Date: RFI No.
RFP Reference (Sect/Para/Page) QUESTION GOVERNMENT RESPONSE
8/8/2018 Are the cameras being replaced IP, POE (Power over Ethernet)?
mixture of IP-external power, IP-POE, Fiber - external power
8/8/2018 Can you share with us the make/ model of the NVR and cameras to be replaced?
DIVAR 7000 video management appliance 8TB DIP-7042-
4HD
8/8/2018
• Is the existing cable to be reused?
o Aprox. how long are the runs o Are any over fiber?
Yes, pending db loss meets current BICSI. convert fiber cameras in wire room to CAT6E
Vary 40' to approximately 500', site survey recommended if need exact distances
Yes, identified in SOW to convert to IP, current fiber is 62.5MM with ST connector in wire room
8/8/2018 Do you have any part numbers you’d prefer us to quote for the new cameras, or specifications we should meet or exceed?
Meet specifications of SOW, all cameras at a minimum must be HD/PTZ/Optical Zoom/compatible, Current camera that meet requirements with the exception of thermal (Cameras 1, 32, 42, and 43 per SOW) are Bosch
HD 7000 VG5-7230-CPT4
8/8/2018 The combined synopsis/solicitation on www.fbo.gov
Do you plan on having a site walk?
A site visit will be conducted 15 August 2018 at 0900 hours CST at the Tulsa Air National Guard Base located at 9100 East 46th Street North, Tulsa, OK 74115. When arriving at the base park in the parking lot on the west side of the entrance as you pull in. Walk to the security guard shack with your government issued ID and get a visitors badge. Somebody will go out to the gate at 0900 hours to escort you on base and begin the site visit.
Pre-Bid RFI Log for SFS Cameras
8/8/2018 is the site visit in Tulsa OK on 8/15 mandatory?
The site visit is not mandatory but vendors will be held to the standards of the solicitation whether or not they attend the site visit.
8/8/2018 is there a drawing of the buildings?
Yes, current building maps do not have camera system mapped out, Maps can be provided upon award of contract.