Signed Plans_STSL_Phase 5-2 Liner_IFB_2026-10-16.pdf

PDF 40 MB Posted

Attached to
Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill
Solicitation number
PWG127-SOLID-6580
Issued by
San Bernardino County, California

About this file

This is a set of signed construction plans for the Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill, a public works project in Redlands, California managed by the state and local jurisdiction. The project involves the construction of a liner system at the sanitary landfill facility located at 31 Refuse Road, Redlands, CA 92373. A mandatory pre-bid meeting and job walk are required for all prospective bidders, with attendees required to bring proper Personal Protection Equipment including a safety vest, hard hat, and working boots. The Invitation for Bid (IFB) was issued with a contract opportunity identifier and is scheduled for completion on or before October 16, 2026.

The signed plans document serves as the technical specifications and design drawings for the liner construction work. Bidders are expected to review these detailed plans as part of their bid preparation and site evaluation process. The mandatory job walk provides an opportunity for potential contractors to assess site conditions, confirm existing conditions align with the plans, and identify any challenges or logistical considerations related to the landfill environment. Specific pricing terms, set-asides, funding sources, and contract award information are not detailed within the plan document itself, as these elements typically appear in the separate IFB solicitation documents and bid specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .