Statement of Work SFS Camera Replacement
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FSBA/OKANG CSC 16723 - 1
Guidance Communications Install SFS Camera Replacement Tulsa OK ANG
Form 9# 18 June 2018
PART 1 – GENERAL
1.01 DESCRIPTION OF WORK:
A. Provide and install IP capable cameras compatible with existing Bosch system and all current end equipment (Windows 10 Compatible), Tulsa, OKANG, per UFC; as indicated by drawings and requirements of this section. Perform preventive maintenance inspection on all existing cameras and provide fix actions as required. Provide valid contractor cost estimate through 30 September 2018. Site Survey must be conducted prior to award of contract. Installation, training, and as-built drawings must be complete within 120 days of award of contract.
B. Contractor shall terminate Camera to patch panel as required by the following sections and on available drawings. 138 Communications Flight will make the connection from patch panel to network switch.
C. Camera # 5 - Inbound Windshield - currently stationary, provide HD/optical zoom and PTZ(Pan, Tilt, Zoom)
Camera # 6 - Inbound Tag - currently stationary, provide HD/optical zoom and PTZ
Camera # 7 - Outbound - currently stationary, provide HD/optical zoom and PTZ
Camera # 2 - Bldg. 401 - upgrade to HD/optical zoom
Camera # 3 - Bldg. 020 - upgrade to HD/optical zoom
Camera # 4 - Bldg. 222 - upgrade to HD/optical zoom
Camera # 1 - Mono-Pole SFS - upgrade to HD/optical zoom, thermal,convert to IP capable
Camera # 27 - LGX - upgrade to HD/optical zoom
Camera # 26 - Bldg. 316- upgrade to HD/optical zoom
Camera # 43 - Hangar South - upgrade to HD/optical zoom, thermal, convert to IP capable
Camera # 42 - Hangar North - upgrade to HD/optical zoom, thermal, convert to IP capable
Camera # 28 - 502 - needs to be upgraded to HD/optical zoom
Camera # 32 - Tower Yard – replace with HD/optical zoom and thermal, current camera can be reutilized at another location
Camera # - Bldg 330 – replace with HD/optical zoom, PTZ, convert to IP capable
Camera # - Bldg 403- Install HD/optical zoom/PTZ/IP Capable camera on southeast corner of facility, also install and connect CAT6E cabling from camera location and terminate on patch panel specified by 138CF within bldg. 403 IT closet. 138CF will make connection from patch panel to network switch
FSBA/OKANG CSC 16723 - 2
The priority of importance for the thermal cameras are as follows; Hangar South, Tower Yard, Hangar North, and mono pole.
D. Provide user/administrator training for 138FW personnel.
E. Limited Access Locations: None known.
1.02 QUALITY ASSURANCE:
A. Products: Catalog and model numbers are intended to indicate type and quality of design and material as well as exact operating features required.
B. Brand Specific Materials (except where noted):
BOSCH camera system and software. All components must be compatible with BOSCH camera software and components.
C. Installer: A firm with at least five (5) years of successful installation experience on projects with communication installation work similar to that required for the project. Bosch certified installer/programmer required on-site.
D. NEC Compliance: Comply with National Electrical Code (NFPA No. 70).
E. UL and Labels: Any contractor provided equipment must be industry certified which has been listed and labeled by Underwriters’ Laboratories.
F. Validate as-builts and cable test before finalizing.
1.03 SUBMITTALS:
A. Manufacturer’s Data: Submit manufacturer's data materials.
B. Shop Drawings: Submit dimensioned drawings (AutoCad) of installed equipment showing accurately scaled basic units.
C. Include with shop drawings a riser (if required), wiring diagrams, and specification data sheets. Submittals indicating typical single line risers and typical specification sheets only will not be acceptable.
D. Provide project support agreement to the 138 Fighter Wing for any allied support required.
1.04 DELIVERY, STORAGE AND HANDLING: Handle equipment carefully to prevent internal components damage, breakage, denting and scoring of the enclosure finish. Do not install damaged equipment. Store equipment in a clean dry space. Protect from dirt, fumes, water, construction debris and physical damage. Properly dispose of excess material.
PART 2 - PRODUCTS
2.01 MATERIALS AND EQUIPMENT:
General CAT-6E (LAN): Terminate and test all. Except as otherwise indicated, provide manufacturer's standard materials and components as indicated by their published product information, designed and constructed as recommended by the manufacturer, and as required for a complete installation.
2.02 CONDUIT AND WIRING: Wiring shall be installed per UFC.
FSBA/OKANG CSC 16723 - 3
PART 3 - EXECUTION
3.01 INSTALLATION: Install in accordance with the UFC, the manufacturer’s instructions and recognized industry practices to ensure the equipment complies with these requirements and serves the intended purposes. Map of installation locations will be provided by customer.
3.02 SPECIFIC INSTRUCTIONS: Label all termination points in rooms and on patch panel (Camera #).
3.03 TESTING: Upon completion provide hard/soft copy of “As Built” drawings, including plan layout, conduit runs, and wiring diagrams as finally installed. Customer will provide current drawings to update.
END OF SECTION