SICG028-25 Questions Answers ATTACHMENT 01.pdf

PDF 562 KB Posted

Attached to
SICG028-25 Aberdeen Test Center - Radio Tower Geotechnical Exploration
Solicitation number
SICG028-25
Issued by

About this file

This document is a set of Questions and Answers related to Solicitation SICG028-25 for the Aberdeen Test Center - Radio Tower Geotechnical Exploration project. The key details are:

The solicitation is a Firm Fixed Price, Construction-type purchase order set aside for Small Businesses. The North American Industry Classification System (NAICS) code is 238910, Core drilling and test boring for construction. The contractor must provide labor and materials to perform a geotechnical exploration, limited laboratory testing, and provide a geotechnical engineering report for the radio tower design, which will be performed by others. Bid bonds are not required, but signed and dated resumes for the Project Manager and Geotechnical Engineer must be provided with the proposal. Projects successfully completed within the past 7 years can be submitted for past performance, and geotechnical engineering/design work performed by key subcontractors will be rated equally to the prime contractor's experience. The federal agency issuing the solicitation is the Department of Justice, Bureau of Prisons Correctional Facilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Block 13 of the SF 1442 says that a bid bond is required; however, the estimated project magnitude is less than $25,000. Can you please confirm that we do not need to submit a bid bond with our proposal?

Bid Bonds are not required.

Section G shows that we need to provide a signed and dated resume for the Project Manager and Geotechnical Engineer; however, Section M does not require signature or dates on resumes. Can you please confirm that signed and dated resumes are only required after contract award?

Signed and dated Resumes are required with your proposal.

Page 28 of 30 of the RFP states that the contractor must have 7 years of experience; however, then goes on to say that projects need to have been completed in the last 3 years for evaluation. Can you please confirm that we can submit projects successfully completed within the past 7 years in our proposal?

Yes, projects that were successfully completed within the past 7 years can be submitted for past performance.

Since geotechnical engineering/design work is a specialized scope, can you please confirm that we are allowed to use Key Subcontractor experience for Past Performance and that it will be rated equally to the Prime Offeror’s experience?

Geotechnical engineering/design work past performance can be submitted as key subcontractor and will be rated equally to prime experience.