This document is a set of architectural drawings and a door repair survey for the Sheridan VA Medical Center in Sheridan, Wyoming. The drawings provide detailed location plans and repair schedules for doors in multiple buildings at the medical center, including buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 31, 32, 35, 36, 37, 41, 42, 55, and 61.
The door deficiencies identified include main ingress/egress doors requiring push bars, operational doors requiring electronic access control, fire-rated doors with excessive clearances or missing labels, and doors in hazardous areas. The repair notes indicate the required work, such as installing electronic access control systems (PACS) and addressing fire protection and accessibility issues. The drawings provide the building, room number, door type, handicap accessibility, wall rating, door rating, frame rating, deficiencies, and repair notes for each door requiring attention.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924R0113 0002.docx | DOCX document | |
| ATTENDANCE LIST-SITE WALK 7-24-2024.pdf | ||
| 36C25924R0113 0001.docx | DOCX document | |
| 10 TY-001thruTY-G-1 - Security-PACS.pdf | ||
| Bldg 6.pdf | ||
| Bldg 87.pdf | ||
| B1 - 26187111 Asbestos and Lead Paint Survey Report.pdf | ||
| FACP Locations.xlsx | XLSX spreadsheet | |
| B86-3rd FL Life Safety Drawing.pdf | ||
| Bldg 71 71N.pdf | ||
| Sheridan VAMC - 2019 Asbestos Management Operations Plan_FINAL.pdf | ||
| Bldg 8.pdf | ||
| 36C25924R0113.docx | DOCX document | |
| 36C25924R0113 Past Performance Questionnaire_Blank.docx | DOCX document | |
| S22- 852.219-75 LOS Certification.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
55110
41 42
23 24
71N
5 19
M A
R
IN
E
CO
R
PS
Water Treatment Plant
1.9 Miles SW
COAST GUARD LANE
SOLDIER CREEK ROA
D
FORT ROAD
FREEDOM LANE
FREEDOM LANE
FREED
O
M
LA
N E
FREEDOM LANE
IN
D
E
PE
N D
E N
C E
L A
N E
A
IR
F O
R C
E L
A N
E
A R
M Y
L A
N E
C A
V A
L R
Y L
A N
E
AIR FORCE LANE
A R
M Y
L A
N E
N A
V
Y LA
N E
NAVY LANE
N A
V Y
L A
N E
F R
E E
D O
M L
A N
E
MARINE CORPS LANE
COAST GUARD LANE
MAIN ELEC
TRANSFORMER
AND SWITCH
H N44°41'91"
W106°39'17"
PRIMARY
H
ALT
LANE
S71
S86
S4
FAA ROAD
HEADQUARTERS LANE
TOWER ROAD
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
G-001
COVER PAGE
SCALE 1" = 200'-0" 400'200'001 VICINITY MAP
N
U.S. DEPARTMENT
OF VETERAN AFFAIRS
DOOR REPAIR SURVEY
SHERIDAN VA MEDICAL CENTER
SHERIDAN, WY 82801
THIS SITE
02 LOCATION MAP
N
AutoCAD SHX Text W
AutoCAD SHX Text C
AutoCAD SHX Text
FS
AutoCAD SHX Text
WATER METERING HOUSE
AutoCAD SHX Text
EMR GEN
AutoCAD SHX Text
BOILER PLANT
AutoCAD SHX Text
NATURAL GAS METER HOUSE
AutoCAD SHX Text
COAL SILO
AutoCAD SHX Text
WATER TOWER
AutoCAD SHX Text
EMR GEN
AutoCAD SHX Text
OXYGEN TANKS
AutoCAD SHX Text
EMR GEN
AutoCAD SHX Text
WATER RESERVOIR
AutoCAD SHX Text
WATER TREATMENT PLANT
AutoCAD SHX Text
WATER TREATMENT CHEMICAL BUILDING
AutoCAD SHX Text
EMERGENCY OXYGEN CONNECTION POINT
AutoCAD SHX Text
PRIMARY DECON AREA
AutoCAD SHX Text
EMR GEN
AutoCAD SHX Text
EMR GEN
AutoCAD SHX Text
WATER TOWER SUPPORT BLDG
AutoCAD SHX Text
WATER TREATMENT PLANT SUPPORT
AutoCAD SHX Text
EMR GEN
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
UP
DN
SUPERVISOR/
PROGRAM
MANAGER
OFFICE
CONFERENCE
ROOM
MEN'S ROOM
PRIVACY
OFFICER
WOMEN'S ROOM
LOBBY
CONSULT
CENTER
CORRIDOR
C101
ELEV.
E101
ELEVATOR
LOBBY
DN
UP
IT CLOSET
ST101
STAIR
FEC
ST102
STAIR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-601
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BLDG-1 1ST FLOOR)
B1-106
B1-106
BUILDING NUMBER: 1
ROOM NUMBER: 106
ROOM NAME: LOBBY
DOOR TYPE: GLASS DOOR WITH TRANSOM AND SIDE LITES
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: MAIN INGRESS / EGRESS
(REQUIRES PUSH BAR)
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 1)
N
INSTALL PACS
DOOR REPAIR SCHEDULE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
OFFICE
EXERCISE
UNISEX
ENTRY
UNISEX
EDUCATION
STORAGE/IT
LOUNGE
HAC
STAIR
ST101
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-602
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BLDG-2 1ST FLOOR)
B2-107B2-101
B2-107
BUILDING NUMBER: 2
ROOM NUMBER: 107
ROOM NAME: ENTRY
DOOR TYPE: SINGLE LEAF HOLLOW CORE METAL DOOR
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: OPERATIONAL DOOR THAT REQUIRES PACS
REPAIR NOTES:
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 2)
N
B2-101
INSTALL PACS
LOUNGE
SINGLE LEAF HOLLOW CORE METAL DOOR
YES
N/A
N/A
N/A
OPERATIONAL DOOR THAT REQUIRES PACS
INSTALL PACS
DOOR REPAIR SCHEDULE
AutoCAD SHX Text 103B
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
ASSOCIATE
DIRECTOR
CONFERENCE
ROOM
CHIEF OF
STAFF
COS
HSS
STAIRS
ST101 SECRETARY
GROUP
PRACTICE
MANAGER
103 DIRECTOR
WAITING
EXECUTIVE
HSS
VESTIBULE
ELEV
E101
COPY/
FAX
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-603
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BLDG-3 1ST FLOOR)
B3-110
B3-110
BUILDING NUMBER: 3
ROOM NUMBER: 110
ROOM NAME: VESTIBULE
DOOR TYPE: DOUBLE LEAF GLASS DOOR WITH SIDE LITES
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: TRAMWAY (REQUIRES PUSH BAR OPTION
FROM TRAMWAY LOCKDOWN CAPABILITIES)
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 3) N
INSTALL PACS
DOOR REPAIR SCHEDULE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
E101
UP
DN
ELEVATOR
TRAMWAY
FRONT LOBBY
118SOCIAL WORK
GROUP ROOM
SOCIAL WORK
AO
SUICIDE
PREVENTION
CHIEF OF
SOCIAL WORK
INTERVIEW
ROOM
INTERVIEW
ROOM
INTERVIEW
ROOM
EMPLOYEE
BREAK ROOM
CORR
C101
EXTERIOR
STAIR
ST103
108 109
HUD/VASH
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
112A
REAR
LOBBY
118C
TCM/VJO
MFH/HBPC
PORCH
P101
STAIR
ST101
CPAC
OFFICE
HBPC
SUPERVISOR
UNISEX
RR
115B
STORAGE
115A
VENDING
HBPC
118B
DN
DN
IT CLOSET
118A
DN
UP
UP
UP
DN
DN
TRAMWAYTRAMWAY
UP
DN
DN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-604
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-4 1ST FLOOR) - PART 1
B4-118C B4-C101
B4-118C
BUILDING NUMBER: 4
ROOM NUMBER: 118C
ROOM NAME: REAR LOBBY
DOOR TYPE:
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: INTERNAL DOOR THAT REQUIRES PACS
REPAIR NOTES:
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 4) - PART 1
N
KEY PLAN
B4-C101
B4-118
B4-118
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
C101
CORRIDOR
SINGLE LEAF GLASS SLIDING DOOR
YES
N/A
N/A
N/A
OPERATIONAL DOOR THAT REQUIRES PACS
INSTALL PACSINSTALL PACS
FRONT LOBBY
YES
N/A
N/A
N/A
INSTALL PACS
SINGLE LEAF GLASS SLIDING DOOR
INTERNAL DOOR THAT REQUIRES PACS
SINGLE LEAF HOLLOW CORE METAL DOOR
WITH VISION LITE
DOOR REPAIR SCHEDULE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
E101
UP
DN
ELEVATOR
TRAMWAY
UP
FRONT LOBBY
REAR
LOBBY
PORCH
P101
CPAC
OFFICE
HBPC
SUPERVISOR
UNISEX
RR
115B
STORAGE
115A
STAIR
ST102
LOBBY
VENDING
STOR
131A
TOUCHDOWN
SPACE
HUMAN
RESOURCES
HUMAN
RESOURCES
RESTROOM
EXTERIOR
STAIR
ST104
HR STAFF
HR STAFF
CORR
C102
STORAGE
RESTROOM
STOR
HR LEAD
ER/LR
BREAKROOM
STOR
120B
KITCHENETTE
120A
ER
HBPC
118B
IT CLOSET
118A
DN
UP
UP
UP
DN
DN
TRAMWAYTRAMWAY
UP
DN
DN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-605
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-4 1ST FLOOR) - PART 2A
B4-2-116 B4-115
B4-2-116
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 4) - PART 2A
N
KEY PLAN
B4-115
B4-132
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
VENDING
N/A
N/A
N/A
INSTALL PACS
INTERNAL DOOR THAT REQUIRES PACS.
INSTALL DOOR
B4-132
BUILDING NUMBER: 4
ROOM NUMBER: 116
ROOM NAME: LOBBY
DOOR TYPE:
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: INTERNAL DOOR THAT REQUIRES PACS
REPAIR NOTES: INSTALL PACS
BUILDING NUMBER: 4
ROOM NUMBER: 115
ROOM NAME: PIV OFFICE
DOOR TYPE: SINGLE LEAF HOLLOW CORE METAL DOOR
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: INTERNAL DOOR THAT REQUIRES PACS
REPAIR NOTES: INSTALL PACS
SINGLE LEAF HOLLOW CORE METAL DOOR
NO
SINGLE LEAF HOLLOW CORE METAL DOOR
WITH VISION LITE
DOOR REPAIR SCHEDULE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
UP
UP
DN
DN
TRAMWAYTRAMWAY
UP
DN
DN
E101
DN
UP
DN
ELEVATOR
TRAMWAY
UP
FRONT LOBBY
REAR
LOBBY
PORCH
P101
CPAC
OFFICE
HBPC
SUPERVISOR
UNISEX
RR
115B
STORAGE
115A
STAIR
ST102
LOBBY
VENDING
STOR
131A
TOUCHDOWN
SPACE
HUMAN
RESOURCES
HUMAN
RESOURCES
RESTROOM
EXTERIOR
STAIR
ST104
HR STAFF
HR STAFF
CORR
C102
STORAGE
RESTROOM
STOR
HR LEAD
ER/LR
BREAKROOM
STOR
120B
KITCHENETTE
120A
ER
HBPC
118B
IT CLOSET
118A
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-606
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-4 1ST FLOOR) - PART 2B
B4-1-116 B4-TW
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 4) - PART 2B
N
KEY PLAN
B4-131
B4-131
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
HUMAN RESOURCES
N/A
N/A
N/A
INSTALL PACS
INTERNAL DOOR THAT REQUIRES PACS
B4-1-116
BUILDING NUMBER: 4
ROOM NUMBER: 1-116
ROOM NAME: LOBBY
DOOR TYPE:
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: INTERNAL DOOR THAT REQUIRES PACS
REPAIR NOTES: INSTALL PACS
BUILDING NUMBER: 4
ROOM NUMBER: TW
ROOM NAME: TRAMWAY
DOOR TYPE:
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: TRAMWAY (REQUIRES PUSH BAR OPTION
FROM TRAMWAY LOCKDOWN CAPABILITIES)
REPAIR NOTES: INSTALL PACS
SINGLE LEAF GLASS DOOR
YES
B4-TW
DOUBLE LEAF HOLLOW CORE METAL DOOR
WITH NARROW LITES
SINGLE LEAF GLASS DOOR WITH TRANSOM
AND SIDE LITES
DOOR REPAIR SCHEDULE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
DN
TRAMWAY
UP
UP
RR
UP
UP
DN
TRAMWAY
DN
TRAMWAY
UP
UP
UP
RR
UP
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-607
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-5 1ST FLOOR) - PART 1
B5-C101 B5-1-C102
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 5) - PART 1 N
B5-2-C102
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
KEY PLAN
C101
CORRIDOR
SINGLE LEAF GLASS DOOR
NO
N/A
N/A
N/A
MAIN INGRESS / EGRESS (REQUIRES PUSH
BAR)
INSTALL PACS
B5-1-C102
B5-C101
C102
CORRIDOR
SINGLE LEAF GLASS DOOR WITH SIDE LITES
YES
N/A
N/A
N/A
MAIN INGRESS / EGRESS (REQUIRES PUSH
BAR)
INSTALL PACS
C102
CORRIDOR
SINGLE LEAF GLASS DOOR WITH SIDE LITES
YES
N/A
N/A
N/A
MAIN INGRESS / EGRESS (REQUIRES PUSH
BAR)
INSTALL PACS
B5-2-C102
DOOR REPAIR SCHEDULE
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
EXTERIOR STAIR
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
MENTAL HEALTH PROVIDER OFFICE
AutoCAD SHX Text
MENTAL HEALTH INTERNS
AutoCAD SHX Text
CONF/ BREAKROOM
AutoCAD SHX Text
PHARMACY OFFICE
AutoCAD SHX Text
HOUSEKEEPING BREAKROOM
AutoCAD SHX Text
OFFICE HSKPG
AutoCAD SHX Text
HSKPG FOREMAN
AutoCAD SHX Text
HSKPG SUPPORT
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
HAC
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ST102
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 116A
AutoCAD SHX Text 114A
AutoCAD SHX Text
AutoCAD SHX Text 115A
AutoCAD SHX Text
AutoCAD SHX Text
ST101
AutoCAD SHX Text C102
AutoCAD SHX Text
AutoCAD SHX Text 118A
AutoCAD SHX Text
AutoCAD SHX Text
PORCH
AutoCAD SHX Text
WOOD PORCH
AutoCAD SHX Text
HAC
AutoCAD SHX Text
STRATEGIC PLANNING OFFICER
AutoCAD SHX Text
DAV
AutoCAD SHX Text
SOCIAL WORK OFFICE
AutoCAD SHX Text
GPM OFFICE
AutoCAD SHX Text
COPY ROOM
AutoCAD SHX Text
SINK
AutoCAD SHX Text
RR-WOMEN
AutoCAD SHX Text
RR-MEN
AutoCAD SHX Text
MENTAL HEALTH PROVIDER OFFICE
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
EXTERIOR STAIR
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
MENTAL HEALTH PROVIDER OFFICE
AutoCAD SHX Text
MENTAL HEALTH INTERNS
AutoCAD SHX Text
CONF/ BREAKROOM
AutoCAD SHX Text
PHARMACY OFFICE
AutoCAD SHX Text
HOUSEKEEPING BREAKROOM
AutoCAD SHX Text
OFFICE HSKPG
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
HSKPG FOREMAN
AutoCAD SHX Text
HSKPG SUPPORT
AutoCAD SHX Text
HAC
AutoCAD SHX Text
STOR
AutoCAD SHX Text
MAILROOM
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
LACTATION ROOM
AutoCAD SHX Text
INTERIOR DESIGN/ EMERGENCY MANAGEMENT
AutoCAD SHX Text
EXTERIOR STAIR
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
HAC
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ST102
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 116A
AutoCAD SHX Text 114A
AutoCAD SHX Text
AutoCAD SHX Text 115A
AutoCAD SHX Text
AutoCAD SHX Text
ST101
AutoCAD SHX Text C102
AutoCAD SHX Text
AutoCAD SHX Text 118A
AutoCAD SHX Text
AutoCAD SHX Text C103
AutoCAD SHX Text 121A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C104
AutoCAD SHX Text
ST103
AutoCAD SHX Text
AutoCAD SHX Text
PORCH
AutoCAD SHX Text
WOOD PORCH
AutoCAD SHX Text
HAC
AutoCAD SHX Text
STRATEGIC PLANNING OFFICER
AutoCAD SHX Text
DAV
AutoCAD SHX Text
SOCIAL WORK OFFICE
AutoCAD SHX Text
GPM OFFICE
AutoCAD SHX Text
COPY ROOM
AutoCAD SHX Text
SINK
AutoCAD SHX Text
RR-WOMEN
AutoCAD SHX Text
RR-MEN
AutoCAD SHX Text
RR
AutoCAD SHX Text
MENTAL HEALTH PROVIDER OFFICE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
TRAMWAY
DN
TRAMWAY
UP
UP
UP
RR
UP
UP
DN
TRAMWAY
DN
UP
UP
RR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-608
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-5 1ST FLOOR) - PART 2
B5-TW B5-C103
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 5) - PART 2 N
KEY PLAN
B5-121
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
B5-C103
BUILDING NUMBER: 5
ROOM NUMBER: TW
ROOM NAME: TRAMWAY
DOOR TYPE:
HANDICAP OPENER: YES
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES:
REPAIR NOTES: INSTALL PACS
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
C103
CORRIDOR
SINGLE LEAF GLASS DOOR
NO
N/A
N/A
N/A
INSTALL PACS
MAIL ROOM
SINGLE LEAF HOLLOW CORE METAL DOOR
NO
N/A
N/A
N/A
INSTALL PACS
B5-121
B5-TW
TRAMWAY (REQUIRES PUSH BAR OPTION
FOR TRAMWAY LOCKDOWN CAPABILITIES
MAIN INGRESS / EGRESS (REQUIRES PUSH
BAR)
MAIN INGRESS / EGRESS (REQUIRES PUSH
BAR) (DUTCH DOOR)
SINGLE LEAF GLASS DOOR WITH TRANSOM
AND SIDE LITES
DOOR REPAIR SCHEDULE
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
EXTERIOR STAIR
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
MENTAL HEALTH PROVIDER OFFICE
AutoCAD SHX Text
MENTAL HEALTH INTERNS
AutoCAD SHX Text
CONF/ BREAKROOM
AutoCAD SHX Text
PHARMACY OFFICE
AutoCAD SHX Text
HOUSEKEEPING BREAKROOM
AutoCAD SHX Text
OFFICE HSKPG
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
HSKPG FOREMAN
AutoCAD SHX Text
HSKPG SUPPORT
AutoCAD SHX Text
HAC
AutoCAD SHX Text
STOR
AutoCAD SHX Text
MAILROOM
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
LACTATION ROOM
AutoCAD SHX Text
INTERIOR DESIGN/ EMERGENCY MANAGEMENT
AutoCAD SHX Text
EXTERIOR STAIR
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
HAC
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ST102
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C101
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 116A
AutoCAD SHX Text 114A
AutoCAD SHX Text
AutoCAD SHX Text 115A
AutoCAD SHX Text
AutoCAD SHX Text
ST101
AutoCAD SHX Text C102
AutoCAD SHX Text
AutoCAD SHX Text 118A
AutoCAD SHX Text
AutoCAD SHX Text C103
AutoCAD SHX Text 121A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C104
AutoCAD SHX Text
ST103
AutoCAD SHX Text
AutoCAD SHX Text
PORCH
AutoCAD SHX Text
WOOD PORCH
AutoCAD SHX Text
HAC
AutoCAD SHX Text
STRATEGIC PLANNING OFFICER
AutoCAD SHX Text
DAV
AutoCAD SHX Text
SOCIAL WORK OFFICE
AutoCAD SHX Text
GPM OFFICE
AutoCAD SHX Text
COPY ROOM
AutoCAD SHX Text
SINK
AutoCAD SHX Text
RR-WOMEN
AutoCAD SHX Text
RR-MEN
AutoCAD SHX Text
RR
AutoCAD SHX Text
MENTAL HEALTH PROVIDER OFFICE
AutoCAD SHX Text
HOUSEKEEPING BREAKROOM
AutoCAD SHX Text
OFFICE HSKPG
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
HSKPG FOREMAN
AutoCAD SHX Text
HSKPG SUPPORT
AutoCAD SHX Text
HAC
AutoCAD SHX Text
STOR
AutoCAD SHX Text
MAILROOM
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
LACTATION ROOM
AutoCAD SHX Text
INTERIOR DESIGN/ EMERGENCY MANAGEMENT
AutoCAD SHX Text
EXTERIOR STAIR
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 114A
AutoCAD SHX Text
AutoCAD SHX Text 115A
AutoCAD SHX Text
AutoCAD SHX Text
ST101
AutoCAD SHX Text C102
AutoCAD SHX Text
AutoCAD SHX Text 118A
AutoCAD SHX Text
AutoCAD SHX Text C103
AutoCAD SHX Text 121A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C104
AutoCAD SHX Text
ST103
AutoCAD SHX Text
AutoCAD SHX Text
PORCH
AutoCAD SHX Text
HAC
AutoCAD SHX Text
RR
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
002A
C001
003A
001A 001C
CORRIDOR
002B
STORAGE
ELEV
UP
OIT
ELEV MECH
ROOM
UP
UP
STORAGE
DN
12"
UNISEX
RESTROOM
MECHANICAL
ROOM
ELEV
LOBBY
MECHANICAL
ROOM
STAIR
ST001
E001
C002
CORRIDOR
LINE OF
STAIR
ABOVE
LINE OF
STAIR
ABOVE
LINE OF 1ST FLOOR
PORCH ABOVE
LINE OF 1ST FLOOR
PORCH ABOVE
TRAMWAY
REC
STORAGE
REC
STORAGE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-609
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-6 BASEMENT)
10312003
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 BASEMENT PLAN (BDG 6) N
10312003
001C
ELEVATOR MECHANICAL ROOM
NO
1 HR
DOOR LABEL MISSING
FRAME LABEL MISSING
DOOR LABEL IS MISSING - NFPA 80-2010
4.3.1; NFPA 101-2012 8.3.3.2.2, EXCESSIVE
UNDERCUT - NFPA 80-2010 5.2.4.2 (5), NFPA
80-2010 4.8.4; NFPA 101-2012 18.3.6.3 (2),
REQUIRED FRAME LABEL IS MISSING - NFPA
80-2010 6.3.1.1; NFPA 101-2012 8.3.3.2.3
19.3.6.3.4
FIRE PROTECTION, EVALUATE.
DOOR REPAIR SCHEDULE
http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
LAUNDRY
C102
PORCH
C101
ST103
STOR.
(OXY)
HAC
100A
LOBBY
ST102
GROUP ROOM
112STOR.
CLASSROOM
119A
101A
118A
CLOS.
CLOSET
CLOSET
ELECTRONICS
111A
117A
CLOSET
CORRIDOR
CORRIDOR
PORCH
TRAMWAY
CONCRETE
PAD
DN
DAY ROOM
DN
UP
UP
DN
DN
DN
ELEV
UNISEX
RR
UNISEX
RR
FRONT DESK/
RECEPTION
MEN'S RR
REAR LOBBY
100B
DN
ST101
STAIR
STAIR
STAIR
E101
UP
MECH
CHASE
PSYCHOLOGIST
SOCIAL
WORK
OFFICE
INTAKE
ROOM
VOCATIONAL
REHABILITATION
COUNSELOR/
SPECIALIST
UNISEX
RR
OFFICES
VACANT
OFFICE
MED ROOM
INTERVIEW
ROOM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-610
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-6 1ST FLOOR)
B6-TW
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 6) N
10312000
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
B6-TW
TW
TRAMWAY
NO
N/A
N/A
N/A
TRAMWAY (REQUIRES PUSH BAR OPTION
FOR TRAMWAY LOCKDOWN CAPABILITIES
INSTALL PACS
NO
1 HOUR
90 MINUTES
N/A
EXCESSIVE UNDERCUT - NFPA 80-2010
5.2.4.2 (5), NFPA 80-2010 4.8.4; NFPA 101-2012
18.3.6.3 (2) 19.3.6.3.4
10312000 10312005
10312005
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
NO
1 HOUR
90 MINUTES
N/A
EXCESSIVE UNDERCUT - NFPA 80-2010
5.2.4.2 (5), NFPA 80-2010 4.8.4; NFPA 101-2012
18.3.6.3 (2) 19.3.6.3.4
FIRE PROTECTION, ADDITIONAL PARTS
REQUIRED
FIRE PROTECTION, ADDITIONAL PARTS
REQUIRED
DOOR REPAIR SCHEDULE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
HAC
ELEV
HAC
STOR
ST201
UPPER LEVEL TRAMWAY
ST203 ST202204
GROUP ROOM
OFFICES
PSYCH
TECH
ROOM
PACK ADMIT
SECTION207
DAY ROOM
200201
OFFICES
INTERVIEW
ROOM
STOR
207A
CLOSET
WOMEN'S RR
C201C202
CORRIDOR
206A
STORAGE
DN
INTERVIEW
ROOM
DN
CORRIDOR
GROUP ROOM
DN
ROOF BELOW
MEN'S RR
STAIR STAIR
STAIR
E201
PSYCHOLOGIST
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-611
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-6 2ND FLOOR)
10312007
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 2ND FLOOR PLAN (BDG 6) N
DAY ROOM
NO
1 HR
45 MIN
90 MIN
DOOR DOES NOT LATCH - RUBBING ISSUE -
NFPA 80-2010 5.2.13, 5.1.3.1. DOOR HITS
FRAME ON LATCH SIDE. EXCESSIVE
CLEARANCE - NFPA 80-2010 5.2.4.2 (5), NFPA
80-2010 6.3.1.7. EXCESSIVE CLEARANCE
LATCH SIDE. CAN BE ADJUSTED.
10312007
SINGLE LEAF WOODEN DOOR WITH NARROW
LITE AND SIDE LITE
FIRE PROTECTION, DOOR NEEDS TO BE
REPLACED.
DOOR REPAIR SCHEDULE
http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
CORRIDOR
C002
CORRIDOR
C004
CORRIDOR
VEST
015B
ALCOVE
013B
ALCOVE
HAC
U P
UP UP
C003
ELEV EQUIP
003A
DRESSING
DATA
MECHANICAL CLOSET
CORRIDOR
C001
MECH/ELEC
FAN UNIT FAN UNIT
STAIR
ST002
STAIR
ST001
ELEVATOR
E001
MEN'S RR
015A
SECURE
PHARMACY
CACHE
013A
009C
009H
012A
012B
STORAGE
009D
CORR
C005
ELEV
LOBBY
008ELEV
E002
ASSISTANT
CHIEF ACQ &
LOGISTICS
MED SUPPLY
OFFICE
SHIPPING &
RECEIVING
MECHANICAL /
ELECTRICAL
CONFERENCE
ROOM
NUTRITION
BREAKROOM
WAREHOUSE
SOUTHWAREHOUSE
NORTH
MECH/ ELEC/
FIRE
FIRE
SPRINKLER
MEDICAL
SUPPLY BREAK
OUT ROOM
MEN'S
LOCKERS
WOMEN'S
LOCKERS
WOMEN'S
RR
MEDICAL SUPPLY
CLEAN STORAGE
SPD - BREAK
OUT ROOM
U P
UP UP
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-612
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-7 BASEMENT)
B7-014 B7-C005
BUILDING NUMBER: 7
ROOM NUMBER: 014
ROOM NAME: VESTIBULE
DOOR TYPE:
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: OPERATIONAL DOORS THAT REQUIRE PACS
REPAIR NOTES:
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 BASEMENT PLAN (BDG 7) N KEY PLAN
INSTALL PACS
B7-014
C005
CORRIDOR
NO
N/A
N/A
N/A
INSTALL PACS
SINGLE LEAF HOLLOW CORE METAL DOOR
B7-C005
OPERATIONAL DOORS THAT REQUIRE PACS
SINGLE LEAF HOLLOW CORE METAL DOOR
WITH NARROW LITE
DOOR REPAIR SCHEDULE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
114MEN'S
RR
CHAPLAIN
PROTESTANT
CHAPLAIN
LEAD CLINICAL
CHAPLAIN
WOMEN'S
RR
HAC
MEETING ROOM
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
STORAGE
OFFICE
CORR.
C102
STAIR
ST102
CORR
C103
LOADING DOCK
SUPERVISOR
UP
UP
DN
DN
UPUP
DNDN UP
TRAMWAY TO
BUILDING 6
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-613
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-7 1ST FLOOR) - PART 1
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 7) - PART 1 N KEY PLAN
B7-3-TW
B7-101
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
B7-101
B7-C103
MEETING ROOM
SINGLE LEAF GLASS SLIDING DOOR
YES
N/A
N/A
N/A
INSTALL PACS
OPERATIONAL DOORS THAT REQUIRE PACS
DOOR REPAIR SCHEDULE
B7-C103
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
C103
CORRIDOR
YES
N/A
N/A
N/A
INSTALL PACS
OPERATIONAL DOORS THAT REQUIRE PACS
DOUBLE LEAF GLASS SLIDING DOOR
B7-2-TW
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
YES
N/A
N/A
N/A
TRAMWAY (REQUIRES PUSH BAR OPTION
FOR TRAMWAY LOCKDOWN CAPABILITIES)
INSTALL PACS
B7-3-TW
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
TW
TRAMWAY B7 TO 86
SINGLE LEAF GLASS DOOR
B7-2-TW
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
TW
TRAMWAY B7 TO B8
SINGLE LEAF GLASS DOOR
YES
N/A
N/A
N/A
TRAMWAY (REQUIRES PUSH BAR OPTION
FOR TRAMWAY LOCKDOWN CAPABILITIES)
INSTALL PACS
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
ITEM
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
DN
DN
UPUP
DNDN UP
TRAMWAY TO
BUILDING 6
TRAMWAY TO
BUILDING 8
UP
DN
KITCHEN
CHIEF
NUTRITION &
FOOD
SERVICES
NUTRITION/
FOOD SERVICES
FOOD
STORAGE
OFFICE
FOOD
STORAGE
COOLER/FREEZER
DNUP
TRAMWAY TO
BUILDING 6
STOR
118A
CORR.
C102
STAIR
ST104
CORR
C101
STAIR
ST101
FOOD
SERVICE LINE
PATIENT DINING
ELEVATOR
E101
STOR
117B
OFFICE
117A
MECH
120A
SUPERVISOR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-614
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-7 1ST FLOOR) - PART 2
SCALE 1/8" = 1'-0" 4'0 8' 16'01 1ST FLOOR PLAN (BDG 7) - PART 2
N
KEY PLAN
B7-120
B7-118
B7-1-TW B7-118
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
B7-120
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
NUTRITION / FOOD SERVICES
SINGLE LEAF GLASS DOOR
NO
N/A
N/A
N/A
OPERATIONAL DOOR THAT REQUIRES PACS
INSTALL PACS
PATIENT DINING
YES
N/A
N/A
N/A
INSTALL PACS
SINGLE LEAF SLIDING GLASS DOOR
TW
NO
N/A
N/A
N/A
TRAMWAY (REQUIRES PUSH BAR OPTION
FOR TRAMWAY LOCKDOWN CAPABILITIES)
INSTALL PACS
OPERATIONAL DOOR THAT REQUIRES PACS
B7-C101
DOOR REPAIR SCHEDULE
B7-C101
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
C101
CORRIDOR
YES
N/A
N/A
N/A
INSTALL PACS
DOUBLE LEAF SLIDING GLASS DOOR
OPERATIONAL DOOR THAT REQUIRES PACS
B7-1-TW
TRAMWAY
SINGLE LEAF GLASS DOOR WITH TRANSOM
AND SIDE LITES
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
ITEM
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
HAC
HAC
DN
UP
DOOR TO
ROOF ACCES
@ 25" A.F.F.
STOR
UP
DN
CLOS.
STAIR
ST203
STAIR
ST305
201A
CORR
C204
CORR
C203
HAC
VOCATIONAL
REHAB
OFFICE
BEHAVIORAL
HEALTH
OFFICE
RADIO/
CONTROL
ROOM
EEO
OFFICE
CONFERENCE
ROOM
SUPPLY
ROOM
MECHANICAL
ROOM
CONFERENCE
ROOM
VOC
REHAB
STORAGEST202
STAIR
TO ATTIC
DNDN
UP
DOOR TO
ROOF ACCES
@ 25" A.F.F.
UP
DN DN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-615
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-7 2ND FLOOR)
B7-203 B7-204
BUILDING NUMBER: 7
ROOM NUMBER: 203
ROOM NAME: RADIO / CONTROL ROOM
DOOR TYPE:
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES:
REPAIR NOTES:
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 2ND FLOOR PLAN (BDG 7) N KEY PLAN
SUPPLY ROOM
NO
N/A
N/A
N/A
B7-203
B7-200B7-204
B7-200
BUILDING NUMBER: 7
ROOM NUMBER: 200
ROOM NAME: CONFERENCE ROOM
DOOR TYPE:
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: OPERATIONAL DOORS THAT REQUIRE PACS
REPAIR NOTES: INSTALL PACS
OPERATIONAL DOORS THAT REQUIRE PACS
INSTALL PACS
OPERATIONAL DOORS THAT REQUIRE PACS
INSTALL PACS
DOOR REPAIR SCHEDULE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
UP
ELEV.
C001011
001002 003A
005A 005B
008007
RR
STAIR
STAIR
S001
S002
E001
OIT STORAGEMECH/FIRE
SERVER ROOM
OFFICE CORRIDOR
C003
C002
C O
R R
ID
O
R
CORRIDOR
ELEV. LOBBY
BIOMED/IT
STAGING AREA
OIT CHIEF
OFFICE
FIBER-
OPTIC
ROOM
005C
TELE COM EQUIP
UPS
ROOM
OIT
STORAGE
OIT
STORAGE/
MECH
OIT
OFFICE
OIT
OFFICE
ELEVATOR
MECH
OIT OFFICE/ LAB
OIT
STOR
ROOM
OIT
ELEV.
024025
C001011
001002 003A
005A 005B
008007
WOMEN'S
BIOMED
RESTROOM
RR
MECH/BIOMED/OIT
STORAGE
STAIR
STAIR
STAIR
S001
S002
S003
E001
OIT STORAGEMECH/FIRE
SERVER ROOM
OFFICE
FMS STOR.
MECH
HAC
ROOM
WORK AREA
CORRIDOR
C003
C002
C00
C O
R R
ID
O
R
CORRIDOR
CORRID
OR
ELEV. LOBBY
PARTS STOR.
FIRE
BIOMED/IT
STAGING AREA
RESTROOM
BIOMED
OIT CHIEF
OFFICE
BIOMED
SUPERVISOR
ISO
OFFICE
FIBER-
OPTIC
ROOM
005C
TELE COM EQUIP
UPS
ROOM
MECH
AIR COMP.
OIT
STORAGE
OIT
STORAGE/
MECH
OIT
OFFICE
OIT
OFFICE
ELEVATOR
MECH
OIT OFFICE/ LAB
OIT
STOR
MEN'S
ROOM
OIT
FMS
STORAGE
ELECT/
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-616
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-8 BASEMENT) - PART 1
B8-S002 10312015
BUILDING NUMBER: 8
ROOM NUMBER: S002
ROOM NAME: STAIR
DOOR TYPE:
HANDICAP OPENER: NO
WALL RATING: N/A
DOOR RATING:
FRAME RATING:
N/A
N/A
DEFICIENCIES: INTERNAL DOORS REQUIRE PACS
REPAIR NOTES:
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
SCALE 1/8" = 1'-0" 4'0 8' 16'01 BASEMENT PLAN (BDG 8) - PART 1
KEY PLAN
INSTALL PACS
ELEVATOR MECHANICAL ROOM
NO
1 HR
90 MIN
LABEL PRESENT; NO RATING SPECIFIED
EXCESSIVE UNDERCUT - NFPA 80-2010
5.2.4.2 (5), NFPA 80-2010 4.8.4; NFPA 101-2012
18.3.6.3 (2), 19.3.6.3.4
INSTALL PACS
N
10312015
B8-S002
DOOR REPAIR SCHEDULE
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
ELEV.
UP
024025
C001
WOMEN'S
BIOMED
RESTROOM
MECH/BIOMED/OIT
STORAGE
STAIR
STAIR
S002
S003
E001
OFFICE
FMS STOR.
MECH
HAC
ROOM
WORK AREA
CORRIDOR
C00
CORRID
OR
ELEV. LOBBY
PARTS STOR.
FIRE
BIOMED/IT
STAGING AREA
RESTROOM
BIOMED
BIOMED
SUPERVISOR
ISO
OFFICE
MECH
AIR COMP.
STORAGE
ELEVATOR
MECH
MEN'S
OIT
FMS
STORAGE
ELECT/
ELEV.
024025
C001011
001002 003A
005A 005B
008007
WOMEN'S
BIOMED
RESTROOM
RR
MECH/BIOMED/OIT
STORAGE
STAIR
STAIR
STAIR
S001
S002
S003
E001
OIT STORAGEMECH/FIRE
SERVER ROOM
OFFICE
FMS STOR.
MECH
HAC
ROOM
WORK AREA
CORRIDOR
C003
C002
C00
C O
R R
ID
O
R
CORRIDOR
CORRID
OR
ELEV. LOBBY
PARTS STOR.
FIRE
BIOMED/IT
STAGING AREA
RESTROOM
BIOMED
OIT CHIEF
OFFICE
BIOMED
SUPERVISOR
ISO
OFFICE
FIBER-
OPTIC
ROOM
005C
TELE COM EQUIP
UPS
ROOM
MECH
AIR COMP.
OIT
STORAGE
OIT
STORAGE/
MECH
OIT
OFFICE
OIT
OFFICE
ELEVATOR
MECH
OIT OFFICE/ LAB
OIT
STOR
MEN'S
ROOM
OIT
FMS
STORAGE
ELECT/
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS
Stamp Drawing Phase
Classification
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PRELIMINARY - NOT FOR CONSTRUCTION
OF 60
SHERIDAN VAMC
DOOR REPAIR SURVEY
FORT RD, SHERIDAN
07/29/2022
- PMG
A-617
DOOR REPAIR LOCATION PLAN
& SCHEDULE
(BDG-8 BASEMENT) - PART 2
SCALE 1/8" = 1'-0" 4'0 8' 16'01 BASEMENT PLAN (BDG 8) - PART 2
N
KEY PLAN
B8-018
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
ELEVATOR LOBBY
NO
N/A
N/A
N/A
INSTALL PACS
INTERNAL DOORS THAT REQUIRES PACS
B8-018
DOOR REPAIR SCHEDULE
10312022
10312022
BUILDING NUMBER:
ROOM NUMBER:
ROOM NAME:
DOOR TYPE:
HANDICAP OPENER:
WALL RATING:
DOOR RATING:
FRAME RATING:
DEFICIENCIES:
REPAIR NOTES:
ISO OFFICE
NO
N/A
N/A
N/A
INSTALL PACS
OPERATIONAL DOORS THAT REQUIRES
PACS
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
OFFICE
MEN'S RR
WOMEN'S RR
OFFICE
OFFICE
OFFICE
WAITING ROOM
OFFICE
OFFICE
ELEV. LOBBY
UNISEX
MEN'S
STOR
127A
TELE./COMM.
CORRIDOR
C106
ELEV.
OFFICE
105A
STAIR
CORRIDOR
C102
CORRIDOR
C103
CORRIDOR
C101
S102
E101
CR
ES
MEDS
119A
PSYCHOLOGIST
OFFICE
DEPUTY
ACOS
OFFICE
EXAM
ROOM
PSYCHOLOGY
TECHNICIAN
PRIVATE
CHECK-IN
EXAM
ROOM
IT CLOSET
RRRR
HAC
OFFICE
MEN'S RR
WOMEN'S RR
OFFICE
OFFICE
OFFICE
WAITING ROOM
OFFICE
OFFICE
ELEV. LOBBY
UNISEX
MEN'S
STOR
127A
TELE./COMM.
CORRIDOR
C106
ROOM
CONFERENCE
128 132
GROUP
OFFICE
OFFICE
OFFICE
OFFICE
HAC
OFFICE
OFFICE
UNISEX
VEST.
ELEV.
OFFICE
105A
STAIR
STAIR
CORRIDOR
C102
CORRIDOR
C103
CORRIDOR
C104
CORRIDOR
C105
CORRIDOR
C101
STAIR
S101
S102
S103
E101
CR
ES
PSYCHOLOGY
TELEHEALTH
OFFICE
MEDS
119A
PSYCHOLOGIST
OFFICE
DEPUTY
ACOS
OFFICE
ACOS
OFFICE
EXAM
ROOM
PHARMACY
OFFICE
SOCIAL
WORK
OFFICE
SOCIAL
WORK
OFFICE
PSYCHOLOGY
TELEHEALTH
OFFICE
PSYCHOLOGY
TECHNICIAN
PRIVATE
CHECK-IN
BREAK
EXAM
ROOM
ROOM
ROOM
IT CLOSET
RRRR
RR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Proje…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .