Signed LR Checklist.pdf
PDF 251 KB Posted
- Attached to
- PAMS repair in Northbrook
- Solicitation number
- 25-532EPA-AIR53-B-46306
- Issued by
- Cook County, Illinois
About this file
This is a Service Procurement and Contracting Checklist from March 2014 (revised) that outlines requirements for service contracts involving AFSCME bargaining unit work for Illinois state agencies. The document provides guidelines for contracting services that fall within the scope of AFSCME collective bargaining agreement work, referencing Article XXIX and the Personal Service Contract Memorandum of Understanding (PSC MOU) from the 2012 agreement.
The checklist outlines six specific categories for contracting services: Time Limited Work (including emergency work up to 60 days, temporary/seasonal work up to 6 months, and work when no appropriate eligible list exists), Specialized Professional services, Time Limited Projects (up to 12 months, renewable for an additional 12 months), Sub-contracting, Written waivers for exceeded time frames, and Renewal of existing contracts. Each category requires written notice to AFSCME Council 31 and proper documentation. The document also includes a section for non-AFSCME bargaining unit work certification and requires a Labor Relations Administrator's signature, with the current document signed and dated 01/14/25.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1 standard-illinois-certifications-v.23.18~3.docx | DOCX document | |
| Quote Repair of PAMS system.pdf | ||
| 3 standard-terms-and-conditions 2~3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SERVICE PROCUREMENT AND CONTRACTING CHECKLIST
(March 2014 Revised)
Contracts that include services within the scope of bargaining unit work are allowed in certain circumstances. However, all such agreements shall be in accordance with Article XXIX, page 103-104; the Personal Service Contract Memorandum of Understanding (PSC MOU), page 236-237 of the 2012 AFSCME collective bargaining agreement; or the Mediated Resolution Memorandum when the work performed would arguably be performed by AFSCME represented employees if the work was performed by State Personnel.
In compliance with these agreement(s), agencies must identify and document the provisions under which the services are to be contracted. Please check the applicable paragraph below and maintain substantiating documentation:
Name: PBC/Contract # : Term: Amount:
Work Location: Date of Vacancy (if applicable)
Scope of Services:
Assessment of Need (attempts to redistribute work or TA, LOA, nature of duties, EPAR #, etc.):
I. AFSCME-Bargaining Unit Work- Same or comparable work is arguably performed by bargaining unit employees. Any contract determined to be inconsistent with guidelines below must be terminated within 45 days.
1. Time Limited Work � Work based on one of the following exceptions:
a. Emergency Work � consistent with section 8b.8 of the Personnel Code (20 ILCS 415), may be acquired for a period not to exceed 60 days. With a minimum 14-day written notice, prior to initial termination, this contract may be extended if agreed to by Council 31, in writing, in advance.
b. Temporary or Seasonal Work � consistent with section 8b.9 of the Personnel Code, may be acquired for a period not to exceed 6 months out of any 12 month period. With a minimum 14 day written notice, prior to initial termination, this contract may be extended if agreed to by Council 31, in writing, in advance.
c. No Appropriate Eligible List � consistent with section 8b.10 of the Personnel Code, may be acquired for a period not to exceed 6 months out of any 12 month period. With a minimum 14 day written notice, prior to initial termination, this contract may be extended if agreed to by Council 31, in writing, in advance.
2. Specialized Professional � The work to be performed under this contract requires specialized, professional or technical services which cannot reasonably be provided by employees. Use of contractual resources to perform this work is not restricted. ____________Written notice to Council 31
(date)
3. Time Limited Projects - The work to be performed under this contract is for time limited projects required to meet certain agency mandates for which specific funds have been dedicated. These services may be acquired for up to 12 months, renewable for an additional 12 months. __________Written notice to Council 31
(date)
4. Sub-contracting: Written notice provided to Council 31 Pursuant to Article XXIX on
(date)
5. Written waiver obtained from Council 31 for exceeded time frames set forth in #(I)1.
(date)
6. Renewal of an existing contract, no substantial modification to the scope of work or cost of the contract. Written notice provided to AFSCME Council 31 prior to the contract�s initial term _________ (date)
II. Non-AFSCME Bargaining Unit Work � Same or comparable work is not arguably performed by bargaining unit employees as determined by the agency�s Bureau of Personnel or Division of Labor Relations.
LR Administrator Signature Date 01/14/25
File details come from the government source that posted it. Updated .