SIR 6973GH-26-Q-00078.pdf

PDF 478 KB Posted

Attached to
6973GH-26-Q-00078- Refurbish, repair, paint Ext. Maint. Bldg. TKO VOR in Mankato, KS
Solicitation number
6973GH-26-Q-00078
Issued by

About this file

This is a Screening Information Request (SIR) and Solicitation for construction services issued by the Federal Aviation Administration (FAA) Aeronautical Center. The FAA seeks qualified contractors to perform refurbishment, repair, and painting of the TKO VOR (VHF Omnidirectional Range) equipment building located in Mankato, Kansas. The procurement is a total small business set-aside with an estimated price range of $10,000–$50,000 and will be awarded as a firm fixed-price contract to the lowest-priced responsible offeror.

Proposals must be submitted electronically to Sheryl Gregory (sheryl.y.gregory@faa.gov) by April 20, 2026, at 5:00 PM CST. The contractor must begin performance within 15 calendar days of receiving the notice to proceed and complete all work within 45 calendar days. Key deliverables include comprehensive labor, materials, equipment, supervision, and all incidental work necessary for building refurbishment and exterior painting in accordance with attached technical specifications (10 pages) and drawings (1 page). The contractor must coordinate daily work activities with the Resident Engineer/Contracting Officer's Representative and is prohibited from working at the site without FAA personnel present as an escort. Applicable wage determinations (KS20260044, dated 01/02/2026) apply. The contract includes numerous standard FAA clauses addressing safety, environmental compliance, records management, personnel security, electronic invoicing, and compliance with federal acquisition regulations, including requirements for small business subcontracting, Davis-Bacon Act prevailing wages, and various federal policy provisions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED BID (RFP)

CS-26-00664

AAQ-720 DIVERSIFIED FRANCHISE ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ720-AFN

OKLAHOMA CITY OK 73125

ATTN: Sheryl Gregory, AAQ-720

6500 S. MacArthur Blvd., Bldg.14-AHQ, RM233A Oklahoma City, OK 73169

Sheryl Gregory 405-954-8204 x 63

PURCHASE REQUEST NO.

6973GH-26-Q-00078

10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Proposals are due on April 20, 2026 at 5:00 pm CST. Proposals will not be accepted after this timeframe.

o This acquisition is Set Aside for Total Small Business.

o The estimated price range of this procurement is $10,000-$50,000 o Please see the Technical Specifications for the Refurbishment, repair, paint of exterior bldg. TKO VOR; 10 pages.

o Please see Drawings TKO VOR; 1 page o Please see the Wage Determination; KS20260044 01/02/2026; 6 pages.

11. The Contractor shall begin performance within

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and is not required.is, B. An offer guarantee

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.

D. Offers providing less than

12B. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in item 12B.)

15 45 calendar days and complete it within ________________ ________________ calendar days after receiving x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.

04/13/2026

Sheryl Gregory Highlight

Sheryl Gregory Highlight

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (MUST BE FULLY COMPLETED BY OFFEROR)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Contract Authority)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE

BY

2PAGE OF

AAQ-720 DIVERSIFIED FRANCHISE ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ720-AFN

OKLAHOMA CITY OK 73125

Janice K. Hammonds

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

Continued...

x

Sheryl Gregory Highlight

Sheryl Gregory Highlight

Sheryl Gregory Highlight

Sheryl Gregory Highlight

Sheryl Gregory Highlight

Sheryl Gregory Highlight

Sheryl Gregory Highlight

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 63

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

6973GH-26-Q-00078

(A) (B) (C) (D) (E) (F)

JCN: 602408

00001 The contractor is responsible for furnishing all materials (unless noted otherwise in the contract documents), equipment, labor, transportation, insurance, notifications, licenses, permits, fees and supervision necessary for the refurbishment, repair and painting of the TKO VOR equipment building in Mankato, KS in accordance with the applicable drawings, specifications and conditions of the contract.

Electronic & IT: 03

Section A - Solicitation/Contract Form Clauses

Section B - Supplies or Services/Prices Section B - Schedule

Clause List

The remainder of this page has been intentionally left blank.

Section C - Description/Specifications Scope of Work

C.1 STATEMENT OF WORK (SOW) OVERVIEW

The contractor must furnish all labor, tools, materials, equipment, and supplies, necessary to accomplish the construction project set forth, in accordance with the attached technical specifications, drawings, and all other terms, conditions, and provisions as set forth herein.

The Contractor must coordinate and report each day’s work in advance with the Resident Engineer/COR. The Contractor will not be allowed to or to work at the site without the RE/COR on site to serve as an escort.

Clause List

AC4548 EMERGENCY SITUATIONS AND EXERCISES DURING CONTRACT PERFORMANCE

(JUL 2015)

(a) Emergency situations and exercises are temporary exceptions to the prohibition of contractor personnel not being subject to the direction and control of Government personnel when performing non-personal contract services in FAA facilities.

(b) All contractor personnel at a FAA work site or facility during an actual emergency shall conform to the procedures posted or directed by FAA officials responsible for emergency response at that site or facility. Such officials include evacuation wardens/monitors, security personnel, Emergency Readiness Officers, management, etc.

(c) Contractor personnel shall participate in all emergency exercises, including evacuations, as part of performance under this contract. On rare occasions and based on advance arrangements that are then announced at the time of an exercise, contractor personnel will be excused from evacuations.

(d) Contractor management/supervisors shall ensure that each contractor employee assigned work in FAA facilities possesses a general awareness of emergency and evacuation procedures at all locations where the employees might be during an emergency or exercise. Information on emergency procedures may be requested from the Contracting Officer’s Representative (COR) or a designated FAA contact point at the work site.

Section D - Packaging and Marking

Section E - Inspection and Acceptance Clause List

E.1 INSPECTION

The Contracting Officer or his authorized representative may at all reasonable times inspect or otherwise evaluate the work being performed hereunder and the premises on which it is being performed. If any inspection or evaluation is made on the premises of the vendor or his subcontractor, the vendor must provide and must require his subcontractors to provide all reasonable facilities and assistance for the safety and convenience of the Government representatives in the performance of their duties. All inspections and evaluations must be performed in such a manner as will not unduly delay the work.

3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)

3.10.4-11 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS

(APR 1996)

Section F - Deliveries or Performance

Section G - Contract Administration Data Clause List

3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR

2012)

(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within to be determined calendar days prior to the notice to proceed. COR duties may include, but are not limited to:

(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.

(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.

(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:

(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;

(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;

(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and

(4) final acceptance under the contract.

(End of clause)

AC1227 RELEASE FORM (JAN 1997)

The contractor will be required to execute Contractor's Release Form DOT

F 4220.4 (2-71) prior to final payment under the contract. (Note: A copy of

Form DOT F 4220.4 (2-71) is attached hereto for information purposes.)

Section H - Special Contract Requirements Clause List

H.1 PERMITS AND RESPONSIBILITIES

The Contractor must secure and pay for all permits, licenses, special inspections, etc.., required in the execution of the work, whether of a permanent or temporary nature.

Limit work to normal business working hours Monday through Friday, length of work day is no less than 8 hours and no more than 10 hours., unless otherwise indicated. No work will be scheduled or performed on Saturdays, Sundays, federal holidays, or during holiday maintenance moratorium periods, unless approved by the FAA in writing. Deviation from this work schedule may be discussed prior to the Notice to Proceed date during the Pre-Construction Conference. Additional changes/requests to agreed upon work schedule must be submitted to the COR and forwarded to the CO for approval. All work beyond normal work hours must be requested in writing to the COR 48 hours in advance.

H.2 PRESS RELEASE INFORMATION

The FAA’s Office of Communications must review and approve all marketing materials, including press releases and articles about the work being performed under the contract on behalf of the agency, prior to release. Media inquiries about work being performed under the contract on behalf of the agency must be referred to the FAA Contracting Officer AND FAA’s Office of Communications at pressoffice@faa.gov.”

H.3 FAA 2026 Moratorium Dates

Memorial Day May 21, 2026 to May 26, 2026

Independence Day July 1, 2026 to July 6, 2026

Labor Day September 3, 2026 to September 8, 2026

Thanksgiving November 21, 2026 to November 30, 2026 Hard Moratorium:

November 25, 2026 to November 27, 2026

Christmas- New Year December 19, 2026-January 4, 2027

H.4 2026 FEDERAL HOLIDAYS

Date Holiday

Thursday, January 01 New Year’s Day

Monday, January 19 Birthday of Martin Luther King, Jr.

Date Holiday

Monday, February 16* Washington’s Birthday

Monday, May 25 Memorial Day

Friday, June 19 Juneteenth National Independence Day

Friday, July 03** Independence Day

Monday, September 07 Labor Day

Monday, October 12 Columbus Day

Wednesday, November 11 Veterans Day

Thursday, November 26 Thanksgiving Day

Friday, December 25 Christmas Day

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section

5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.

(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:

Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.

(End of Clause)

Section I - Contract Clauses Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023)

3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024)

3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024)

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024)

3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2024)

3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2024)

3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2024)

3.2.2.3-48 OTHER CONTRACTS (JUL 2024)

3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS (JUL 2024)

3.2.2.3-51 OPERATIONS AND STORAGE AREAS (JUL 2024)

3.2.2.3-52 USE AND POSSESSION BEFORE THE PROJECT IS COMPLETE (JUL 2024)

3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2024)

3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2024)

3.2.2.3-55 AVAILABILITY AND USE OF UTILITY SERVICES (JUL 2024)

3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2024)

3.2.2.3-58 LAYOUT OF WORK (JUL 2024)

3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2024)

3.2.2.3-66 CONTRACTOR'S DAILY LOG (JUL 2024)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)

3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (OCT 2015)

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)

3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)

3.2.5-1 OFFICIALS NOT TO BENEFIT (OCT 2024)

3.2.5-3 GRATUITIES OR GIFTS (OCT 2024)

3.2.5-4 CONTINGENT FEES (OCT 2024)

3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2024)

3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 2024)

3.3.1-9 INTEREST (APR 2023)

3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)

3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS

(OCT 2012)

3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD

MANAGEMENT (OCT 2024)

3.4.1-7 NOTICE TO PROCEED (OCT 2019)

3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (OCT 2020)

3.4.1-12 INSURANCE (OCT 2019)

3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (APR 2025)

3.5-4 PATENT INDEMNITY - CONSTRUCTION CONTRACTS (JAN 2009)

3.6.1-1 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2019)

3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-

DISABLED VETERAN OWNED, AND HUBZONE SMALL BUSINESS CONCERNS (APR 2025)

3.6.1-4 SMALL BUSINESS SUBCONTRACTING PLAN (APR 2025)

3.6.1-7 LIMITATIONS ON SUBCONTRACTING (JUL 2021)

3.6.1-11 MENTOR-PROTEGE REQUIREMENTS AND EVALUATION (APR 2025)

3.6.1-15 POST-AWARD SMALL BUSINESS PROGRAM RE-REPRESENTATION (JUL 2023)

3.6.2-1 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME

COMPENSATION (OCT 2018)

3.6.2-2 CONVICT LABOR (APR 2025)

3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (APR 2022)

3.6.2-13 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (APR 2022)

3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (APR 2025)

3.6.2-18 DAVIS BACON ACT (APR 2025)

3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (APR 2025)

3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2025)

3.6.2-21 APPRENTICES AND TRAINEES (APR 2025)

3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (APR 2025)

3.6.2-28 SERVICE CONTRACT LABOR STANDARDS (APR 2025)

3.6.2-31 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS-

PRICE ADJUSTMENT (APR 2025)

3.6.2-39 TRAFFICKING IN PERSONS (OCT 2024)

3.6.2-44 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (APR 2025)

3.6.2-46 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (APR 2025)

3.6.3-7 WASTE MANAGEMENT AND POLLUTION PREVENTION (APR 2025)

3.6.3-8 ALTERNATIVES TO PRODUCTS CONTAINING OZONE DEPLETING SUBSTANCES

AND HYDROFLUOROCARBONS (APR 2025)

3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (OCT 2024)

3.6.3-19 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (APR 2025)

3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2024)

3.6.4-5 FAA BUY AMERICAN PREFERENCE - STEEL AND MANUFACTURED GOODS (APR

2022)

3.6.4-8 BUY AMERICAN ACT AND FAA BUY AMERICAN PREFERENCE - USMCA

IMPLEMENTATION ACT - BALANCE OF PAYMENTS PROGRAM (JAN 2024)

3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)

3.6.6-1 DRUG FREE WORKPLACE (APR 2023)

3.6.6-2 SEAT BELT USE BY CONTRACTOR EMPLOYEES (APR 2023)

3.6.6-3 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JUL 2023)

3.8.9-2 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (JUL 2023)

3.9.1-1 CONTRACT DISPUTES (JAN 2020)

3.9.1-2 PROTEST AFTER AWARD (AUG 1997)

3.10.1-7 BANKRUPTCY (APR 1996)

3.10.1-8 SUSPENSION OF WORK (SEP 1998)

3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF

IMPROVEMENTS (JUL 2023)

3.10.1-16 CHANGES AND CHANGED CONDITIONS (JUL 2023)

3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)

3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)

3.10.1-28 CHANGES REQUIRED BY AMS (JAN 2024)

3.10.2-6 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS

(APR 2025)

3.10.4-23 CONTRACTOR AND SUBCONTRACTOR COMPLIANCE WITH FASTENER ACT (NOV

1997)

3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT

1996)

3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)

3.11-62 PREFERENCE FOR PRIVATELY OWNED U.S. FLAG COMMERCIAL VESSELS (APR

2025)

3.13-14 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (APR 2025)

3.2.2.3-41 PERFORMING WORK (APR 2024)

The Contractor must perform, using its own organization, work equivalent to at least 51 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if the Contractor requests a reduction and the CO determines that it would be to the FAA's advantage to do so.

(End of clause)

3.2.2.3-44 PHYSICAL DATA (JUL 2024)

Data and information the FAA provides or refers to below is for the Contractor's information. The FAA is not responsible for any interpretation or conclusions drawn from the data or information from the Contractor. Further, the FAA does not warrant construction methodology which may be included in these documents.

(a) The descriptions of physical conditions on the drawings and in the specifications are the result of site investigations by the on-site engineer.

(b) Other relevant information it is the Contractor's responsibility to obtain weather patterns for the area, inspect the site in a manner which will provide the Contractor sufficient information concerning the site conditions in order to complete the project within the stated amount of time.

(End of clause)

3.2.2.3-50 PROPERTY PROTECTION (JUL 2024)

(a) The Contractor must construct and maintain any temporary fences, gates and other facilities needed to preserve crops, control livestock, and protect property. Before cutting a fence, the Contractor must take necessary precautions to prevent livestock from straying. The Contractor must prevent loss of tension in or damage to adjacent portions of the fence. The Contractor must immediately replace all fencing and gates cut, removed, damaged, or destroyed with new materials to the original standard. Undamaged gates may be reused.

(b) The Contractor must comply with the property owner's requests to leave gates open or closed.

(c) The Contractor must use all necessary precautions to avoid destroying surveying markers such as section corners, witness trees, property corners, mining claim markers, bench markers, triangulation stations, and the like. If the Contractor must destroy any marker, the Contractor must first notify the agency responsible for the marker, as well as the Contracting Officer's (CO) representative, and replace the markers.

(d) The Contractor must use care to prevent unnecessary damage to property in or near the work area caused by the Contractor's work. Unnecessary damage is that which the Contractor can avoid through efficient and careful performance of the work, considering the Contractor's land rights. If the Contractor damages any property, the Contractor must at once notify the owner or custodian and make or arrange to make prompt and full restitution.

(e) Maps and specifications the FAA provides may not give the location of all water supply, drainage, irrigation, and other underground facilities. Before entering a tract of land for contract purposes, the Contractor must determine from the property owner (or other reasonably available source) the location of any irrigation system, domestic water system, source of water, and drainage system existing on the property, whether serving that property or other property. The Contractor must avoid damaging or obstructing these facilities or polluting water supplies.

(f) The Contractor must hold the FAA harmless from any and all suits, actions, and claims for damages, including environmental impairment, to property arising from any of the Contractor's acts or omissions, the Contractor's subcontractors, or any of the Contractor's employees or subcontractor employees, in any way related to the work or operations under this contract.

(g) The Contractor must indemnify and hold harmless the property owners or parties lawfully in possession against all claims or liabilities asserted by third parties, including all governmental agencies, resulting directly or indirectly from the Contractor's wrongful or negligent acts or omissions.

(End of clause)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (JUL 2024)

(a) If either the specifications or the drawings (but not both) mention tasks, the Contractor must assume that the tasks are in both. If the drawings and specifications differ, the specifications govern. If there is a discrepancy in the figures, in the drawings, or in the specifications, the Contractor must submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify the Contractor in writing. Any adjustment made by the Contractor without the CO's determination is at the Contractor's own risk and expense. As needed, the CO will provide necessary detailed drawings and other information, unless otherwise provided.

(b) Wherever in the specifications or the drawings, the FAA uses "directed," "required," "ordered," "designated," "prescribed," or similar words, they refer to the CO's requirements. Similarly, "approved," "acceptable," "satisfactory," or similar words refer to the CO's approval, unless otherwise expressly stated. The Contractor must have a complete set of plans and specifications on-site and available for the FAA's use.

(c) Where the FAA uses "as shown," "as indicated," "as detailed," or similar words, they refer to the drawings accompanying this contract, unless stated otherwise. The word "provided" means "provided and installed."

(d) Omissions from the drawings and specifications or the erroneous description of details of work which are necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve the Contractor from performing those omitted or erroneously described details of the work. The Contractor must perform them as if fully and correctly set forth and described in the drawings and specifications.

(e) The Contractor must check all drawings the FAA provides before starting work and must promptly notify the CO of any discrepancies. In general, the Contractor should follow figures marked on drawings, rather than scale measurements. In general, large-scale drawings have precedence over small-scale drawings. The Contractor must compare all drawings and verify the figures before laying out the work. If the Contractor does not verify the figures, the Contractor will be responsible for any errors that might have been avoided had it verified them.

(f) "Shop drawings" means drawings, the Contractor or any subcontractor submit to the FAA under a construction contract, showing in detail the proposed fabrication and assembly of structural elements and the installation (that is, form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials the Contractor provided to explain in detail specific portions of the work the contract requires.

The FAA may duplicate, use, and disclose in any manner and for any purpose shop drawings you deliver under this contract.

(g) If this contract requires material offers (for example, shop drawings, catalog cuts, certificates of conformance), the Contractor must coordinate all of its offers, and review them for accuracy, completeness, and compliance with contract requirements. The Contractor must provide evidence that it approves the submittals. If the Contractor submits materials to the FAA without this evidence, the FAA may return them and ask the Contractor to resubmit the materials. The CO will indicate whether he or she approves or disapproves the offer, and if the CO does not approve it as submitted, will indicate the reasons for rejecting it. Any work done before the CO's approval is at the Contractor's risk. The CO's approval does not relieve the Contractor from responsibility for any errors or omissions in the submittals, nor from responsibility for complying with the contract requirements, except as described under (h).

(h) If the submittals vary from the contract requirements, the Contractor must describe the variations in writing, separate from the submittal, when it submits them. Send this description, a copy of the offer, and a proposal to incorporate it into the contract directly to the CO. If the CO approves a variation, the CO must issue an appropriate contract modification, unless the variation is minor or does not involve a change in price or in time of performance.

(i) The Contractor must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. The CO will keep three sets (unless otherwise indicated) of all offers and will return one set to the Contractor.

(j) The Contractor must insert this clause, with appropriate changes in the designation of the parties, in all subcontracts.

(End of clause)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (JUL 2024) - ALTERNATE I

(JUL 2024)

(a) If either the specifications or the drawings (but not both) mention tasks, the Contractor must assume that the tasks are in both. If the drawings and specifications differ, the specifications govern. If there is a discrepancy in the figures, in the drawings, or in the specifications, the Contractor must submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify the Contractor in writing. Any adjustment made by the Contractor without the CO's determination is at the Contractor's own risk and expense. As needed, the CO will provide necessary detailed drawings and other information, unless otherwise provided.

(b) Wherever in the specifications or the drawings, the FAA uses "directed," "required," "ordered," "designated," "prescribed," or similar words, they refer to the CO's requirements. Similarly, "approved," "acceptable," "satisfactory," or similar words refer to the CO's approval, unless otherwise expressly stated. The Contractor must have a complete set of plans and specifications on-site and available for the FAA's use.

(c) Where the FAA uses "as shown," "as indicated," "as detailed," or similar words, they refer to the drawings accompanying this contract, unless stated otherwise. The word "provided" means "provided and installed."

(d) Omissions from the drawings and specifications or the erroneous description of details of work which are necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve the Contractor from performing those omitted or erroneously described details of the work. The Contractor must perform them as if fully and correctly set forth and described in the drawings and specifications.

(e) The Contractor must check all drawings the FAA provides before starting work and must promptly notify the CO of any discrepancies. In general, the Contractor should follow figures marked on drawings, rather than scale measurements. In general, large-scale drawings have precedence over small-scale drawings. The Contractor must compare all drawings and verify the figures before laying out the work. If the Contractor does not verify the figures, the Contractor will be responsible for any errors that might have been avoided had it verified them.

(f) "Shop drawings" means drawings, the Contractor or any subcontractor submit to the FAA under a construction contract, showing in detail the proposed fabrication and assembly of structural elements and the installation (that is, form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials the Contractor provided to explain in detail specific portions of the work the contract requires.

The FAA may duplicate, use, and disclose in any manner and for any purpose shop drawings you deliver under this contract.

(g) If this contract requires material offers (for example, shop drawings, catalog cuts, certificates of conformance), the Contractor must coordinate all of its offers, and review them for accuracy, completeness, and compliance with contract requirements. The Contractor must provide evidence that it approves the submittals. If the Contractor submits materials to the FAA without this evidence, the FAA may return them and ask the Contractor to resubmit the materials. The CO will indicate whether he or she approves or disapproves the offer, and if the CO does not approve it as submitted, will indicate the reasons for rejecting it. Any work done before the CO's approval is at the Contractor's risk. The CO's approval does not relieve the Contractor from responsibility for any errors or omissions in the submittals, nor from responsibility for complying with the contract requirements, except as described under (h).

(h) If the submittals vary from the contract requirements, the Contractor must describe the variations in writing, separate from the submittal, when it submits them. Send this description, a copy of the offer, and a proposal to incorporate it into the contract directly to the CO. If the CO approves a variation, the CO must issue an appropriate contract modification, unless the variation is minor or does not involve a change in price or in time of performance.

(i) The Contractor must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. The CO will keep three sets (unless otherwise indicated) of all offers and will return one set to the Contractor.

(j) The Contractor must insert this clause, with appropriate changes in the designation of the parties, in all subcontracts.

(k) When the Contractor finishes the work under this contract, it must provide the Contracting Officer’s Representative (COR) complete reproducible sets of all shop drawings as the FAA provides final approval. These drawings must show all changes and revisions made up to the time the Contractor finishes the work and the FAA accepts it.

(End of clause)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (JUL 2024) - ALTERNATE

II (JUL 2024)

(a) If either the specifications or the drawings (but not both) mention tasks, the Contractor must assume that the tasks are in both. If the drawings and specifications differ, the specifications govern. If there is a discrepancy in the figures, in the drawings, or in the specifications, the Contractor must submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify the Contractor in writing. Any adjustment made by the Contractor without the CO's determination is at the Contractor's own risk and expense. As needed, the CO will provide necessary detailed drawings and other information, unless otherwise provided.

(b) Wherever in the specifications or the drawings, the FAA uses "directed," "required," "ordered," "designated," "prescribed," or similar words, they refer to the CO's requirements. Similarly, "approved," "acceptable," "satisfactory," or similar words refer to the CO's approval, unless otherwise expressly stated. The Contractor must have a complete set of plans and specifications on-site and available for the FAA's use.

(c) Where the FAA uses "as shown," "as indicated," "as detailed," or similar words, they refer to the drawings accompanying this contract, unless stated otherwise. The word "provided" means "provided and installed."

(d) Omissions from the drawings and specifications or the erroneous description of details of work which are necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve the Contractor from performing those omitted or erroneously described details of the work. The Contractor must perform them as if fully and correctly set forth and described in the drawings and specifications.

(e) The Contractor must check all drawings the FAA provides before starting work and must promptly notify the CO of any discrepancies. In general, the Contractor should follow figures marked on drawings, rather than scale measurements. In general, large-scale drawings have precedence over small-scale drawings. The Contractor must compare all drawings and verify the figures before laying out the work. If the Contractor does not verify the figures, the Contractor will be responsible for any errors that might have been avoided had it verified them.

(f) "Shop drawings" means drawings, the Contractor or any subcontractor submit to the FAA under a construction contract, showing in detail the proposed fabrication and assembly of structural elements and the installation (that is, form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials the Contractor provided to explain in detail specific portions of the work the contract requires.

The FAA may duplicate, use, and disclose in any manner and for any purpose shop drawings you deliver under this contract.

(g) If this contract requires material offers (for example, shop drawings, catalog cuts, certificates of conformance), the Contractor must coordinate all of its offers, and review them for accuracy, completeness, and compliance with contract requirements. The Contractor must provide evidence that it approves the submittals. If the Contractor submits materials to the FAA without this evidence, the FAA may return them and ask the Contractor to resubmit the materials. The CO will indicate whether he or she approves or disapproves the offer, and if the CO does not approve it as submitted, will indicate the reasons for rejecting it. Any work done before the CO's approval is at the Contractor's risk. The CO's approval does not relieve the Contractor from responsibility for any errors or omissions in the submittals, nor from responsibility for complying with the contract requirements, except as described under (h).

(h) If the submittals vary from the contract requirements, the Contractor must describe the variations in writing, separate from the submittal, when it submits them. Send this description, a copy of the offer, and a proposal to incorporate it into the contract directly to the CO. If the CO approves a variation, the CO must issue an appropriate contract modification, unless the variation is minor or does not involve a change in price or in time of performance.

(i) The Contractor must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. The CO will keep three sets (unless otherwise indicated) of all offers and will return one set to the Contractor.

(j) The Contractor must insert this clause, with appropriate changes in the designation of the parties, in all subcontracts.

(k) When the Contractor finishes the work under this contract, it must provide the COR & CO one (1) complete sets of all shop drawings as the FAA provides final approval. These drawings must show all changes and revisions made up to the time the Contractor finishes the work and the FAA accepts it.

(End of clause)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014) - ALTERNATE I (JUL 2004)

(a) Before beginning work, the Contractor (you) must:

(1) Perform a hazards analysis of the work specified in this contract. Consider both the site and adjacent conditions.

Identify all significant hazards. Some of the hazards you might encounter are falling from structures, tripping, electrical shock, fire, falling objects, environmental hazards, vehicular accidents, etc.

(2) Submit a safety plan for dealing with each specific hazard identified, whether you or FAA identified it.

(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding about the content and implementation of the plan.

(4) The CO or her or his representatives may require other hazards to be added to the plan. If the CO determines that your planned hazard avoidance measures are insufficient, the CO or a designated representative may require you to revise the plan. You may not begin work involving identified hazards unless you have submitted adequate plans to the CO and the CO has reviewed them. This approval does not relieve you of your liability for safe performance.

(End of clause)

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2024)

The Contractor must (a) begin work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) perform the work diligently, and (c) complete the entire work ready for use not later than 45 calendar days after Notice to Proceed is issued. The time stated for completion must include final cleanup of the premises.

(End of clause)

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETING WORK (JUL 2024) -

ALTERNATE I (JUL 2024)

The Contractor must (a) begin work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) perform the work diligently, and (c) complete the entire work ready for use not later than 45 days after the Notice to Proceed is issued. The time stated for completion must include final cleanup of the premises.

(d) The completion date is based on the assumption that the successful offeror will receive the notice to proceed by to be determined. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds to FAA within the time specified in the offer.

(End of clause)

3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (OCT 2024)

(a) The FAA will pay the Contractor the contract price as provided in this contract.

(b) The FAA will make financing payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer (CO), on estimates of work accomplished that meets the standards of quality established under the contract, as approved by the CO. The Contractor must furnish a breakdown of the total contract price showing the amount included therein for each principal category of the work, which must substantiate the payment amount requested in order to provide a basis for determining financing payments, in such detail as requested by the CO. In the preparation of estimates, the CO may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site may also be taken into consideration if --

(1) Consideration is specifically authorized by this contract; and

(2) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.

(c) Along with each request for financing payments, the contractor must furnish the following certification, or payment will not be made:

I hereby certify, to the best of my knowledge and belief, that-

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) Payments to subcontractors and suppliers have been made from previous payments received under the contract, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of chapter 39 of Title 31, United States Code; and

(3) This request for financing payments does not include any amounts that the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract.

[enter name] (Name) [enter title] (Title) [enter date] (Date)

(d) If the Contractor, after making a certified request for financing payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the unearned amount), the Contractor must-

(1) Notify the CO of such performance deficiency;

(2) Be obligated to pay the FAA an amount (computed by the CO in the manner provided in "Interest" clause) equal to interest on the unearned amount from the date of receipt of the unearned amount until-

(i) The date the Contractor notifies the CO that the performance deficiency has been corrected; or

(ii) The date the Contractor reduces the amount of any subsequent certified request for financing payments by an amount equal to the unearned amount.

(e) If the CO finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the CO will authorize payment to be made in full. However, if satisfactory progress has not been made, the CO may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the CO may retain from previously withheld funds and future financing payments that amount the CO considers adequate for protection of the FAA and will release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment will be made for the completed work without retention of a percentage.

(f) All material and work covered by financing payments made will, at the time of payment, become the sole property of the FAA, but this will not be construed as--

(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or

(2) Waiving the right of the FAA to require the fulfillment of all the terms of the contract.

(g) In making these financing payments, the FAA will, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) above will not apply to that portion of financing payments attributable to bond premiums.

(h) The FAA will pay the amount due the Contractor under this contract after-

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed voucher; and

(3) Presentation of release of all claims against the FAA arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned.

(i) Notwithstanding any provision of this contract, financing payments will not exceed 80 percent on work accomplished on undefinitized contract actions. A contract action is any action resulting in a contract, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the "Changes" clause, or funding and other administrative changes.

(End of clause)

3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (JAN 2024)

(a) Definitions. As used in this clause

"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the Unique Identity Identifier (UEI) or the Electronic Funds Transfer indicator, into the SAM database.

"System for Award Management (SAM) database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

"Unique Entity Identifier (UEI)" (also known as the Unique Entity ID) means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

"Electronic Funds Transfer indicator" means a 4-character suffix to the Unique Entity Identifier. This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.