SICG027-24 - ATTACHMENT 01 - FIGURE NO 1-5.pdf

PDF 345 KB Posted

Attached to
Aberdeen Testing Center -ELECTRICAL SERVICE PARTICLE MACHINE
Solicitation number
SICG027-24
Issued by

About this file

This document appears to be a set of figures and electrical requirements related to a federal contract opportunity.

The contract opportunity, named "Aberdeen Testing Center -ELECTRICAL SERVICE PARTICLE MACHINE" with Solicitation Number SICG027-24, is issued by the Department of Justice Bureau of Prisons Correctional Facilities. The intent is to result in a Firm Fixed Price, Construction Type purchase order for providing approximately 400+ linear feet of electrical service from existing switchgear to power a government-furnished magnetic particle machine. A site visit is mandatory on August 19, 2024, and the quote is due on September 6, 2024. The project must be completed within 365 days of award. The electrical requirements, including voltage, amps, and wire size, are detailed in the figures and a summary table. No performance work statement or statement of objectives is provided in this document.

View the file

Other files

File Type Posted
SICG027-24 AMD01.pdf PDF
SICG027-24 1600001801.pdf PDF
FORM SF-25A PAYMENT BOND.pdf PDF
FORM SF-24 BID BOND.pdf PDF
FORM SF-25 PERFORMANCE BOND.pdf PDF
ACH Vendor Enrollment Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Figure No. 1 – Site plan for familiarization.

Figure No. 2 – Magnetic Particle Machine Plan View, not to scale.

½” NPT Air Filter/Regulator

Line Box 460V/60Hz/3Ph 300 Amp

Figure No. 3 – Magnetic Particle Machine Cross-Section View, not to scale.

Figure No. 4 – Magnetic Particle Machine Cross-Section View, not to scale.

Line Box 460V/60Hz/3Ph 300 Amp

Line Box 460V/60Hz/3P h

Figure No. 5 – Conceptual plan view with dimensions.

Voltage Line Amps – Momentary 10,000 DC Load Amps

Fused Disconnect Switch Wire From Disconnect Switch to Unit

3 Phase 460 VAC 60 Cycle 300 Amps 200 Amp Fused with 200 Amp Fusetrons

For 100 Foot Run #1 AWG

Note: Service conduit should be installed to the junction box provided on the power pack and three phase power supply connected.

Connect ground lead to frame of the power pack.

Table No.1 – Summary of electrical requirements from vendor.

½” NPT Air Filter/Regulator

File details come from the government source that posted it. Updated .