SHC26 Specifications.pdf

PDF 15 MB Posted

Attached to
Maintenance Dredging of New York Harbor, Sandy Hook Federal Navigation Channel
Solicitation number
W912DS26BA028
Issued by

About this file

Summary

This is a Solicitation & Specifications document (IFB No. W912DS26BA028) for an unrestricted competitive procurement for maintenance dredging services in New York Harbor's Sandy Hook Channel, New Jersey Federal Navigation Project. The U.S. Army Corps of Engineers, New York District, is soliciting bids for dredging operations with NAICS code 237990. The document establishes comprehensive technical, administrative, and contractual requirements organized into divisions covering procurement procedures, general requirements, and waterway/marine construction specifications.

The specifications require contractors to perform maintenance dredging operations including material removal, transportation, placement, and monitoring at designated dredging areas within Sandy Hook Channel. Contractors must comply with extensive documentation requirements including daily construction quality control reports, daily dredging reports, transportation and placement logs, daily site safety and health inspection logs, and wildlife observation logs (whale, turtle, and sturgeon reports). Key submission requirements include an Accident Prevention Plan, Safety and Occupational Health program compliance per EM 385-1-1, environmental control procedures, and adherence to Title 33 oil and hazardous material operations regulations. The project requires a bid bond on Standard Form 24, proper wage rate compliance per Davis-Bacon Act requirements, representations and certifications, and completion of all contract clauses. Contractors must provide project identification and safety performance signage and coordinate work with existing Transcontinental Gas Pipeline infrastructure in Lower New York Bay. The specifications reference contract drawings (site plan, dredging areas, and sounding maps) available through the District Engineer's office and incorporate applicable federal and state environmental permits and water quality certificates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New York District

THIS IS AN UNRESTRICTED PROCUREMENT NAISC CODE 237990

SAFETY PAYS

MAINTENANCE DREDGING

NEW YORK HARBOR,

SANDY HOOK CHANNEL, NEW JERSEY

FEDERAL NAVIGATION PROJECT

Solicitation &

Specifications

IFB No. W912DS26BA028

Maintenance Dredging of NY Harbor, Sandy Hook Channel, NJ FNP SHC26

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 00 01 06/26 COVER SHEET

00 00 02 05/26 CHECK LIST FOR BIDDERS

00 01 15 05/26 LIST OF DRAWINGS

00 10 00 01/20 SF 1442 AND BIDDING SCHEDULE

00 21 13 01/20 INSTRUCTIONS, CONDITIONS, AND NOTICE

TO BIDDERS

00 45 00 01/20 REPRESENTATION AND CERTIFICATION

00 70 00 01/20 CONTRACT CLAUSES

00 90 00 01/20 WAGE RATES

00 90 01 05/26 LIST OF DOCUMENTS, EXHIBITS, AND OTHER

ATTACHMENTS

00 90 02 06/26 FCD / WATER QUALITY CERTIFICATE

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 05/26 SUMMARY OF WORK

01 20 00 05/26 PRICE AND PAYMENT PROCEDURES

01 30 00 06/26 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 06/25 PROJECT SCHEDULE

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 35 26 11/20, CHG 4: 08/23 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL

01 45 00.15 10 06/25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 50 00 06/25 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 06/26 DREDGING

35 20 23.10 18 05/21 SBOBA DREDGED MATERIAL TRANSPORT,

PLACEMENT AND MONITORING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 00 01

COVER SHEET

06/26

PART 1 GENERAL

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

DOCUMENT 00 00 01 Page 1

SECTION 00 00 01

COVER SHEET

06/26

PART 1 GENERAL

NEW YORK DISTRICT

CORPS OF ENGINEERS

NEW YORK, NEW YORK 10278-0090

INVITATION FOR BIDS

FOR

MAINTENANCE DREDGING

NEW YORK HARBOR,

SANDY HOOK CHANNEL, NEW JERSEY

FEDERAL NAVIGATION PROJECT

1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS26BA028.

2. BIDS MUST SET FORTH full, accurate, and complete information as requested by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed in Title 18, United States Code, Section 1001.

3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 16).

4. REPRESENTATIONS AND CERTIFICATIONS- SECTION 00 45 00

Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.

5. THIS PROJECT IS NOT A SMALL BUSINESS SET-ASIDE.

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section --

DOCUMENT 00 00 01 Page 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 00 02

CHECK LIST FOR BIDDERS

05/26

PART 1 GENERAL

DOCUMENT 00 00 02 Page 1

SECTION 00 00 02

CHECK LIST FOR BIDDERS

05/26

PART 1 GENERAL

ATTACHED IS IFB FOR

MAINTENANCE DREDGING

NEW YORK HARBOR,

SANDY HOOK CHANNEL, NEW JERSEY

FEDERAL NAVIGATION PROJECT

ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE

FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR BID INELIGIBLE FOR

AWARD. IMPORTANT ITEMS FOR YOU TO CHECK ARE INCLUDED IN BUT NOT LIMITED

TO THOSE LISTED BELOW. THIS INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN

SUBMITTING A PROPER BID.

__ HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?

__ HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION 00

45 00) PORTION OF THE SOLICITATION?

__ IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?

__ IS YOUR BID PROPERLY SIGNED?

__ A BID BOND IS REQUIRED. HAS YOUR SURETY PROVIDED YOU WITH A BID BOND ON

STANDARD FORM 24 OR A SIMILAR FORM CONTAINING THE SAME LANGUAGE AS A

STANDARD FORM 24?

__ IS YOUR BID GUARANTEE IN THE PROPER AMOUNT?

__ IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY AND

ARE ALL REQUIRED SEALS AFFIXED?

__ IS THE NAME IN WHICH YOU SUBMITTED THE BID THE SAME ON YOUR BID AS ON

THE BID BOND?

__ IS YOUR BID BOND INCLUDED WITH YOUR BID? (A LATE BID GUARANTEE IS

TREATED THE SAME AS A LATE BID)

__ HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR BID BY ALTERING THE

PROVISIONS OF THE SOLICITATION?

__ WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH BID ITEM? (THE

SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)

__ ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES

LEGIBLE?

__ IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY

INITIALED BY THE PERSON SIGNING THE BID?

__ DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT IS A

DOCUMENT 00 00 02 Page 2

SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID

OPENING TIME?

__ WILL YOUR BID ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE

SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE INSTRUCTIONS,

CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 16 OF THE SOLICITATION.)

BIDDER IS RESPOSIBLE TO ENSURE BID IS SUBMITTED ON TIME.

DOCUMENT 00 00 02 Page 3

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 15

LIST OF DRAWINGS

05/26

PART 1 GENERAL

1.1 SUMMARY

1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS

PART 2 PRODUCTS

PART 3 EXECUTION

DOCUMENT 00 01 15 Page 1

SECTION 00 01 15

LIST OF DRAWINGS

05/26

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS

a. The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

b. The Contractor shall:

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

c. In general:

(1) Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

d. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

e. The work shall conform to the following contract drawings and maps, all of which form a part of these specifications and are available in the office of the District Engineer, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, New York, N.Y.

DOCUMENT 00 01 15 Page 2

10278-0090:

Contract drawings are as follows:

FY 2026

Maintenance Dredging of New York Harbor, Sandy Hook Channel, New Jersey, Federal Navigation Project

SHEET NO. TITLE

G-001 Cover Sheet & Index

G-101 Project Site Plan & Notes

C-101 Dredging Areas and Sounding Map

f. The Contractor shall check all drawings furnished to him immediately upon their receipt and shall promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements unless dimensions are specified. Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have thereby been avoided (DOD FAR Suppl. 52.236-7002).

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

Not Used.

DOCUMENT 00 01 15 Page 3

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 10 00

SF 1442 AND BIDDING SCHEDULE

01/20

PART 1 GENERAL

1.1 SF 1442 SOLICITATION, OFFER, AND AWARD

1.2 BID SCHEDULE

PART 2 PRODUCTS

PART 3 EXECUTION

DOCUMENT 00 10 00 Page 1

SECTION 00 10 00

SF 1442 AND BIDDING SCHEDULE

01/20

PART 1 GENERAL

1.1 SF 1442 SOLICITATION, OFFER, AND AWARD

To be provided by Contracting Division.

1.2 BID SCHEDULE

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 10 00 Page 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 21 13

INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

01/20

PART 1 GENERAL

DOCUMENT 00 21 13 Page 1

SECTION 00 21 13

INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

01/20

PART 1 GENERAL

To be provided by Contracting Division.

DOCUMENT 00 21 13 Page 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 45 00

REPRESENTATION AND CERTIFICATION

01/20

PART 1 GENERAL

PART 2 PRODUCTS

PART 3 EXECUTION

DOCUMENT 00 45 00 Page 1

SECTION 00 45 00

REPRESENTATION AND CERTIFICATION

01/20

PART 1 GENERAL

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 45 00 Page 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 70 00

CONTRACT CLAUSES

01/20

PART 1 GENERAL

PART 2 PRODUCTS

PART 3 EXECUTION

DOCUMENT 00 70 00 Page 1

SECTION 00 70 00

CONTRACT CLAUSES

01/20

PART 1 GENERAL

To be provided by Contracting Division.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 70 00 Page 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 90 00

WAGE RATES

01/20

PART 1 GENERAL

1.1 NOTE

PART 2 PRODUCTS

PART 3 EXECUTION

DOCUMENT 00 90 00 Page 1

SECTION 00 90 00

WAGE RATES

01/20

PART 1 GENERAL

1.1 NOTE

Wage rates provided by Contracting Division.

A copy of the wage rate shall be displayed at a highly visible location on the dredge at all times for the duration of the project.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DOCUMENT 00 90 00 Page 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 90 01

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

05/26

PART 1 GENERAL

1.1 SUBMITTALS

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 ATTACHMENTS

3.1.1 Attachment A New York Harbor, Sandy Hook Channel

3.1.2 Attachment B Sample Daily Construction Quality Control Report

3.1.3 Attachment C Project Sign and Safety Sign

3.1.4 Attachment D Title 33 Oil and Hazardous Material Operations

3.1.5 Attachment E Accident Prevention Plan Worksheet

3.1.6 Attachment F Daily Reports for Dredging

3.1.7 Attachment G USACE Transportation and Placement Log

3.1.8 Attachment H Daily Site Safety and Health Inspection Log

3.1.9 Attachment I Daily Whale and Turtle Report Logs, and Incident

Report of Sturgeon

3.1.10 Attachment J New York Harbor, Sandy Hook Federal Navigation

Channel 2017 Grain Size Analysis - See attachments to this solicitation on SAM.GOV for complete Sampling and Testing Results Package.

3.1.11 Attachment K Submittal Register EXAMPLE

3.1.12 Attachment L XYZ Data of September 2025 Before Dredge Survey

3.2 Transcontinental Gas Pipe Line Company (Transco) - Lower New York

Bay Lateral Documentation

DOCUMENT 00 90 01 Page 1

SECTION 00 90 01

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

05/26

PART 1 GENERAL

1.1 SUBMITTALS

Not Used

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 ATTACHMENTS

The following attachments have been provided for reference to the bidder for use in performing the contract requirements.

3.1.1 Attachment A New York Harbor, Sandy Hook Channel Reference Map

3.1.2 Attachment B Sample Daily Construction Quality Control Report

3.1.3 Attachment C Project Sign and Safety Sign

3.1.4 Attachment D Title 33 Oil and Hazardous Material Operations

3.1.5 Attachment E Accident Prevention Plan Worksheet

3.1.6 Attachment F Daily Reports for Dredging

3.1.7 Attachment G USACE Transportation and Placement Log

3.1.8 Attachment H Daily Site Safety and Health Inspection Log

3.1.9 Attachment I Daily Whale and Turtle Report Logs, and Incident Report of Sturgeon

3.1.10 Attachment J New York Harbor, Sandy Hook Federal Navigation Channel 2017 Grain Size Analysis - See attachments to this solicitation on SAM.GOV for complete Sampling and Testing Results Package.

3.1.11 Attachment K Submittal Register EXAMPLE

3.1.12 Attachment L XYZ Data of September 2025 Before Dredge Survey

3.2 Transcontinental Gas Pipe Line Company (Transco) - Lower New York Bay Lateral Documentation

Related documentation from the installation of the Transco Gas Pipe Line - Lower New York Bay Lateral are made available to bidders as attachments to this solicitation [for information only] as Attachment M:

a. Map of Transcontinental Gas Pipe Line Company - Lower New York Bay

DOCUMENT 00 90 01 Page 2

Lateral

b. Department of the Army Permit No. 7447 (1967-06280)

DOCUMENT 00 90 01 Page 3

SBOBA

PLACEMENT

SITE

NY HARBOR, SANDY HOOK CHANNEL DREDGING AREAS

SECTION 00 90 01 ATTACHMENT A

NEW YORK HARBOR, SANDY HOOK CHANNEL, NJ

FEDERAL NAVIGATION PROJECT

REFERENCE MAP

CONTRACTORS QUALITY CONTROL REPORT (QCR)

DAILY LOG OF CONSTRUCTION

REPORT NUMBER

XXX

DATE

14 Sep 2026 - Monday

CONTRACT NUMBER

W912DS26CXXXX

PROJECT

Maintenance Dredging of New York Harbor, Sandy Hook Channel, NJ

LABOR HOURS

Crew Number of

Employees Hours WorkedPosition

N/A X.00 X.00No labor hours to report

Total hrs worked to date: XX.00 Hrs worked MTD: XX.00 Total: X.00 X.00

EQUIPMENT HOURS

Equipment Name Idle

Hours Operating

HoursDescription

No equipment hours to report X.00 X.00

Total operating hrs to date: X,XXX.00 Idle hrs MTD: XX.00 Opr hrs MTD: XX.00 Total: X.00 X.00

QC Narratives

XXX

PREP/INITIAL DATES

Preparatory inspections held today: XXX

Initial inspections held today: XXX

ACTIVITY START/FINISH

XXX activities were started or finished today

QC REQUIREMENTS

XXX QC requirements were entered today

ISSUED QA/QC DEFICIENCES

XXX QC Deficiency items were issued today

CORRECTED QA/QC DEFICENCY

XXX QC Deficiency items were corrected today

CONTRACTORS ON SITE

XXX Contractors had their first or last day on the site

CONTRACTOR WEATHER

Weather Caused No Delay Temperature Min X F Max X F No Precipitation No Wind

Dredging Contractor Co.

00 90 01: Attachment B

CONTRACTORS QUALITY CONTROL REPORT (QCR)

DAILY LOG OF CONSTRUCTION

REPORT NUMBER

XXX

DATE

14 Sep 2026 - Monday

CONTRACT NUMBER

W912DS26CXXXX

PROJECT

Maintenance Dredging of New York Harbor, Sandy Hook Channel, NJ

MISHAP REPORTING

No mishaps reported today

QC REPRESENTATIVE SIGNATURE DATE SUPERINTENDENT'S INITIALS DATE

CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.

00 90 01: Attachment B

Introduction: Construction Project Signs EP 310-1-6a 01 Jun 06

16-1

The use of signs to identify Corps managed or supervised design, construc-tion, and rehabilitation projects - both for military and civil works - is an important part of efforts to keep the public informed of Corps work. For this purpose, a construction project sign package has been adopted. This package consists of two signs: one for project identification and the other to show on-the-job safety performance of the contractor.

These two signs are to be displayed side by side and mounted for reading by passing viewers. Exact placement location will be designated by the contracting officer’s representative.

The panel sizes and graphic formats have been standardized for visual consistency throughout all Corps operations.

Panels are fabricated using HDO plywood or aluminum with dimensional lumber uprights and bracing. The sign faces are nonreflective vinyl.

All legends are to be die-cut or computer-cut in the sizes and typefaces specified and applied to the white panel back-ground following the graphic formats shown on pages 16-2 and 16-3. The Communication Red panel on the left side of the construction project sign with Corps Signature (reverse version) is screen-printed onto the white back-ground.

A display of these two signs is shown on the following two pages. Mounting and fabrication details are provided on page 16-4.

Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.

00 90 01: Attachment C

16-2

EP 310-1-6a 01 Jun 06

Construction Project Identification Sign

Below are two samples of the Construc-tion Project Identification sign showing how this panel is adaptable for use to identify either military (top) or civil works projects (bottom). The graphic format for this 4’x 6' sign panel follows the legend guidelines and layout as specified below.

The large 4’x 4' section of the panel on the right is to be white with black legend.

The 2’x 4' section of the sign on the left with the full Corps Signature (reverse version) is to be screen-printed Commu-nication Red on the white background The designation of a sponsor in the area indicated is optional with Military or Civil Works construction signs. Signs may list one sponsoring entity. If agreement on a sponsor designation cannot be achieved, the area should be left blank.

This sign is to be placed with the Safety Performance sign shown on the following page. Mounting and fabrication details are provided on page 16-4.

Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.

Legend Group 1: One- to two-line description of Corps relationship to project.

Color: White Typeface: 1.25" Helvetica Regular Maximum line length: 19”

Legend Group 2: Division or District Name (optional). Placed below 10.5” reverse Signature (6” Castle).

Color: White Typeface: 1.25" Helvetica Regular

Legend Group 2a: One- to three-line identifica-tion of Military or Civil Works sponsor (optional). Place below Corps Signature to cross-align with Group 5a-b.

Color: White Typeface: 1.25" Helvetica Regular Maximum line length: 19"

Legend Group 3: One- to three-line project title legend describes the work being done under this contract.

Color: Black Typeface: 3" Helvetica Bold Maximum line length: 42"

Legend Group 4: One- to two-line identification of project or facility (civil works) or name of sponsoring department (military).

Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"

Cross-align the first line of Legend Group 4 with the first line of the Corps Signature (US Army Corps) as shown.

Legend Groups 5a-b: One- to five-line identification of prime contractors including:

type (architect, general contractor, etc.), corporate or firm name, city, state. Use of Legend Group 5 is optional.

Color: Black Typeface: 1.25" Helvetica Regular Maximum line length: 21"

All typography is flush left and rag right, upper and lower case with initial capitals only as shown. Letter- and word-spacing to follow Corps standards as specified in Appendix D.

4.5” 2”

6.25”

10.5”

2.5”

6”

4.5”

4.5”

6”

2.25”

9.5”

1.875” 1.875” 1.875” 1.875”

7.75”

Sign Type

Legend Size (A)

Panel Size

Post Size

Specification Code

Mounting Height

Color Bkg/Lgd

CID-01 various 4’x6’ 4”x4” HDO-3 48” WH-RD/BK

3” 3” 42” 3”

3” 21” 1” 21” 2”

New York Harbor, Sandy Hook Channel Federal Navigation Project

Maintenance Dredging

New York District

Contractor:

Example Dredging Co.

City, State

Safety Performance Sign EP 310-1-6a

16-3 title with First Aid logo in the top section of the sign, and the performance record captions are standard for all signs of this type. Legend groups 2 and 3 below identify the project and the contractor and are to be placed on the sign as shown.

Safety record numbers are mounted on individual metal plates and are screw-mounted to the background to allow for daily revisions to posted safety perfor-mance record.

Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.

3” 33.030” eq. 8” eq.

6”

4.5”

10.5”

2.25” 3”

2.25” 3”

4.875”

4.875”

6.75”

4.875” .75” 4.875”

4.5”

3”

3” 42” 3”

2.25” 2.25” 2.25” 2.25”

.75”

3”

.75”

Sign Legend Panel Post Specification Mounting Color Type Size (A) Size Size Code Height Bkg/Lgd

CID-02 various 4’x4’ 4”x4” HDO-3 48” WH/BK-SG

Each contractor’s safety record is to be posted on Corps managed or supervised construction projects and mounted with the Construction Project Identification sign specified on page 16-2.

The graphic format, color, size and type-faces used on the sign are to be repro-duced exactly as specified below. The

Legend Group 1: Standard two-line title “Safety is a Job Requirement” with 8” (outside diameter) Safety Green first aid logo.

Color: To match Pantone system 347 Typeface: 3" Helvetica Bold Color: Black

Legend Group 2: One- to two-line project title legend describes the work being done under this contract and name of host project.

Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"

Legend Group 3: One- to two-line identifica-tion: name of prime contractor and city, state address. Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"

Legend Group 4: Standard safety record captions as shown.

Color: Black Typeface: 1.25” Helvetica Regular

Replaceable numbers are to be mounted on white .060 aluminum plates and screw-mounted to background.

Color: Black Typeface: 3" Helvetica Regular Plate size: 2.5" x 4.5"

All typography is flush left and rag right, upper and lower case with initial capitals only as shown. Letter- and word-spacing to follow Corps standards as specified in Appendix D.

Fabrication and Mounting GuidelinesEP 310-1-6a

16-4 tions for HDO plywood panel preparation are provided in Appendix B.

Shown below the mounting diagram is a panel layout grid with spaces provided for project information. Photocopy this page and use as a worksheet when preparing sign legend orders.

For additional information on the proper method to prepare sign panel graphics, contact the district Sign Program Manager.

48”

48”

18”

Construction Project Identification Sign Legend Group 1: Corps Relationship 1.

2.

Legend Group 2: Division/District Name 1.

2.

Legend Group 3: Project Title 1.

2.

3.

Legend Group 4: Facility Name 1.

2.

Legend Group 5: Contractor/A&E 1.

2.

3.

4.

5.

Safety Performance Sign Legend Group 2: Project Title 1.

2.

Legend Group 3: Contractor/A&E 1.

2.

Legend Group 2a: Military/Civil Works Sponsor 1.

2.

Legend Group 5b: Contractor/A&E 1.

2.

3.

4.

5.

All Construction Project Identification signs and Safety Performance signs are to be fabricated and installed as de-scribed below. The signs are to be erected at a location designated by the contracting officer representative and shall conform to the size, format, and typographic standards shown on pages16-2 and 16-3. Detailed specifica-

The sign panels are to be fabricated from .75" High Density Overlay Plywood. Panel preparation to follow HDO specifications provided in Appendix B.

Sign graphics to be prepared on a white nonreflective vinyl film with positionable adhesive backing.

All graphics except for the Communication Red background with Corps Signature on the project sign are to be die-cut or computer-cut nonreflective vinyl, prespaced legends prepared in the sizes and typefaces specified and applied to the background panel following the graphic formats shown on pages 16-2 and 16-3.

The 2’x 4’ Communication Red panel (to match Pantone system 032) with full Corps Signa-ture (reverse version) is to be screen-printed on the white background. Identification of the district or division may be applied under the signature with white cut vinyl letters prepared to Corps standards.

Drill and insert six (6) .375" T-nuts from the front face of the HDO sign panel. Position holes as shown. Flange of T-nut to be flush with sign face.

Apply graphic panel to prepared HDO plywood panel following manufacturers’ instructions.

Sign uprights to be structural grade 4" x 4" treated Douglas Fir or Southern Yellow Pine, No.1 or better. Post to be 12' long. Drill six (6) .375" mounting holes in uprights to align with T-nuts in sign panel. Countersink (.5") back of hole to accept socket head cap screw (4" x .375").

Assemble sign panel and uprights. Imbed assembled sign panel and uprights in 4' hole.

Local soil conditions and/or wind loading may require bolting additional 2" x 4" struts on inside face of uprights to reinforce installation as shown.

Signature Color Use Guidelines EP 310-1-6a

4-3

The illustrations below show the various color configurations possible when using the Corps Signature on signs. Note that there are fewer possible ways to render the Signature on a sign panel than are specified for print applications (see Graphic Standards Manual, pages 1-5).

a) The most prominent use of the Signature will be on identification signs. For Standard Identification, post and panel signs, the reverse Signature is used; the Mark is Communication Red, the Signature type is white.

b) For large-scale Standard Identification signs of individual fabricated letters, the positive version is used; the Mark is Commu-nication Red and the Signature typography is white (see page 5-7).

c) The Corps Participation Credit sign uses an all white reverse Signature on a Corps Brown background.

d) The header panels on Building Office Directories use a reverse Signature in white on Dark Grey.

e) Construction Project Identification signs use an all white reverse Signature on a Communication Red background.

f) Boundary signs use the positive Signature in black on a white background.

Color StandardsEP 310-1-6a

4-4

Within the Corps sign system there are five standard color palettes. Three have been developed by the Corps and include: 1) Recreation Area signs,

2) Lock, Dam and Waterway signs, and

3) Office Interior signs. Two color groups have been adopted from existing standards: 1) Traffic signs (MUTCD) and

2) Workplace Safety signs (ANSI). Each of these is illustrated on the following pages with descriptions for their use.

The two-character color code is in parentheses immediately after the color.

Additional color application instructions are included in each respective section.

Colors must conform to the standards presented on the following pages when preparing signs.

For many of the colors shown on the next five pages, a corresponding Federal Standard Color number is listed. These numbers refer to color samples con-tained in a fan deck titled Federal Standard 595B Colors. The fan deck is published by the General Services Administration, order number 7690-01- 162-2210.

Recreation Area Color Standards EP 310-1-6a

4-5

Shown below are the colors for use on Corps identification, directional, and recreation area signs.

Communication Red (CR): Corps Mark (Castle) on identification signs. The closest Federal Standard Color is 11350, but the match with the 595B fan deck is not exact. The Graphics Standards Manual (EP 310-1-6) specifies Communication Red shall match Pantone Red 032.

Corps Brown (BR): Background for identifica-tion, directional, recreation, and symbol signs.

The closest Federal Standard Color is 20095.

White (WH): Legend for identification, directional, and recreation signs. Background for boundary signs. The closest Federal Standard Color is 27925, but the match with the 595B fan deck is not exact.

Black (BK): Legend and Signature for boundary signs. The closest Federal Standard Color is 17038.

Workplace Safety Sign Color Standards EP 310-1-6a

4-7

The colors shown below are used on all safety signs as described in Section 11 of this manual.

Safety Red (SR): Federal Standard Color 11310, but the match with the 595B fan deck is not exact. Danger; warning of an immediate hazard.

Safety Yellow (SY): Federal Standard Color 13591, but the match with the 595B fan deck is not exact. Caution; warning of potential hazard.

Safety Green (SG): Federal Standard Color 14109, but the match with the 595B fan deck is not exact. Notice; for safety.

Safety Blue (SB): Federal Standard Color 15092. Information; general.

Black (SK): Federal Standard Color 17038.

Directional and all descriptive legends.

White (SW): Federal Standard Color 27875. All sign backgrounds, except for Caution.

[Code of Federal Regulations] [Title 33, Volume 2] [Revised as of July 1, 2005] From the U.S. Government Printing Office via GPO Access

[CITE: 33CFR154.105]

[Page 314-316]

TITLE 33--NAVIGATION AND NAVIGABLE WATERS

CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY

(CONTINUED)

PART 154 FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK

--Table of Contents

Subpart A_ General

Sec. 154.105 Definitions.

As used in this part:

Barrel means a quantity of liquid equal to 42 U.S. gallons. Boundary Line means any of the lines described in 46 CFR part 7. Captain of the Port (COTP) means the U.S. Coast Guard officer commanding a Captain of the Port Zone described in Part 3 of this chapter, or that person's authorized representative.

Caretaker Status denotes a facility where all piping, hoses, loading arms, storage tanks, and related equipment in the marine transfer area are completely free of oil or hazardous materials, where these components have been certified as being gas free, where piping, hoses, and loading arms terminating near any body of water have been blanked, and where the facility operator has notified the COTP that the facility will be in caretaker status.

Commandant means the Commandant of the Coast Guard or an authorized representative.

Contiguous Zone means the entire zone established by the United States under Article 24 of the Convention on the Territorial Sea and the Contiguous Zone, but not extending beyond 12 miles from the baseline from which the breadth of the territorial sea is measured.

District Commander means the officer of the Coast Guard designated by the Commandant to command a Coast Guard District, as described in Part 3 of this chapter or an authorized representative.

Facility means either an onshore or offshore facility, except for an offshore facility operating under the jurisdiction of the Secretary of the Department of Interior, and includes, but is not limited to, structure, equipment, and appurtenances thereto, used or capable of being used to

00 90 01: Attachment D transfer oil or hazardous materials to or from a vessel or public vessel. Also included are facilities that tank clean or strip and any floating structure that is used to support an integral part of the facility's operation. A facility includes federal, state, municipal, and private facilities.

Facility operator means the person who owns, operates, or is responsible for the operation of the facility. Hazardous material means a liquid material or substance, other than oil or liquefied gases, listed under 46 CFR 153.40 (a), (b), (c), or (e).

Marine transfer area means that part of a waterfront facility handling oil or hazardous materials in bulk between the vessel, or where the vessel moors, and the first manifold or shutoff valve on the pipeline encountered after the pipeline enters the secondary containment required under 40 CFR 112.7 or 49 CFR 195.264 inland of the terminal manifold or loading arm, or, in the absence of secondary containment, to the valve or manifold adjacent to the bulk storage tank, including the entire pier or wharf to which a vessel transferring oil or hazardous materials is moored.

MARPOL 73/78 means the International Convention for the Prevention of Pollution from Ships, 1973 (done at London, November 2, 1973) as modified by the Protocol of 1978 relating to the International Convention for the Prevention of Pollution from Ships, 1973 ( done at London, February 17, 1978).

Mobile facility means any facility that can readily change location, such as a tank truck or tank car, other than a vessel or public vessel.

Monitoring device means any fixed or portable sensing device used to monitor for a discharge of oil or hazardous material onto the water, within or around a facility, and designed to notify operating personnel of a discharge of oil or hazardous material.

Officer in Charge, Marine Inspection (OCMI) means the U.S. Coast Guard officer commanding a Marine Inspection Zone described in Part 3 of this chapter, or an authorized representative.

Offshore facility means any facility of any kind located in, on, or under, any of the navigable waters of the United States, and any facility of any kind which is subject to the jurisdiction of the United States and is located in, on, or under any other waters, other than a vessel or a public vessel.

Oil means oil of any kind or in any form, including but not limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil.

Onshore facility means any facility (including, but not limited to, motor vehicles and rolling stock) of any kind located in, on, or under any land within the United States other than submerged land.

Person in charge means an individual designated as a person in charge of transfer operations under Sec. 154.710 (for facilities) or Sec. 155.700 (for vessels) of this chapter.

STCW means the International Convention on Standards of Training, Certification, and Watchkeeping for Seafarers, 1978.

Self-propelled tank vessel means a self-propelled tank vessel other than a tank.ship.

Tank barge means a non-self-propelled tank vessel.

Tank.ship means a self-propelled tank vessel constructed or adapted primarily to carry oil or hazardous material in bulk in the cargo spaces.

Tank vessel means a vessel that is constructed or adapted to carry, or that carnes, oil or hazardous material in bulk as cargo or cargo residue, and that--

(a) Is a vessel of the United States;

(b) Operates on the navigable waters of the United States; or

(c) Transfers oil or hazardous material in a port or place subject to the jurisdiction of the

United States.

Transfer means any movement of oil or hazardous material to, from, or within a vessel by means of pumping, gravitation, or displacement. A transfer is considered to begin when the person in charge on the transferring vessel or facility and the person in charge on the receiving facility or vessel first meet to begin completing the declaration of inspection as required by Sec. 156.150 of this chapter. A transfer is considered to be complete when all the connections for the transfer have been uncoupled and secured with blanks or other closure devices and both of the persons in charge have completed the declaration of inspection to include the date and time the transfer was complete.

Vessel operator means a person who owns, operates, or is responsible for the operation of a vessel.

[CGD 75-124, 45 FR 7169, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36252, Sept. 4, 1990; CGD 79-116, 60 FR 17141, Apr. 4, 1995; CGD 93-056, 61 FR 41458, Aug. 8, 1996; 62 FR 3610, Jan. 24, 1997; CGD 79-116, 62 FR 25125, May 8, 1997]

TRANSFER OPERA TIONS--Table of Contents

Subpart A_ Oil and Hazardous Material Transfer Operations

Sec.

156.100 Applicability.

156.105 Definitions.

15 6 .107 Alternatives.

156.110 Exemptions.

156.111 Incorporation by reference.

156.112 Suspension order.

156.113 Compliance with suspension order.

156.115 Person in charge: Limitations.

156.118 Advance notice of transfer.

156.120 Requirements for transfer.

156.125 Discharge cleanup.

156.130 Connection.

156.150 Declaration of inspection.

156.160 Supervision by person in charge.

156.170 Equipment tests and inspections.

Subpart B _ Special Requirements for Lightering of Oil and Hazardous Material Cargoes

156.200 Applicability.

156.205 Definitions.

156.210 General.

156.215 Pre-arrival notices.

156.220 Reporting of incidents.

156.225 Designation of lightering zones.

156.230 Factors considered in designating lightering zones.

Subpart C _ Lightering Zones and Operational Requirements for the Gulf of Mexico

156.300 Designated lightering zones.

156.310 Prohibited areas.

156.320 Maximum operating conditions.

156.330 Operations.

Authority: 33 U.S.C. 1231, 1321G); 46 U.S.C. 3703a, 3715; E.O.11735, 3 CFR 1971-1975

Comp., p. 793. Section 156.120(bb) and (ee) are also issued under 46 U.S.C. 3703.

This subpart applies to the transfer of oil or hazardous material on the navigable waters or contiguous zone of the United States to, from, or within each vessel with a capacity of 250 barrels or more; except that, this subpart does not apply to transfer operations within a public vessel.

[CGD 86-034, 55 FR 36255, Sept. 4, 1990]

Subpart A_ Oil and Hazardous Material Transfer Operations

Sec. 156.105 Definitions.

Except as specifically stated in a section, the definitions in Sec. 154.105 of this chapter apply to this subpart.

[CGD 90-071a, 59 FR 53291, Oct. 21, 1994]

Subpart A_ Oil and Hazardous Material Transfer Operations

Sec. 156.107 Alternatives.

(a) The COTP may consider and approve alternative procedures, methods, or equipment standards to be used by a vessel or facility operator in lieu of any requirements in this part if:

(1) Compliance with the requirement is economically or physically impractical;

(2) The vessel or facility operator submits a written request for the alternative at least 30 days before operations under the alternative are proposed, unless the COTP authorizes a shorter time;

and

(3) The alternative provides an equivalent level of safety and protection from pollution by oil or hazardous material, which is documented in the request.

(b) The COTP takes final approval or disapproval action on any alternative requested, m writing, within 30 days of receipt of the request.

[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36255, Sept. 4, 1990]

Subpart A_ Oil and Hazardous Material Transfer Operations

Sec. 156.110 Exemptions.

(a) The Assistant Commandant for Marine Safety, Security and Environmental Protection, acting for the Commandant, may grant an exemption or partial exemption from compliance with any requirement in this part, and the District Commander may grant an exemption or partial exemption from compliance with any operating condition or requirement in subpart C of this part, if:

(1) The vessel or facility operator submits an application for exemption via the COTP at least 30 days before operations under the exemption are proposed, unless the COTP authorizes a shorter time; and

(2) It is determined, from the application, that:

(i) Compliance with a specific requirement is economically or physically impractical;

(ii) No alternative procedures, methods, or equipment standards exist that would provide an equivalent level of safety and protection from pollution by oil or hazardous material; and

(iii) The likelihood of oil or hazardous material being discharged as a result of the exemption is minimal.

(b) If requested, the applicant must submit any appropriate information, including an environmental and economic assessment of the effects of and reasons for the exemption and proposed procedures, methods or equipment standards.

( c) The exemption may specify the procedures, methods, or equipment standards that will apply.

( d) An exemption is granted or denied in writing. The decision of the Assistant Commandant for Marine Safety, Security and Environmental Protection is a final agency action.

[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 88-052, 53 FR 25122, July 1, 1988; CGD 86-034, 55 FR 36255, Sept. 4, 1990; CGD 93-081, 60 FR 45017, Aug. 29, 1995;

CGD 96-026, 61 FR 33666, June 28, 1996; CGD 93-056, 61 FR 41461, Aug. 8, 1996; CGD0 97-

023, 62 FR 33364, June 19, 1997; USCG-2002-12471, 67 FR 41333, June 18, 2002]

Subpart A_ Oil and Hazardous Material Transfer Operations

Sec. 156.111 Incorporation by reference.

(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in paragraph (b) of this section, the Coast Guard must publish notice of the change in the Federal Register; and the material must be available to the public. All approved material is available for inspection at the U.S. Coast Guard, Office of Compliance (G-MOC), 2100 Second Street, SW, Washington, DC 20593-0001 and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202- 741-6030, or go to: http://www.archives.gov/federal--register/code--of--federal-- regulations/ibr -locations.html. All approved material is available from the sources indicated in paragraph (b) of this section.

(b) The material approved for incorporation by reference in this part and the sections affected are as follows:

Oil Companies International Marine Forum (OCIMF) 15th Floor, 96 Victoria Street, London SWlE 5JW, England.

Ship to Ship Transfer Guide (Petroleum), Second Edition, 1988-- 156.330.

International Chamber of Shipping

12 Carthusian Street, London EClM 6EB, England.

Guide to Helicopter/Ship Operations, Third Edition, 1989--156.330.

[CGD 93-081, 60 FR 45017, Aug. 29, 1995, as amended by CGD 96-026, 61 FR 33666, June 28, 1996; 69 FR 18803, Apr. 9, 2004]

Subpart A_ Oil and Hazardous Material Transfer Operations

Sec. 156.112 Suspension order.

The COTP or OCMI may issue a suspension order to suspend transfer operations to the vessel or facility operator when the COTP or OCMI finds there is a condition requiring action to prevent the discharge or threat of discharge of oil or hazardous material, or when the COTP or OCMI is unable to verify compliance with the regulations through an inspection. A suspension order:

(a) May be effective immediately;

(b) Is issued in writing unless it is effective immediately and then it may be issued orally and followed up in writing;

( c) Includes a statement of each condition requiring correction to-

( 1) Prevent the discharge of oil or hazardous material; or

(2) Comply with Sec. 154.735 of this chapter; and

(d) Is withdrawn when the COTP, OCMI, or District Commander, as applicable, determines that the condition requiring action to prevent the discharge or threat of discharge of oil or hazardous material has been corrected or no longer exists.

[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36255, Sept. 4, 1990]

Subpart A_ Oil and Hazardous Material Transfer Operations

Sec. 156.113 Compliance with suspension order.

(a) No vessel or facility operator to whom a suspension order has been issued may conduct transfer operations from the time the order is effective until that order is withdrawn by the applicable COTP, OCMI, or by the District Commander.

(b) The vessel or facility operator may request reconsideration of the suspension order either orally or in writing to the COTP or OCMI who issued it. The request may contain supporting documentation and evidence that the vessel or facility operator wishes to have considered.

( c) Any person not satisfied with a ruling made under the procedure contained in paragraph (b) of this section may appeal that ruling in writing, except as allowed under paragraph ( e) of this section, to the Coast Guard District Commander of the district in which the suspension order was issued. The appeal may contain supporting documentation and evidence that the appellant wishes to have considered. The appeal does not stay the effect of the suspension order while the COTP or OCMI ruling is being reviewed. The District Commander issues a ruling after reviewing the appeal.

( d) The ruling by the District Commander is final agency action.

( e) If the delay in presenting a written appeal under paragraph ( c) of this section would have a significant adverse impact on the appellant, the appeal may initially be presented orally. If an initial presentation of the appeal is made orally, the appellant must submit the appeal in writing within five days of the oral presentation to the District Commander to whom the oral appeal was made, containing, at a minimum the basis for the appeal and a summary of the material presented orally.

[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36255, Sept. 4, 1990]

Subpart A_ Oil and Hazardous Material Transfer Operations

Sec. 156.115 Person in charge: Limitations.

(a) No person may serve as the person in charge of transfer operations on more than one vessel at a time during transfers between vessels or between two or more vessels and a facility unless authorized by the COTP.

(b) No person may serve as the person in charge of both a vessel and a facility during transfer operations unless authorized by the COTP.

[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36255, Sept. 4, 1990]

Subpart A_ Oil and Hazardous Material Transfer Operations

Sec. 156.118 Advance notice of transfer.

(a) The COTP may require a facility operator to notify the COTP of the time and place of each transfer operation at least 4 hours before it begins for facilities that:

(1) Are mobile;

(2) Are in a remote location;

(3) Have a prior history of oil or hazardous material spills; or ( 4) Conduct infrequent transfer operations.

(b) In the case of a vessel to vessel transfer, the COTP may require a vessel operator of a lightering or fueling vessel to notify the COTP of the time and place of each transfer operation, as specified by the COTP, at least 4 hours before it begins.

( c) No person may conduct such transfer operations until advance notice has been given as specified by the COTP.

Note: The notification may be accomplished by submitting a written schedule, periodically updated to be current.

[CGD 75-124, 45 FR 7177, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36255, Sept. 4, 1990]

Sec. 156.120 Requirements for transfer.

A transfer is considered to begin when the person in charge on the transferring vessel or facility and the person in charge on the receiving facility or vessel first meet to begin completing the declaration of inspection, as required by Sec. 156.150 of this part. No person shall conduct an oil or hazardous material transfer operation unless:

(a) The vessel's moorings are strong enough to hold during all expected conditions of surge, current, and weather and are long enough to allow adjustment for changes in draft, drift, and tide during the transfer operation;

(b) Transfer hoses and loading arms are long enough to allow the vessel to move to the limits of its moorings without placing strain on the hose, loading arm, or transfer piping system;

( c) Each hose is supported to prevent kinking or other damage to the hose and strain on its coupling.

( d) Each part of the transfer system is aligned to allow the flow of oil or hazardous material;

( e) Each part of the transfer system not necessary for the transfer operation is securely blanked or shut off;

(f) The end of each hose and loading arm that is not connected for the transfer of oil or hazardous material is blanked off using the closure devices required by Sec. Sec. 154.520 and

155.805 of this chapter;

(g) The transfer system is attached to a fixed connection on the vessel and the facility except that when a vessel is receiving fuel, an automatic back pressure shutoff nozzle may be used;

(h) Each overboard discharge or sea suction valve that is connected to the vessel's transfer or cargo tank system is sealed or lashed in the closed position; except when used to receive or discharge ballast in compliance with 33 CFR Part 157;

(i) Each transfer hose has no unrepaired loose covers, kinks, bulges, soft spots, or any other defect which would permit the discharge of oil or hazardous material through the hose material and no gouges, cuts, or slashes that penetrate the first layer of hose reinforcement ("reinforcement" means the strength members of the hose, consisting of fabric, cord and/or metal);

(j) Each hose or loading arm in use meets Sec. Sec. 154.500 and 154.510 of this chapter, respectively;

(k) Each connection meets Sec. 156.130;

(1) Any monitoring devices required by Sec. 154.525 of this chapter are installed and operating properly;

(m) The discharge containment equipment required by Sec. 154.545 of this chapter is readily accessible or deployed as applicable;

(n) The discharge containment required by Sec. Sec. 154.530, 155.310, and 155.320 of this chapter, as applicable, is in place and periodically drained to provide the required capacity;

(o) Each drain and scupper is closed by the mechanical means required by Sec. 155.310;

(p) All connections in the transfer system are leak free except that a component in the transfer system, such as the packing glands of a pump, may leak at a rate that does not exceed the capacity of the discharge containment provided during the transfer operation;

(q) The communications required by Sec. Sec. 154.560 and 155.785 of this chapter are operable for the transfer operation;

(r) The emergency means of shutdown required by Sec. Sec. 154.550 and 155.780 of this chapter, as applicable, is in position and operable;

( s) There is a person in charge on the transferring vessel or facility and the receiving vessel or facility except as otherwise authorized under Sec. 156.115;

(t) Each person in charge required by paragraph (s) of this section:

(1) Is at the site of the transfer operation and immediately available to the transfer personnel;

(2) Has in his or her possession a copy of the facility operations manual or vessel transfer procedures, as appropriate; and

(3) Conducts the transfer operation in accordance with the facility operations manual or vessel transfer procedures, as appropriate;

(u) The personnel required, under the facility operations manual and the vessel transfer procedures, to conduct the transfer operation:

( 1) Are on duty; and

(2) Conduct the transfer operation in accordance with the facility operations manual or vessel transfer procedures, as appropriate;

(v) At least one person is at the site of the transfer operation who fluently speaks the language or languages spoken by both persons in charge;

(w) The person in charge of the transfer on the transferring vessel or facility and the person in charge of it on the receiving vessel or facility have held a conference, to ensure that each person in charge understands--

( 1) The identity of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .