SICG027-24 - ATTACHMENT 01 - FIGURE NO 1-5.pdf
PDF 345 KB Posted
- Solicitation number
- SICG027-24
About this file
This document appears to be a set of figures and electrical requirements related to a federal contract opportunity.
The contract opportunity, named "Aberdeen Testing Center -ELECTRICAL SERVICE PARTICLE MACHINE" with Solicitation Number SICG027-24, is issued by the Department of Justice Bureau of Prisons Correctional Facilities. The intent is to result in a Firm Fixed Price, Construction Type purchase order for providing approximately 400+ linear feet of electrical service from existing switchgear to power a government-furnished magnetic particle machine. A site visit is mandatory on August 19, 2024, and the quote is due on September 6, 2024. The project must be completed within 365 days of award. The electrical requirements, including voltage, amps, and wire size, are detailed in the figures and a summary table. No performance work statement or statement of objectives is provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SICG027-24 AMD01.pdf | ||
| SICG027-24 1600001801.pdf | ||
| FORM SF-25A PAYMENT BOND.pdf | ||
| FORM SF-24 BID BOND.pdf | ||
| FORM SF-25 PERFORMANCE BOND.pdf | ||
| ACH Vendor Enrollment Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure No. 1 – Site plan for familiarization.
Figure No. 2 – Magnetic Particle Machine Plan View, not to scale.
½” NPT Air Filter/Regulator
Line Box 460V/60Hz/3Ph 300 Amp
Figure No. 3 – Magnetic Particle Machine Cross-Section View, not to scale.
Figure No. 4 – Magnetic Particle Machine Cross-Section View, not to scale.
Line Box 460V/60Hz/3Ph 300 Amp
Line Box 460V/60Hz/3P h
Figure No. 5 – Conceptual plan view with dimensions.
Voltage Line Amps – Momentary 10,000 DC Load Amps
Fused Disconnect Switch Wire From Disconnect Switch to Unit
3 Phase 460 VAC 60 Cycle 300 Amps 200 Amp Fused with 200 Amp Fusetrons
For 100 Foot Run #1 AWG
Note: Service conduit should be installed to the junction box provided on the power pack and three phase power supply connected.
Connect ground lead to frame of the power pack.
Table No.1 – Summary of electrical requirements from vendor.
½” NPT Air Filter/Regulator
File details come from the government source that posted it. Updated .