About this file
This document is an Emergency Purchase Extension Approval from the State of Illinois Chief Procurement Office for General Services. The requesting agency is the Illinois Department of Transportation (IDOT) District 1. The emergency contract is for the provision of automotive repair parts to allow IDOT District 1 to continue repairing its aging vehicle fleet and maintain roadway operations. The original emergency contract was valued at an estimated $2,000,000 and ran from December 31, 2023 to March 29, 2024. This extension would run from March 30, 2024 to June 30, 2024 for an additional estimated $2,000,000. IDOT previously conducted a formal procurement but was unable to award a contract, so this emergency extension is needed until a new competitive procurement can be put in place.
The extension includes a 4% Business Enterprise Program (BEP) goal, with 1% participation from Truck Tire Sales and 3% from J.T. Barrier, LLC. IDOT is requesting this extension to avoid disruptions to its operations, safety concerns, and increased costs that would result from not having access to the necessary repair parts for its aging fleet. A denial of the extension could lead to vehicle downtime, compromised safety, higher repair expenses, and service interruptions for IDOT's transportation responsibilities.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EMERGENCY PURCHASE EXTENSION APPROVAL
State of Illinois Chief Procurement Office for General Services Emergency Purchase Extension Approval v.24.1 Page 1 of 3
Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.
Zip: 60563State: ILCity: NapervilleAddress: 700 Enterprise Ct.
Vendor: Genuine Parts Company
Zip: 62764State: ILCity: SpringfieldAddress: 2300 S. Dirkesn Parkway
Requesting Agency DOT - Transportation Division: District 1
Extension Justification BidBuy Reference #: 24-494DOT-DISTR-P-61194
Amount of original contract: $ 2,000,000
Actual or Estimated: Estimated
Original BidBuy Reference #: B-40696
Original Emergency Term Start Date: Dec 31, 2023 Original Emergency Term End Date: Mar 29, 2024
Expected Extension Start Date: Mar 30, 2024 Expected Extension End Date: Jun 30, 2024
Amount of extension contract: $2,000,000 Actual or Estimated: Estimated
Is there BEP participation on this contract? If yes, please detail
BEP goal setting indicates 4% goal. BEP 4%: Truck Tire Sales (1%) J.T. Barrier, LLC (3%)
Has this emergency contract been extended before? Please detail in the space below:
BidBuy Reference # Amount Start Date End Date
$0.00
$0.00
$0.00
1. Provide detail about the events that led the agency to conduct an emergency procurement:
IDOT issued a formal procurement, however no vendor was awarded. IDOT is working on reissuing a formal procurement.
2. What is the scope of work of the initial emergency contract? Please detail below:
Provide automotive repair parts for IDOT to repair the equipment timely and continue roadway operations.
3. Does this extension change the scope of work? Yes No If yes, please detail below:
Emergency Purchase Extension Approval v.24.1 Page 2 of 3
Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.
Zip: 60563State: ILCity: NapervilleAddress: 700 Enterprise Ct.
Vendor: Genuine Parts Company
Zip: 62764State: ILCity: SpringfieldAddress: 2300 S. Dirkesn Parkway
Requesting Agency DOT - Transportation Division: District 1
4. Provide justification for extending the original emergency contract:
To allow IDOT District 1 to continue purchasing auto repair parts. Most of IDOT's fleet is aging and replacement equipment has been difficult to replenish over the past 3 fiscal years. Aging equipment generally needs more repair that new equipment.
5. Does this emergency contract correct or eliminate the emergency condition?
Yes No Please detail:
This is a continuing need until a long-term contract can be put in place.
6. Explain why the need cannot be met through a competitive procurement process.
IDOT a competitive procurement has been published 3/7/2024
7. Is a competitive procurement in process to replace this emergency contract?
Yes No Status: published
8. What is the effect of a denial of this extension request?
A denial of the extension request to continue purchasing auto repair parts for IDOT District 1 could have several significant effects:
Operational Disruption: Without access to necessary repair parts, the maintenance and repair of IDOT's aging fleet would be disrupted, potentially leading to vehicle downtime and reduced operational efficiency.
Safety Concerns: Aging equipment often requires more frequent repairs to ensure safe operation. A lack of repair parts could compromise the safety of vehicles and pose risks to both drivers and other road users.
Increased Costs: Delayed repairs or inadequate maintenance due to a lack of parts may lead to more severe damage over time, resulting in higher repair costs or the need for premature replacement of vehicles.
Service Interruptions: IDOT's ability to fulfill its transportation responsibilities, such as road maintenance and emergency response, could be compromised if vehicles are unavailable or inoperable due to maintenance issues.
Overall, a denial of the extension request could have detrimental effects on both the operational effectiveness and safety of IDOT District 1's fleet, as well as potentially increasing costs and impacting service delivery.
Emergency Purchase Extension Approval v.24.1 Page 3 of 3
Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.
Zip: 60563State: ILCity: NapervilleAddress: 700 Enterprise Ct.
Vendor: Genuine Parts Company
Zip: 62764State: ILCity: SpringfieldAddress: 2300 S. Dirkesn Parkway
Requesting Agency DOT - Transportation Division: District 1
BidBuy Reference #: 24-494DOT-DISTR-P-61194
Signatures below cannot be delegated.
APO Signature
I am requesting an extension of the requested emergency contract. I believe all statements herein are true and correct to the best of my knowledge.
APO Signature: Date: Mar 7, 2024
SPO Signature
SPO Signature: Date: Mar 7, 2024
CPO Signature Based on my review, I approve the Agency to proceed in accordance with the emergency contract extension detailed in this document.
Based upon my review, I approve the Agency to proceed with the following changes:
CPO Signature: Date:
Page of
Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.
State of Illinois Chief Procurement Office for General Services Emergency Purchase Extension Approval v. 24.1
EMERGENCY PURCHASE EXTENSION APPROVAL
State of Illinois Chief Procurement Office for General Services Emergency Purchase Extension Approval v.24.1 Page of Section 20-30(a) of the Procurement Code provides that a contract for an emergency may be extended beyond 90 calendar days with the approval of the chief procurement officer (CPO). Prior to execution of the extension, the CPO shall receive this completed form justifying the extension. The duration of the extension shall be limited to the scope of the emergency.
Extension Justification Actual or Estimated:
Has this emergency contract been extended before? Please detail in the space below:
BidBuy Reference # Amount Start Date End Date
1. Provide detail about the events that led the agency to conduct an emergency procurement:
2. What is the scope of work of the initial emergency contract? Please detail below:
3. Does this extension change the scope of work?
If yes, please detail below:
4. Provide justification for extending the original emergency contract:
5. Does this emergency contract correct or eliminate the emergency condition?
Please detail:
6. Explain why the need cannot be met through a competitive procurement process.
7. Is a competitive procurement in process to replace this emergency contract?
8. What is the effect of a denial of this extension request?
Signatures below cannot be delegated.
APO Signature I am requesting an extension of the requested emergency contract. I believe all statements herein are true and correct to the best of my knowledge.
SPO Signature CPO Signature 11.0.0.20130303.1.892433.887364
| DropDownList1: If yes, please detail |
| DropDownList1: DOT - Transportation |
| DropDownList1: DOT - Transportation |
| DropDownList1: DOT - Transportation |
| CurrentPage: |
| PageCount: |
| VendorZip: 60563 |
| VendorState: IL |
| VendorCity: Naperville |
| VendorAddress: 700 Enterprise Ct. |
| Vendor: Genuine Parts Company |
| AgencyZip: 62764 |
| AgencyState: IL |
| AgencyCity: Springfield |
| AgencyAddress: 2300 S. Dirkesn Parkway |
| AgencyDivision: District 1 |
| ReferenceNumber: 24-494DOT-DISTR-P-61194 |
| AmountOfOriginal: 2000000.00000000 |
| ActualOrEstimated2: Estimated |
| TextField15: B-40696 |
| Start: 2023-12-31 |
| End: 2024-03-29 |
| ExpectedExtensionStartDate: 2024-03-30 |
| ExpectedExtensionEnd: 2024-06-30 |
| AmtExtensionExpenditure: 2000000.00000000 |
| ActualOrEstimated3: Estimated |
| TextField5: BEP goal setting indicates 4% goal. BEP 4%: Truck Tire Sales (1%) J.T. Barrier, LLC (3%) |
| TextField7: |
| NumericField4: 0 |
| DateField3: |
| DateField4: |
| TextField8: |
| NumericField2: 0 |
| DateField5: |
| DateField6: |
| TextField9: |
| NumericField3: 0 |
| DateField7: |
| DateField8: |
| TextField6: IDOT issued a formal procurement, however no vendor was awarded. IDOT is working on reissuing a formal procurement. |
| TextField13: Provide automotive repair parts for IDOT to repair the equipment timely and continue roadway operations. |
| CheckBox7: 0 |
| CheckBox8: 1 |
| TextField1: |
| TextField2: To allow IDOT District 1 to continue purchasing auto repair parts. Most of IDOT's fleet is aging and replacement equipment has been difficult to replenish over the past 3 fiscal years. Aging equipment generally needs more repair that new equipment. |
| WhoAuthorizedWork: |
| CheckBox3: 0 |
| CheckBox4: 1 |
| TextField10: This is a continuing need until a long-term contract can be put in place. |
| TextField12: IDOT a competitive procurement has been published 3/7/2024 |
| CheckBox6: 1 |
| CheckBox5: 0 |
| DropDownList2: published |
| TextField11: |
| TextField14: A denial of the extension request to continue purchasing auto repair parts for IDOT District 1 could have several significant effects: |
Operational Disruption: Without access to necessary repair parts, the maintenance and repair of IDOT's aging fleet would be disrupted, potentially leading to vehicle downtime and reduced operational efficiency.
Safety Concerns: Aging equipment often requires more frequent repairs to ensure safe operation. A lack of repair parts could compromise the safety of vehicles and pose risks to both drivers and other road users.
Increased Costs: Delayed repairs or inadequate maintenance due to a lack of parts may lead to more severe damage over time, resulting in higher repair costs or the need for premature replacement of vehicles.
Service Interruptions: IDOT's ability to fulfill its transportation responsibilities, such as road maintenance and emergency response, could be compromised if vehicles are unavailable or inoperable due to maintenance issues.
Overall, a denial of the extension request could have detrimental effects on both the operational effectiveness and safety of IDOT District 1's fleet, as well as potentially increasing costs and impacting service delivery.
| TextField3: 24-494DOT-DISTR-P-61194 |
| AuthorizedSignature: |
| TitleField: 2024-03-07 |
| SignatureField2: |
| DateField2: 2024-03-07 |
| CheckBox1: 1 |
| CheckBox2: 0 |
| TextField4: |
| SignatureField1: |
| DateField1: |