Addendum 1 - STSL Unit 2 Phase 5-2 Liner Construction Project~1.pdf
PDF 4 MB Posted
- Solicitation number
- PWG127-SOLID-6580
- Issued by
- San Bernardino County, California
About this file
This Addendum No. 1 is issued by the San Bernardino County Solid Waste Management Division for the Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill in Redlands, California. The addendum, dated November 4, 2026, addresses bidder inquiries and clarifications to the original bid documents. The bid opening is scheduled for 10:00 AM on November 12, 2026. Key project requirements include mandatory compliance with the 50 percent self-performance requirement per SSPWC Section 3-2, with no specialty items designated for calculation purposes. The County declined bidder requests to extend the bid due date from November 12, 2026, or to modify the self-performance threshold to 30 percent. Final Plans and Specifications are available for download through the E-Pro system in PDF format, with supplemental information and CAD plans also accessible through the same platform. The addendum confirms that the project has been rebid following cancellation of the prior solicitation to clarify plans and specifications, and notes that all bids from the previous bidding round remain publicly available through E-Pro.
The addendum includes pre-bid sign-in sheets as Attachment 1 and directs bidders to obtain all previous bid submissions through the E-Pro system for reference. No pricing information, set-asides, incumbent contractors, or funding source details are modified by this addendum. All other requirements of the original Plans and Bid Documents remain unchanged. Bidders are instructed to acknowledge receipt of Addendum No. 1 in their bid proposals. Contact information is provided for Johnny D. Gayman, Engineering Manager, and Jesus Torres for additional questions regarding the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAN BERNARDINO COUNTY
SOLID WASTE MANAGEMENT DIVISION
222 West Hospitality Lane, 2nd Floor San Bernardino, CA 92415-0017
ADDENDUM NO. 1
TO THE PLANS AND BID DOCUMENTS FOR THE UNIT 2 PHASE 5-2 LINER
CONSTRUCTION PROJECT
AT THE SAN TIMOTEO SANITARY LANDFILL
in Redlands, California
November 4, 2026
BID OPEN: 10:00AM NOVEMBER 12, 2026
The following changes and/or additions shall be made to the Plans and Bid Documents for the Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill.
All other requirements of the Plans and Bid Documents shall remain the same.
The following changes shall be made part of the Contract Documents, and the Bidder should acknowledge receipt thereof on the Bid Proposal.
I. GENERAL
Pre-Bid “Sign in Sheets” are attached to this Addendum No. 1 as Attachment 1.
II. QUESTIONS AND ANSWERS
The following question (s) have been received by the bidders:
1. “In the supplemental information to the plans and bid documents, A9 states that the self-perform requirement for this project will follow SSPWC, Section 3 – Control of the Work, Subsection 3-2-Self Performance. This specification requires 50% self-performance. Please consider requiring 30% self-performance. This modification may promote additional market interest and result in additional bidders on your project. Additionally, please provide a list of which bid items are considered specialty for the self-performance calculation.”
A1.The County will not modify the self-performance requirements for this project.
Bidders shall comply with the requirements specified in SSPWC, Section 3 – Control of the Work, Subsection 3-2 – Self Performance. Additionally, SWMD has not designated any of the bid items for this project as specialty items.
2. Will the County consider pushing the bid due date out two (2) weeks to 11/25/2026?
Several members of our Remediation Division will be out of the country until mid- November. This time would be invaluable and extremely useful in submitting our best bid package.
A2. The County will not be changing the bid due date at this time.
3. Per the warning on the STSL Unit 2 Phase 5-2 Liner Project Full Spec Package with
Attachments IFB_2026-10-16, we would like to request copies of the Final Plans and Specifications from the Dept of Public Works. Please advise how we can obtain these documents.
A3. The Final Plans and Specifications (PDF format) are available for download through E-Pro. Additionally, Supplemental Information has been added to the project bid documents and is also available for download through E-Pro. Bidders are advised to review this document carefully, as it contains important project information, including a link to access the CAD plans.
4. “This project has re-opened bidding. We missed out on the last opportunity due to missing the pre-bid meeting. We are curious on why this project is rebidding at this time?”
A4. County elected to cancel the prior solicitation and rebid the project to clarify the plans and specifications.
5. Could you provide the list of sub-contractors used for the previous bids.
A5. All bids submitted during the previous bidding are publicly available through E-Pro.
If you have any questions, please contact Jesus Torres at (909) 387-1092 or you may contact me at (909) 386-9017.
Johnny D. Gayman, P.E. Date Engineering Manager
E4635 Johnny Gayman 2024
E4635 Text Box 11/4/2026
Attachment 1
Pre-Bid Sign-in Sheets
November 4, 2026
File details come from the government source that posted it. Updated .