Site Drawrings Culpeper Stormwater.pdf
PDF 5 MB Posted
- Attached to
- J046--Stormwater Contract-Stormwater services requirement for Culpeper National Cemetery
- Solicitation number
- 36C78626Q0088
About this file
This document is a comprehensive product specification and installation/maintenance manual for the BayFilter stormwater filtration system by Advanced Drainage Systems, Inc. for a project at Culpeper Cemetery in Culpeper, Virginia (Project No. S148131).
The BayFilter is an offline stormwater treatment system designed to remove fine sediments, heavy metals, and phosphorus from stormwater runoff. Key product specifications include: internal components (concrete vault structure, PVC manifold piping, and filter cartridges) provided by BaySaver Technologies LLC; PVC manifold piping meeting ASTM D1785 standards with pre-cut and pre-assembled components; filter cartridges with polyethylene external shells and spiral-layered filtration media consisting of zeolite, perlite, and activated alumina; and precast concrete vaults complying with ASTM C478, C857, and C858 standards. Performance requirements mandate removal of at least 85% suspended solids, 65% total phosphorus, 65% turbidity, 40% total copper, and 40% total zinc; 50% or greater turbidity reduction; a minimum 65% total phosphorus load removal; and a treated sediment capacity of 150-350 pounds for 80% TSS removal. Filter cartridges feature a hydrodynamic backwash mechanism, no moving parts, and a maximum flow rate restriction of 45 GPM per cartridge.
The maintenance section specifies that initial inspections occur within six months of installation, with typical biannual inspection cycles thereafter, and that maintenance should be performed by certified BaySaver contractors. Maintenance comprises cartridge removal and replacement, vault cleaning via vacuum truck, manifold inspection and cleaning, and return of used cartridges to BaySaver Technologies at 1302 Rising Ridge Road, Unit 1, Mount Airy, MD 21771 for exchange/recycling. Installation procedures detail utility location, excavation requirements, subgrade preparation, soil bearing capacity verification, proper vault assembly with watertight seals, manifold and pipe installation, and placement of hold-down bars and brackets. The document includes detailed construction drawings with multiple BayFilter configurations (models 522 and 545) and site-specific location maps for the Culpeper Cemetery project areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| culpeper schedule 2.rtf | RTF text file | |
| revised stormwater culpeper.docx | DOCX document | |
| Culpeper Amend 1 QA.docx | DOCX document | |
| 36C78626Q0088 amendment.docx | DOCX document | |
| Attachment C Past performance questionnaire_.docx | DOCX document | |
| Attachment A SOW Culpeper Stormwater.docx | DOCX document | |
| Attachment D Wage Determination Culpeper.docx | DOCX document | |
| Attachment B Culpeper Schedule.rtf | RTF text file | |
| 36C78626Q0088v3.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
©2013 ADS, INC.
PROJECT INFORMATION
ADS SALES REP:
ENGINEERED
PRODUCT
MANAGER:
PROJECT NO:
ADVANCED DRAINAGE SYSTEMS, INC.
R
CULPEPER CEMETERY
CUPEPER, VA
TIM GIMPLE
540-235-4519
TIM.GIMPLE@ADS-PIPE.COM
S148131
JIM CLARK
240-463-0124
JAMES.CLARK@ADS-PIPE.COM
BAYSAVER BAYFILTER SPECIFICATIONS
PRODUCTS
A. INTERNAL COMPONENTS: ALL COMPONENTS INCLUDING CONCRETE STRUCTURE(S), PVC MANIFOLD PIPING AND FILTER CARTRIDGES, SHALL BE PROVIDED BY BAYSAVER TECHNOLOGIES LLC, 1030 DEER HOLLOW DRIVE, MOUNT AIRY, MD (800.229.7283).
B. PVC MANIFOLD PIPING: ALL INTERNAL PVC PIPE AND FITTINGS SHALL MEET ASTM D1785. MANIFOLD PIPING SHALL BE PROVIDED TO THE
CONTRACTOR PARTIALLY PRE-CUT AND PRE-ASSEMBLED.
C. FILTER CARTRIDGES: EXTERNAL SHELL OF THE FILTER CARTRIDGES SHALL BE SUBSTANTIALLY CONSTRUCTED OF POLYETHYLENE OR EQUIVALENT MATERIAL ACCEPTABLE TO THE MANUFACTURER. FILTRATION MEDIA SHALL BE ARRANGED IN A SPIRAL LAYERED FASHION TO MAXIMIZE AVAILABLE FILTRATION AREA. AN ORIFICE PLATE SHALL BE SUPPLIED WITH EACH CARTRIDGE TO RESTRICT THE FLOW RATE
TO A MAXIMUM OF 45 GPM.
D. FILTER MEDIA: FILTER MEDIA SHALL BE BY BAYSAVER TECHNOLOGIES LLC AND SHALL CONSIST OF THE FOLLOWING MIX: A BLEND OF
ZEOLITE, PERLITE AND ACTIVATED ALUMINA.
E. PRECAST CONCRETE VAULT: CONCRETE STRUCTURES SHALL BE PROVIDED ACCORDING TO ASTM C. THE MATERIALS AND STRUCTURAL DESIGN OF THE DEVICES SHALL BE PER ASTM C478, C857 AND C858. PRECAST CONCRETE SHALL BE PROVIDED BY BAYSAVER
TECHNOLOGIES, LLC.
PERFORMANCE
A. THE STORMWATER FILTER SYSTEM SHALL BE AN OFFLINE DESIGN CAPABLE OF TREATING 100% OF THE REQUIRED TREATMENT FLOW AT
FULL SEDIMENT LOAD CONDITIONS.
B. THE STORMWATER FILTER SYSTEM'S CARTRIDGES SHALL HAVE NO MOVING PARTS.
C. THE STORMWATER TREATMENT UNIT SHALL BE DESIGNED TO REMOVE AT LEAST 85% OF SUSPENDED SOLIDS, 65% OF TOTAL
PHOSPHORUS, 65% OF TURBIDITY, 40% OF TOTAL COPPER, AND 40% OF TOTAL ZINC BASED ON FIELD DATA COLLECTED IN COMPLIANCE
WITH THE TECHNOLOGY ACCEPTANCE RECIPROCITY PARTNERSHIP TIER II TEST PROTOCOL.
D. THE STORMWATER FILTRATION SYSTEM SHALL REDUCE INCOMING TURBIDITY (MEASURED AS NTUs) BY 50% OR MORE AND SHALL NOT
HAVE ANY COMPONENTS THAT LEACH NITRATES OR PHOSPHATES.
E. THE STORMWATER FILTRATION CARTRIDGE SHALL BE EQUIPPED WITH A HYDRODYNAMIC BACKWASH MECHANISM TO EXTEND THE
FILTER'S LIFE AND OPTIMIZE ITS PERFORMANCE.
F. THE STORMWATER FILTRATION SYSTEM SHALL BE DESIGNED TO REMOVE A MINIMUM OF 65% OF THE INCOMING TOTAL PHOSPHORUS
(TP) LOAD.
G. THE STORMWATER FILTRATION SYSTEM'S CARTRIDGES SHALL HAVE A TREATED SEDIMENT CAPACITY FOR 80% TSS REMOVAL BETWEEN
150-350 LBS.
BAYFILTER MAINTENANCE
THE BAYFILTER SYSTEM REQUIRES PERIODIC MAINTENANCE TO CONTINUE OPERATING AT ITS PEAK EFFICIENCY DESIGN. THE MAINTENANCE PROCESS COMPRISES THE REMOVAL AND REPLACEMENT OF EACH BAYFILTER CARTRIDGE AND THE CLEANING OF THE VAULT OR MANHOLE WITH A VACUUM TRUCK. FOR BEST RESULTS, BAYFILTER MAINTENANCE SHOULD BE PERFORMED BY A CERTIFIED MAINTENANCE CONTRACTOR. A QUICK CALL TO AN ADS ENGINEER OR CUSTOMER SERVICE REPRESENTATIVE WILL PROVIDE YOU WITH A LIST OF RELIABLE CONTRACTORS IN YOUR AREA.
WHEN BAYFILTER IS INITIALLY INSTALLED, WE RECOMMEND THAT AN INSPECTION BE PERFORMED ON THE SYSTEM IN THE FIRST SIX (6) MONTHS.
AFTER THAT, THE INSPECTION CYCLE TYPICALLY FALLS INTO A BIANNUAL PATTERN GIVEN NORMAL STORM OCCURRENCE AND ACTUAL SOLIDS
LOADS.
WHEN BAYFILTER EXHIBITS FLOWS BELOW DESIGN LEVELS, THE SYSTEM SHOULD BE INSPECTED AND MAINTAINED AS SOON AS PRACTICAL.
REPLACING A BAYFILTER CARTRIDGE SHOULD BE CONSIDERED AT OR ABOVE THE LEVEL OF THE MANIFOLD.
MAINTENANCE PROCEDURES
1. REMOVE THE MANHOLE COVERS AND OPEN ALL ACCESS HATCHES.
2. BEFORE ENTERING THE SYSTEM MAKE SURE THE AIR IS SAFE PER OSHA STANDARDS OR USE A BREATHING APPARATUS. USE LOW O2, HIGH
CO, OR OTHER APPLICABLE WARNING DEVICES PER REGULATORY REQUIREMENTS.
3. USING A VACUUM TRUCK, REMOVE ANY LIQUID AND SEDIMENTS THAT CAN BE REMOVED PRIOR TO ENTRY.
4. USING A SMALL LIFT OR THE BOOM OF THE VACUUM TRUCK, REMOVE THE USED CARTRIDGES BY LIFTING THEM OUT.
5. ANY CARTRIDGES THAT CANNOT BE READILY LIFTED CAN BE EASILY SLID ALONG THE FLOOR TO A LOCATION THEY CAN BE LIFTED VIA A BOOM
LIFT.
6. WHEN ALL THE CARTRIDGES HAVE BEEN REMOVED, IT IS NOW PRACTICAL TO REMOVE THE BALANCE OF THE SOLIDS AND WATER. LOOSEN THE
STAINLESS CLAMPS ON THE FERNCO COUPLINGS FOR THE MANIFOLD AND REMOVE THE DRAINPIPES AS WELL. CAREFULLY CAP THE MANIFOLD AND THE FERNCO'S AND RINSE THE FLOOR, WASHING AWAY THE BALANCE OF ANY REMAINING COLLECTED SOLIDS.
7. CLEAN THE MANIFOLD PIPES, INSPECT, AND REINSTALL.
8. INSTALL THE EXCHANGE CARTRIDGES AND CLOSE ALL COVERS.
9. THE USED CARTRIDGES MUST BE SENT BACK TO ADS FOR EXCHANGE/RECYCLING AND CREDIT ON UNDAMAGED UNITS.
BAYFILTER INSTALLATION NOTES
1. CONTACT UTILITY LOCATOR TO MARK ANY NEARBY UNDERGROUND UTILITIES AND MAKE SURE IT IS SAFE TO EXCAVATE.
2. REFERENCE THE SITE PLAN AND STAKE OUT THE LOCATION OF THE BAYFILTER VAULT.
3. EXCAVATE THE HOLE, PROVIDING ANY SHEETING AND SHORING NECESSARY TO COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY
REGULATIONS.
4. LEVEL THE SUB–GRADE TO THE PROPER ELEVATION. VERIFY THE ELEVATION AGAINST THE MANHOLE DIMENSIONS, THE INVERT
ELEVATIONS, AND THE SITE PLANS. ADJUST THE BASE AGGREGATE, IF NECESSARY.
5. HAVE THE SOIL BEARING CAPACITY VERIFIED BY A LICENSED/ENGINEER FOR THE REQUIRED LOAD BEARING CAPACITY. ON SOLID
SUB–GRADE, SET THE FIRST SECTION OF THE BAYFILTER PRE–CAST VAULT.
6. CHECK THE LEVEL AND ELEVATION OF THE FIRST SECTION TO ENSURE IT IS CORRECT BEFORE ADDING ANY RISER SECTIONS.
7. IF ADDITIONAL SECTION(S) ARE REQUIRED, ADD A WATERTIGHT SEAL TO THE FIRST SECTION OF THE BAYFILTER VAULT. SET ADDITIONAL
SECTION(S) OF THE VAULT, ADDING A WATERTIGHT SEAL TO EACH JOINT.
8. INSTALL THE PVC OUTLET MANIFOLD.
9. INSTALL THE PVC OUTLET PIPE IN BAYFILTER VAULT.
10. INSTALL THE INLET PIPE TO THE BAYFILTER VAULT.
11. AFTER THE SITE IS STABILIZED, REMOVE ANY ACCUMULATED SEDIMENT OR DEBRIS FROM THE VAULT AND INSTALL THE FLOW DISKS, DRAINDOWN MODULES (IF APPLICABLE), AND THE BAYFILTER CARTRIDGES.
12. PLACE FULL SET OF HOLD DOWN BARS AND BRACKETS INTO PLACE.
BayFilter Maintenance Manual
Maintenance of the BayFilter System
The BayFilter™ system requires periodic maintenance to continue operating at the design efficiency. The maintenance process comprises the removal and replacement of each BayFilter™ cartridge and drain down module and the cleaning of the vault or manhole with a vacuum truck.
BayFilter™ maintenance should be performed by a BaySaver Technologies, Inc. certified maintenance contractor.
The maintenance cycle of the BayFilter™ system will be driven mostly by the actual solids load on the filter. The system should be periodically monitored to be certain it is operating correctly. Since stormwater solids loads can be variable, it is possible that the maintenance cycle could be more or less than the projected duration.
The BayFilter systems in New Development applications are designed to treat the WQv in 24 hours initially. Later in the cycle these cartridges will flow at a slower rate, and when the WQv does not drain down within +/- 40 hours after the storm event, the system must be maintained.
When a BayFilter™ system is first installed, it is recommended that it be inspected every six (6) months. When the filter system exhibits flows below design levels the system should be maintained.
Filter cartridge replacement should also be considered when sediment levels are at or above the level of the 4 inch manifold system. Please contact the BaySaver Technologies Inc. Engineering Department for maintenance cycle estimations or assistance at 1.800.229.7283.
Maintenance Procedures
1. Remove the manhole covers and open all access hatches.
2. Before entering the system make sure the air is safe per OSHA Standards or use a breathing apparatus. Use low O2, high CO, or other applicable warning devices per regulatory requirements.
3. Using a vacuum truck remove any liquid and sediments that can be removed prior to entry.
4. Using a small lift or the boom of the vacuum truck, remove the used cartridges by lifting them out.
5. Any cartridges that cannot be readily lifted directly out of the vault should be removed from their location and carried to the lifting point using the Trolley system installed in the
Vault (if applicable).
6. When all cartridges and drain down modules are removed, remove the balance of the solids and water; then loosen the stainless clamps on the Fernco couplings in the pipe manifold; remove the drain pipes as well. Carefully cap the manifold and the Fernco’s and rinse the floor removing the balance of the collected solids.
7. Clean the manifold pipes, inspect, and reinstall.
8. Install the exchange cartridges and close all covers.
9. The used cartridges must be sent back to BaySaver Technologies, Inc. for exchange/recycling and credit on undamaged units (1302 Rising Ridge Rd, Unit 1; Mt.
Airy, MD 21771. Phone: 800 229-7283)
AS
N
O
TE
D
SHEET
OF
D
AT
E:
PR
O
JE
C
T
D R
AW
N
C H
EC
KE
D
TH
IS
D R
AW
IN
G H
AS
B
EE
N
P R
EP
AR
ED
B
AS
ED
O N
IN
FO
R M
AT
IO
N P
R O
VI
D
ED
T
O A
D S
U N
D
ER
T H
E D
IR
EC
TI
O
N O
F
TH
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R O
R O
TH
ER
P R
O
JE
C T
R
EP
R
ES
EN
TA
TI
VE
TH
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R S
H
AL
L R
EV
IE
W T
H
IS
D R
AW
IN
G P
R
IO
R T
O C
O N
ST
R
U C
TI
O
N
IT
IS
T H
E U
LT
IM
AT
E
R
ES
PO
N
SI
BI
LI
TY
O F
TH
E
SI
TE
D
ES
IG
N
E N
G
IN
EE
R
T O
E N
SU
R
E
TH
AT
T
H E
PR
O
D U
C T(
S) D
EP
IC
TE
D
A N
D A
LL
A
SS
O
C
IA
TE
D
D
ET
AI
LS
M
EE
T
AL
L
AP
PL
IC
AB
LE
L
AW
S, R
EG
U
LA
TI
O N
S, A
N D
P R
O
JE
C T
R
EQ
U
IR
EM
EN
TS
T R
U
EM
AN
B
LV
D
H
IL
LI
AR
D , O
H
AD
VA
N C
ED
D
R
AI
N
AG
E
SY
ST
EM
S, IN
C
R
2 5
/0
4/
S1
KL
J
KL
J
C U
PE
PE
R , V
A
C U
LP
EP
ER
C
EM
ET
ER
Y
D A
T E
D R
W N
C H
K D
D E
S C
R I P
T I O
N
4/
/2
KL
J
KL
J
AD
D
ED
B
FV
4/
/2
KL
J
KL
J
M O
VE
D
B
FV
-1
2-
M D
G M
W U
PD
AT
ED
D
ES
IG
N O
F 3B
P
ER
P R
EC
AS
TE
R
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
SECTION A-A
SCALE : 1/4" = 1'
PLAN VIEW
SCALE : 1/4" = 1'
OUTLET
COLLECTION
MANIFOLD
POLYMER SEAL
INLET DRAINAGE
MATERIAL
MEDIA SPIRAL
OUTLET DRAINAGE
MATERIAL
FLOW CONTROL
ORIFICE
AIR RELEASE VALVE
OUTLET PIPE
INLET PLATE
FILTER LEG
OUTLET
PATHWAY
BAYFILTER
WATER QUALITY FLOW RATE
CARTRIDGE DESIGN FLOW RATE 22.5 GPM
DRAINAGE AREA
# BAYFILTER CARTRIDGES
TREATED SEDIMENT CAPACITY
THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS A
STORMWATER FILTRATION DEVICE DESIGNED TO REMOVE FINE
SEDIMENTS, HEAVY METALS, AND PHOSPORUS. THE BAYFILTER
SYSTEM RELIES ON A SPIRAL WOUND MEDIA FILTER CARTRIDGE
WITH APPROXIMATELY 45 SQUARE FEET OF FILTRATION AREA. THE
FILTER CARTRIDGES ARE HOUSED IN A CONCRETE STRUCTURE
THAT EVENLY DISTRIBUTES THE FLOW BETWEEN CARTRIDGES.
THE SYSTEM IS INLINE WITH AN INTERNAL BYPASS WEIR THAT
ROUTES HIGH INTENSITY STORMS AROUND THE CARTRIDGES. THE
FILTER CARTRIDGES REMOVE POLLUTANTS FROM RUNOFF BY
FILTRATION (INTERCEPTION/ATTACHMENT) AND ADSORPTION.
522 BAYFILTER
0.4 CFS
8-12-8
24" SOLID LID
448.33 ±
60" X 60" TRAFFIC RATED HATCH
3" FLEXIBLE COUPLER
3" PVC TEE W/ FLOWDISK (TYP)
3" PVC OUTLET MANIFOLD
522 BAYFILTER CARTRIDGE (TYP)
3.07'
[36.84"]
3.74' [44.84"]
1.67' [20.04"]
0.50' [6.00"] 0.50'
[6.00"]
444.59 445.09
446.26
STEPS (TYP)
12" OUTLET PIPE
12" INLET PIPE
WEIR
6" INLET ORIFICE
AA
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
*SEDIMENT CAPTURE PER CURRENT NJDEP APPROVAL
CAPTURED SEDIMENT CAPACITY*
12.00'
8.
HOLD DOWN BAR (TYP)
522 BAYFILTER
CARTRIDGE
(TYP)
3" PVC PLUG (TYP)
3" PVC TEE W/FLOW DISK
(TYP EACH CARTRIDGE LOCATION)
3" PVC OUTLET MANIFOLD
12" OUTLET PIPE
INVERT - 444.59
12" INLET PIPE
INVERT - 445.09
3" FLEXIBLE COUPLER (TYP)
VERTICAL DRAIN DOWN MODULE (TYP)
STEPS (TYP)
60" X 60" TRAFFIC
RATED HATCH
24" SOLID LID
WEIR
6" INLET ORIFICE
2.50'
O
TE
D
SHEET
OF
D
AT
E:
PR
O
JE
C
T
D R
AW
N
C H
EC
KE
D
TH
IS
D R
AW
IN
G H
AS
B
EE
N
P R
EP
AR
ED
B
AS
ED
O N
IN
FO
R M
AT
IO
N P
R O
VI
D
ED
T
O A
D S
U N
D
ER
T H
E D
IR
EC
TI
O
N O
F
TH
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R O
R O
TH
ER
P R
O
JE
C T
R
EP
R
ES
EN
TA
TI
VE
TH
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R S
H
AL
L R
EV
IE
W T
H
IS
D R
AW
IN
G P
R
IO
R T
O C
O N
ST
R
U C
TI
O
N
IT
IS
T H
E U
LT
IM
AT
E
R
ES
PO
N
SI
BI
LI
TY
O F
TH
E
SI
TE
D
ES
IG
N
E N
G
IN
EE
R
T O
E N
SU
R
E
TH
AT
T
H E
PR
O
D U
C T(
S) D
EP
IC
TE
D
A N
D A
LL
A
SS
O
C
IA
TE
D
D
ET
AI
LS
M
EE
T
AL
L
AP
PL
IC
AB
LE
L
AW
S, R
EG
U
LA
TI
O N
S, A
N D
P R
O
JE
C T
R
EQ
U
IR
EM
EN
TS
T R
U
EM
AN
B
LV
D
H
IL
LI
AR
D , O
H
AD
VA
N C
ED
D
R
AI
N
AG
E
SY
ST
EM
S, IN
C
R
3 5
/0
4/
S1
KL
J
KL
J
C U
PE
PE
R , V
A
C U
LP
EP
ER
C
EM
ET
ER
Y
D A
T E
D R
W N
C H
K D
D E
S C
R I P
T I O
N
4/
/2
KL
J
KL
J
AD
D
ED
B
FV
4/
/2
KL
J
KL
J
M O
VE
D
B
FV
-1
2-
M D
G M
W U
PD
AT
ED
D
ES
IG
N O
F 3B
P
ER
P R
EC
AS
TE
R
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
SECTION A-A
SCALE : 1/4" = 1'
PLAN VIEW
SCALE : 1/4" = 1'
OUTLET
COLLECTION
MANIFOLD
POLYMER SEAL
INLET DRAINAGE
MATERIAL
MEDIA SPIRAL
OUTLET DRAINAGE
MATERIAL
FLOW CONTROL
ORIFICE
AIR RELEASE VALVE
OUTLET PIPE
INLET PLATE
FILTER LEG
OUTLET
PATHWAY
BAYFILTER
WATER QUALITY FLOW RATE
CARTRIDGE DESIGN FLOW RATE 45 GPM
DRAINAGE AREA
# BAYFILTER CARTRIDGES
TREATED SEDIMENT CAPACITY
THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS A
STORMWATER FILTRATION DEVICE DESIGNED TO REMOVE FINE
SEDIMENTS, HEAVY METALS, AND PHOSPORUS. THE BAYFILTER
SYSTEM RELIES ON A SPIRAL WOUND MEDIA FILTER CARTRIDGE
WITH APPROXIMATELY 90 SQUARE FEET OF FILTRATION AREA. THE
FILTER CARTRIDGES ARE HOUSED IN A CONCRETE STRUCTURE
THAT EVENLY DISTRIBUTES THE FLOW BETWEEN CARTRIDGES.
THE SYSTEM IS INLINE WITH AN INTERNAL BYPASS THAT ROUTES
HIGH INTENSITY STORMS AROUND THE CARTRIDGES. THE FILTER
CARTRIDGES REMOVE POLLUTANTS FROM RUNOFF BY FILTRATION
(INTERCEPTION/ATTACHMENT) AND ADSORPTION.
545 BAYFILTER
0.3 CFS
3A 6-9-3
A A
*SEDIMENT CAPTURE PER CURRENT NJDEP APPROVAL
CAPTURED SEDIMENT CAPACITY*
24" SOLID LID
4.00' [48.00"]
4.67' [56.00"]
2.83' [33.96"]
0.50' [6.00"] 0.50'
[6.00"]
388.03 388.53
390.86
12" OUTLET PIPE
12" INLET PIPE
WEIR
6" INLET ORIFICE
392.70 ±
60" X 60" TRAFFIC RATED HATCH
HOLD DOWN BAR (TYP)
545 BAYFILTER CARTRIDGE (TYP)
6" PVC PLUG (TYP)
6" PVC TEE W/FLOW DISK
(TYP EACH CARTRIDGE LOCATION)
6" PVC OUTLET MANIFOLD
12" OUTLET PIPE
INVERT - 388.03
12" INLET PIPE
INVERT - 388.53
6" FLEXIBLE COUPLER (TYP)
VERTICAL DRAIN DOWN MODULE (TYP)
STEPS (TYP)
60" X 60" TRAFFIC
RATED HATCH
24" SOLID LID
WEIR
6" INLET
ORIFICE
9.00'
2.00'
6.
6" FLEXIBLE COUPLER
6" PVC TEE W/ FLOWDISK (TYP)
6" PVC OUTLET MANIFOLD
545 BAYFILTER
CARTRIDGE (TYP)
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
STEPS (TYP)
12" INLET PIPE
INVERT - 388.53
RIM - 388.27 ±
3.08' [37.00"] 1.67'
[20.04"]
OUTLET - 385.01
BYPASS OPENING - 386.68
0.50' [6.00"]
6" INLET ORIFICE
12"X18"
BYPASS OPENING
SOLID TRENCH COVER (TYP)
WEIR WALL
INLET - 385.65
522 BAYFILTER CARTRIDGE (TYP)
3" FLEXIBLE COUPLER
3" PVC TEE W/FLOW DISK (TYP)
3" PVC OUTLET MANIFOLD
DDMV-1
12" INLET PIPE
12" OUTLET PIPE
0.64' [7.68"]
2.75' [33.00"]
BAFFLE WALL
SURFACE MOUNT FRAME
SURFACE MOUNT FRAME
AS
N
O
TE
D
SHEET
OF
D
AT
E:
PR
O
JE
C
T
D R
AW
N
C H
EC
KE
D
TH
IS
D R
AW
IN
G H
AS
B
EE
N
P R
EP
AR
ED
B
AS
ED
O N
IN
FO
R M
AT
IO
N P
R O
VI
D
ED
T
O A
D S
U N
D
ER
T H
E D
IR
EC
TI
O
N O
F
TH
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R O
R O
TH
ER
P R
O
JE
C T
R
EP
R
ES
EN
TA
TI
VE
TH
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R S
H
AL
L R
EV
IE
W T
H
IS
D R
AW
IN
G P
R
IO
R T
O C
O N
ST
R
U C
TI
O
N
IT
IS
T H
E U
LT
IM
AT
E
R
ES
PO
N
SI
BI
LI
TY
O F
TH
E
SI
TE
D
ES
IG
N
E N
G
IN
EE
R
T O
E N
SU
R
E
TH
AT
T
H E
PR
O
D U
C T(
S) D
EP
IC
TE
D
A N
D A
LL
A
SS
O
C
IA
TE
D
D
ET
AI
LS
M
EE
T
AL
L
AP
PL
IC
AB
LE
L
AW
S, R
EG
U
LA
TI
O N
S, A
N D
P R
O
JE
C T
R
EQ
U
IR
EM
EN
TS
T R
U
EM
AN
B
LV
D
H
IL
LI
AR
D , O
H
AD
VA
N C
ED
D
R
AI
N
AG
E
SY
ST
EM
S, IN
C
R
4 5
/0
4/
S1
KL
J
KL
J
C U
PE
PE
R , V
A
C U
LP
EP
ER
C
EM
ET
ER
Y
D A
T E
D R
W N
C H
K D
D E
S C
R I P
T I O
N
4/
/2
KL
J
KL
J
AD
D
ED
B
FV
4/
/2
KL
J
KL
J
M O
VE
D
B
FV
-1
2-
M D
G M
W U
PD
AT
ED
D
ES
IG
N O
F 3B
P
ER
P R
EC
AS
TE
R
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
SECTION A-A
SCALE : 1/4" = 1'
PLAN VIEW
SCALE : 1/4" = 1'
OUTLET
COLLECTION
MANIFOLD
POLYMER SEAL
INLET DRAINAGE
MATERIAL
MEDIA SPIRAL
OUTLET DRAINAGE
MATERIAL
FLOW CONTROL
ORIFICE
AIR RELEASE VALVE
OUTLET PIPE
INLET PLATE
FILTER LEG
OUTLET
PATHWAY
BAYFILTER
WATER QUALITY FLOW RATE
CARTRIDGE DESIGN FLOW RATE 22.5 GPM
DRAINAGE AREA
# BAYFILTER CARTRIDGES
TREATED SEDIMENT CAPACITY
THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS A
STORMWATER FILTRATION DEVICE DESIGNED TO REMOVE FINE
SEDIMENTS, HEAVY METALS, AND PHOSPORUS. THE BAYFILTER
SYSTEM RELIES ON A SPIRAL WOUND MEDIA FILTER CARTRIDGE
WITH APPROXIMATELY 45 SQUARE FEET OF FILTRATION AREA. THE
FILTER CARTRIDGES ARE HOUSED IN A CONCRETE STRUCTURE
THAT EVENLY DISTRIBUTES THE FLOW BETWEEN CARTRIDGES.
THE SYSTEM IS INLINE WITH AN INTERNAL BYPASS WEIR THAT
ROUTES HIGH INTENSITY STORMS AROUND THE CARTRIDGES. THE
FILTER CARTRIDGES REMOVE POLLUTANTS FROM RUNOFF BY
FILTRATION (INTERCEPTION/ATTACHMENT) AND ADSORPTION.
522 BAYFILTER
0.35 CFS
3B 6-16-7
A A
*SEDIMENT CAPTURE PER CURRENT NJDEP APPROVAL
CAPTURED SEDIMENT CAPACITY*
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
.0
0'
6.00'
2.
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
HOLD DOWN BAR (TYP)
522 BAYFILTER
CARTRIDGE (TYP)
3" PVC PLUG (TYP)
3" PVC TEE W/FLOW DISK
(TYP EACH CARTRIDGE
LOCATION)
3" PVC OUTLET MANIFOLD
12" OUTLET PIPE
INVERT - 385.01
12" INLET PIPE
INVERT - 385.65
3" FLEXIBLE COUPLER (TYP)
VERTICAL DRAIN
DOWN MODULE (TYP)
WEIR
6" INLET ORIFICE
TRENCH COVER (TYP)
TRANSFER HOLE
NOTE:
TRENCH RAILS AND COVERS WILL BE BOLTED TO TOP OF VAULT IN FIELD BY CONTRACTOR.
WHEN THE TRENCH COVERS ARE SET, CONTRACTOR TO PAVE OR BACK FILL UP TO GRADE.
PLAN VIEW WITH TRENCH COVERS
NTS
BOLT HATCH TO
SUPPORT RAIL
(TYP. EACH LOCATION)
SURFACE MOUNT RAIL (TYP.)
O
TE
D
SHEET
OF
D
AT
E:
PR
O
JE
C
T
D R
AW
N
C H
EC
KE
D
TH
IS
D R
AW
IN
G H
AS
B
EE
N
P R
EP
AR
ED
B
AS
ED
O N
IN
FO
R M
AT
IO
N P
R O
VI
D
ED
T
O A
D S
U N
D
ER
T H
E D
IR
EC
TI
O
N O
F
TH
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R O
R O
TH
ER
P R
O
JE
C T
R
EP
R
ES
EN
TA
TI
VE
TH
E
SI
TE
D
ES
IG
N E
N G
IN
EE
R S
H
AL
L R
EV
IE
W T
H
IS
D R
AW
IN
G P
R
IO
R T
O C
O N
ST
R
U C
TI
O
N
IT
IS
T H
E U
LT
IM
AT
E
R
ES
PO
N
SI
BI
LI
TY
O F
TH
E
SI
TE
D
ES
IG
N
E N
G
IN
EE
R
T O
E N
SU
R
E
TH
AT
T
H E
PR
O
D U
C T(
S) D
EP
IC
TE
D
A N
D A
LL
A
SS
O
C
IA
TE
D
D
ET
AI
LS
M
EE
T
AL
L
AP
PL
IC
AB
LE
L
AW
S, R
EG
U
LA
TI
O N
S, A
N D
P R
O
JE
C T
R
EQ
U
IR
EM
EN
TS
T R
U
EM
AN
B
LV
D
H
IL
LI
AR
D , O
H
AD
VA
N C
ED
D
R
AI
N
AG
E
SY
ST
EM
S, IN
C
R
5 5
/0
4/
S1
KL
J
KL
J
C U
PE
PE
R , V
A
C U
LP
EP
ER
C
EM
ET
ER
Y
D A
T E
D R
W N
C H
K D
D E
S C
R I P
T I O
N
4/
/2
KL
J
KL
J
AD
D
ED
B
FV
4/
/2
KL
J
KL
J
M O
VE
D
B
FV
-1
2-
M D
G M
W U
PD
AT
ED
D
ES
IG
N O
F 3B
P
ER
P R
EC
AS
TE
R
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
D ee r H ol lo w
D riv e 1-
0-
BA
YS
AV
ER
M ou nt A iry , M
D
1-
0-
9-
SECTION A-A
SCALE : 1/4" = 1'
PLAN VIEW
SCALE : 1/4" = 1'OUTLET
COLLECTION
MANIFOLD
POLYMER SEAL
INLET DRAINAGE
MATERIAL
MEDIA SPIRAL
OUTLET DRAINAGE
MATERIAL
FLOW CONTROL
ORIFICE
AIR RELEASE VALVE
OUTLET PIPE
INLET PLATE
FILTER LEG
OUTLET
PATHWAY
BAYFILTER
WATER QUALITY FLOW RATE
CARTRIDGE DESIGN FLOW RATE 22.5 GPM
DRAINAGE AREA
# BAYFILTER CARTRIDGES
TREATED SEDIMENT CAPACITY
THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS A
STORMWATER FILTRATION DEVICE DESIGNED TO REMOVE FINE
SEDIMENTS, HEAVY METALS, AND PHOSPORUS. THE BAYFILTER
SYSTEM RELIES ON A SPIRAL WOUND MEDIA FILTER CARTRIDGE
WITH APPROXIMATELY 45 SQUARE FEET OF FILTRATION AREA. THE
FILTER CARTRIDGES ARE HOUSED IN A CONCRETE STRUCTURE
THAT EVENLY DISTRIBUTES THE FLOW BETWEEN CARTRIDGES.
THE SYSTEM IS INLINE WITH AN INTERNAL BYPASS WEIR THAT
ROUTES HIGH INTENSITY STORMS AROUND THE CARTRIDGES. THE
FILTER CARTRIDGES REMOVE POLLUTANTS FROM RUNOFF BY
FILTRATION (INTERCEPTION/ATTACHMENT) AND ADSORPTION.
522 BAYFILTER
0.8 CFS
8-22-16
A A
*SEDIMENT CAPTURE PER CURRENT NJDEP APPROVAL
CAPTURED SEDIMENT CAPACITY*
2.74' [32.92"]
3.41' [40.92"] 0.50'
[6.00"]
385.77 386.27
8" OUTLET PIPE
14" X 40" OUTLET BOX
389.18 ±
72" X 72" HATCH
3" FLEXIBLE COUPLER (TYP)
3" PVC TEE W/ FLOWDISK (TYP)
3" PVC OUTLET MANIFOLD (TYP)
522 BAYFILTER CARTRIDGE (TYP)
HOLD DOWN BAR (TYP)
522 BAYFILTER
CARTRIDGE (TYP)
3" PVC PLUG (TYP)
3" PVC TEE W/FLOW DISK
(TYP EACH CARTRIDGE
LOCATION)
3" PVC OUTLET MANIFOLD
(TYP)
8" OUTLET PIPE
INVERT - 385.77
8" INLET PIPE
INVERT - 386.27
3" FLEXIBLE COUPLER (TYP)
VERTICAL DRAIN DOWN
MODULE (TYP)
72" X 72" HATCH
(TYP 2 PLCS)
PROPOSED DIVERSION
STRUCTURE SHOWN AS
30" NYLOPLAST BASIN
WEIR CREST - 387.44
(TBD BY ENGINEER)
8" INLET PIPE
8.00'
.0
0'
14" X 40" OUTLET BOX
PROPOSED STRUCTURE
SHOWN AS 30"
NYLOPLAST BASIN
(TBD BY ENGINEER)
18" BYPASS PIPE
(SIZE TBD BY ENGINEER)
8" FLEXIBLE COUPLER (TYP)
AREA 1
AREA 3A
AREA 3B
BFV 4
CEMPHIMysliD Text Box
SD1
SD1
SD2
| Culpeper Bay Filters layout.pdf |
| Sheets and Views |
| REV3A- Culpeper Cemetery (148131) 11-11-20-COVER |
| REV3A- Culpeper Cemetery (148131) 11-11-20-2 |
| REV3A- Culpeper Cemetery (148131) 11-11-20-3 |
| REV3A- Culpeper Cemetery (148131) 11-11-20-4 |
| REV3A- Culpeper Cemetery (148131) 11-11-20-5 |
| REV3A- Culpeper Cemetery (148131) 11-11-20-OVERVIEW |
| REV3A- Culpeper Cemetery (148131) 11-11-20-OVERVIEW (2) |
| REV3A- Culpeper Cemetery (148131) 11-11-20-OVERVIEW (3) |
| REV3A- Culpeper Cemetery (148131) 11-11-20-OVERVIEW (4) |
| CNC 1A outfall.pdf |
| CNC 2A outfall.pdf |
| CNC 1b outfall.pdf |
File details come from the government source that posted it. Updated .