BLANK -TKO VOR EIFS REPAIR Painting SOV.xls

XLS spreadsheet 39 KB Posted

Attached to
6973GH-26-Q-00078- Refurbish, repair, paint Ext. Maint. Bldg. TKO VOR in Mankato, KS
Solicitation number
6973GH-26-Q-00078
Issued by

About this file

This is a blank Schedule of Values (SOV) template for a construction project to refurbish the exterior of the TKO VOR (VHF Omnidirectional Range) maintenance building located in Mankato, Kansas. The SOV outlines ten line items for the Federal Aviation Administration (FAA) project, including mobilization and temporary facilities; EIFS (Exterior Insulation and Finish Systems) cleaning, surface preparation, and repairs; sealant removal and replacement at all penetrations; elastomeric coating application in two coats; exterior painting of wood, vent hoods, conduit, boxes, and panels; concrete foundation preparation and painting; wood framing and vented vinyl soffit system installation; propane tank bollard preparation and painting; and final site cleanup and restoration. The template includes columns for unit of measure, quantity, unit cost, and item cost, but contains no populated pricing data. This is a firm-fixed-price construction contract with a proposal due date of April 20, 2026, at 5:00 p.m. CST to Sheryl Gregory (sheryl.y.gregory@faa.gov). All contractors must be registered in the System for Award Management (SAM.gov) by the proposal deadline. The FAA is responsible for providing specifications, drawings, and other contract documents, while the contractor must furnish all materials, equipment, labor, transportation, insurance, and necessary supervision to complete the work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF VALUES (SOV)
Project/Location: Refurbish TKO VOR Building Exterior - Mankato, KS
Item #:Work Item:Unit:Quantity:Unit Cost:Item Cost:
1Mobilization, travel, temporary facilities (porta-john)Job
2EIFS Cleaning & Surface PreparationSF
3EIFS RepairsJob
4Remove & Replace Sealant at All PenetrationsJob
5Elastomeric Coating – 2 Coats (entire EIFS surface)SF
6Exterior Painting – Wood, Vent Hoods, Conduit, Boxes, PanelsJob
7Concrete Foundation Prep & PaintLF
8Install Wood Framing & Vented Vinyl Soffit SystemJob
9Prep & Paint Propane Tank BollardsEA
10Clean up and restore siteJob
Total:
Signed: ____________________________________ Date: _____________