This Statement of Work (SOW) details specifications for installing water service lines for the Indian Health Service in Pawhuska, Oklahoma. The document outlines comprehensive technical requirements for water service line installation, including pipe materials (ultra-high molecular weight polyethylene, PE 3408, DR 11 or DR 9), installation standards, trench specifications, testing protocols, and disinfection procedures. Key technical requirements include maintaining 30-inch horizontal and 12-inch vertical separation between water and sewer services, using non-flare compression fittings with stainless steel pipe stiffeners, and following specific bedding and backfill standards.

The related federal contract opportunity is a 100% Indian Owned set-aside solicitation (RFQ 246-25-Q-0045) under NAICS code 237110, with an estimated price range under $50,000 and a 60-calendar day performance period. The procurement requires contractors to submit a firm fixed-price quote, technical specifications, two relevant past performance examples, and an Indian Economic Enterprise Representation Form. Key dates include an official site visit on March 31, 2025, questions due by April 4, 2025, and quote submission deadline of April 21, 2025. The Indian Health Service will evaluate quotes on price and technical acceptability, with award going to the lowest priced, technically acceptable offeror.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Service Lines PE Date: June 2020

Author: Caylen Willingham, EIT Water Service Lines PE

STATEMENT OF WORK

1.01 SUMMARY OF WORK TO BE DONE BY CONTRACTOR

A. Furnish and install a water service line as shown on the drawing.

1.02 SITE LOCATION

A. 23952 OK-99, Pawhuska. OK 74056 SR#4420

1.03 CONSTRUCTION SCHEDULE

A. Contact the Construction Inspector three business days before the start of any work.

B. Failure to perform work on the date scheduled will require 24-hour notice for rescheduling the work.

C. Leave all work exposed until inspected and approved. Work not inspected before it is covered will be re-exposed at the Contractor’s expense.

1.04 QUALITY ASSURANCE

A. Perform work under the direction of personnel licensed in the state including, but not limited to Plumbing.

1.05 WARRANTY

A. Provide a minimum one-year warranty for all materials and labor, covering defects in the materials or workmanship.

1.06 WATER SERVICE LINES (Sizes: 1-inch through 3-inch diameter IPS PE pipe)

A. References (use latest versions)

1. ASTM D2609 Standard Specification for Plastic Insert Fittings for Polyethylene (PE) Plastic Pipe.

2. ASTM D2737 Standard Specification for Polyethylene (PE) Plastic Tubing.

3. ASTM D2774 Standard Practice for Undergound Installation of Thermoplastic

Pressure Piping.

4. AWWA C651 Disinfecting Water Lines

5. AWWA C901 Polyethylene (PE) Pressure Pipe and Tubing, ½ in. Through 3 in.

for Water Service.

6. NSF Standard 014 Plastic Piping System Components and Related Materials.

7. NSF Standard 061 Drinking Water System Components – Health Effects.

B. PE Pipe Material Requirements

1. Ultra-high molecular weight polyethylene pipe

a. PE 3408

b. DR 11 (pressure rating 160 psi) or DR 9 (pressure rating 200 psi)

C. Fittings:

1. Non-flare compression type fittings with stainless steel pipe stiffeners at each joint.

Water Service Lines PE Date: June 2020

Author: Caylen Willingham, EIT Water Service Lines PE

1.07 INSTALLATION

A. Install water service lines and appurtenances in the locations, sizes and materials shown on the drawings or staked in the field.

B. Water and sewer service crossing and parallel installation.

1. Maintain a 30-inch horizontal separation between water and sewer services.

2. Maintain a 12-inch vertical separation for crossing water and sewer services. The water service is to be placed above the sewer service whenever possible.

3. Water service line splices or joints will not be permitted within 10 feet of a sewer line crossing.

C. Thrust blocking is to be provided at all changes in direction.

1.08 TRENCH

A. Depth: Minimum 30 inches.

B. Bottom: Free from stones greater than 3/4 inch, large dirt clods, and any frozen material.

C. Bedding: If the trench bottom is hardpan, rock, or has stones larger than 3/4 inch in diameter in the largest dimension:

a. Over excavate 6 inches.

b. Place 6 inches of mechanically compacted imported bedding (maximum particle size 3/4 inch) under the pipe

c. Place pipe in trench.

d. Place 6 inches of mechanically compacted imported bedding (maximum particle size 3/4 inch) on the sides and above the pipe D. Backfill: restore trenches to initial grade.

1.09 TESTING

A. Before joints are covered, test pipe for leaks.

B. Visually inspect all connections and fittings for leaks in the presence of the

Construction Inspector.

C. Repair all leaks before backfilling.

1.10 DISINFECTION

A. Disinfect in accordance with AWWA C651 before placing in service.

1. Sample and test until 2 consecutive (minimum of 24 hours apart) negative Bac-T tests are obtained.

2. Provide a copy of the negative test to the Project Engineer.

1.11 CLOSEOUT ACTIVITIES

A. Restore the site as close as is practical to its original condition.

B. Provide record drawings to the Project Engineer.

Caylen Willingham, P.E.