This document is a Simplified Acquisition Statement of Work (SOW) for the installation of bollards on the public sidewalk around the FBI Seattle office building. The key details are:
The scope of work includes submitting preconstruction submittals, installing bollard elements, obtaining necessary permits from the City of Seattle and Seattle Department of Transportation (SDOT), making corrections as needed, and providing project closeout documentation. The purpose is to provide improved security measures between the street and the FBI office building. The period of performance is 60 working days from notice to proceed. The work shall not impede day-to-day building operations or create blind spots for building cameras. This requirement is set aside for total small business and will be awarded based on Lowest Price Technically Acceptable (LPTA) under FAR Parts 12 and 13.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Copy of SELF CERTIFYING DOCUMENT.xlsx | XLSX spreadsheet | |
| RFQ- Perimeter Bollard Project.pdf | ||
| 20240322_Updated Site Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL BUREAU OF
INVESTIGATION
FINANCE DIVISION | PROCUREMENT
SECTION
Simplified Acquisition
Statement of Work (SOW)
Statement of Work for Seattle Division
1.0 Background
Currently, there are no bollards on two sides of the public sidewalk around the FBI
Seattle office building. Due to the continuing security concerns around downtown
Seattle, this project will install bollards to provide the FBI with better security measures between the street and the office building.
2.0 Scope
The scope of work involved is as followed:
1) Submit preconstruction submittals based on design documents. (Construction
Schedule, Product Data, Shop Drawings, Samples, Relevant Test Data).
2) Install bollards elements for barriers deterrent.
3) Submit/Get approval from the City of Seattle/Seattle Department of
Traffic (SDOT) on relevant construction permits such as traffic control plans.
4) Make corrections as needed by the City of Seattle/SDOT
5) Project Closeout documentation as applicable: O&M, Warranties, As-Builts
6) Additional information to be noted:
• Utility, drainage, and ADA grading work is not anticipated with the project.
• Modifications to existing areaways, if encountered, are not anticipated.
3.0 Objectives
The purpose of this requirement is to provide the installation of bollards, obtain the necessary permits required by the City of Seattle and the Seattle Department of Traffic
(SDOT), and services will be performed at the FBI Seattle building on 1110 3rd Ave, Seattle, WA 98101.
4.0 Tasks
• Review record drawings within the City of Seattle’s record vault for utilities, areaways, and miscellaneous infrastructure elements that may be present.
• Review design documents included with the solicitation.
• Perform site visit and confirm surface improvement dimensions provided in plan/Design Documents prepared by the FBI project team.
• Develop RFIs to submit FBI project team to reflect information gathered.
• Review and coordinate with the FBI’s project manager (PM) for bollard and infill material selection and layout.
• Develop site utilization plan for FBI project team approval prior to construction.
• Implement temporary security measures as required by FBI project team based on review of site utilization plan.
• Document locations and bollard detail on as-built plan, including attachment details if needed.
• Coordinate meeting with SDOT to review construction plans and layout, if needed. Obtain permitting with the City of Seattle and SDOT.
• Installation of bollards.
5.0 Delivery
Description Estimated Durations
1) Mandatory Site visits on September 10th, 2024
2) Existing Conditions Review 2 weeks
3) RFIs Submit and Review 4 weeks
4) Acceptance of Bid/Notice to Proceed 2 weeks
5) Preconstruction Documentation 4 weeks
6) Procurement of Materials 2-4 weeks
7) Construction 2-4 weeks
8) Punchlist and Acceptance 2 weeks
9) Closeout Documentation 4 weeks
6.0 Government-Furnished Property
None
7.0 Security Requirements
Work shall not impede day-to-day building operations of
Government/FBI space. Work shall not create “blind spot” of camera visuals. (e.g. vehicles/equipment acting as barrier, temporary construction blocking building access)
8.0 Place of Performance
The work is being done in the Seattle’s downtown FBI HQ office on 1110 3rd Ave, Seattle, WA 98101.
9.0 Period of Performance
The period of performance is 60 working days from notice to proceed but is subject to change based on submitted bid schedules.
10.0 Travel
No travel is required.