10 TY-001thruTY-G-1 - Security-PACS.pdf

PDF 7 MB Posted

Attached to
Z2DA--T2D 666_ Door Upgrades for Security and Fire (666-22-109) (VA-24-00054237)
Solicitation number
36C25924R0113
Issued by

About this file

This document appears to be a set of construction drawings and project specifications for upgrading the security infrastructure at the Sheridan VA Medical Center. The project includes upgrading the physical access control system (PACS), installing new security cameras, and updating the telecommunications rooms across multiple buildings. Key details include:

The project is titled "EHRM Infrastructure Upgrade Sheridan VAMC" with a project number of 666-21-700. The solicitation number is 36C25924R0113. The work is to be performed at the Sheridan VA Medical Center located at 1898 Fort Road, Sheridan WY 82801. The Department of Veterans Affairs Veterans Health Administration is the federal agency overseeing the project. The project involves remodeling and upgrading the security and data infrastructure at the medical center, including new dual-factor authentication access control, security cameras, and telecommunications racks and cabling. The construction documents provide detailed floor plans, single-line diagrams, and security device schedules for the proposed upgrades across multiple buildings.

View the file

Other files

File Type Posted
36C25924R0113 0002.docx DOCX document
ATTENDANCE LIST-SITE WALK 7-24-2024.pdf PDF
36C25924R0113 0001.docx DOCX document
Bldg 6.pdf PDF
Bldg 87.pdf PDF
B1 - 26187111 Asbestos and Lead Paint Survey Report.pdf PDF
FACP Locations.xlsx XLSX spreadsheet
B86-3rd FL Life Safety Drawing.pdf PDF
Bldg 71 71N.pdf PDF
Sheridan VAMC - 2019 Asbestos Management Operations Plan_FINAL.pdf PDF
Bldg 8.pdf PDF
SHERIDAN_VAMC_DOOR_DEFICIENCIES_1-23-2024.pdf PDF
36C25924R0113.docx DOCX document
36C25924R0113 Past Performance Questionnaire_Blank.docx DOCX document
S22- 852.219-75 LOS Certification.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14 13

303132

55110

41 42

23 24

71N

TY100

1,2,3

TY101

1,2,3

TY102

1,2,3

TY103

1,2,3

TY104

1,2,3

TY105

1,2,3

TY106

1,2,3

TY109

1,2,3

TY107

1,2,3

TY108

1,2,3

TY110

1,2,3

TY111

1,2,3

TY112

1,2,3

TY113

1,2,3

TY114

1,2,3

TY115

1,2,3

TY116

1,2,3

TY117

1,2,3

TY118

1,2,3

TY119

1,2,3

TY120

1,2,3

TY119

1,2,3

TY120

1,2,3

TY124

1,2,3

TY123

1,2,3,4,5

TY125

1,2,3

TY126

1,2,3

TY127

1,2,3

TY128

1,2,3

TY001

TY-001

SHERIDAN VA - SITE PLAN

SCALE: NTS

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project Title

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

/2

8/

:0 5:

P

M

100% CONSTRUCTION DOCUMENTS

07/13/2023

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

KRRD

1898 FORT ROAD

SHERIDAN,WY 82801--

666-21-700

SITE ELECTRICAL/SECURITY

NOTES

VA OIT DATA

CENTER

MAIN SECURITY

FIBER HUB

TELECOMMUNICATIONS

ROOMS ARE BEING

REMODELED UNDER

SEPARATE PROJECT

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text i

AutoCAD SHX Text g

AutoCAD SHX Text n

AutoCAD SHX Text E

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text i

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text f

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text P

AutoCAD SHX Text r

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text w

AutoCAD SHX Text a

AutoCAD SHX Text D

AutoCAD SHX Text d

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text m

AutoCAD SHX Text y

AutoCAD SHX Text a

AutoCAD SHX Text R

AutoCAD SHX Text

PE 14834

AutoCAD SHX Text Date

AutoCAD SHX Text W

AutoCAD SHX Text Y

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G tim.cummins Text Box 196 230

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 1 RACK

BUILDING 3 RACK

BUILDING 4 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 5 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 24 RACK

BASEMENT LEVEL

FIRST LEVEL

SECOND LEVEL

BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5BUILDING 24

TRAMWAYTRAMWAY

J

JJJ

NEW MAIN VA

OIT FIBER FROM

BUILDING 8

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO EXISTING CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

NEW BUILDING 2 RACK

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERASCAT 6A TO NEW

DATA DEVICES

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO NEW CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO EXISTING CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW

CAMERAS

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERASCAT 6A TO NEW

DATA DEVICES

REDUNDANT FIBER PATHWAY

MAIN VA OIT FIBER PATHWAY

ROOM 1-101 ROOM 2-104 ROOM 24-002

ROOM 3-003

ROOM 4-118A ROOM 5-114A

THESE LINES ARE

BELOW GRADE

REFER TO ELECTRICAL

PLANS FOR FIBER

SPECIFICATION

REFER TO CIVIL PLANS FOR

NEW PATHWAYS TO

BUILDINGS ONCE FIBER

LEAVES EXISTING TRAMWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAYMAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

ALL FIBER TELECOMMUNICATION RACKS

TO BE PROVIDED BY DIVISION 27

CONTRACTOR. REFER TO ELECTRICAL

PLANS AND SPECIFICATIONS

GENERAL NOTE

TY002

TY-002

DATA INFRASTRUCTURE SINGLE LINE - PART 1 OF 4

SCALE: NTS

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project Title

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

/2

8/

:0 5:

P

M

100% CONSTRUCTION DOCUMENTS

07/13/2023

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

KRRD

1898 FORT ROAD

SHERIDAN,WY 82801--

666-21-700

DATA INFRASTRUCTURE

SINGLE LINE - PART 1 OF 4

CONTINUED ON SHEET TY-003

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text i

AutoCAD SHX Text g

AutoCAD SHX Text n

AutoCAD SHX Text E

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text i

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text f

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text P

AutoCAD SHX Text r

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text w

AutoCAD SHX Text a

AutoCAD SHX Text D

AutoCAD SHX Text d

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text m

AutoCAD SHX Text y

AutoCAD SHX Text a

AutoCAD SHX Text R

AutoCAD SHX Text

PE 14834

AutoCAD SHX Text Date

AutoCAD SHX Text W

AutoCAD SHX Text Y

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G tim.cummins

197 230

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF

O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF

O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 8

MAIN FIBER

HUB

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 6 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 7 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF

O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF

O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 7 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

BUILDING 7

SECURITY

RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 8 RACK

BUILDING 9 RACK

BUILDING 6 BUILDING 7 BUILDING 8

BUILDING 86

BUILDING 87

BASEMENT LEVEL

FIRST LEVEL

SECOND LEVEL

THIRD LEVEL

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 86 RACK

TRAMWAY

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 86 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 87 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

BUILDING 87 SECURITY RACK

J

EXISTING MAIN VA OIT

NETWORK TO REMAIN

NEW REDUNDANT VA

OIT NETWORK REFER

TO CIVIL FOR UTILITY

PATHWAYS

EXISTING FIBER

PATHWAYS TO

REMAIN

PROVIDE NEW

VA OIT MAIN

FIBER NETWORK

TO BUILDING 24

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO EXISTING CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO EXISTING CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO EXISTING

CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO NEW CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO EXISTING CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO EXISTING CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

ROOM 6-101 ROOM 86-102

ROOM 86-322

ROOM 87-175 ROOM 7-217A

ROOM 7-001 ROOM 8-003

ROOM 8-124

REFER TO ELECTRICAL

PLANS FOR FIBER

SPECIFICATION

REFER TO CIVIL PLANS

FOR NEW PATHWAYS

TO BUILDINGS ONCE

FIBER LEAVES

EXISTING TRAMWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 61 RACK

BUILDING 61

J

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

ROOM 61-201

REDUNDANT

FIBER PATHWAY

ALL FIBER TELECOMMUNICATION RACKS

TO BE PROVIDED BY DIVISION 27

CONTRACTOR. REFER TO ELECTRICAL

PLANS AND SPECIFICATIONS

GENERAL NOTE

TY-003

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project Title

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

/2

8/

:0 5:

P

M

100% CONSTRUCTION DOCUMENTS

07/13/2023

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

KRRD

1898 FORT ROAD

SHERIDAN,WY 82801--

666-21-700

TY003

DATA INFRASTRUCTURE SINGLE LINE - PART 2 OF 4

SCALE: NTS

DATA INFRASTRUCTURE

SINGLE LINE - PART 2 OF 4

CONTINUED ON SHEET TY-002

CONTINUED ON SHEET TY-004

EXISTING SECURITY FIBER PATHWAY

MAIN VA

OIT FIBER

PATHWAY

MAIN VA

OIT FIBER

PATHWAY

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text i

AutoCAD SHX Text g

AutoCAD SHX Text n

AutoCAD SHX Text E

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text i

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text f

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text P

AutoCAD SHX Text r

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text w

AutoCAD SHX Text a

AutoCAD SHX Text D

AutoCAD SHX Text d

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text m

AutoCAD SHX Text y

AutoCAD SHX Text a

AutoCAD SHX Text R

AutoCAD SHX Text

PE 14834

AutoCAD SHX Text Date

AutoCAD SHX Text W

AutoCAD SHX Text Y

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G tim.cummins

198 230

BUILDING 9 SECURITY

FIBER HUB TO BE

ABANDONED BY VA

UNDER SEPARATE

PROJECT

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 9 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 11 RACK

BUILDING 9 BUILDING 11 BUILDING 31 BUILDING 32

BUILDING 71

BUILDING 71N

BASEMENT LEVEL

FIRST LEVEL

SECOND LEVEL

THIRD LEVEL

TRAMWAY

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 71 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 71 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 71N RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

BUILDING 71N

SECURITY RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 71N RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 31 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 32 RACK

J J J

EXISTING SECURITY

FIBER TO BE

ABANDONED BY VA ON

SEPARATE PROJECT

ROUTE FIBER FOR

MAIN VA NETWORK

TO NEW RACK FROM

EXISTING RACK

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TO EXISTING CAMERAS

TO EXISTING

DATA DEVICES

CAT 6A TO NEW

DATA DEVICES

ROOM 9-102

ROOM 71-344

ROOM 71N-147

ROOM 71N-221

ROOM 11-109 ROOM 31-201 ROOM 32-104

THESE LINES ARE

BELOW GRADE

REDUNDANT FIBER PATHWAY

MAIN VA OIT FIBER

PATHWAYREDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY REDUNDANT

FIBER PATHWAY

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER MAIN VA OIT

FIBER

REFER TO ELECTRICAL

PLANS FOR FIBER

SPECIFICATION

REFER TO CIVIL PLANS FOR

NEW PATHWAYS TO

BUILDINGS ONCE FIBER

LEAVES EXISTING TRAMWAY

ALL FIBER TELECOMMUNICATION RACKS

TO BE PROVIDED BY DIVISION 27

CONTRACTOR. REFER TO ELECTRICAL

PLANS AND SPECIFICATIONS

GENERAL NOTE

TY-004

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project Title

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

/2

8/

:0 5:

P

M

100% CONSTRUCTION DOCUMENTS

07/13/2023

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

KRRD

1898 FORT ROAD

SHERIDAN,WY 82801--

666-21-700

TY004

DATA INFRASTRUCTURE SINGLE LINE - PART 3 OF 4

SCALE: NTS

DATA INFRASTRUCTURE

SINGLE LINE - PART 3 OF 4

CONTINUED ON TY-003

CONTINUED ON TY-005

EXISTING SECURITY

FIBER PATHWAY

MAIN VA OIT FIBER PATHWAY

REDUNDANT FIBER PATHWAY

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text i

AutoCAD SHX Text g

AutoCAD SHX Text n

AutoCAD SHX Text E

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text i

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text f

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text P

AutoCAD SHX Text r

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text w

AutoCAD SHX Text a

AutoCAD SHX Text D

AutoCAD SHX Text d

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text m

AutoCAD SHX Text y

AutoCAD SHX Text a

AutoCAD SHX Text R

AutoCAD SHX Text

PE 14834

AutoCAD SHX Text Date

AutoCAD SHX Text W

AutoCAD SHX Text Y

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G tim.cummins

199 230

BUILDING 35 BUILDING 36 BUILDING 37 BUILDING 42 BUILDING 90

BUILDING 91

BASEMENT LEVEL FIRST LEVEL

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 35 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 36 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

BUILDING 37 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 42 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 90 RACK

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 91 RACK

J

J

J

J

J

CONNECT TO

EXISTING FIBER

CONNECTION

FOR MAIN VA

NETWORK

CONNECT TO

EXISTING FIBER

CONNECTION

FOR MAIN VA

NETWORK

ROUTE CAT6A BUNDLE

FROM BUILDING 91 TO

BUILDING 90

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

CAT 6A TO NEW

DATA DEVICES

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERASCAT 6A TO NEW

DATA DEVICES

ROOM 35-002 ROOM 36-102 ROOM 37-101A ROOM 42-100 ROOM 90-103

ROOM 91-201

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

REDUNDANT

FIBER PATHWAY

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

MAIN VA OIT

FIBER

GILLETTE CBOC

CAT 6A TO NEW

DATA DEVICES

FIRST LEVEL

A

OZ

B

LEG 1 LEG 2 LEG 1 LEG 2

OY OX OZ

GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2 GRP A

GRP B LEG 1

LEG 2

GROUP A

OX OY

GROUP B

OZ OX

GROUP A

OY OZ

GROUP B

OX

PHASE Z PHASE Y PHASE X

OY

1 1

8 8

9 9

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

Tem p/H um idity O ut

C B1

O

FF

O

O N I

C B2

O

FF O

O N I

C B3

R eset

O

FF

O

O N I

C H

ATSW

O

R

TH

P R O

D U

C T

W arning

O K

C ritical

10/100 In / IO

IO

IO

CB3

CB2

CB1

CB3

CB2

CB1

CB1

CB2

CB3

CB1

CB2

CB3

BUILDING 42 RACK

J

NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER

TO NEW CAMERAS

ROOM 42-100

REDUNDANT

FIBER PATHWAY

CAT 6A TO

NEW DATA

DEVICES

REFER TO ELECTRICAL

PLANS FOR FIBER

SPECIFICATION

REFER TO CIVIL PLANS FOR

NEW PATHWAYS TO

BUILDINGS ONCE FIBER

LEAVES EXISTING TRAMWAY

THESE LINES ARE

BELOW GRADE

ALL FIBER TELECOMMUNICATION RACKS

TO BE PROVIDED BY DIVISION 27

CONTRACTOR. REFER TO ELECTRICAL

PLANS AND SPECIFICATIONS

GENERAL NOTE

TY-005

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project Title

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

/2

8/

:0 5:

P

M

100% CONSTRUCTION DOCUMENTS

07/13/2023

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

KRRD

1898 FORT ROAD

SHERIDAN,WY 82801--

666-21-700

TY005

DATA INFRASTRUCTURE SINGLE LINE - PART 4 OF 4

SCALE: NTS

DATA INFRASTRUCTURE

SINGLE LINE - PART 4 OF 4

CONTINUED ON TY-004

MAIN VA OIT FIBER PATHWAY

REDUNDANT FIBER PATHWAY

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text i

AutoCAD SHX Text g

AutoCAD SHX Text n

AutoCAD SHX Text E

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text i

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text f

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text P

AutoCAD SHX Text r

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text w

AutoCAD SHX Text a

AutoCAD SHX Text D

AutoCAD SHX Text d

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text m

AutoCAD SHX Text y

AutoCAD SHX Text a

AutoCAD SHX Text R

AutoCAD SHX Text

PE 14834

AutoCAD SHX Text Date

AutoCAD SHX Text W

AutoCAD SHX Text Y

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G tim.cummins

200 230

TO NEW CONTROLLER INSIDE EXISTING

RACK. CONTRACTOR TO COORDINATE NEW

CONTROLLER LOCATION WITH VA OIT AND

SECURITY PERSONAL PRIOR TO ORDERING

JUNCTION BOX

BY DIVISION 26 CONTRACTOR

CONDUIT BY DIVISON 26 CONTRACTOR.

CABLING BY DIVISON 28 CONTRACTOR.

ELECTRIC DOOR

STRIKE/LOCK

RETRACTOR, BY

DOOR HARDWARE

VENDOR.

DC

ES

DOOR

NOTE:

1. IN THE EVENT OF A LOSS OF POWER OR

A FIRE ALARM SIGNAL DOOR LOCKING

MECHANISM TO DISABLE ALLOWING

FREE ACCESS THROUGH DOOR.

2. THIS DOOR DOES NOT RECIEVE ANY

EQUIPMENT FOR AUTOMATIC OPENING.

W

S

PROVIDE NEW DUAL

FACTOR CARD

ACCESS READER

WITH KEYPAD

RTES

RTEB

PROVIDE NEW REQUEST TO EXIT

SENSOR ON SECURE SIDE OF DOOR

PROVIDE NEW REQUEST TO EXIT

BUTTON ON SECURE SIDE OF DOOR

REQUEST TO EXIT SENSOR TO SERVE DUAL FUNCTIONS.

IF CONTROLLED ACCESS SPACE IS ENTERED WITHOUT

AN ACCEPTED PIV CARD THEN REQUEST TO EXIT

SENSOR TO SERVE AS MOTION INTRUSION DETECTION.

CONTRACTOR TO PROVIDE ALARM SIGNAL TO VA

DISPATCH FOR MONITORING OF ALL

TELECOMMUNICATIONS SPACES

GENERAL NOTES

TO EXISTING DOOR CONTROLLER

JUNCTION BOX

CONDUIT BY DIVISON 26 CONTRACTOR.

CABLING BY DIVISON 28 CONTRACTOR.

ELECTRIC DOOR

STRIKE/LOCK

RETRACTOR, BY

DOOR HARDWARE

VENDOR.

DC

ES

DOOR

NOTE:

1. IN THE EVENT OF A LOSS OF POWER OR

A FIRE ALARM SIGNAL DOOR LOCKING

MECHANISM TO DISABLE ALLOWING

FREE ACCESS THROUGH DOOR.

2. THIS DOOR DOES NOT RECIEVE ANY

EQUIPMENT FOR AUTOMATIC OPENING.

W

S

EXISTING CARD

READER ACCESS

RTES

RTEB

EXISTING REQUEST TO EXIT

SENSOR ON SECURE SIDE OF DOOR

EXISTING REQUEST TO EXIT

BUTTON ON SECURE SIDE OF DOOR

REQUEST TO EXIT SENSOR TO SERVE DUAL FUNCTIONS.

IF CONTROLLED ACCESS SPACE IS ENTERED WITHOUT

AN ACCEPTED PIV CARD THEN REQUEST TO EXIT

SENSOR TO SERVE AS MOTION INTRUSION DETECTION.

CONTRACTOR TO VERIFY ALARM SIGNAL TO VA DISPATCH

FOR MONITORING OF ALL TELECOMMUNICATIONS

SPACES

GENERAL NOTES

LOCATION NOTESMANUFACTURER MODEL NO.

SECURITY CAMERA SCHEDULE

SYMBOL

NOTES:

HYPERLINK

MILESIGHT MS-C5374-PB (5MP) -

TYPE

C

CAMERA INTERIOR

RESOLUTION

>4K SPEC

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project Title

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

/2

8/

:0 5:

P

M

100% CONSTRUCTION DOCUMENTS

07/13/2023

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

KRRD

1898 FORT ROAD

SHERIDAN,WY 82801--

666-21-700

TY006

NEW DOOR ACCESS CONTROL DETAIL

SCALE: NTS

TY-006

SECURITY DETAILS

TY006

MODIFICATIONS TO EXISTING DOOR ACCESS CONTROL DETAIL

SCALE: NTS

https://www.milesight.com/static/file/en/download/datasheet/ipc/Milesight-360%C2%B0-Panoramic-H.265-Fisheye-Network-Camera-Datasheet-en.pdf AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text e

AutoCAD SHX Text e

AutoCAD SHX Text n

AutoCAD SHX Text i

AutoCAD SHX Text g

AutoCAD SHX Text n

AutoCAD SHX Text E

AutoCAD SHX Text l

AutoCAD SHX Text a

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text i

AutoCAD SHX Text s

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text f

AutoCAD SHX Text o

AutoCAD SHX Text r

AutoCAD SHX Text P

AutoCAD SHX Text r

AutoCAD SHX Text s

AutoCAD SHX Text e

AutoCAD SHX Text w

AutoCAD SHX Text a

AutoCAD SHX Text D

AutoCAD SHX Text d

AutoCAD SHX Text n

AutoCAD SHX Text o

AutoCAD SHX Text m

AutoCAD SHX Text y

AutoCAD SHX Text a

AutoCAD SHX Text R

AutoCAD SHX Text

PE 14834

AutoCAD SHX Text Date

AutoCAD SHX Text W

AutoCAD SHX Text Y

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G tim.cummins

201 230

SUPERVISOR/

PROGRAM

MANAGER

OFFICE

CONFERENCE

ROOM

MEN'S ROOM

PRIVACY

OFFICER

WOMEN'S ROOM

LOBBY

CONSULT

CENTER

CORRIDORELEV.

ELEVATOR

LOBBY

IT CLOSET

STAIR

STAIR

C101E101

ST101

ST102

DN

DN

UP

UP

C

S

W

C

S

W

C

TY-1-1

TY-1-1

(E) EXISTING PACS - DUAL

FACTOR AUTHENTICATION

(CARD READER AND

KEYPAD TO REMAIN

(E) EXISTING

SECURITY CAMERA

TO REMAIN

(E) EXISTING

TELECOMMUNICATION

RACKS TO REMAIN

(E) EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

(E) EXISTING CAMERA RACK TO REMAIN

(E) EXISTING

SECURITY CAMERA

TO REMAIN

(E) EXISTING

TELECOMMUNICATION

RACK TO REMAIN

TELE COM

1-102

(E) EXISTING PACS DUAL

FACTOR AUTHENTICATION

(CARD READER AND

KEYPAD TO REMAIN

(E) EXISTING

CAMERA RACK

TO REMAIN

(E) EXISTING TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER TO

REMAIN

TY006

ee nignElanoissefo r

P r se waDdnomyaR PE 14834

Date

WYO M I NG

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

/1

/2

:0

:0

A

M

100% CONSTRUCTION DOCUMENTS

07/13/2023

BUILDING 1 TR SECURITY

TY-1-1

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

KRRD

1898 FORT ROAD

SHERIDAN,WY 82801--

666-21-700

3/16" = 1'-0"

BUILDING 1 - LEVEL 1 - FLOOR PLAN

3/8" = 1'-0"

BUILDING 1 - LEVEL 1 - TR SECURITY - DEMOLITION

3/8" = 1'-0"

BUILDING 1 - LEVEL 1 - TR SECURITY - NEW CONSTRUCTION

tim.cummins

202 230

103B

ST101

OFFICE

EXERCISE

UNISEX

ENTRY

UNISEX

LOUNGE

HAC

STAIR

103B

ST101

OFFICE

EXERCISE

UNISEX

ENTRY

UNISEX

LOUNGE

HAC

STAIR

C

S W

103B ST101

STAIR

S

W

C

TY-2-1

TY-2-1

TELE COM

2-104

STORAGE

2-102A

NO CAMERA, NO PACS,

NO INTRUSION

DETECTION

CURRENTLY IN SPACE

TELE COM

2-104

STORAGE

2-102A

INSTALL NEW SECURITY

CAMERA IN ROOM

INSTALL NEW PACS (DUAL

FACTOR AUTHENTICATION

ACCESS CONTROL)

TELE COM

2-104

STORAGE

2-102A

INSTALL NEW TYCO

SOFTWARE HOUSE

CARD ACCESS

CONTROLLER WITH

ALTRONIX POWER

SUPPLY

NEW

TELECOMMUNICATION

RACK BY DIVISION 27

TY006

ee nignElanoissefo r

P r se waDdnomyaR PE 14834

Date

WYO M I NG

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

/1

/2

:0

:0

A

M

100% CONSTRUCTION DOCUMENTS

07/13/2023

BUILDING 2 TR SECURITY

TY-2-1

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

KRRD

1898 FORT ROAD

SHERIDAN,WY 82801--

666-21-700

3/16" = 1'-0"

BUILDING 2 - LEVEL 1 - FLOOR PLAN

3/8" = 1'-0"

BUILDING 2 - LEVEL 1 - TR SECURITY - DEMOLITION

3/8" = 1'-0"

BUILDING 2 - LEVEL 1 - TR SECURITY - NEW CONSTRUCTION

tim.cummins

203 230

ST001

003 E−1

COMM.

STORAGE

MECHANICAL

WORK ROOM

STAIR

BREAK ROOM

WOMEN

JAN.

CORR.

MEN

MECHANICAL

CORR.

ELE. EQ.

STOR ELEV

MECHANICAL CRAWLSPACE

C

S

W

S

W

S

W

CC

MID

TY-3-B

TY-3-B

REMOVE (E) EXISTING PACS

(CARD READER AND KEYPAD)

AND PREPARE FOR REUSE IN

NEW LOCATION

(E) EXISTING TYCO

SOFTWARE HOUSE CARD

ACCESS CONTROLLER TO

REMAIN

(E) EXISTING

TELECOMMUNICATION

RACK TO REMAIN

INSTALL NEW DUAL

FACTOR

AUTHENTICATION CARD

READERS ON NEW

WALL, CONNECT TO

EXISTING CARD

ACCESS CONTROLLER

TELE COM

3-002

TELE COM

3-003

(E) EXISTING TYCO

SOFTWARE HOUSE CARD

ACCESS CONTROLLER TO

REMAIN

NEW CAMERAS

CONNECT TO RACK

MOUNTED POE SWITCH

NEW

TELECOMMUNICATION

RACK BY DIVISION 27

TY006

TY006

(E) EXISTING

TELECOMMUNICATION

RACK TO REMAIN

ee nignElanoissefo r

P r se waDdnomyaR PE 14834

Date

WYO M I NG

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

/1

/2

:0

:0

A

M

100% CONSTRUCTION DOCUMENTS

07/13/2023

BUILDING 3 TR SECURITY

TY-3-B

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

KRRD

1898 FORT ROAD

SHERIDAN,WY 82801--

666-21-700

3/16" = 1'-0"

BUILDING 3 - BSMT - FLOOR PLAN

3/8" = 1'-0"

BUILDING 3 - BSMT - TR SECURITY - DEMOLITION

3/8" = 1'-0"

BUILDING 3 - BSMT - TR SECURITY - NEW CONSTRUCTION

tim.cummins

204 230

TRAMWAYTRAMWAY

DN

UP

UP

UP

DN

DN

UP

DN

DN

FRONT LOBBY

118SOCIAL WORK

GROUP ROOM

SOCIAL WORK

AO

SUICIDE

PREVENTION

CHIEF OF

SOCIAL WORK

INTERVIEW

ROOM

INTERVIEW

ROOM

INTERVIEW

ROOM

EMPLOYEE

BREAK ROOM

CORR

C101

EXTERIOR

STAIR

ST103

HAC

UNISEX

RR

UNISEX RR

HUD/VASH

SOCIAL WORK

OFFICE

SOCIAL WORK

OFFICE

112A

REAR

LOBBY

118C

TCM/VJO

MFH/HBPC

PORCH

P101

STAIR

ST101

CPAC

OFFICE

HBPC

SUPERVISOR

UNISEX

RR

115B

STORAGE

115A

STAIR

ST102

LOBBY

VENDING

STOR

131A

TOUCHDOWN

SPACE

HUMAN

RESOURCES

RESTROOM

EXTERIOR

STAIR

ST104

HR STAFF

HR STAFF

CORR

C102

STORAGE

RESTROOM

HAC

STOR

HR LEAD

ER/LR

BREAKROOM

STOR

120B

KITCHENETTE

120A

ER

HBPC

118B

IT CLOSET

118A

C

S

W

S W

C

TY-4-1

TY-4-1

REMOVE (E) EXISTING WALL

MOUNTED SECURITY CAMERA AND

PREPARE FOR REUSE IN NEW

LOCATION.

RELOCATE TYCO/SOFTWARE HOUSE

ISTAR ULTRA CONTROLLER

(CARD READER CONTROLLER)

RELOCATE MAXIAL POWER SUPPLY

(POWER FOR DOOR CONTROLLERS)

REMOVE (E) EXISTING PACS -

(CARD READER AND KEYPAD)

AND PREPARE FOR REUSE IN

NEW LOCATION

(E) EXISTING

TELECOMMUNICATION

RACK TO REMAIN

C

NEW LOCATION OF

EXISTING CARD

ACCESS READER

TELE COM

4-118A

NEW LOCATION OF EXISTING

SECURITY CAMERA

NEW LOCATION OF EXISTING

TYCO/SOFTWARE HOUSE

ISTAR ULTRA CONTROLLER

(CARD READER CONTROLLER)

EXISTING ELECTRICAL

PANEL

(E) EXISTING

TELECOMMUNICATION

RACK TO REMAIN

TY006

ee nignElanoissefo r

P r se waDdnomyaR PE 14834

Date

WYO M I NG

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .