20240322_Updated Site Plan.pdf
PDF 556 KB Posted
- Attached to
- FBI Seattle Division Perimeter Bollard Project
- Solicitation number
- SHOP-PR-24-003425
About this file
This document contains design plans and construction details for a project to install security bollards around the perimeter of the FBI Seattle Division building. The plans include details on the proposed bollard locations, dimensions, materials, and installation requirements.
The related federal contract opportunity is a Request for Quotation (RFQ) issued by the FBI Procurement Section to identify a vendor to install the bollards per the attached design documents and Statement of Work. This requirement is set aside for small businesses and will be awarded based on Lowest Price Technically Acceptable (LPTA) criteria. Key details include the solicitation number SHOP-PR-24-003425, project name "FBI Seattle Division Perimeter Bollard Project", and the contracting agency is the Department of Justice Federal Bureau of Investigation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| SOW.pdf | ||
| Copy of SELF CERTIFYING DOCUMENT.xlsx | XLSX spreadsheet | |
| RFQ- Perimeter Bollard Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING FIRE
HYDRANT
5' CLEARANCE
REQUIRED ALL SIDES
EXISTING LAMP POST
EXISTING LAMP POST
EXISTING LAMP POST EXISTING TREES
EXISTING TREE
EXISTING TREE
EXISTING LAMP POST
EXISTING
CROSS WALK
BUTTON ON
POST
EXISTING CROSS WALK
BUTTON ON POST
240 West Main Street, Suite 100 Charlottesville, VA 22902
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
3/
/2
3:
:1
PM
C100
Proposed Bollard Plan
FBI
Site Security Improvements
Checker Author
22 Mar 24
WA010
1/8" = 1'-0" 1 Proposed Bollard Plan
2 Axon
O N
E W
AY
V
EH
IC
U
LA
R
TR
AF
FI
C
ONE WAY VEHICULAR TRAFFICTHIRD AVENUE
SP
RI
N G
S
TR
EE
T
BO
LL
AR
DS
H
ER
E
AR
E
SL
O
PE
D
CO
N
DI
TI
O
N
SE
E
DE
TA
IL
/A
EX
IS
TI
N
G S
TR
EE
T
SL
O
PE
No. Description Date
Abraham Lincoln Building 1110 3rd Avenue
Seattle, WA 98101
BUILDING ENTRANCE
4' 8' 16'0
2"0 1/8" = 1'-0"
N
VAULT/MANHOLE SCHEDULE
MH01 - UNMAKERD
MH02 - WATER
MH03 - ATT COMMS
V01 - 21"x33", TC Box
V02 - WUSCO/METER
V03 - SDOT
V04 - SCL
V05 - SDOT
V06 - UNMARKED, 24"X60"
V07 - UNMARKED, 23"X33"
V08 - UNMARKED, 44"X32"
V09 - CWM
MH-01
V-01
TC BOX
21"X33"
V-
W U
SC
O
/M
ET
ER
"x
V-09
CWM
20"X32"
V-08 44"X32"
V-06 24"X60"
V-05
SDOT
V-07 23"X33"
MH-03
ATT
COMMS
MH-02
WATER
32 156
V-03
SDOT
V-04
SCL
241118222
8484 84
C101
C101
C101
C101
C101
C101
PER SECTION 406.4, MAINTAIN MIN 36" CLEAR LANDING
LENGTH, AND MAINTAIN WIDTH OF RAMP. NEW BOLLARD
LOCATIONS SHALL NOT INTERFERE WITH THIS CLEAR
ZONE.
EXISITING RAMP, FLARE, AND
CURB CUT.
EXISTING FIRE HYDRANT
5' CLEARANCE REQUIRED ALL SIDES
84 84 84
84115
130105 84
8' CLEARANCE REQUIRED ALL SIDES
EXISTING ADA DETECTABLE
WARNING TILES TO REMAIN
EXISTING STREET NAME
INLAY
EXISITING RAMP, FLARE, AND
CURB CUT.
L1 0' - 0"
REBAR REINFORCED CONCRETE SECURITY
BOLLARDS
AGGREGATES TO MEET ASTM C33 AND ASTM
C150 STANDARDS
COLOR/FINISH: WHITE/LSB
INSTALLATION ON LEVEL SURFACE ONLY,
SEE DETAIL 03 FOR ANCHOR
OPTIONAL ANGLED PROFILE
0' - 0 1/2"
L1 0' - 0"
CUSTOM POURED CONCRETE SECURITY
BOLLARD REINFORCED REBAR
AGGREGATES TO MEET ASTM C33 AND ASTM
C150 STANDARDS
COLOR/FINISH: WHITE/LSB
SEE DETAIL 03 FOR ANCHORING
SLOPE OF BOLLARD BASE TO BE
CONFIRMED BY CONTRACTOR FOR BOLLARDS
ALONG SPRING STREET IN SLOPED CONDITION
(SLOPE IS APPX 20% - TO BE VERIFIED FOR EACH LOCATION)
/5 C101
240 West Main Street, Suite 100 Charlottesville, VA 22902
Scale
Date
Drawn By
Checked By
Project Number
As indicated
3/
/2
3:
:1
PM
C101
Site Dimensioned Plan
FBI
Site Security Improvements
Checker Author
22 Mar 24
WA010
1/8" = 1'-0" 1 Existing Site Spacing
No. Description Date
3/4" = 1'-0" 2 Level Surface Application
3" = 1'-0" 4 Recess Callout
3/4" = 1'-0" 3 Slopped Surface Application
GENERAL NOTES
1. EACH CONCRETE BOLLARD SHALL BE A MINIMUM OF 1100 LBS EACH
2. STEEL REINFORCEMENT SHALL BE INCLUDED PER MANUFACTURER'S
REQUIREMENTS, #3 REBAR
3. THREADED RODS TO BE EPOXIED INTO EXISTING CONCRETE.
4. EPOXY BOTTOM OF BOLLARD TO SIDEWALK, CAULK PERIMETER.
5. BOLLARD PLACEMENT SHALL NOT OVERLAP EXISTING
VAULTS/MANHOLES. CONTRACTOR TO VERIFY IN FIELD PRIOR TO INSTALL.
Abraham Lincoln Building 1110 3rd Avenue
Seattle, WA 98101
6" = 1'-0" 5 Anchoring Detail
6"
NOT TO SCALE
58 1
240 West Main Street, Suite 100 Charlottesville, VA 22902
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
3/
/2
3:
:2
PM
C102
Construction Limits
FBI
Site Security Improvements
Checker Author
22 Mar 24
WA010
No. Description Date
CONSTRUCTION LIMITS, PHASES 1, 2, 3 AND 4.
| Sheets |
| C100 - Proposed Bollard Plan |
| C101 - Site Dimensioned Plan |
| C102 - Construction Limits |
| 20240322_Revit File - Sheet - C101 - Site Dimensioned Plan.pdf |
| Sheets |
| C100 - Proposed Bollard Plan |
| C101 - Site Dimensioned Plan |
| C102 - Construction Limits |
| 20240322_Revit File - Sheet - C102 - Construction Limits.pdf |
| Sheets |
| C100 - Proposed Bollard Plan |
| C101 - Site Dimensioned Plan |
| C102 - Construction Limits |
File details come from the government source that posted it. Updated .