition | $ 25,000.00 | $ 25,000.00 |
| (Unit Price in words: _____________________________________ | |||||
| 9 | 1 | LS | Allowance: Landscaping/Hardscaping Restoration | $ 25,000.00 | $ 25,000.00 |
| (Unit Price in words: _____________________________________ | |||||
| 10 | 70 | Each | Perform Pre- and Post-Construction Cleaning and CCTV Sewer Lateral Inspection | ||
| (Unit Price in words: _____________________________________ | |||||
| 11 | 10 | CY | ACP Storage and Disposal | ||
| (Unit Price in words: _____________________________________ | |||||
| 12 | 1 | LS | Perform GPS Survey for all installed laterals | ||
| (Unit Price in words: _____________________________________ | |||||
| Section A - Base Bid Total (items 001 through 012, with all applicable taxes included) | $ - 0 |
Items 013-019-Yr 1
| BID ITEM | APPROX.QTY. | UNIT | DESCRIPTION, WITH UNIT PRICE IN WORDS | UNIT PRICE | TOTAL ITEM PRICE |
| (PRICE IS INCLUSIVE OF ALL APPLICABLE TAXES) | |||||
| 13 | 5 | Ton | Dispose of excavated soils at Class 1 landfill | ||
| (Unit Price in words: _____________________________________ | |||||
| 14 | 5 | Ton | Dispose of excavated soils at Class 2 landfill | ||
| (Unit Price in words: _____________________________________ | |||||
| 15 | 5 | Each | Remove/relocate sewer lateral by open-cut excavation in paved area | ||
| (Unit Price in words: _____________________________________ | |||||
| 16 | 5 | Each | Remove/relocate of sewer lateral by open-cut excavation in unpaved area | ||
| (Unit Price in words: _____________________________________ | |||||
| 17 | 5 | Each | Remove and Replace 4" or 6" Sewer Lateral Pipe (>12' invert depth) by open cut method | ||
| (Unit Price in words: _____________________________________ | |||||
| 18 | 5 | Each | Replace 4" or 6" Sewer Lateral Pipe (>12' invert depth) by pipe bursting method | ||
| (Unit Price in words: _____________________________________ | |||||
| 19 | 5 | Each | Abandon 4" or 6" Sewer Lateral Pipe (>12' invert depth) | ||
| (Unit Price in words: _____________________________________ | |||||
| Section B - SUP Bid Total (items 013 through 019, with all applicable taxes included) | $ - 0 |
Items 013-019-Yr 2
| BID ITEM | APPROX.QTY. | UNIT | DESCRIPTION, WITH UNIT PRICE IN WORDS | UNIT PRICE | TOTAL ITEM PRICE |
| (PRICE IS INCLUSIVE OF ALL APPLICABLE TAXES) | |||||
| 13 | 5 | Ton | Dispose of excavated soils at Class 1 landfill | ||
| (Unit Price in words: _____________________________________ | |||||
| 14 | 5 | Ton | Dispose of excavated soils at Class 2 landfill | ||
| (Unit Price in words: _____________________________________ | |||||
| 15 | 5 | Each | Remove/relocate sewer lateral by open-cut excavation in paved area | ||
| (Unit Price in words: _____________________________________ | |||||
| 16 | 5 | Each | Remove/relocate of sewer lateral by open-cut excavation in unpaved area | ||
| (Unit Price in words: _____________________________________ | |||||
| 17 | 5 | Each | Remove and Replace 4" or 6" Sewer Lateral Pipe (>12' invert depth) by open cut method | ||
| (Unit Price in words: _____________________________________ | |||||
| 18 | 5 | Each | Replace 4" or 6" Sewer Lateral Pipe (>12' invert depth) by pipe bursting method | ||
| (Unit Price in words: _____________________________________ | |||||
| 19 | 5 | Each | Abandon 4" or 6" Sewer Lateral Pipe (>12' invert depth) | ||
| (Unit Price in words: _____________________________________ | |||||
| Section B - SUP Bid Total (items 013 through 019, with all applicable taxes included) | $ - 0 |
Items 013-019-Yr 3
| BID ITEM | APPROX.QTY. | UNIT | DESCRIPTION, WITH UNIT PRICE IN WORDS | UNIT PRICE | TOTAL ITEM PRICE |
| (PRICE IS INCLUSIVE OF ALL APPLICABLE TAXES) | |||||
| 13 | 5 | Ton | Dispose of excavated soils at Class 1 landfill | ||
| (Unit Price in words: _____________________________________ | |||||
| 14 | 5 | Ton | Dispose of excavated soils at Class 2 landfill | ||
| (Unit Price in words: _____________________________________ | |||||
| 15 | 5 | Each | Remove/relocate sewer lateral by open-cut excavation in paved area | ||
| (Unit Price in words: _____________________________________ | |||||
| 16 | 5 | Each | Remove/relocate of sewer lateral by open-cut excavation in unpaved area | ||
| (Unit Price in words: _____________________________________ | |||||
| 17 | 5 | Each | Remove and Replace 4" or 6" Sewer Lateral Pipe (>12' invert depth) by open cut method | ||
| (Unit Price in words: _____________________________________ | |||||
| 18 | 5 | Each | Replace 4" or 6" Sewer Lateral Pipe (>12' invert depth) by pipe bursting method | ||
| (Unit Price in words: _____________________________________ | |||||
| 19 | 5 | Each | Abandon 4" or 6" Sewer Lateral Pipe (>12' invert depth) | ||
| (Unit Price in words: _____________________________________ | |||||
| Section B - SUP Bid Total (items 013 through 019, with all applicable taxes included) | $ - 0 |
File details come from the government source that posted it. Updated .