SGBP 24-0025 Drawings - Install New Dock Elevator.pdf
PDF 18 MB Posted
- Attached to
- Dock Elevator Installation at Offutt AFB Federal contract opportunity
- Solicitation number
- FA460025B0002
About this file
This document is a detailed architectural and engineering set of drawings for installing a new dock elevator at a facility. The project involves comprehensive plans for demolition, new construction, and modification of existing spaces on levels one and two, with a focus on elevator replacement. The drawings include detailed floor plans, electrical, plumbing, fire protection, and mechanical system layouts across multiple interim and final stages of the project. Key technical elements include the installation of a new Elevator 3 adjacent to the existing Elevator 2, with careful consideration for maintaining operational continuity during the renovation. The plans cover various rooms such as warehouses, storage areas, chemical treatment rooms, electrical rooms, and support spaces like custodial areas and corridors, ensuring a holistic approach to the elevator installation and surrounding infrastructure modifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SGBP 24-0025 Photographs.pdf | ||
| Solicitation Amendment FA460025B00020002 SF 30.pdf | ||
| Solicitation Amendment - FA460025B00020002.pdf | ||
| Questions and Answers Document.pdf | ||
| Solicitation Amendment - FA460025B00020001.pdf | ||
| Solicitation Amendment FA460025B00020001 SF 30.pdf | ||
| DBA WD NE20250059 Mod 9 - 22 Aug 2025.pdf | ||
| SGBP 24-0025 SPEC.pdf | ||
| Solicitation - FA460025B0002.pdf | ||
| NCIC Screening and Pass Request.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A -1 0 1
XX
G-002
FREIGHT ELEVATOR
FROM LEVEL TWO
TO LEVEL ONE
LEVEL TWO PATH TO CONSTRUCTION AREA
LOADING DOCK AND BUILDING ENTRANCE AT LEVEL TWO
FOR MATERIALS AND PERSONNEL;
SEE SHEET G-002
PROJECT WORK AREA
LEVEL TWO AND LEVEL ONE
D1
D4
D4
DW
DV
DJ
DK
DL
DM
DN
DP
DQ
DR
DS
DT
DU
DE
DF
DG
D2 D3
DH
J636L
WAREHOUSE
D1.108
GOODWILL
INDUSTRIES
CUSTODIAL
D1.110
ELEV
MACH.
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
STAIR 12
D1.S12
STAIR 13
D1.S13
EAST CT
CHEMICAL
TREATMENT
D1.106
D1.S13
JANITOR
D1.114
D1.114
D1.112.3
GENERAL
STORAGE
D1.112
D1.108.1
CORRIDOR
D1.099A
LOBBY
D1.099C
WEST CT
CHEMICAL
TREATMENT
D1.104
WEST CT
ELECTRICAL
ROOM
D1.100
D1.104.1
EAST CT
ELECTRICAL
ROOM
D1.102
D1.106.1
D1.110
D1.112.1
D1.100.1 D1.102.1
D1.106.2
D1.S12
D1.104.2
D1.116
EXISTING
ELEVATOR 2
D1.E2
D1.099A.1
D1.110.2
GOODWILL
INDUSTRIES
CUSTODIAL
OFFICE
D1.110A
D1.108.2
C.O.
CMU
CMU
CMU
DRAIN
POWER
UNIT
POWER
UNIT
CR
F.E.
EXIST.
LIGHT
& FANS
FOR
CAR
DISC.
EXISTING PANELS
CMU
EXIST.
LIGHT
& FANS
FOR
CAR
DISC.
EXIST. ELEV.
CONTROLLER
EXISTING SUMP
PUMP PIT AND
COVER
AD101
A-102
DEMOLITION
PLAN
FLOOR
PLAN
LOADING
AND
SCREENING
D2.124
CENTRAL
DESTRUCTION
FACILITY
D2.122
ELEC.
D2.116
IT
D2.112
DOCK
OFFICE
D2.124A
UNISEX
TOILET
D2.118
CORRIDOR
D2.099A
55 CES
LOADING/STAGING/
BULK
STORAGE
D2.100A
55-CES
REPAIR
CENTER
D2.100B
GENERAL
STORAGE
D2.106
MECHANICAL
ROOM
D2.120
J.C.
D2.114
STAIR 13
D2.S13
STAIR 12
D2.S12
LOBBY
D2.099C
CORRIDOR
D2.099B
GEN.
STOR
D2.110
GEN.
STOR.
D2.108
WELDING
GAS TANK
STORAGE
D2.100C
AIR
COMPRESSOR
D2.100E
FLAMMABLE
STORAGE
D2.100D
LOCKSMITH
D2.100F
REFRIGERANT
STORAGE
D2.100G
KITCHENETTE
D2.104C
55 OFFICE
D2.104B
55 ENTRY
D2.104A
W TOILET
D2.104F
WOMEN'S
LOCKER
ROOM
D2.104E
MEN'S
LOCKER
ROOM
D2.104H
W
SHOWER
D2.104G
M
SHOWER
D2.104K
M TOILET
D2.104J
LOCKER
ROOM
CORRIDOR
D2.104D
D2.099
D2.108
D2.124.7
D2.S13.1
D2.124.5
D2.124.4
D2.124.3
D2.124.6
D2.118
D2.114
D2.116
D2.112
D2.110
D2.106
D2.S12
D2.124.2
D2.100E
D2.S13.2
D2.100C
D2.100D D2.100F
D2.104C
D2.104HD2.104E
D2.104A
D1
D1
D4
D4
DW
DV
DJ
DK
DL
DM
DN
DP
DQ
DR
DS
DT
DU
DE
DF
DG
D2 D3
DH
NEW
ELEVATOR 3
D2.E3
EXISTING
ELEVATOR 2
D2.E2
CMU
CMU
DEMOLITION
PLAN
FLOOR
PLAN
AD101
A-102
ELEV
MACH.
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
JANITOR
D1.114
D1.114
D1.112.3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
D1.116
EXISTING
ELEVATOR 2
D1.E2 D1.108.2
C.O.
CMU
CMU
CMU
DRAIN
POWER
UNIT
POWER
UNIT
CR
F.E.
EXIST.
LIGHT
& FANS
FOR
CAR
DISC.
EXISTING PANELS
CMU
EXIST.
LIGHT
& FANS
FOR
CAR
DISC.
EXIST. ELEV.
CONTROLLER
EXISTING SUMP
PUMP PIT AND
COVER
DS
DR
D1E01 EXISTING PIT LADDER
E02 EXISTING PIPE ABOVE PIT; SEE PLUMBING
FOR DEMOLITION REQUIREMENTS
E03 EXISTING STEEL TUBE BEAMS AND
COLUMN
E04 EXISTING 2" WIDE CONCRETE LEDGE
E05 EXISTING ADJACENT CONSTRUCTION TO
REMAIN (WALLS, FLOORS, DOORS/FRAMES,
CEILINGS, FINISHES, ETC. EXCEPT AS
NOTED)
E06 EXISTING FLOOR DRAIN AND CLEANOUT
E07 EXISTING STEEL CHANNELS AT JAMBS AND
HEAD OF OPENING TO REMAIN
EXISTING ITEM NOTES
R01
DQ
DP
D2
R01 REMOVE CMU WALL 8'-0" WIDE x 9'-0" HIGH.
EXISTING STEEL CHANNELS TO REMAIN AT
OPENING JAMBS AND HEAD.
R02 REMOVE CONCRETE CAP FROM TOP OF
BOREHOLE. BOREHOLE TO REMAIN.
R03 REMOVAL OF EXISTING ELEVATOR
EQUIPMENT ITEMS SHOWN BOLD CAN NOT
OCCUR UNTIL THE NEW ELEVATOR SYSTEM
IS COMPLETELY UP AND RUNNING. SEE
FLOOR PLAN.
R04 REMOVE FIRE EXTINGUISHER. SAVE FOR
RE-LOCATION IN THIS PROJECT. SEE
FLOOR PLAN.
R05 RE-LOCATED EXISTING ELEVATOR
EQUIPMENT ITEMS SHOWN BOLD CAN NOT
OCCUR UNTIL THE NEW ELEVATOR SYSTEM
IS COMPLETELY UP AND RUNNING. SEE
FLOOR PLAN.
R06 REMOVE EXISTING ATC SYSTEM INSIDE
THIS DASHED AREA AS REQUIRED FOR
REROUTING OF EXISTING SPRINKLER
PIPING DRAIN LINE. REINSTALL ATC
SYSTEM WHEN PIPING WORK IS COMPLETE.
R07 REMOVE STAINLESS STEEL CRASH RAIL AT
NEW CMU OPENING AREA.
DEMOLITION PLAN KEY NOTES
E01
E01
E02
E03
E04
E04
R02
BOTTOM OF THESE EXISTING
PANELS = 6'-6" A.F.F.
R04
R03
R05
D3
E05
E05
R06
E07
E06
R06
R07
ELEC.
D2.116
IT
D2.112
CORRIDOR
D2.099A
GENERAL
STORAGE
D2.106
LOBBY
D2.099C
D2.116
D2.112
D2.106
NEW
ELEVATOR 3
D2.E3
EXISTING
ELEVATOR 2
D2.E2
CMU
CMU
DS
DR
D1
R01
DQ
DP
D2
E03
E07
R07
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
JANITOR
D1.114
D1.114
D1.112.3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
D1.116
EXISTING
ELEVATOR 2
D1.E2 D1.108.2
C.O.
CMU
CMU
CMU
DRAIN
CR
CMU
EXIST. ELEV.
CONTROLLER
EXISTING SUMP
PUMP PIT AND
COVER
DS
DR
D1
DQ
DP
D2
P01 REMOVAL OF OIL COOLER DISCONNECTS
SHOW BOLD
P02 REMOVE FIRE EXTINGUISHER. SAVE FOR
RE-LOCATION IN THIS PROJECT. ARROW IS
POINTING TO NEW LOCATION.
P03 INSTALL ELEVATOR 3 EQUIPMENT - ONCE
NEW ELEVATOR SYSTEM IS COMPLETELY UP
AND RUNNING THEN REMOVAL OF EXISTING
ELEVATOR EQUIPMENT ITEMS CAN BE DONE.
SEE DEMOLITION PLAN FOR EXISTING ITEMS
TO BE REMOVED OR RELOCATED.
P04 EXISTING BOREHOLE
P05 PROVIDE FULL-HEIGHT TEMPORARY
PARTITION AS REQUIRED TO LIMIT THE
SPREAD OF DUST TO ADJACENT BUILDING
AREAS, AND TO PROVIDE A SAFE AND
SECURE BARRIER TO THE CONSTRUCTION
AREA AT ALL TIMES AS FOLLOWS:
- CONSTRUCT PARTITION OF 2x4
WOOD STUDS @ 16" O.C.
- APPLY 1/2" PLYWOOD TO EXTERIOR
FACES OF STUDS. SECURE
PLYWOOD WITH SCREWS.
- ANCHOR PARTITION TO EXISTING
FLOOR SLAB AND OVERHEAD
COMPONENTS IN A MANNER THAT
DOES NOT DAMAGE THE EXISTING
SLAB OR OVERHEAD COMPONENTS
- PROVIDE A DOOR WITH PADLOCK
AND HASP IN THIS PARTITION;
SECURE PADLOCK WHEN WORK IS
NOT UNDERWAY IN THE
CONSTRUCTION AREA
P06 PROVIDE AN MINIMUM 28'-0" H. (ABOVE PIT
FLOOR) SPACE DIVIDER/FENCE PANEL
DURING THE CONSTRUCTION TO PREVENT
CONSTRUCTION PERSONNEL AND/OR
EQUIPMENT FROM BEING NEAR OR
UNDERNEATH THE EXISTING ELEVATOR,
WHICH IS TO REMAIN ACTIVE THROUGHOUT
THE DURATION OF THE WORK TO INSTALL
NEW ELEVATOR #3.
INTERIM PLAN KEY NOTES
BOTTOM OF THESE EXISTING
PANELS = 6'-6" A.F.F.
F.E.
EXISTING PANELS
EXIST.
LIGHT
& FANS
FOR
CAR
DISC.
EXIST.
LIGHT
& FANS
FOR
CAR
DISC.
ELEV.
CONTROLLER
F.E.
SINGLE
POWER
UNIT
DISC.
P02
P01
P03
P03
D3
THE INTENT OF THIS PLAN IS SHOW THE ELEVATOR
EQUIPMENT LOCATIONS WHEN THE NEW ELEVATOR
WORK IS COMPLETE BUT BEFORE THE
REPLACEMENT/REROUTING OF THE EXISTING
ELEVATOR EQUIPMENT HAS BEGUN.
P05
P04
OIL
LINE
X X X X X X
P06
ELEC.
D2.116
IT
D2.112
CORRIDOR
D2.099A
GENERAL
STORAGE
D2.106
LOBBY
D2.099C
D2.116
D2.112
D2.106
NEW
ELEVATOR 3
D2.E3
EXISTING
ELEVATOR 2
D2.E2
CMU
CMU
DS
DR
D1
DQ
DP
D2
P05
X X X X X X
P06
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
JANITOR
D1.114
D1.114
D1.112.3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
D1.116
EXISTING
ELEVATOR 2
D1.E2 D1.108.2
C.O.
CMU
CMU
CMU
DRAIN
CR
CMU
EXIST. ELEV.
CONTROLLER
EXISTING SUMP
PUMP PIT AND
COVER
DS
DR
D1
DQ
DP
D2
A01 EQUIPMENT CLEARANCES SHOWN DASHED.
A02 RE-LOCATED EXISTING EQUIPMENT.
A03 INFILL HOLE IN CMU WALL AT REMOVED
SPRINKLER PIPE WITH FIRE CAULK.
FLOOR PLAN KEY NOTES
E01
E01
E03
E04
E04
ELEV
MACH.
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
JANITOR
D1.114
D1.114
D1.112.3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
D1.116
EXISTING
ELEVATOR 2
D1.E2 D1.108.2
C.O.
CMU
CMU
CMU
DRAIN
CR
CMU
EXIST. ELEV.
CONTROLLER
EXISTING SUMP
PUMP PIT AND
COVER
ELEV.
CONTROLLER
F.E.
SINGLE
POWER
UNIT
SINGLE
POWER
UNIT
DISC.
GROUND.
BAR
2- LIGHT
& FANS
FOR
CAR
DISC.
ON TOP
OF EACH
OTHER
A-301
A-301
D3E01 EXISTING PIT LADDER
E02 NOT USED.
E03 EXISTING STEEL TUBE BEAMS AND
COLUMN
E04 EXISTING 2" WIDE CONCRETE LEDGE
E05 EXISTING ADJACENT CONSTRUCTION TO
REMAIN (WALLS, FLOORS, DOORS/FRAMES,
CEILINGS, FINISHES, ETC. EXCEPT AS
NOTED)
E06 EXISTING FLOOR DRAIN AND CLEANOUT
E07 EXISTING STEEL CHANNELS AND JAMBS
AND HEAD TO REMAIN
E08 EXISTING BOREHOLE
EXISTING ITEM NOTES
E05
E05
A01
TYP.
A02
A02
A02
A03
E06
E07
E08
ELEC.
D2.116
IT
D2.112
CORRIDOR
D2.099A
GENERAL
STORAGE
D2.106
LOBBY
D2.099C
D2.116
D2.112
D2.106
NEW
ELEVATOR 3
D2.E3
EXISTING
ELEVATOR 2
D2.E2
CMU
CMU
DS
DR
D1
DQ
DP
D2
E03
A-301
A-301
ELEC.
D2.116
IT
D2.112
CORRIDOR
D2.099A
GENERAL
STORAGE
D2.106
LOBBY
D2.099C
D2.116
D2.112
D2.106
NEW
ELEVATOR 3
D2.E3
EXISTING
ELEVATOR 2
D2.E2
CMU
CMU
E07
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
D 1.
.2
JANITOR
D1.114
D1.114
D1.112.3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
D1.116
EXISTING
ELEVATOR 2
D1.E2 D1.108.2
C.O.
CMU
CMU
CMU
DRAIN
CR
CMU
EXIST. ELEV.
CONTROLLER
EXISTING SUMP
PUMP PIT AND
COVER
DS
DR
D1 D201 PREP AND PAINT EXISTING STEEL
CHANNELS AT OPENING JAMBS AND HEAD
P-1LG
FINISHES PLAN KEY NOTES
ELEV
MACH.
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
D 1.
.2
JANITOR
D1.114
D1.114
D1.112.3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
D1.116
EXISTING
ELEVATOR 2
D1.E2 D1.108.2
C.O.
CMU
CMU
CMU
DRAIN
CR
CMU
EXIST. ELEV.
CONTROLLER
EXISTING SUMP
PUMP PIT AND
COVER
ELEV.
CONTROLLER
F.E.
SINGLE
POWER
UNIT
SINGLE
POWER
UNIT
DISC.
GROUND.
BAR
2- LIGHT
& FANS
FOR
CAR
DISC.
ON TOP
OF EACH
OTHER
D3
NOTES
ROOM FINISH SCHEDULE
NO. DESCRIPTION FLOOR BASE
NORTH WALL EAST WALL SOUTH WALL WEST WALL CEILING
MAT. FIN. MAT. FIN. HEIGHTMAT. FIN. MAT. FIN. MAT. FIN.
AT ACOUSTICAL TILE CEILING
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
EX EXISTING
EXP EXPOSED
P PAINT
RB RESILIENT BASE
ROOM FINISH SCHEDULE LEGEND
NOTE: REFER TO COLOR SCHEDULE FOR ALL INTERIOR FINISHES.
D2.099C LOBBY EX CONC EX RB-1 EX CMU EX -- -- EX CMU P-1LG EX CMU P-1R EX AT-1/AT-1.1 -- 10'-0"
D1.099C LOBBY EX CONC EX RB-1 EX CMU EX -- -- EX CMU P-1LG EX CMU P-1Y EX AT-1/AT-1.1 -- 10'-0"
D1.112A ELEVATOR MACHINE ROOM EX CONC --- EX CMU P-1LG EX GWB P-1LG EX CMU P-1LG EX CMU P-1LG EXP -- --
ALL ROOMS NOT LISTED ON ROOM FINISH SCHEDULE ARE EXISTING TO REMAIN.
PREP AND PAINT P-1LG
ELEC.
D2.116
LOBBY
D2.099C
D2.116
D2.112
NEW
ELEVATOR 3
D2.E3
EXISTING
ELEVATOR 2
D2.E2
CMU
CMU
DS
DR
D1 D2
ELEC.
D2.116
LOBBY
D2.099C
D2.116
D2.112
NEW
ELEVATOR 3
D2.E3
EXISTING
ELEVATOR 2
D2.E2
CMU
CMU
PREP AND PAINT P-1LG
ELEV. = 100'-0"
LEVEL 1
ELEV. = +/-94'-6"
PIT FLOOR
ELEV. = 116'-0"
LEVEL 2 DOCK
ELEV. = 131'-9"
TOP OF STEEL LOW POINT
ELEV. = 132'-8"
TOP OF STEEL HIGH POINT
ELEV. = 100'-0"
LEVEL 1
ELEV. = +/-94'-6"
PIT FLOOR
ELEV. = 116'-0"
LEVEL 2 DOCK
ELEV. = 131'-9"
TOP OF STEEL LOW POINT
ELEV. = 132'-8"
TOP OF STEEL HIGH POINT
LOBBY
D1.099C
NEW
ELEVATOR 3
D1.E3
LOBBY
D2.099C
LOBBY
D1.099C
LOBBY
D2.099C
LIGHT
EXISTING 6"x12" STEEL TUBE
EXISTING 6"x12" STEEL TUBE
EXISTING HOIST BEAM
NEW ELEVATOR 3
OIL LINE COMING
THROUGH
EXISTING CMU
WALL
EXISTING ELEVATOR 2
BEYOND
EXISTING METAL WALL PANEL
EXISTING CMU WALL
EXISTING CONCRETE WALL
EXISTING
CONCRETE
PIT FLOOR
EXISTING CMU WALL
EXISTING CMU WALL
EXISTING CONCRETE BEAM
EXISTING ROOF FRAMING
EXISTING CMU WALL
EXISTING CONCRETE BEAM
EXISTING CMU WALL
EXISTING ROOF FRAMING
EXISTING ELEVATOR 2
OIL LINE
EXISTING ELECTRICAL
CONDUIT
SPRINKLER SYSTEM PIPING
EXISTING CONCRETE
FLOOR AND WALL
ELEVATOR DOORS
ELEVATOR DOORS
EXISTING CONCRETE FLOOR
ELEVATOR DOORS
ELEVATOR DOORS
EXISTING CONCRETE
FLOOR AND WALL
EXISTING CONCRETE FLOOR
EXISTING ELEVATION
2 BORE HOLE AND
PLUNGER
EXISTING STEEL CHANNELS/PLATES
AT OPENING HEAD, JAMBS AND SILL
TO REMAIN
DEMOLITION NOTES:PLUMBING GENERAL NOTES:
FIRE PROTECTION
MECHANICAL SYMBOLS MECHANICAL SYMBOLS
PIPINGPLUMBING
FIRE PROTECTION GENERAL NOTES:
ABBREVIATIONS
D4
D4
DW
DV
DJ
DK
DL
DM
DN
DP
DQ
DR
DS
DT
DU
DE
DF
DG
D2 D3
DH
J636L
WAREHOUSE
D1.108
GOODWILL
INDUSTRIES
CUSTODIAL
D1.110
ELEV
MACH.
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
STAIR 12
D1.S12
STAIR 13
D1.S13
EAST CT
CHEMICAL
TREATMENT
D1.106
JANITOR
D1.114
GENERAL
STORAGE
D1.112
CORRIDOR
D1.099A
LOBBY
D1.099C
WEST CT
CHEMICAL
TREATMENT
D1.104
WEST CT
ELECTRICAL
ROOM
D1.100
EAST CT
ELECTRICAL
ROOM
D1.102
EXISTING
ELEVATOR 2
D1.E2
GOODWILL
INDUSTRIES
CUSTODIAL
OFFICE
D1.110A
D1
D1
D4
D4
DW
DV
DJ
DK
DL
DM
DN
DP
DQ
DR
DS
DT
DU
DE
DF
DG
D2 D3
DH
J636L
WAREHOUSE
D1.108
GOODWILL
INDUSTRIES
CUSTODIAL
D1.110
ELEV
MACH.
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
STAIR 12
D1.S12
STAIR 13
D1.S13
EAST CT
CHEMICAL
TREATMENT
D1.106
JANITOR
D1.114
GENERAL
STORAGE
D1.112
CORRIDOR
D1.099A
LOBBY
D1.099C
WEST CT
CHEMICAL
TREATMENT
D1.104
WEST CT
ELECTRICAL
ROOM
D1.100
EAST CT
ELECTRICAL
ROOM
D1.102
EXISTING
ELEVATOR 2
D1.E2
GOODWILL
INDUSTRIES
CUSTODIAL
OFFICE
D1.110A
D1.112A
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
EXISTING
ELEVATOR 2
D1.E2
D1
DQ
DR
DS
D2 D3
ELEV
MACH.
D1.112A
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
EXISTING
ELEVATOR 2
D1.E2
SUMP PUMP FUNNEL DRAIN
SCALE: NTS
FLAG NOTES
D1
DQ
DS
D2 D3
D4
D4
DJ
DK
DL
DM
DN
DP
DQ
DR
DS
DT
DE
DF
DG
D2 D3
DH
J636L
WAREHOUSE
D1.108
GOODWILL
INDUSTRIES
CUSTODIAL
D1.110
ELEV
MACH.
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
STAIR 12
D1.S12
STAIR 13
D1.S13
EAST CT
CHEMICAL
TREATMENT
D1.106
JANITOR
D1.114
GENERAL
STORAGE
D1.112
CORRIDOR
D1.099A
LOBBY
D1.099C
WEST CT
CHEMICAL
TREATMENT
D1.104
WEST CT
ELECTRICAL
ROOM
D1.100
EAST CT
ELECTRICAL
ROOM
D1.102
EXISTING
ELEVATOR 2
D1.E2
GOODWILL
INDUSTRIES
CUSTODIAL
OFFICE
D1.110A
D1
D1
D4
D4
DJ
DK
DL
DM
DN
DP
DQ
DR
DS
DT
DE
DF
DG
D2 D3
DH
J636L
WAREHOUSE
D1.108
GOODWILL
INDUSTRIES
CUSTODIAL
D1.110
ELEV
MACH.
D1.112A
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
STAIR 12
D1.S12
STAIR 13
D1.S13
EAST CT
CHEMICAL
TREATMENT
D1.106
JANITOR
D1.114
GENERAL
STORAGE
D1.112
CORRIDOR
D1.099A
LOBBY
D1.099C
WEST CT
CHEMICAL
TREATMENT
D1.104
WEST CT
ELECTRICAL
ROOM
D1.100
EAST CT
ELECTRICAL
ROOM
D1.102
EXISTING
ELEVATOR 2
D1.E2
GOODWILL
INDUSTRIES
CUSTODIAL
OFFICE
D1.110A
D1.112A
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
EXISTING
ELEVATOR 2
D1.E2
D1
DQ
DR
DS
D2 D3
ELEV
MACH.
D1.112A
CORRIDOR
D1.099B
NEW
ELEVATOR 3
D1.E3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
EXISTING
ELEVATOR 2
D1.E2
FLAG NOTES
D1
DQ
DR
DS
D2 D3
ELECTRICAL SYMBOLS ELECTRICAL SYMBOLS
SUBSCRIPTS
ABBREVIATIONS
LIGHTING AND POWER
GENERAL NOTES DEMOLITION NOTES
FIRE DETECTION AND ALARM
FLAG NOTES
D1
D4
D4
DW
DV
DJ
DK
DL
DM
DN
DP
DQ
DR
DS
DT
DU
DE
DF
DG
D2 D3
DH
D1
D1
D4
D4
DW
DV
DJ
DK
DL
DM
DN
DP
DQ
DR
DS
DT
DU
DE
DF
DG
D2 D3
DH
CMU
CMU
J636L
WAREHOUSE
D1.108
GOODWILL
INDUSTRIES
CUSTODIAL
D1.110
UNISEX
TOILET
D1.116
CORRIDOR
D1.099B
STAIR 12
D1.S12
STAIR 13
D1.S13
EAST CT
CHEMICAL
TREATMENT
D1.106
JC
D1.114
CORRIDOR
D1.099A
WEST CT
CHEMICAL
TREATMENT
D1.104
WEST CT
ELECTRICAL
ROOM
D1.100
EAST CT
ELECTRICAL
ROOM
D1.102
GOODWILL
INDUSTRIES
CUSTODIAL
OFFICE
D1.110A
LOADING
AND
SCREENING
D2.124
CENTRAL
DESTRUCTION
FACILITY
D2.122
DOCK
OFFICE
D2.124A
UNISEX
TOILET
D2.118
CORRIDOR
D2.099A
55 CES
LOADING/STAGING/
BULK
STORAGE
D2.100A
55-CES
REPAIR
CENTER
D2.100B
GENERAL
STORAGE
D2.106
MECHANICAL
ROOM
D2.120
J.C.
D2.114
STAIR 13
D2.S13
STAIR 12
D2.S12
CORRIDOR
D2.099B
GEN.
STOR
D2.110
GEN.
STOR.
D2.108
WELDING
GAS TANK
STORAGE
D2.100C
AIR
COMPRESSOR
D2.100E
FLAMMABLE
STORAGE
D2.100D
LOCKSMITH
D2.100F
REFRIGERANT
STORAGE
D2.100G
KITCHENETTE
D2.104C
55 OFFICE
D2.104B
55 ENTRY
D2.104A
W TOILET
D2.104F
WOMEN'S
LOCKER
ROOM
D2.104E
MEN'S
LOCKER
ROOM
D2.104H
W
SHOWER
D2.104G
M
SHOWER
D2.104K
M TOILET
D2.104J
LOCKER
ROOM
CORRIDOR
D2.104D
HATCHING LEGEND
ELEC.
D2.116
IT
D2.112
CORRIDOR
D2.099A
GENERAL
STORAGE
D2.106
LOBBY
D2.099C
NEW
ELEVATOR 3
D2.E3
EXISTING
ELEVATOR 2
D2.E2
A
ELEV
MACH.
D1.112A
CORRIDOR
D1.099B
ELEVATOR 3
D1.E3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
EXISTING
ELEVATOR 2
D1.E2
ELEC.
D2.116
IT
D2.112
CORRIDOR
D2.099A
GENERAL
STORAGE
D2.106
LOBBY
D2.099C
NEW
ELEVATOR 3
D2.E3
EXISTING
ELEVATOR 2
D2.E2
A
ELEV
MACH.
D1.112A
CORRIDOR
D1.099B
ELEVATOR 3
D1.E3
GENERAL
STORAGE
D1.112
LOBBY
D1.099C
EXISTING
ELEVATOR 2
D1.E2
F F F
GENERAL NOTES
FF
ELEVATOR INTERCONNECTION SCHEMATIC (SPRINKLED)
NO SCALE
DISTRIBUTION PANEL LD7A-DB-2NHB1
CKT # O/C REMARKS LOAD VA DESCRIPTION
PANEL LD9B-PB-2SLB1
DESCRIPTION LOAD VA REMARKS O/C CKT # PH CKT # O/C REMARKS LOAD VA DESCRIPTION
File details come from the government source that posted it. Updated .