This document is a solicitation (Solicitation Number SICG028-25) for a Firm Fixed Price, Construction Type purchase order for a geotechnical exploration project at the US Army Aberdeen Test Center, Aberdeen Proving Ground.
The solicitation is 100% set aside for Small Business under NAICS code 238910, Core drilling and test boring for construction. The contractor shall provide labor and materials to perform a geotechnical exploration, limited laboratory testing, and provide a geotechnical engineering report to determine the site soil bearing capacity, allowable settlement, and foundation design recommendations for a radio tower design. The period of performance is 90 calendar days after contract award. Proposals are due on December 13, 2024 at 2PM EST. Key evaluation factors include key resumes, schedule, past performance, and price. The solicitation includes a mandatory site visit on November 13, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
SICG028-25
UNICOR, FPI CENTRAL OFFICE
400 1ST ST NW
WASHINGTON DC 20534-0004
GENERAL INTENTION:
It is the intent of this solicitation to result in a Firm Fixed Price, Construction Type purchase order for a project at the US Army Aberdeen Test Center, Aberdeen Proving Ground as outlined in the attached Statement of Work (SOW).
The solicitation is 100% set aside for Small Business.
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-05. The North American Industrial Classification System (NAICS) Code applicable to this project is 238910, Core drilling and test boring for construction.
See - CLIN 01 and CLIN 02 -SOW - Section C- B800B Radio Tower Geotechnical Exploration
1031330211
COCO
Kimberly Schwinn 202-305-3730
1600002092
1 of 3011/05/2024
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
UNICOR, FPI CENTRAL OFFICE
Kimberly Schwinn Kimberly.Schwinn2@usdoj.gov
UNICOR FPI CENTRAL ACCOUNTS PAYABLE
PO BOX 11849
LEXINGTON, KY 40578-1849
KIMBERLY SCHWINN
Section A: Optional Form 308 or SF33 Section B: Supplies or Services / Pricing or Cost (Line Items)
1. The following information pertains to the SF1442, Solicitation, Offer, and Award:
OMB Clearance Number 1103-0018
Block 8: Emailed to:
UNICOR, FPI
ATTN: Kimberly Schwinn, CONTRACTING OFFICER 400 First Street NW Washington, DC 20534 202-305-3724
Block 17: LUMP SUM (ENTER THE AMOUNT IN SECTION B).
Block 24, and 27, See Section H.
GENERAL INTENTION: It is the intent of this solicitation to result in a Firm Fixed Price, Construction Type purchase order for a project at the US Army Aberdeen Test Center, Aberdeen Proving Ground as outlined in the attached Statement of Work (SOW). The solicitation is 100% set aside for Small Business.
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-05.
The North American Industrial Classification System (NAICS) Code applicable to this project is 238910, Core drilling and test boring for construction.
Contract Line Item: Offerors shall enter unit price and amount for contract line item.
QUESTIONS WILL ONLY be accepted in writing and WILL NOT BE ACCEPTED AFTER MONDAY, NOVEMBER 18, 2024, at 2 PM EST.
Responses to questions and site visit will be posted via www.SAM.gov.
NO PHONE CALLS PLEASE.
Proposal due date is FRIDAY, DECEMBER 13, 2024 at 2PM EST. Late offers will not be accepted.
QUESTIONS PERTAINING TO THIS SOLICITATION WILL ONLY BE ADDRESSED
IN WRITING VIA EMAIL TO: KIMBERLY.SCHIWNN2@USDOJ.GOV
SICG028-25 Page 3 of 30
CONTRACTOR’S RESPONSIBILITY: It is the responsibility of the Contractor to follow any Special Security Requirements of the facility where the work is performed in the performance of the contract and to consider the effects of those security requirements in the pricing of the proposal.
Possess valid government issued identification and all other documentation required to enter Aberdeen Proving Ground (APG).
Aberdeen Test Center is located within the Restricted Area of APG. Valid government issued identification is required to gain an escort badge for the day of the site visit.
No foreign nationals are allowed in the Restricted Area.
No photography may be taken in the Restricted Area.
Security Disclaimer:
Due to agency security CD's and flash drives are prohibited from being installed in Government provided computers. Electronic submission is the preferred method of document exchange; such examples include submittals, drawings, schedules and close-out documents. Files that are too large to be send via e-mail should be sent via DOD Safe https://safe.apps.mil/.
SITE VISIT IS MANDATORY.
CONRACTORS MUST CLEAR TWO SECURITY CHECKPOINTS TO ATTEND THIS
SITE VISIT.
THE FIRST CHECKPOINT REQUIRES:
If you do not have clearance to access the base you must report to the APG address below to obtain a day visitor pass. You must be a legal US Citizen and have a valid government ID when requesting this pass. Obtaining this pass could take between 30 to 45 minutes.
APG Visitor Control B5701 6244 MD Blvd
APG, MD 21005
Account for the time above ensuring you allow enough time to be able to meet the required 1:00 PM EST time at the second location.
SICG028-25 Page 4 of 30
THE SECOND CHECKPOINT:
WEDNESDAY, NOVEMBER 13, 2024, at 10:30 AM EST
ATC Security Office (Building 324) 6867 Colleran Road
APG, MD 21005
The Contractor shall inspect the site where services are to be performed. This site review shall satisfy the Contractor's need to identify all general and local conditions that may affect the cost of the contract. Failure to inspect the site will not constitute grounds for claims after contract award. UP to two
(2) people per company may attend.
Mandatory attendance is required for award. Company Name, Name of attendees, and phone number for attendees must be submitted to KIMBERLY.SCHIWNN2@USDOJ.GOV by Monday, NOVEMBER 11, 2024 at
2:00 PM EST
NOTE: If you have clearance to access the base - you are still required to submit your names for the site visit by the deadline of Monday, NOVEMBER 11, 2024 at 2:00 PM EST in order to attend the site visit.
US ARMY ABERDEEN TEST CENTER REQUIREMENTS: Non-CAC holders are able to gain access to the installation by the Phillips Army Airfield B1060, 6870 Cruise Rd, APG MD, 21005-5059/ATC Security Office (Building 324, 6867 Colleran Road). A background check will be conducted as part of the process and two forms of identification are required. A visitor's pass will be provided if the background check is cleared. Please allow an significant time (1-2 hours) for the entire process.
PROJECT MUST BE COMPLETED WITHIN NINETY DAYS (90) OF AWARD.
Quote due date is FRIDAY, DECEMBER 13, 2024 at 2PM EST. Late offers will not be accepted.
Offer must indicate Solicitation No. SICG028-25, name, address and telephone number of offeror, technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation, terms of any expressed warranty, price and any discount terms. Offeror must ensure all SAM documentation is completed and current, Representations and Certifications FAR 52.212-3, and include acknowledgment of all amendments, if issued. Offerors must hold prices firm for 90 calendar days from the date specified for
SICG028-25 Page 5 of 30 receipt of offers. Offers or modifications to offers received at the address specified for the receipt of offers after the exact time specified may not be considered.
Vendors shall submit signed and dated offers by email to KIMBERLY.SCHWINN2@usdoj.gov
THE FOLLOWING INFORMATION IS REQUIRED TO BE COMPLETED BY THE
OFFEROR:
VENDOR'S UEI NUMBER:_______________________________
VENDOR'S POINT OF CONTACT: _____________________________________
VENDOR'S TELEPHONE & FAX NUMBER: ______________________________
VENDOR'S EMAIL ADDRESS: ________________________________________
VENDOR'S BUSINESS SIZE (i.e. SMALL,LARGE,ETC.): ________________
By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database (System Award Management) prior to award, during performance and through final payment of any contract resulting from this solicitation.
_______________________________________________ Signature
SICG028-25 Page 6 of 30
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date
Terms: DST
00001 Geotechnical Exploration 1 EA 04/30/2025
CLIN 001 – Geotechnical Exploration
1.,,Contractor shall mobilize to the project site and perform two geotechnical borings depths in accordance with standard industry practices.
2.,,It is likely that unexploded ordnance (UXO) detection and remediation will be required during intrusive during this project. The
Contractor shall submit a Site Specific Safety and Health Plan and
Activity Hazard Analysis (AHA) to Aberdeen Test Center (ATC) for review prior to performing physical site work.
3.,,Obtain an Aberdeen Proving Ground (APG) Excavation Permit prior to excavation. Per the instruction of the authorized Aberdeen Proving
Ground Excavation Permit (obtained by the Contractor), provide UXO detection during the course of all intrusive earthwork activity.
a.,,Contact Inframap on Aberdeen Proving Ground for information on filing for an excavation permit.
i.,,6488 Rodman Road, Building 4305, Room 101, APG, Maryland 21005 ii.,,Phone: 410-272-0756
SICG028-25 Page 7 of 30
4.,,Contractor shall perform the Standard Penetration Test during the boring operation and collect soil samples for standard, limited laboratory testing and analysis.
a.,,At minimum, limited laboratory testing shall include the following:
i.,,Grain Size Analysis (ASTM D6913) ii.,,Atterberg Limits (ASTM 4318) iii.,,Standard Proctor (ASTM 698)
5.,,It is expected that the groundwater table is encountered during boring operations. Contractor shall verify initial depth of water table upon encounter, then remeasure approximately 24-hours after drilling.
00002 Engineering Report 1 EA 04/30/2025
CLIN 002 –Geotechnical Engineering Report
1.,,Contractor shall publish the findings of the exploration and limited laboratory analysis in a geotechnical engineering report. All drawings and reports shall be sealed and certified by a Professional Engineer registered in the State of Maryland before submitting to the Government for review and acceptance.
2.,,Contractor shall compute and provide the soil bearing capacity and allowable settlement.
3.,,Contractor shall provide recommendations for construction to include the management of hydrated, plastic, weak soils; as foundation construction to support the radio tower (to include specifications for the type of foundation, depths, considerations, others).
SICG028-25 Page 8 of 30
Project Name: B800B Radio Tower Geotechnical Exploration
WORK STATEMENT
Contractor shall provide labor and materials to perform a geotechnical exploration, limited laboratory testing, and provide a geotechnical engineering report for the subject project.
The geotechnical exploration shall be performed to determine the site soil bearing capacity, allowable settlement, and foundation design recommendations for incorporation in the radio tower design. The radio tower design shall be performed by others.
The following figure (Figure No. 1) illustrates the proposed project site:
Figure No. 1 – Proposed project site- provided as ATTACHMENT 01
The proposed self-supporting tower is 160 linear feet tall and includes an ice bridge and antenna system.
The Contractor is requested to provide a line-item proposal prepared in accordance with the following CLIN (Contract Line Item) structure:
SEE CLINS 01 and 02.
RELEVANT REFERENCE DOCUMENTS
1. Army Regulation (AR) 420-1: Army Facilities Management (24 August 2012)
a. Reference:
https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/ARN15517_R4 20_1_admin_FINAL.pdf
2. Unified Facilities Criteria (UFC) 3-201-01: Civil Engineering (01 April 2021)
3. Aberdeen Proving Ground Regulation (APGR) 385-007:
Excavation Permit Program
PERIOD OF PERFORMANCE
The Government requires completion of this project within 90 calendar days after Purchase Order award. The Purchase Order defines completion as the completion of all contractual obligations and requirements.
SICG028-25 Page 9 of 30
GOVERNMENT SERVICES
1. The Contracting Officer (KO) has sole authority to obligate the Government. The Contractor is not authorized to perform work outside the contract without authority of the Contracting Officer (KO) or designated agents.
2. The Contracting Officer (KO) appoints the Contracting Officer’s Representative (COR) to serve as the Government's technical representative and primary point of contact in the field following contract award. The COR, or their authorized representative, will inspect and perform surveillance of various phases of work in progress to ensure work is performing performed in accordance with specifications. The COR, or authorized agent, will perform all inspection and acceptance on behalf of the Government for this project.
GENERAL CONDITIONS
The contents of this document shall prevail and supersede any exclusions or disclaimers listed on the Contractor’s proposal.
The Contractor shall provide all plant, supervision, labor, materials, equipment, supplies and transportation necessary to complete this scope of work. Except as provided elsewhere in this purchase order, all work shall comply with applicable State, local and Federal laws and regulations, industry and construction codes and standards, manufacturer’s specifications and recommendations, and all purchase order special provisions, terms and conditions.
The Contractor shall be responsible for obtaining and maintaining all required licenses and permits to perform construction work on a Federal installation, be properly bonded and insured in accordance with Federal Acquisition Regulation (FAR) requirements.
All work shall be performed under the Standard Level of Care.
The Contractor is to provide a baseline Construction Schedule, in which time is of the essence, and an accepted Schedule of Values (SOV) prior to the commencement of construction activities.
The Contractor shall submit progress schedules biweekly.
Schedules shall include work sequence.
SICG028-25 Page 10 of 30
Contractor shall be responsible and bound by all Occupational Safety and Health Administration (OSHA) regulations, and the US Army Corps of Engineers (USACE) Safety and Health Requirements Manual (EM 385-1-1). Where the standards conflict, the Contractor shall perform to the higher standard. An online version of EM 385-1-1 may be located at the following website:
https://www.publications.usace.army.mil/Portals/76/Publications/ EngineerManuals/EM_385-1-1.pdf
Contractor shall submit an Accident Prevention Plan containing Activity Hazard Analyses (AHA) and Site Specific Safety and Health Plan in advance of performing work.
The Contractor is to perform work in the Restricted Area and all personnel must adhere to the standing security requirements.
The Contractor shall be responsible for obtaining all security badges for their employees and Subcontractors and for providing all required escorts for the Project.
The Contractor shall check and verify all conditions and dimensions at the project site before proceeding with the work.
The Contractor shall report all discrepancies to the COR for correction prior to beginning any work.
Contractor is responsible for providing quality control (QC) inspection/testing to assure all work and materials are in strict compliance with the scope of work, all regulations, and all codes of the governing contract and local authorities.
Submit Daily Construction Reports (DCR’s) detailing the actual work completed and verified labor count.
Certified Payrolls shall be submitted biweekly to the KO and
COR.
The Government authorizes the Contractor to work onsite from 0700 to 1700 hours Monday through Friday. Government “Regular Day Off” (RDO) occurs every other Friday. The Government and Contractor must negotiate, schedule, and approve work performed.
SECTION D - PACKAGING AND MARKING
PRESERVATION, PACKING AND MARKING
SICG028-25 Page 11 of 30
Preservation, packaging, and packing for all items delivered hereunder shall be in accordance with commercial practice, and shall be paid by the contractor. All packaging, postage fees and payment related to submitting information, forms and reports, etc. to the Government (i.e. Contracting Officer, Contracting Officer's Representative) shall be paid by the Contractor.
MARKING
All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the contract number and task order number, if applicable, for which the information is being submitted.
SECTION E: INSPECTION AND ACCEPTANCE
52.246-12 Inspection of Construction. (Aug 1996)
CONTRACTING OFFICER'S REPRESENTATIVE (COR)
The COR is responsible, as applicable, for: receiving all deliverables, inspecting and accepting the supplies or services provided hereunder in accordance with the terms and conditions of this contract; providing direction to the contractor which clarifies the contract effort, fills in details or otherwise serves to accomplish the contractual Scope of Work; evaluating performance; and certifying all invoices/vouchers for acceptance of the supplies or services furnished for payments.
SECTION F: DELIVERY & PERFORMANCE
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) For each building, the Contractor shall be required to (a) commence work under the awarded contract within 10 calendar days of receipt of task order, and (b) prosecute the work diligently.
The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.236-15 Schedules for Construction Contracts. (Apr 1984)
PERFORMANCE SITE
SICG028-25 Page 12 of 30
ABERDEEN TEST CENTER
3573376 BLDG 358 MICHAELVILLE ROAD
ABERDEEN PROV GND, MD 21005-5059
CONTRACT PERIOD OF PERFORMANCE
The period of performance of this contract shall be ninety (90) days, and commence from the contract award date and continue thru final completion.
SECTION G CONTRACT ADMINISTRATION DATA:
FEDERAL GOVERNMENT HOLIDAYS
The following is a list of Federal Holidays observed by the Government:
New Year's Day (JAN 1) Martin Luther King's Birthday (3rd Monday in January) Washington's Birthday (3rd Monday in February) Memorial Day (last Monday in May) Juneteenth (JUN 19) Independence Day (JUL 4) Labor Day (1st Monday in September) Columbus Day (2nd Monday in OCT) Veteran's Day (November 11th) Thanksgiving (4th Thursday in November) Christmas (DEC 25)
ADMINISTRATIVE INFORMATION
A. ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR
CONTRACT AWARD AND ADMINISTRATION
1. Administration of this contract shall be performed by:
Kimberly Schwinn, Contract Specialist E-mail: Kimberly.Schwinn2@usdoj.gov UNICOR, Federal Prison Industries Attn: Kimberly Schwinn, Contract Specialist 400 First Street NW 8th Floor Washington, DC 20534
Written communications shall make reference to the purchase order number and shall be mailed to the above address, or sent via Email to Kimberly.schwinn2@usdoj.gov
SICG028-25 Page 13 of 30
Administrative Contracting Officer is Kimberly Schwinn at Kimberly.Schwinn2@usdoj.gov
The Contracting Officer (CO) has the overall and primary responsibility for the administration of this Contract. The CO alone, without delegation, is authorized to take actions on behalf of the Government to: modify or deviate from the contract terms, conditions, requirements, specifications, details and/or delivery schedules; make final decisions involving deductions from contract payments or other consideration due to the Government, for nonperformance or unsatisfactory performance, whether or not in dispute; terminate the contract for convenience or default; issue final decisions regarding contract questions or matters under dispute. The CO may delegate certain other responsibilities to an authorized representative.
JAR 2852.201-70, CONTRACTING OFFICER'S REPRESENTATIVE
a) The following are hereby designated to act as Contracting Officer's Representative (COR) under this contract:
Dianne Swauger Aberdeen Test Center (410)-278-0194 Dianne.Swauger.civ@army.mil
(b) The COR is responsible, as directed by the CO, for: 1.
receiving all deliverables, inspecting and accepting the supplies or services provided hereunder in accordance with the terms and conditions of this contract; 2. providing direction to the contractor which clarifies the contract effort; 3.
fills in details or otherwise serves to accomplish the contractual Scope of Work; 4. evaluating performance; and certifying all invoices/vouchers for acceptance of the supplies or services furnished for payments.
(c) The COR does not have the authority to alter the contractor's obligations under the contract, and/or modify any of the expressed terms, conditions, specifications, or cost of the agreement. If as a result of technical discussions, it is desirable to alter/change contractual obligations or the Scope of Work, the Contracting Officer shall issue such changes in writing and signed.
CONTRACTOR'S PROJECT SITE MANAGER
SICG028-25 Page 14 of 30
The Contractor shall provide a full time Project Site Manager for all construction and/or installation activities. The Project Site Manager shall be present in the work area whenever work is being performed.
Contractor's Project Site Manager shall provide signed and dated resume to include a copy of certifications for credentialed professionals.
Project Site Manager resume must show at a minimum:
Five (5) years of experience overseeing federal construction contracts at military installations that are similar in size and scope to current requirement. Resume must show:
-Start and End Dates,
- Brief Description,
- Dollar Value,
- Period of Performance and
- A Point of Contact/ Reference
In the event of replacement of Project Site Manager, the Contractor is required to replace the individuals listed below with individuals of comparable qualifications. USG reserves the right to accept/reject any new team members.
CONTRACTOR'S Geotechnical Engineer
Contractor's Geotechnical Engineer shall provide signed and dated resume to include a copy of certifications for credentialed professionals.
Project Geotechnical Engineer resume or firm portfolio must show at a minimum:
Five (5) years of experience in the field of geotechnical engineering and is licensed as a Professional Engineer in the State of Maryland. Resume must show:
-Start and End Dates,
- Brief Description,
- Dollar Value,
- Period of Performance and
- A Point of Contact/ Reference
In the event of replacement of Geotechnical Engineer, the Contractor is required to replace the individuals listed below with individuals of comparable qualifications. USG reserves the right to accept/reject any new team members.
SICG028-25 Page 15 of 30
REQUIREMENTS FOR CORRECTION OF SUB-STANDARD PERFORMANCE
When any member of the Contract Administration Team (CO & COR) becomes aware of substandard performance in any area of the Contract, the Contractor will be given verbal and/or written notification, depending on the circumstances of the issue. The Contractor shall resolve the performance issues consistent with the requirements specified in the SOW and/or task order. For other types of deficiencies where the corrective actions are not specifically stated, the Contractor shall submit a Plan of Action to correct the performance issue within ten (10) working days. If it is not corrected to the satisfaction of the Contract Administration Team member, the Contract Administration Team member shall annotate the performance files and include the observations in the Contractor Performance Report as appropriate.
SECTION H SPECIAL CONTRACT REQUIREMENTS:
CONTRACT AWARD
The Government intends to award a Firm Fixed-Price Construction type purchase order as a result of this solicitation. Award will be made to the offeror, pursuant to an affirmative determination of responsibility, whose offer conforms to the terms of the solicitation and is determined to be in the best interest of the Government, based upon evaluation of the factors included in this solicitation.
WAGE DETERMINATION APPLICABLE TO THIS CONTRACT
The rates referred to in the Davis-Bacon Act for Bricklayers, Laborers, Carpenters, Electricians, etc., are included in the General Wage Determination issued by U.S. Department of Labor Employment Standards Administration Wage and Hour Division, General Decision Number MD20240005 dated 01/05/2024.
Payment will be made to individuals used in the performance of this purchase order, the rates of wages contained therein. The complete wage rate decision is incorporated as a part of this solicitation.
SUBMISSION AND PAYMENT OF INVOICE
Reference Standard Contract Clause entitled "Prompt Payment For Construction Contracts (FAR 52.232-27) of this solicitation.
Invoice shall include the complete Purchase Order number and
SICG028-25 Page 16 of 30 line item(s) billed. To avoid delay in payment, invoice shall be submitted in an original and one copy (if prepared by a copying process, one copy shall be marked "Original").
Pay Application shall be submitted at the end of the project to:
ATC, ATTN: Dianne Swauger, Contracting Officer Representative, dianne.swauger.civ@army.mil
UNICOR, Federal Prison Industries, ATTN: Kimberly Schwinn, Contracting Officer, Kimberly.Schwinn2@usdoj.gov
UNICOR, Federal Prison Industries, ATTN: Yvette Hairston-Mercer, yvette.hairston-mercer@usdoj.gov
Delay in contractor payment due to invoice submission to any other email address than listed above shall be the fault of the contractor, and payment will be processed only upon receipt at the email address noted above, and after approval by project
COR.
ONE INVOICES SHALL REFERENCE THE PURCHASE ORDER NUMBER.
Invoice must match the purchase order dollar amount and payment will only be processed upon approval by project COR.
Payment Application must be submitted using AIA Document G702/G703.
LIABILITY COVERAGE / INSURANCE
52.228-5 Insurance-Work on a Government Installation
Insurance-Work on a Government Installation (Jan 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective-
(1) For such period as the laws of the State in which this
SICG028-25 Page 17 of 30 contract is to be performed prescribe; or
(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract.
The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
(End of clause)
(a) (In accordance with Standard FAR Contract Clause 52.228-5 entitled "Insurance - Work on a Government Installation (JAN 1997) the Contractor shall procure and maintain, during the entire period of his performance under this contract, the following minimum insurance:
(1) General Liability Insurance
Bodily injury liability insurance, in the minimum limit of $500,000 per occurrence is required on the comprehensive form policy.
(2) Automobile Liability Insurance This insurance is required on the comprehensive form policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles sued in connection with the performance of the contract. At least, the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
(3) Workmen's Compensation and Employer's Liability Insurance
Employer's liability coverage is required in the minimum amount of $100,000 or as required by the state where the project is performed.
(b) Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies
SICG028-25 Page 18 of 30 evidencing required insurance shall contain an endorsement to the effect that cancellation of any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the state in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.
(c) The Contractor agrees to insert in all subcontracts the required insurance information provided above, including this paragraph (c).
CONTRACTOR'S RESPONSIBILITY
It is the responsibility of the Contractor to follow any Special Security Requirements of the facility where the work is performed in the performance of the contract and to consider the effects of those security requirements in the pricing of the proposal.
Construction Progress Telecoms: Biweekly telecoms with CO/COR to discuss design issues and project progress as necessary. The Contractor shall provide call-in number, lead the discussion and provide minutes to all participants (electronic submission only); to include action items, items for clarification and information requests within three business days of the biweekly status calls.
PROJECT MAGNITUDE
Pursuant to paragraph 36.204 of the Federal Acquisition Regulation, the estimated cost of this acquisition is less than $25,000
SICG028-25 Page 19 of 30
SECTION I CLAUSES:
52.203-5 Covenant Against Contingent Fees (MAY 2014)
52.203-7 Anti-Kickback Procedures (JUN 2020)
52.203-17 Contractor Employee Whistleblower Rights and Requirement to inform Employees of Whistleblower Rights (JUN 2020)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.(JAN 2017)
52.204-2 Security Requirements.(MAR 2021)
52.204-9 Personal Identity Verification of Contractor Personnel
(JAN 2011)
52.204-13 System for Award Management Maintenance (OCT 2018)
52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(NOV 2021)
52.204-27 Prohibition on a ByteDance Covered Application Prohibition on a ByteDance Covered Application (Jun 2023)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015)
52.213-4 Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services). (FEB 2024)
52.215-8 Order of Precedence—Uniform Contract Format. (Oct 1997)
52.219-6 Notice of Total Small Business Set-Aside. (NOV 2020)
SICG028-25 Page 20 of 30
52.219-28 Post-Award Small Business Program Representation.
(SEP 2023)
52.222-3 Convict Labor. (June 2003)
52.222-6 Construction Wage Rate Requirements (AUG 2018)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (JUL 2021)
52.222-9 Apprentices and Trainees. (July 2005)
52.222-10 Compliance with Copeland Act Requirements. (Feb 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination—Debarment. (MAY 2014)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (Feb 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (JUN 2020)
52.222-21 Prohibition of Segregated Facilities. (APR 2015)
52.222-26 Equal Opportunity. (SEP 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)
52.222-29 Notification of Visa Denial. (APR 2015)
52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020)
52.222-50 Combating Trafficking in Persons (NOV 2021)
52.222-55 Minimum Wage Under Executive Order 13658 (JAN 2022)
SICG028-25 Page 21 of 30
52.222-62 Paid Sick Leave Under Executive Order 13706. (JAN 2022)
52.223-5 Pollution Prevention and Right-to-Know Information.
(May 2011)
52.223-6 Drug-Free Workplace. (May 2001)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020)
52.224-1 Privacy Act Notification. (Apr 1984)
52.224-2 Privacy Act. (Apr 1984)
52.225-9 Buy American—Construction Materials (NOV 2021)
52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021)
52.228-5 Insurance—Work on a Government Installation. (Jan 1997)
52.229-3 Federal, State, and Local Taxes. (Feb 2013)
52.232 –5 Payments under Fixed Price Construction Contracts
(MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts (Jan 2017)
52.232-33 Payment by Electronic Funds Transfer-System for Award Management. (OCT 2018)
52.232-35 Designation of Office for Government Receipt of Electronic Funds Transfer Information. (Jul 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (NOV 2021)
52.233-1 Disputes. (MAY 2014) Alternate I (Dec 1991).
52.233-3 Protest after Award (AUG 1996)
SICG028-25 Page 22 of 30
Alternate I (June1985)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions. (Apr 1984)
52.236-3 Site Investigation and Conditions Affecting the Work.
(Apr 1984)
52.236-5 Material and Workmanship (Apr 1984)
52.236-6 Superintendence by the Contractor. (Apr 1984)
52.236-7 Permits and Responsibilities (Nov 1991)
52.236-8 Other Contracts. (Apr 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Apr 1984)
52.236-10 Operations and Storage Areas. (Apr 1984)
52.236-11 Use and Possession Prior to Completion. (Apr 1984)
52.236-12 Cleaning Up. (Apr 1984)
52.236-13 Accident Prevention. (Nov 1991)
52.236-26 Preconstruction Conference. (Feb 1995)
52.242-1 Notice of Intent to Disallow Costs (APR 1984)
52.242-14 Suspension of Work. (APR 1984)
52.244-6 Subcontracts for Commercial Items (SEP 2023)
52.246-21 Warranty of Construction (MAR 1994)
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
________https://www.acquisition.gov/_____
SICG028-25 Page 23 of 30
(End of clause)
52.253-1 Computer Generated Forms. (Jan 1991)
PART III: List of Documents, Exhibits, and Other Attachments
Section J List of Attachments
ACH FORM
ATTACHMENT 01
PART IV: Representations & Instructions
Section K Representations, certifications, and other statements of offerors or respondents
52.204-17 Ownership or Control of Offeror (AUG 2020)
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations – Representations (Nov 2015)
52.222-22 Previous Contracts and Compliance Reports. (Feb 1999) The offeror represents that— It __ __ has, __ __ has not participated in a previous contract or subcontract subject to the Equal Opportunity clause of this solicitation;
It __ __ has, __ __ has not filed all required compliance reports; and Representations indicating submission of required compliance reports, signed by proposed subcontractors, will be obtained before subcontract awards.
(End of provision)
52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation. (DEC 2016)
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran – Representations and Certifications (JUN 2020)
52.236-28 Preparation of Proposals – Construction (OCT 1997)
Section L Instructions
52.204-7 System for Award Management (Oct 2018)
SICG028-25 Page 24 of 30
52.204-16 Commercial and Government Entity Code Reporting (AUG 2020)
52.207-1 Notice of Standard Competition (MAY 2006)
52.214-34 Submission of Offers in the English Language. (APR 1991)
52.215-1 Instructions to Offerors—Competitive Acquisition.
(Jan 2017)
52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (May 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
(End of provision)
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999)
52.225-10 Notice of Buy American Requirement-Construction Materials. (MAY 2014)
52.233-2 Service of Protest (Sept 2006)
52.236-27 Site Visit (Construction). (Feb 1995) Alternate I (Feb 1995).
If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph
(b) of the basic provision
(b) An organized site visit has been scheduled for—
WEDNESDAY, NOVEMBER 13, 2024, at 10:30 AM EST
SICG028-25 Page 25 of 30
(c) Participants will meet at—
ATC Security Office (Building 324) 6867 Colleran Road
APG, MD 21005
Section M Evaluations Factors for Award:
52.212-2, Evaluation - Commercial Items (OCT 2014), significant evaluation factors are Key Resumes, schedule, past performance and cost. Key Resumes, past performance and schedule are significantly more important than cost. Quality, delivery, and customer service will be evaluated under past performance. The Government may make award without discussions; therefore, the offeror’s initial offer should contain their best pricing.
Award will be based on the best value to the Government considering the evaluation factors listed above. Best value may be determined using tradeoffs among the evaluation factors, so that award may be made to other than the lowest-priced or highest technically rated proposal. Please note that all offers which fail to furnish required representations and certifications or past performance information or reject the terms and conditions of the solicitation may be excluded from consideration for award;
Technical Factor - Key Resumes:
Project Site Manager and Geotechnical Engineer.
Project Site Manager resume must show at a minimum:
Five (5) years of experience overseeing federal construction contracts at military installations that are similar in size and scope to current requirement. Resume must show:
-Start and End Dates,
- Brief Description,
- Dollar Value,
- Period of Performance and
- A Point of Contact/ Reference
Project Geotechnical Engineer resume or firm portfolio must show at a minimum:
Five (5) years of experience in the field of geotechnical engineering and is licensed as a Professional Engineer in the State of Maryland. Resume must show:
-Start and End Dates,
- Brief Description, SICG028-25 Page 26 of 30
- Dollar Value,
- Period of Performance and
- A Point of Contact/ Reference
SCHEDULE:
Should include all milestones referred to in the statement of work. Contractor must provide a comprehensive master schedule that demonstrations the complete understanding of the scope and requirements, identifies the critical path, and provides aggressive but achievable timelines.
Key Resumes and Schedule will receive one of the following ratings:
Rating factors are Excellent, Good, Acceptable, Marginal and Unacceptable.
Rating Scale:
Excellent - The proposal meets requirements in all stated areas and exceeds requirements in many areas. The proposal contains several strengths most of which are significant, may contain minimal minor weaknesses which do not require discussions, and contains no deficiencies. Based on information provided, there is little doubt that the contractor demonstrates an exceptional understanding of the services required to exceed most contract requirements. The highest quality of contract performance is anticipated with little or no risk of unsuccessful contract performance.
Good- The proposal meets all stated requirements. The proposal contains strengths, some of which may be significant, may contain minimal weaknesses which do not require discussions, and contains no deficiencies. Based on the information provided, the contractor demonstrates a good understanding of the services required to exceed some contract requirements. There is a high probability of success with little risk of unsuccessful contract performance.
Acceptable - The proposal meets all stated requirements. The proposal may or may not contain strengths, whether significant or not and may contain some weaknesses that will not prevent successful completion of the contract and contains no deficiencies. Based on the information provided, the contractor demonstrates the minimum level of understanding of the services required to meet contract requirements. There is a fair probability of success with a moderate degree of acceptable
SICG028-25 Page 27 of 30 risk.
Marginal - The proposal does not make clear that it meets all stated requirements. The proposal contains deficiencies that could be addressed with changes to the proposal, and/or contains a number of significant weaknesses that may prevent successful completion of the contract, but could contain strengths. Based on information provided, there is doubt that the contractor understands the services required to meet the contract requirements. Requirement/services can be met only with major changes to the proposal. There is a low probability of success with multiple minor risks or one or more major risks that, if not mitigated, will likely impede successful performance.
Unacceptable - The proposal fails to meet the stated requirements. The proposal has one or more deficiencies, gross omissions, and/or significant weaknesses. The proposal demonstrates the contractor's failure to understand much of the scope of work necessary to perform the required tasks, failure to provide a reasonable, logical approach to fulfilling much of the government's requirements or failure to meet many requirements in the solicitation. One or more areas would have to be completely revised in order to attempt to make it other than unacceptable. Proposal presents an unacceptably high degree of risk to successful contract performance.
Past Performance
PAST PERFORMANCE – Contractor must have 7 years of experience plus performing construction and Geotechnical Engineer design work with federal, state, or local government property.
Contractors must identify previous federal, state, and local government contracts that they have completed and that are similar size, value, and type to the contract being evaluated.
Contractor shall submit three projects executed that have similar features of work. The three projects submitted must be self-performed and within the last 3 years for evaluation. The Government may use data from the Past Performance Information Retrieval System and through interviews with personnel familiar with the contractor and their current and past performance.
Past Performance will receive one of the following confidence ratings:
Substantial Confidence: Based on the offeror’s performance record, the Government has high expectation that the offeror will successfully perform the required effort.
SICG028-25 Page 28 of 30
Satisfactory Confidence: Based on the offeror’s the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence: Based on the offeror’s performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
No Confidence: Based on the offeror’s performance record, the Government has no expectation that the offeror will be able to perform the required effort.
Unknown Confidence (Neutral): No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Price.
Proposals will be evaluated to determine if they are fair and reasonable.
PART IV: SUBMISSION REQUIREMENTS
Responsive offers must include the following:
PROPOSAL PACKAGES ARE TO BE SEPARATED INTO TWO SECTIONS A
TECHNICAL PROPOSAL AND A PRICING PROPOSAL. TWO (2) TECHNICAL
PACKAGES SHALL BE SUBMITTED ONE WITH COMPANY INFORMATION AND ONE
REDACTED VERSION WITH NO COMPANY INFORMATION.
Each proposal package shall consist of the following completed and signed documents: SF1442, all amendments issued, three- five past performance records of recent and relevant contracts for the same or similar items in accordance with FAR 52.212-1(b)(10) for past performance evaluation, key resumes, schedule, and technical factors.
Proposal due date is FRIDAY, DECEMBER 13, 2024 at 2PM EST. Late offers will not be accepted. Offer must indicate Solicitation No. SICG028-25, name, address and telephone number of offeror, technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation, terms of any expressed warranty, price and any discount terms. Offeror must ensure all SAM documentation is completed and current, Representations and Certifications FAR
SICG028-25 Page 29 of 30
52.212-3, and include acknowledgment of all amendments, if issued.
Offerors must hold prices firm for 90 calendar days from the date specified for receipt of offers. Offers or modifications to offers received at the address specified for the receipt of offers after the exact time specified may not be considered.
Vendors shall…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .