SIR 692M15-21-R-00001 3-16-2022.pdf
PDF 721 KB Posted
- Attached to
- Screening Information Request (SIR) Information Technology Innovative Procurement for Strategic Sourcing (ITIPSS) Federal contract opportunity
- Solicitation number
- 692M15-21-R-00001
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD
3. SOLICITATION TYPE1. CONTRACT NO. 2. SOLICITATION NUMBER
6. ISSUED BY CODE 7. ADDRESS OFFER TO (If other than Item 6)
5. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder"
NEGOTIATED BID (RFP)
SEALED BID (IFB)
4. DATE ISSUED
PAGE OF PAGES
1 129
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
9. FOR
INFORMATION
CALL
CAUTION: LATE Submissions, Modifications and Withdrawals. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 7, or if hand carried, in the
SOLICITATION
8. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTR., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECS./WORK STATEMENT
SUPPLIES OR SERVICES AND PRICE/COST
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
10. TABLE OF CONTENTS
17. OFFER DATE16. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
14C. CHECK IF REMITTANCE ADDRESS
EXT.NUMBERAREA CODE
14B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE FACILITY
15. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER14A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
13. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)12. DISCOUNT FOR PROMPT PAYMENT the designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above , to furnish any or all items upon which prices are offered at the price set opposite each item , delivered at
11. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted
NOTE: Item 11 does not apply if the solicitation includes Minimum Bid Acceptance Period .
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or by other authorized official written notice.
27. AWARD DATE
(Signature of Contracting Officer)
26. CONTRACT AUTHORITY
24. PAYMENT WILL BE MADE BY
25. NAME OF CONTRACTING OFFICER (Type or print)
CODE 23. ADMINISTERED BY (If other than Item 6)
ITEM
(4 copies unless otherwise specified)
22. SUBMIT INVOICES TO ADDRESS SHOWN IN21. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
20. ACCOUNTING AND APPROPRIATION19. AMOUNT18. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by CONTRACT AUTHORITY)
CODE
03/16/2022 X
AAQ640-AFN
AAQ-640 AIT Branch B FAA William J. Hughes Technical Center Building 300, Fourth Floor Atlantic City International Airport Atlantic City NJ 08405
1700 ES 04/29/2022
Stefanie M. Applegate 609
STEFANIE.M.APPLEGATE@F
AA.GOV
485-4598
X
X
X
X
X
X
X
X
X
X
X
X
PAGE(S)
Stefanie M. Applegate
692M15-21-R-00001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 129
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
692M15-21-R-00001
01000
06000
The purpose of Screening Information Request
(SIR) 692M15-21-R-00001 is to solicit proposals for the Information Technology Innovative Procurement for Strategic Sourcing (ITIPSS)
ITIPSS BASE PERIOD - Ordering Years 1-5 (CLINs 0100-0500). See Attachment B-1 for details
Delivery: 1825 Days After Award
ITIPSS OPTION PERIOD - Ordering Years 6-10 (CLINs 0600-1000). See Attachment B-1 for details
Delivery: 3650 Days After Award
Section B - Supplies or Services/Prices Section B - Schedule
B.1 GENERAL
Information Technology Innovative Procurement for Strategic Sourcing (ITIPSS) is a multiple-award Indefinite Delivery, Indefinite Quantity (IDIQ) contract, for non-personal services. The Contractor must provide, in accordance with SIR SECTION C and as incrementally requested and authorized in the form of individually issued Task Orders, flexible and responsive technical, administrative, management, and professional service solutions to meet a variety of current and future requirements in support of the Office of Information Technology’s (AIT) enterprise-wide performance objectives. The Contractor must provide all management, supervision, labor, facilities, equipment, material supplies, and services (except as may be expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary for, or incident to, the performance of the service solutions specified in individually issued Task Orders.
Due to the nature of the anticipated requirements, resources may be required on a fluctuating schedule, less than full-time basis, or even required to provide additional hours/overtime (See B.4.1.6.1 Application of Overtime) in support of business needs. The unique aspect of this Contract is the need for a flexible workforce that can rapidly respond to fluctuating mission requirements.
Individual Task Orders can use any contract type, or a combination of the types of contract vehicles present in the Acquisition Management System (AMS) to meet the specific requirements being supplied under the Task Order.
If required by the individual Task Order, the Contractor must provide fixed, fully burdened Hourly Labor Rates for both Government site located (“on-site”) and Contractor site located (“off-site”). Rates must include, but are not limited to indirect labor, applicable indirect expenses, and profit. The rates must also include expenses for services in SIR SECTION C, Scope of Services, C.3 and C.4, such as contract execution, including, but not limited to the preparation of invoices, cost and technical proposals, and preparation of deliverables (IDIQ level and anticipated deliverables determined at the Task Order level). The Government will not recognize any additional costs which are not made a part of the fixed, fully burdened hourly rates for T&M Task Orders or are pre-approved on Not-to- Exceed CLINs (such as Other Direct Costs).
All terms and conditions contained in this document, (with the exception of Sections L and M, which will not be a part of any awarded contract), unless otherwise specified will be applicable to all Task Orders issued against this contract without any requirement to so state.
B.2 TYPE AND TERM OF CONTRACT
B.2.1 TYPE OF CONTRACT
ITIPSS is a multiple-award IDIQ contract. Specific tasks or work to be performed will be identified at the Task Order level.
This is a non-personal services contract, as defined in FAA Acquisition Management System 3.8.2. Inherently governmental functions, as described in AMS 3.2.1.3.12, are prohibited under this contract. The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks.
The Contractor must manage its employees and guard against any actions that are of the nature of personal services or give the perception of personal services. The Contractor must notify the Contracting Officer immediately if it perceives any actions that constitute personal services. This contract must not be used to perform any inherently governmental functions.
B.2.2 TERM OF CONTRACT
The term of this IDIQ contract is ten (10) years, including one (1) 5-year base period, and one (1) 5-year option period. The Task Order period of performance will be specified within each individual Task Order. See SECTION F.2 of the Basic Contract.
B.3 MINIMUM AND MAXIMUM CONTRACT QUANTITIES
The minimum ordering obligation under each IDIQ contract issued under the ITIPPS program is $10,000.00 (inclusive of all direct costs, indirect costs, and profit/fee). The minimum ordering obligation under each IDIQ contract must be any quantity or combination of supplies and services equal to the minimum ordering amount. The Government shall meet the contract minimum through the issuance of Task Order(s) within each contract’s period of performance. The minimum quantity applies separately to each IDIQ contract in the ITIPSS Program. The Government has no obligation beyond the minimum ordering obligation specified and if necessary, will meet that obligation at the end of each IDIQ contract’s period of performance.
The maximum cumulative dollar ceiling value of all contracts awarded under this SIR, including any/all option(s) and/or extension(s), is $2,419,300,000 (inclusive of all direct costs, indirect costs, and profit/fee). That ceiling is cumulative among all IDIQ contracts.
Task Orders may be fully funded or incrementally funded in accordance with Acquisition Management System (AMS) clauses 3.3.1-37 and 3.3.1-39. The Contractor is required to notify the Contracting Officer when 75% of the obligated funds are depleted at the Task Order level in accordance with AMS clause 3.3.1-39.
B.4 CONTRACT LINE ITEM NUMBER (CLIN) STRUCTURE AND SCHEDULE
If required by the individual Task Order, the Contractor’s fixed, fully burdened hourly rates by ordering year will be used to price the Labor in individual Task Orders awarded against this IDIQ contract.
The first two digits of the Contract Line Item Number (CLIN) identify the IDIQ contract year, as illustrated in Table B.4.1, Contract Line Item Number (First Two Digits).
CLIN Format Description Performance Period
01xxx Ordering Year One (1)
02xxx Ordering Year Two (2)
03xxx Ordering Year Three (3)
04xxx Ordering Year Four (4)
05xxx Ordering Year Five (5)
Base Period
06xxx Ordering Year Six (6)
07xxx Ordering Year Seven (7)
08xxx Ordering Year Eight (8)
09xxx Ordering Year Nine (9)
10xxx Ordering Year Ten (10)
Option Period
Table B.4.1, Contract Line Item Number (First Two Digits)
Table B.4.2, Contract Line Item Number Categories, illustrates a list of CLINs which will be used, as applicable, at the Task Order level. Any additional CLINs will be established at the Task Order level and/or IDIQ level.
CLIN Description Contract Reference XX001 Time and Material (T&M) Services(IT Mission
Support Services, on-site and off-site, basic and overtime fixed, fully burdened hourly labor rates by labor category; includes indirect costs such as
B.4.1 expenses for contract management/overhead and general and administrative costs, including the preparation of invoices, cost and technical proposals, contract status reports, etc., as well as profit).
XX002 Travel B.4.2 XX003 Other Direct Costs B.4.3 XX004 Firm-Fixed Price (FFP) Services B.4.4
Table B.4.2, Contract Line Item Number Categories
Table B.4.3, Price Schedule Tables, illustrates the tab structure in Attachment B-1 for the Contractor’s IT Mission Support Services (basic and overtime rates, and Government (on-site) and Contractor (off-site) rates for this contract.
Tab No. Tab Name Rate Type (Basic or Overtime)
Locality (OPM Pay Scale)
1 Tables AR-BG & -BC Basic Alaskan Region-Anchorage, AK
2 Tables AR-OG & -OC Overtime Alaskan Region-Anchorage, AK
3 Tables CR-BG & -BC Basic Central Region-Kansas City, MO
4 Tables CR-OG & -OC Overtime Central Region-Kansas City, MO
5 Tables DC-BG & -BC Basic Washington-Baltimore-Northern Virginia, DC-MD-
VA-WV-PA
6 Tables DC-OG & -OC Overtime Washington-Baltimore-Northern Virginia, DC-MD-
VA-WV-PA
7 Tables ER-BG & -BC Basic Eastern Region- Jamaica, NY (New York City)
8 Tables ER-OG & -OC Overtime Eastern Region- Jamaica, NY (New York City)
9 Tables GR-BG & -BC Basic Great Lakes Region- Des Plaines, Illinois
10 Tables GR-OG & -OC Overtime Great Lakes Region- Des Plaines, Illinois
11 Tables NE-BG & -BC Basic New England Region- Burlington, MA
12 Tables NE-OG & -OC Overtime New England Region- Burlington, MA
13 Tables NJ-BG & -BC Basic Philadelphia-Reading-Camden, PA-NJ-DE-MD
14 Tables NJ-OG & -OC Overtime Philadelphia-Reading-Camden, PA-NJ-DE-MD
15 Tables NM-BG & -BC Basic Northwest Mountain Region- Des Moines, WA
16 Tables NM-OG & -OC Overtime Northwest Mountain Region- Des Moines, WA
17 Tables OK-BG & -BC Basic Rest of United States Locality
18 Tables OK-OG & -OC Overtime Rest of United States Locality
19 Tables RU-BG & -BC Basic Rest of United States Locality
20 Tables RU-OG & -OC Overtime Rest of United States Locality
21 Tables SR-BG & -BC Basic Southern Region- College Park, GA
22 Tables SR-OG & -OC Overtime Southern Region- College Park, GA
23 Tables SW-BG & -BC Basic Southwest Region- Fort Worth, TX
24 Tables SW-OG & -OC Overtime Southwest Region- Fort Worth, TX
25 Tables WR-BG & -BC Basic Western-Pacific Region- El Segundo, CA
26 Tables WR-OG & -OC Overtime Western-Pacific Region- El Segundo, CA
Table B.4.3, PRICE SCHEDULE TABLES
At the Task Order level, when payment is made based on actual hours or costs incurred (e.g. cost-reimbursement arrangements and time-and-materials arrangements), the Government will not reimburse costs for cost elements for which there were no estimated costs prior to those costs being incurred. Exceptions, if any, must be issued in writing by the Contracting Officer.
B.4.1 TIME AND MATERIAL (T&M) SERVICES
Information Technology (IT) Mission Support Services labor rates set forth in the Pricing Schedule (Attachment B- 1, Price Schedule) reflect the fixed, fully burdened hourly rates for performance at Government on-site locations as well as Contractor off-site locations within the same geographic areas by ordering year. The fixed, fully burdened hourly rates in the Pricing Schedule (Attachment B-1, Price Schedule) apply to all labor hours, regardless of whether the labor hour is expended by the Contractor or by one of its subcontractors.
The fixed, fully burdened hourly rate includes profit, indirect costs (i.e. overhead, fringe, etc.) and any year-over-year escalation rate (i.e. the annual percentage change in the cost or price of services). Indirect costs include those costs associated with employees over and above gross compensation or payroll (e.g. payroll taxes and social security deductions, workers’ compensation required by the federal government or the state of performance, health insurance, paid time off, company training, vacation, and sick leave, pension contributions, and other benefits. The indirect cost component of the fixed, fully burdened hourly rates must also include expenses for services in SIR SECTION C.3 and C.4, including, but not limited to contract execution, the preparation of invoices, cost and technical proposals, and preparation of deliverables (IDIQ level and anticipated deliverables determined at the Task Order level). The rates must exclude direct travel and other direct costs (ODCs), which will be ordered separately, as needed in the Government’s discretion.
The Contractor’s indirect costs and profit, referred to in combination as the “fixed, fully burdened” or “wrap” rate, as well as any year-over-year escalation rate, must be built around the Contractor’s hourly rates to determine the fixed, fully burdened hourly rate (reference Attachment B-1, Price Schedule, Wrap Rate & Escalation Summary tab). The fixed, fully burdened hourly rates represent the maximum (ceiling) labor rates that the Government will consider and/or accept during the contract period of performance. At the Task Order level, the Contractor will be given an opportunity to propose rates that match or are lower than the respective not-to-exceed (NTE) rates.
The Contractor’s hourly pay rates for all Ordering Years must be in accordance with the Government-provided rates in Table B-1, Price Schedule, which are based on the United States (U.S.) Office of Personnel Management (OPM) General Schedule (GS) and Locality Pay Tables for GS (Grade 5 through Grade 15 (Step 1-10)) and the Executive Schedule (ES) (Level 5 through Level 1) found at http://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/. Hyperlinks to OPM’s pay scales by locality appropriate to this contract are listed in Table B.4.4 (Labor ID Number Structure). At the Task Order level, the Contractor must determine the positions that are and are not subject to the Service Contract Act and Service Contract Act Wage Determination.
B.4.1.1 T&M Labor ID Number
B.4.1.1.1 T&M Labor ID Number Usage
At the IDIQ level, Labor ID Number(s) provide a unique identifier for each individual GS/ES equivalent in each ordering year. At the time a Task Order is placed, as applicable, Labor ID Numbers will be utilized that will include a customized employee labor category title, position description, and GS/ES equivalent. Position descriptions may include, but not be limited to, minimum education and experience requirements.
The Contractor must provide the necessary personnel based on the requirements, including the number of labor hours at the applicable rate for the Labor ID Number specified in the Task Order. Pricing Tables in Attachment B-1 include the Labor ID Number by locality and GS/ES grade equivalencies applicable to future labor categories.
B.4.1.1.2 T&M Labor ID Number Structure
Table B.4.4, Labor ID Number Structure, provides a guide to the Labor ID Number naming convention that will be used at the IDIQ and Task Order level, as applicable. The first two digits of the Labor ID Number shall identify the program year that the work starts (as illustrated in Table B.4.1, Contract Line Item Number (First Two Digits)).
Labor ID Number Format Description
Ordering Year Period of Performance (PoP)
01xxxxxxxxxxx Ordering Year One (1) of the IDIQ contract (BASE PERIOD)
02xxxxxxxxxxx Ordering Year Two (2) of the IDIQ contract (BASE PERIOD)
03xxxxxxxxxxx Ordering Year Three (3) of the IDIQ contract (BASE PERIOD)
04xxxxxxxxxxx Ordering Year Four (4) of the IDIQ contract (BASE PERIOD) 05xxxxxxxxxxx Ordering Year Five (5) of the IDIQ contract (BASE PERIOD)
06xxxxxxxxxxx Ordering Year Six (6) of the IDIQ contract (OPTION PERIOD)
07xxxxxxxxxxx Ordering Year Seven (7) of the IDIQ contract (OPTION PERIOD)
08xxxxxxxxxxx Ordering Year Eight (8) of the IDIQ contract (OPTION PERIOD)
09xxxxxxxxxxx Ordering Year Nine (9) of the IDIQ contract (OPTION PERIOD) 10xxxxxxxxxxx Ordering Year Ten (10) of the IDIQ contract (OPTION PERIOD)
Locality FAA Locations Served OPM Locality Pay Scale Equivalent Used xxARxxxxxxxxx Alaskan Region in Anchorage, AK STATE OF ALASKA xxCRxxxxxxxxx Central Region in Kansas City, MO KANSAS CITY-OVERLAND PARK-KANSAS
CITY, MO-KS
xxDCxxxxxxxxx FAA Headquarters in Washington, DC
WASHINGTON-BALTIMORE-ARLINGTON, DC-
MD-VA-WV-PA
xxERxxxxxxxxx Eastern Region in Jamaica, NY (New York City)
NEW YORK-NEWARK, NY-NJ-CT-PA
xxGRxxxxxxxxx Great Lakes Region in Des Plaines, Illinois
CHICAGO-NAPERVILLE, IL-IN-WI
xxNExxxxxxxxx New England Region in Burlington, MA
BOSTON-WORCESTER-PROVIDENCE, MA-RI-
NH-ME
xxNJxxxxxxxxx William J. Hughes Technical Centerin Harbor Township/Atlantic City, NJ
PHILADELPHIA-READING-CAMDEN, PA-NJ-DE-
MD
xxNMxxxxxxxxx Northwest Mountain Region in Des Moines, WA
SEATTLE-TACOMA, WA
xxOKxxxxxxxxx Mike Monroney Aeronautical Center(AMC) in Oklahoma City, OK
REST OF U.S.
xxRUxxxxxxxxx Rest of the United States REST OF U.S.
xxSRxxxxxxxxx Southern Region in College Park, GA
ATLANTA--ATHENS-CLARKE COUNTY--
SANDY SPRINGS, GA-AL
xxSWxxxxxxxxx Southwest Region in Fort Worth, TX DALLAS-FORT WORTH, TX-OK https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/AK_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/KC_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/KC_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/DCB_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/DCB_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/NY_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/CHI_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/BOS_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/BOS_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/PHL_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/PHL_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/SEA_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/RUS_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/RUS_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/ATL_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/ATL_h.pdf https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/DFW_h.pdf xxWRxxxxxxxxx Western-Pacific Region in El Segundo, CA
LOS ANGELES-LONG BEACH, CA
Labor Category General Schedule/Executive Service Equivalent xxxxGS05xxxxx GS-5 Equivalent xxxxGS06xxxxx GS-6 Equivalent xxxxGS07xxxxx GS-7 Equivalent xxxxGS08xxxxx GS-8 Equivalent xxxxGS09xxxxx GS-9 Equivalent xxxxGS10xxxxx GS-10 Equivalent xxxxGS11xxxxx GS-11 Equivalent xxxxGS12xxxxx GS-12 Equivalent xxxxGS13xxxxx GS-13 Equivalent xxxxGS14xxxxx GS-14 Equivalent xxxxGS15xxxxx GS-15 Equivalent xxxxES00xxxxx ES Equivalent
Labor Category Step/Level Equivalent xxxxxxxxS01xx Step 1 Equivalent xxxxxxxxS02xx Step 2 Equivalent xxxxxxxxS03xx Step 3 Equivalent xxxxxxxxS04xx Step 4 Equivalent xxxxxxxxS05xx Step 5 Equivalent xxxxxxxxS06xx Step 6 Equivalent xxxxxxxxS07xx Step 7 Equivalent xxxxxxxxS08xx Step 8 Equivalent xxxxxxxxS09xx Step 9 Equivalent xxxxxxxxS10xx Step 10 Equivalent xxxxxxxxL05xx Level 5 Equivalent (Executive Service only) xxxxxxxxL04xx Level 4 Equivalent (Executive Service only) xxxxxxxxL03xx Level 3 Equivalent (Executive Service only) xxxxxxxxL02xx Level 2 Equivalent (Executive Service only) xxxxxxxxL01xx Level 1 Equivalent (Executive Service only)
Basic/Overtime Rates xxxxxxxxxxxBx Basic rate xxxxxxxxxxxOx Overtime rate
Government/Contractor Site xxxxxxxxxxxG Government site xxxxxxxxxxxC Contractor site
Table B.4.4, Labor ID Number Structure
B.4.1.2 No Change to Rates
The fixed, fully burdened hourly rates (reference Attachment B-1) are not subject to change after the IDIQ or a Task Order under it is awarded, even if a Subcontractor is added or removed by the Contractor during the performance period of this IDIQ Contract.
https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2021/LA_h.pdf
B.4.1.3 Productive Labor Hours
The Government will only pay for productive, direct labor hours, i.e. those hours authorized by the Contracting Officer and applicable Task Order(s), in performing work under this Contract. This does not include sick leave, holiday, vacations, jury duty, military leave, administrative leave, etc., but does include authorized travel (reference B.4.2, Travel).
B.4.1.4 Geographical Work Locations (Place of Performance)
The place(s) of performance will be specified in each individual Task Order. Support under this Contract may be required at or in reasonable proximity to FAA facilities or on-site Government locations. Services may be ordered at either, or both, Contractor facilities (“off-site”) and FAA facilities (“on-site”). The Contractor may be required to provide support personnel at FAA facilities in any of the FAA locations.
For the purposes of contract pricing, (reference Attachment B-1) localities are based on the following list of FAA locations and the cities in which they are located:
1. FAA Headquarters located in Washington, DC
2. Mike Monroney Aeronautical Center located in Oklahoma City, OK
3. William J. Hughes Technical Center located in Harbor Township/Atlantic City, NJ
4. Alaskan Region located in Anchorage, AK
5. Central Region located in Kansas City, MO
6. Eastern Region located in Jamaica, NY (New York City)
7. Great Lakes Region located in Des Plaines, Illinois
8. New England Region located in Burlington, MA
9. Northwest Mountain Region located in Des Moines, WA
10. Southern Region located in College Park, GA
11. Southwest Region located in Fort Worth, TX
12. Western-Pacific Region located in El Segundo, CA
13. “Rest of the United States” applies to work ordered in any location within the United States (U.S.) and all U.S.
territories not already listed above.
B.4.1.5 Government On-site vs. Contractor Off-site Rates
B.4.1.5.1 Government On-site Rates When performing at Government sites, the fixed, fully burdened hourly rates must take into account that the Government will provide adequate workspace, software, hardware, utilities, telephone, office supplies, janitorial services, and other FAA provided services necessary to meet the performance requirements.
B.4.1.5.2 Contractor Off-site Rates
When performing at a Contractor site, the fixed, fully burdened hourly rates must include applicable indirect costs for office space and all normal supplies and services required to support the work. The Contractor must provide the required space including all utilities, telephone, janitorial services, workstations, associated hardware and software, office equipment/furnishing(s) and supplies to meet the requirements of this Contract.
B.4.1.6 Excess/Overtime Hours
B.4.1.6.1 Application of Overtime
“Overtime” is defined as “time worked by a contractor’s non-exempt employee in excess of the 40 hours in a workweek.”
The Contractor agrees to perform this contract, so far as practicable, without using overtime, particularly as a regular employment practice, except when lower overall costs to the Government will result or when it is necessary to meet urgent program needs [reference AMS Procurement Guidance on overtime in T3.6.2 - Labor Laws]. Under this contract, the use of overtime should not generally increase labor hour costs to the FAA as ITIPPS contractor support personnel are normally salaried and considered “exempt.”
Contractor personnel who are classified as “exempt” require prior written approval by the Contracting Officer to work additional hours (in excess of 40 in a workweek). See SECTION C.4.2.15 - Excess/Overtime Hours Request.
For those Contractor personnel who are classified as “non-exempt” and subject to the requirements of the Service Contract Labor Standards (formerly the Service Contract Act), the requirement of overtime efforts under this contract will result in increased labor hour costs for the overtime efforts requested. In these cases, overtime for ”non-exempt” personnel must be approved in advance, in writing, by the Contracting Officer so as to validate and justify the need for these additional costs. See SECTION C.4.2.15 Excess/Overtime Hours Request.
The Contractor is fully responsible for compliance with applicable labor laws and must not permit any employee to work overtime when the employer will be required to pay the employee premium in accordance with the Fair Labor Standards Act (FLSA) (e.g., a non-exempt employee must receive overtime pay for hours worked in excess of 40 in a work week of at least one and one-half times their regular rates of pay or overtime pay based on this contract for the GS equivalents) without prior, written approval. The only individual authorized to require and/or approve overtime shall be the Contracting Officer.
The Contractor must review all employees in accordance with Section 13(a)(1) of the FLSA as defined by Regulations, 29 CFR Part 541 to determine executive, administrative, professional and other applicable exemptions from overtime pay.
For fixed-price arrangements (i.e., Task Orders or line items in a Task Order), the Government will not pay for overtime.
B.4.1.6.2 Calculation of Overtime for Non-Exempt Contractor Employees
Overtime pay, when applicable, must be calculated in accordance with applicable Federal policies and regulations.
For contractor employees with rates of basic pay equal to or less than the rate of basic pay for the GS-10, Step 1 equivalent, the overtime hourly rate is the employee's hourly rate of basic pay multiplied by 1.5.
For contractor employees with rates of basic pay greater than the basic pay for the GS-10, Step 1 equivalent, the overtime hourly rate is the greater of: 1) the hourly rate of basic pay for the GS-10, Step 1 equivalent, multiplied by 1.5, or 2) the contractor employee's hourly rate of basic pay.
These hourly overtime pay limitations do not apply to prevailing rate (wage) employees or to FLSA overtime pay.
The Contractor must submit approval in accordance with SIR SECTION C.4.2.15, Excess/Overtime Hours Request.
B.4.1.7 Task Order Incentives/Disincentives
The Government reserves the right to include, at the Task Order level and on a Task Order-by-Task Order basis, incentives and/or disincentives designed to obtain specific Task Order objectives by establishing objective, reasonable and attainable targets, and by establishing specific incentives/disincentives (including but not limited to monetary incentives/disincentives) to motivate Contractor performance and encourage efficiency. These incentives/disincentives may include any kind allowable under the AMS, and may include cost incentives/disincentives based on Service Level Agreements relating to quality of performance and/or performance requirements or metrics.
B.4.2 TRAVEL
The Contractor will be reimbursed for allocable, allowable, and reasonable pre-approved travel expenses in accordance with AMS clause 3.3.2-1 “FAA Cost Principles” and 3.3.2-2 “Reimbursement for Travel and
Subsistence.” Travel and per diem reimbursement rates are located at: http://www.gsa.gov/perdiem. Except as otherwise provided herein, the Contractor will be reimbursed for approved travel under a Cost Reimbursable (CR) CLIN in accordance with AMS Procurement Guidance T.3.3.2 “Contract Cost Principles.”
The Government may elect to increase or decrease these values at its discretion during the performance of the contract. Travel must be directly related to and required for performance of this contract. Travel dates, times, and locations must be coordinated with the government and pre-authorized in writing by the FAA Functional Lead overseeing the travel, the Contracting Officer’s Representative (COR) and the Contracting Officer unless otherwise specified in writing by the Contracting Officer at the Task Order level.
The Contractor must include a breakout of all authorized travel expenses as an attachment to its invoices. The Contractor must submit a pre-approved travel authorization with its invoices (reference SECTION C- SCOPE OF SERVICES, C.4.2.13 “Travel and Training Authorization Request”).
Administrative support (coordination of travel arrangements, etc.) will be the responsibility of the Contractor.
Travel costs must not be burdened with any indirect costs unless specifically allowable in accordance with the Contractor’s usual accounting practices at the rate established at the IDIQ level. In no event shall travel costs be burdened with fee/profit.
When local travel between the Contractor employee’s regular place of performance and other locations is specifically authorized by the COR, transportation expenses shall be allowable costs under this contract. For purposes of this clause, local travel means travel within a 50 mile radius of the Contractor employee’s regular place of performance and does not include daily commuting or associated costs. Costs associated with employee commuting are not reimbursable under this contract.
For travel where use of personal automobile has been specifically authorized, reimbursement must be computed based on actual miles travelled from starting point to destination. Other related miscellaneous expenses, such as tolls and parking fees, incurred in the performance of tasks authorized under this contract, will be reimbursed. Car rentals require advance approval of the COR and will be authorized only when consistent with good business practice.
Allowable costs must not exceed the actual cost of renting a compact automobile (a maximum of one for four Contractor personnel), unless extenuating circumstances (e.g., excess baggage) require other arrangements and subsequent COR approval is obtained.
The Government will reimburse the Contractor for Contractor employee’s travel time to or from other authorized work locations; except that for labor categories which are exempt from the Fair Labor Standards Act (FSLA), a reimbursement will be allowed only for travel during the employee’s regular working hours. The Contractor will not be reimbursed for time spent in stand down or temporary layover for the convenience of the Contractor.
B.4.3 OTHER DIRECT COSTS
Depending on the unique nature of a Task Order placed against this IDIQ, a Task Order may require vastly different types of solutions services, and/or resources expended as direct costs. Task Orders may include Other Direct Cost (ODC) Cost Reimbursable CLINs and/or Firm-Fixed-Price (FFP) CLIN for the acquisition of ODCs defined as commercial items.
The Contractor’s ability to obtain the resources treated as ODCs may be critical to Task Order performance. Critical elements merit special consideration to assure that the Contractor fully understands contract requirements. ODCs will be defined at the Task Order level and may include, but are not limited to, special tooling, computer-related service costs, licenses, and professional and consultant services costs deemed necessary to complete the tasks. ODCs exclude travel costs, which are billed under a separate CLIN.
The Contractor may include a fair and reasonable rate/burden (general and administrative costs) on ODCs in accordance with the Contractor’s established accounting practices, but no profit/fee is allowed. The Contractor’s ceiling percentage rate to be applied to this CLIN for the duration of the IDIQ period of performance appears in Attachment B-1 in the tab titled “G&A Rate (ODCs).” The rate must not exceed ten (10) percent. The Contractor will be reimbursed in accordance with AMS clause 3.3.2-1 “FAA Cost Principles.”
The Offeror must justify and fully support the need for any ODC to complete Contract tasks at the Task Order level.
When requested by the Government, ODCs may be proposed using a cost estimating relationship and must include statements of assumptions. The Government may conduct fact-finding conversations with the Contractor prior to awarding ODCs. The Government will analyze proposed ODCs. The Government’s analysis is not bound by the estimating methods used by the Contractor. The Government determines the reasonableness and allowability of the costs according to Government cost accounting standards. Reasonableness will be determined by the Government’s assessment that the proposed costs are crucial to complete the contract, affordable, consistent with the Contractor’s estimating assumptions, and inclusive of all feasible costs estimated to complete the work.
If the Government accepts the proposed ODC, the Contracting Officer will document that acceptance. If the Government does not accept the proposed ODC, the Contracting Officer will document concerns with the proposal and deny, or, develop a pre-negotiation position for costs covered by the estimate. The Government may conduct negotiations with the Contractor prior to awarding ODCs. No costs shall be incurred without explicit written approval from the Contracting Officer written approval should be obtained via the ITIPSS process in SECTION C.4.2.12 “Other Direct Costs Approval Request.”
B.4.4 FIRM-FIXED PRICE (FFP) SERVICES
When it is determined that using Firm-Fixed Price (FFP) contracting for Information Technology (IT) Mission Support Services and/or Deliverables is in the Government’s best interest, CLIN X004 will be utilized. FFP CLINs will include pricing for the services and/or deliverables described in the Task Order, and will include all prime and subcontractor labor; indirect costs such as expenses for contract management/overhead and general and administrative costs, including the preparation of invoices, cost and technical proposals, contract status reports, etc.;
and profit. FFP pricing must exclude direct travel and other direct costs (ODCs), which will be ordered separately, as needed in the Government’s discretion.
Clause List
The remainder of this page has been intentionally left blank.
Section C - Description/Specifications Scope of Work
C.1 INTRODUCTION
The Federal Aviation Administration (FAA), Office of Information Technology’s (AIT), Indefinite Delivery Indefinite Quantity (IDIQ) contract program named Information Technology Innovative Procurement Strategic Sourcing (ITIPSS) is FAA’s leading-edge contract to acquire a full range of IT capabilities, solutions, and emerging technologies through Task Orders that will provide a wide range of state-of-the art professional IT-related service solutions.
C.1.1 MISSION
AIT reports under the Office of Finance and Management (AFN) Finance Directorate. The FAA's AFN/AIT organization, also called IT Shared Services, was established in 2013. AIT is responsible for the sustainment and evolution of information technology (IT) services that support FAA's mission to provide safety and value to the FAA’s business partners, aviation industry, the aviation community and the flying public. AIT delivers IT products and services with quality and speed to help FAA employees provide optimal support to the Agency's mission of safety in flight.
AIT’s mission is to ensure that current systems are maintained at optimal operating levels with no service interruption while technical innovations are developed and delivered on-time and within budget. AIT establishes a foundation of infrastructure, policies, procedures, and standards using innovative technology and methodologies that will ultimately deliver greater efficiencies and an exceptional user experience. AIT is a customer-focused enabler of business which provides quality national IT services.
C.1.2 BACKGROUND
ITIPSS is a mission critical contract vehicle from which to acquire Information Technology (IT) services and solutions for all FAA, non-National Airspace System (non-NAS), IT mission support. The AIT organization has major investments in information technology hardware and software systems for managing applications and information systems regarding FAA facilities inspections, internal and external investigations, IT resources, financial management and reporting, and policies and plans. AIT information systems span nationally and support the administrative, financial, regulatory, disciplinary and investigative security and security risk management programs that are designed to provide operational and facility management capabilities.
AIT collaborates with its customers to understand their business objectives and define requirements for services.
Individual Task Orders will be developed with desired outcomes, performance standards, constraints, including specific labor categories, position descriptions, deliverables, quality assurance standards, and more. Task Orders will either be competed or directly awarded under this Contract based on the Government’s best interests and in accordance with the procedures set forth in this Contract and AMS.
C.2 SCOPE
This Contract covers the entire scope of requirements for AIT and may involve IT-related requirements for other FAA offices. The Contractor must provide a wide range of state-of-the-art multi-disciplinary IT-related service solutions. The Contractor must support AIT in meeting its goals to evolve ongoing programs and implement innovative solutions in support of the FAA’s overall strategic initiatives. The scope covers support for any future application and technology modernization efforts that are adopted by the Government to improve enterprise-wide business systems.
The scope of work is complex in nature. Complexities include, but are not limited to, the potential transition of over 70 existing contracts and task orders, operations in disparate geographical locations, interdependent systems, support for any of AIT’s 800 critical applications, of which over 400 are managed internally; applications include both commercial-off-the-shelf (COTS) products with customization and fully customized applications. The Contractor must take actions to be resilient to continuously evolving threat trends and security vulnerabilities.
The work defined herein, is broad in scope. The Government will define the work using individual Task Order Request for Proposals (TORPs). TORPs will be traceable to the requirements outlined in this scope and contain specific task requirements, deliverables, performance requirements, contract type and a desired level of effort with labor category position descriptions. The Contractor must respond according to the TORP instructions and may be required to refine a project’s scope and level of effort, as necessary. Performance location(s) will be designated within each TORP and requires performance at either, or both, Contractor and Government-owned facilities.
The FAA intends for this contract to remain current and continue to provide a full range of IT-related services within the contract scope throughout the contract’s ordering period and the period of performance (PoP) for any task order issued during the ordering period. Accordingly, the FAA may make updates to the contract, as appropriate, to ensure the contract continues to provide a full range of services within the general scope of the contract.
During the course of this contract and subject to the terms and conditions of this contract, the Contractor must interface with internal FAA offices, other Governmental and Non-Governmental organizations, third-party contractors and service providers from whom the FAA obtains systems and services to carry out the specified tasks and responsibilities as prescribed in the contract.
C.2.1 INFORMATION TECHNOLOGY SOLUTIONS AND SERVICES
The Contractor must keep up with the pace of change in emerging technologies to provide state of the art solutions services as requested and authorized in individually issued Task Orders. Task Orders will require a wide range of state of the art multi-disciplinary solutions or services.
Task Orders are, without limitation, anticipated to include one, or a combination of multiple, of the following subject matter solution areas:
C.2.1.1 IT Management and Administrative Solutions including, but not limited to:
a. Program Management / Project Planning Project management consistent with expected project management lifecycles (PMLC); Management/project plans across expected software development lifecycles (SDLC) and methods (e.g. waterfall, agile, iterative development models); Earned Value Management (EVM) and/or other structured cost/schedule/performance management process; Quality management; Communications management; Project change management; Stakeholder management; System configuration management; Organizational change management; Risk management; Knowledge Management (KM); Workforce development and training support; Portfolio management;
Product portfolio management; Capital Planning and Investment Control (CPIC) support; Information sharing;
Disaster recovery; Continuity of Operations (COOP).
b. Compliance and Evaluation Policy and directives drafting support; Compliance support and Compliance Enforcement Actions (CEA); Operating procedures, processes, and assessments; Investment and business case analysis; Solution assessment and validation;
Business Process Modeling (BPM); Workflow management.
c. Operational Business Intelligence Business Intelligence (BI) studies and analyses; Logistics supportability; Operational impacts; Interoperability reports; Feasibility studies; Cost estimation and analysis; Risk analysis; Capacity studies; Serviceability studies;
White Papers.
d. Office Administration Day to day activities related to office logistics, financial planning and execution, record keeping, and physical distribution.
e. Facilities Support
Design and installation of IT distribution systems; Incidental design and modification support; Connectivity and installation support; Physical security; Site surveys; Relocation or consolidation; Comprehensive installation planning of information transport systems and IT work areas.
f. Asset Management Systematic investment tracking of hardware (H/W) and software (S/W) assets; Inventory; H/W specifications;
Maintenance; Tagging and tracking; Upgrading; Disposal; S/W end-user license agreement (EULA) acquisition and management; S/W and H/W Maintenance Agreement acquisition and management; Preventive maintenance; Asset reports.
C.2.1.2 Technical Solutions including, but not limited to:
a. Enterprise Architecture, Strategy, and Planning Enterprise Risk Management (ERM) Framework; Enterprise Architecture Framework; Data Governance (DG);
Architecture Governance Board; Strategic IT roadmap planning; IT Service Management (ITSM); Research support;
Solution Strategy (including virtualization strategy, cloud computing strategy, big data strategy; citizen development service strategy; platform strategy; microservices strategy; mobile app strategy; business process modeling; data management strategy, analytics strategy, and more); Technology standards; Solution standards; Product roadmaps;
Technology roadmaps; Technology refresh and legacy systems modernization strategy.
b. Requirements Analysis & Management Requirements/Scope Management; Enterprise analysis; Functional requirements; Specifications; Use case development; Agile requirements (e.g., user stories); Process models; Context diagrams; Functional decomposition;
Security requirements; User requirements; User acceptance criteria; Non-functional requirements; Regulatory requirements (e.g., section 508); Service requirements; Process requirements; Product requirements; Usability requirements; Requirements and use cases repository.
c. Infrastructure & Solution Architecture, Planning & Design Concept Maturity and Technology Development (CMTD); Computer-Aided Design (CAD); Computer Automated Engineering (CAE); Wide-Area Network (WAN) and Local-Area Network (LAN) design; Conceptual architecture, logical architecture, and physical architecture for the infrastructure tier, system tier, software tier and data tier;
Security architecture; Redundancy architecture; Zero trust architecture (ZTA); Architecture design patterns;
Software technology design; Database architecture; Mobile application architecture; Architecture patterns; Concept Of Operations (CONOPS) and other architecture and design documentation; Data and information architecture and management support; Proof of concept implementations for current and leading/"bleeding-edge" technologies;
Reference implementations.
Examples of software include, but are not limited to, mobile, embedded, systems, applications, web, serverless, cloud, database, artificial intelligence, machine learning, low code & no code, quantum computing, blockchain, modeling, simulation, automation/autonomous, tooling, and data mining.
d. Infrastructure & Software Implementation Initial Operational Capability (IOC) development and Full Operational Capability (FOC) completion; Solution development; Services Oriented Architecture (SOA); Software code; Application Programming Interface (API);
Microservices; User manuals and technical documentation; Systems/software engineering; Test Driven Development (TDD); Development, demonstration, and transition; Web application design and development;
Enterprise application development and support; Debugging; Mobile application design and development; Graphical User Interface (GUI) development and documentation; Modeling and simulation; Section 508 technical requirements compliance; Web Content Accessibility Guidelines (WCAG compliance); Natural Language Processing (NLP); Data protection procedures; Multi-datacenter aware solutions; Platform-based development;
Development of artificial intelligence and machine-learning algorithm.
e. Test & Evaluation (T&E) Requirement Traceability Matrix (RTM); Functional Testing (e.g., Beta/acceptance testing; Integration testing;
Interface testing; Regression testing; Sanity testing; Smoke testing; System testing; Unit testing); Non-Functional Testing (e.g., Compatibility testing; Compliance testing; Install testing; Load testing; Localization testing;
Performance testing; Recovery testing; Reliability testing; Security testing; Stress testing; Usability testing; Volume testing); Independent Verification & Validation (IV&V); Quality Control (QC); Quality Assurance (QA); Test automation; Testing strategy; Security testing.
f. Solutions Support and Operations & Maintenance (O&M)
1st and 3rd party systems rollout, integration, and support; Data center/warehouse/multi-data center support;
Connectivity and installation support; Archiving and backups; Configuration documentation; Virtual consolidation;
Image creation; Initial configuration; Installation; Integrating; Optimization; Patching and updating; Recovery;
Relocation; Scripting; System/software integration and migration; System administration; platform administration (e.g., collaboration, document management, search, and others); Troubleshooting; Tuning; Upgrading; (X)aaS implementation, integration, and support (i.e., “(X)” meaning Software, Platform, Infrastructure, etc.); Hardware support; Database Management Systems (DBMS) administration and support; Data migration support; Change management and reporting; Configuration management and documentation updates; Emergency services; Continuity and disaster recovery; Inspections and corrections; Intelligence Amplification (IA) support; Internet of Things (IoT) support; big data support;…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .