Site Visit Photo File Descriptions.docx

DOCX document 16 KB Posted

Attached to
Chief Joseph Dam Intake and Tailrace Cranes Replacement, Bridgeport, WA.
Solicitation number
W912DW21R0033
Issued by

About this file

This solicitation is for a construction project to replace the intake and tailrace gantry cranes at Chief Joseph Dam Powerhouse in Bridgeport, Washington. The project scope includes design, fabrication, delivery, installation, testing and certification of a new 50-ton intake gantry crane and 18-ton tailrace gantry crane. It also requires modification of the overhead power conductors, removal of the existing cranes, design and fabrication of new lifting beams, structural analysis of supports and bumper stops, and installation of a new wall-mounted conductor system. The expected magnitude of construction costs is between $10-25 million. The solicitation was issued by the U.S. Army Corps of Engineers Seattle District for performance at Chief Joseph Dam. The response due date is not provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chief Joseph Dam Intake Crane

1. Long profile.

2. CJ Intake Crane looking east showing BPA transmission proximity, intake gates slots, and power bus poles.

3. Close range emphasis downstream, looking east (towards Spillway) showing three-wire power pole w/ light and rails.

4. Close range emphasis upstream, looking east (towards Spillway) showing crane to three-wire power connections, operator stairs w/ proximity to power cable, downstream BPA Transmission proximity to intact deck, and rails.

5. Close range emphasis mid-deck, looking east (towards Spillway) showing crane to power connectors, rotating hammerhead hoist, operator’s cab, main hoist, machine tool cabinets, and operator access stairs and ladders.

6. Close range emphasis upstream, looking east (towards Spillway) showing rotating hammerhead hoist, operator’s cab, main hoist, machine tool cabinets, and operator access stairs and ladders.

Intake Crane Construction Laydown Area

7. Laydown location noted on Sheet G-0004. Photo showing areal extent.

8. Intake Crane Construction Laydown Area looking southeast noting packed gravel parking areas.

9. Intake Crane Construction Laydown Area looking southeast noting packed gravel parking areas in wider perspective.

10. Intake Crane Construction Laydown Area looking upstream and northeast noting access and fencing.

11. Intake Crane Construction Laydown Area looking southeast noting proximity to WA 17, gravel access road, and fencing.

Intake Crane Power Poles and Guidelines

12. West End terminal power pole showing three anchor guy wires.

13. West end dead end pole and three guy wire anchorage.

14. West dead end pole and anchorage looking east.

15. West dead end pole looking east with rail stop and crane perspective.

16. West dead end pole looking east with power connection and wires.

16a. Power pole close connection perspective.

17. Power pole with light and security camera with BPA transmission tower and intake crane perspective.

18. Power pole with light Looking east (towards spillway).

19. East end dead end pole with rail stop and anchor guy wires.

20. East end dead end pole with security camera and light placement perspective.

21. East anchorage looking west and downstream showing dead end and adjacent pole.

22. East power pole anchorage.

Intake Rail Stops

23. West end downstream rail stop looking east.

24. West end upstream rail stop looking south toward Pearl Hill and the WA 17 access point.

25. West end downstream rail stop looking west; Unit 27.

26. West end downstream rail stop looking east; Unit 27.

27. West end upstream rail stop looking southeast.

28. West end upstream rail stop looking west showing C-Block bend and designated construction/demo area.

29. East end upstream rail stop looking east towards the buttonhook and second designated construction/demo area.

30. East end downstream rail stop looking east towards the spillway; buttonhook and second designated construction/demo area are off photo to the right.

31. Close up east end downstream rail stop and rail end looking west.

32. Close up east end upstream rail stop and rail looking southwest.

Tailrace Crane

33. Upstream side tailrace gantry structure w/ operator’s cab and rails; photo looking downstream.

34. Upstream side tailrace gantry structure w/ operator’s cab, machine house, and opposite side power cable spool; photo looking downstream.

35. Downstream tailrace wall showing existing power connection.

36. Tailrace crane looking west showing wall and new power location.

37. Tailrace crane looking west showing eastside crane profile and lift Tailrace Laydown Area

38. Laydown looking north from Pearl Hill showing access and areal extent.

39. Access looking northwest showing WA17 and Pearl Hill Road intersection.

40. Areal extent looking northwest from the access gate.

41. Entrance looking north showing gravel access road.

42. Areal extent looking northwest

43. Areal extent looking south towards Pearl Hill

44. Areal extent looking south towards access gate

45. Areal looking northeast

46. Delineated areal extent looking northwest from Pearl Hill Road Lifting Beams

47. Main unit Draft Tube Lifting Beam overview

48. Draft Tube Lifting Beam sheave and hook

49. Draft Tube Lifting Beam end view showing guide rollers/shoe carrying guard rail

50. Draft Tube Lifting Beam end view rectangular tubes redeployed

51. Draft Tube Lifting Beam load block sheave

52. Draft Tube Lifting Beam operating mechanism

53. Intake Gate Hoist Lifting Beam overview

54. Intake Gate Hoist Lifting Beam end view auxiliary hoist connection

55. Intake Gate Hoist Lifting Beam top connection to top of cylinder

56. Main Hoist Lifting Beam overview

57. Main Hoist Lifting Beam overview

58. Main Hoist Lifting Beam end view showing rollers and guides

59. Main Hoist Lifting Beam overview showing linkages and closures

60. Main Hoist Lifting Beam overview showing linkages and closures

61. Main Hoist Lifting Beam overview showing linkages and closures

62. Main Hoist Lifting Beam overview showing linkages and closures

63. Main Hoist Lifting Beam overview showing linkages and closures

64. Main Hoist Lifting Beam overview showing linkages and closures

65. Main Hoist Lifting Beam overview showing linkages and closures

66. Main Hoist Lifting Beam overview showing linkages and closures

67. Main Hoist Lifting Beam overview showing linkages for gate connections

68. Main Hoist Lifting Beam overview showing linkages and guide pocket

69. Main Hoist Lifting Beam overview showing linkages and guide pocket from the opposite side

70. Main Hoist Lifting Beam overview showing linkage details

71. Main Hoist Lifting Beam overview showing more linkage details