About this file
The document is a Scope of Work for a survey of the low-level radioactive waste disposal facility cap near Sheffield, Illinois. The Illinois Emergency Management Agency and Office of Homeland Security (IEMA-OHS) is seeking a vendor to conduct maintenance at the site, including the cap survey. The scope requires the vendor to use previous survey data to validate the control points and benchmark locations, stake out the 50'x50' grid pattern, record the existing ground surface elevations, generate a surface model with contours, and provide the data files to the Agency in PDF and GIS formats. The work must be completed and delivered by June 30, 2024, with the invoice due by July 5, 2024.
The related state and local contract opportunity is for a vendor to provide maintenance services at the Sheffield low-level radioactive waste site, including mowing, trimming, cap repair, inspections, and cap surveys. The vendor must have at least 3 years' experience and meet the required OSHA training for working at a hazardous site. The contract is for the state of Illinois, specifically in Bureau County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| standard-terms-and-conditions~43.pdf | ||
| standard-illinois-certifications-v.23.1~12.docx | DOCX document | |
| Sheffield Site Maintenance Scope of Work - Attachment A.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheffield Low-Level Radioactive Waste Disposal Facility Cap Survey: Description of Services – Attachment B
Using previous survey data, surveyors shall complete the necessary data prep to find existing benchmarks and control points, locate the 50'x50' grid pattern established and used for the previous landfill cap monitoring survey cross-sections, and make other necessary efforts to validate we are indeed surveying the same positions as previously recorded.
Surveyors shall search for and record all the control points and benchmarks provided which relate to this project. New ties shall be made to all control points from existing site features such as nearby posts, fences, monitoring wells, driveways/paths, or other identifiable items. Project datum shall be adjusted/calibrated to a "best fit" coordinate measurement using the validated control points. Each grid position on the cap shall be staked out, a wire flag will be set, and the existing ground surface will be recorded to include into final report.
A surface model shall be generated, and contour lines added to the surveyed area. Each individual surface elevation grid point shall be labeled on the drawing and a "control point location map" provided. The "control point location map" shall show the locations of all found control points, coordinate values, and tie sheets. Included shall be a baseline for the project and a report which shows the station, offset, elevation, and coordinates for all the points for easy comparisons and so that future surveys can be easily duplicated. Files to the Agency shall be provided in ADOBE.pdf and GIS.shp format.
Survey work must be completed, and work products delivered by June 30, 2024. Invoice by July 5, 2024.