About this file

The document is a solicitation (SFS605SW20001067) from the Missouri Department of Transportation (MoDOT) Southwest District for a Single Feasible Source (SFSR) procurement of LMM Display Modules. The solicitation seeks replacement Dynamic Message Sign (DMS) panels exclusively from LedStar Inc. for their existing message board system, with a specified procurement period from October 31, 2019, to November 6, 2019. Responses were due by November 6, 2019, at 11:00 AM CST, with delivery requirements of Monday through Friday between 7:30 AM and 3:00 PM to the MoDOT Southwest District/Signal Department in Springfield, Missouri. The contract award period spans from November 6, 2019, through December 31, 2020, with 24-hour advance notice required for deliveries.

The procurement follows Missouri Code of State Regulation 7 CSR 10-11.020 for single feasible source procurement, which allows non-competitive purchasing when supplies are proprietary and only available from a single manufacturer or distributor. Vendors could submit responses electronically through the MissouriBUYS eProcurement system or via hard copy. While no specific contract value was explicitly stated, the solicitation notes that purchases over $5,000 require posting notice, and purchases over $25,000 necessitate additional advertising at least five days before contract award. The procurement is specifically for LMM Display Modules to replace DMS panels, with LedStar Inc. identified as the sole source due to the proprietary nature of the modules and the need for compatibility with existing infrastructure.

View the file

Other files

File Type Posted
solicitation_summary.pdf PDF
SFS605SW20001067_Dec_30_24_solicitation_doc.pdf PDF
SFS605SW20001067_Jan_6_25_solicitation_doc.pdf PDF
SFS605SW20001067_Jan_20_25_solicitation_doc.pdf PDF
SFS605SW20001067_Feb_3_25_solicitation_doc.pdf PDF
SFS605SW20001067_Apr_7_25_solicitation_doc.pdf PDF
SFS605SW20001067_Apr_21_25_solicitation_doc.pdf PDF
SFS605SW20001067_Sep_2_24_solicitation_doc.pdf PDF
SFS605SW20001067_Sep_23_24_solicitation_doc.pdf PDF
SFS605SW20001067_Nov_4_24_solicitation_doc.pdf PDF
SFS605SW20001067_Dec_9_24_solicitation_doc.pdf PDF
SFS605SW20001067_Jan_27_25_solicitation_doc.pdf PDF
SFS605SW20001067_Apr_14_25_solicitation_doc.pdf PDF
SFS605SW20001067_May_19_25_solicitation_doc.pdf PDF
SFS605SW20001067_Aug_23_24_solicitation_doc.pdf PDF
SFS605SW20001067_Sep_30_24_solicitation_doc.pdf PDF
SFS605SW20001067_Oct_21_24_solicitation_doc.pdf PDF
SFS605SW20001067_Oct_28_24_solicitation_doc.pdf PDF
SFS605SW20001067_Nov_11_24_solicitation_doc.pdf PDF
SFS605SW20001067_Dec_2_24_solicitation_doc.pdf PDF
SFS605SW20001067_Jan_13_25_solicitation_doc.pdf PDF
SFS605SW20001067_Feb_24_25_solicitation_doc.pdf PDF
SFS605SW20001067_Mar_31_25_solicitation_doc.pdf PDF
SFS605SW20001067_May_12_25_solicitation_doc.pdf PDF
SFS605SW20001067_Jun_23_25_solicitation_doc.pdf PDF
SFS605SW20001067_Aug_30_24_solicitation_doc.pdf PDF
SFS605SW20001067_Sep_9_24_solicitation_doc.pdf PDF
SFS605SW20001067_Sep_16_24_solicitation_doc.pdf PDF
SFS605SW20001067_Oct_7_24_solicitation_doc.pdf PDF
SFS605SW20001067_Oct_14_24_solicitation_doc.pdf PDF
SFS605SW20001067_Nov_18_24_solicitation_doc.pdf PDF
SFS605SW20001067_Nov_25_24_solicitation_doc.pdf PDF
SFS605SW20001067_Mar_17_25_solicitation_doc.pdf PDF
SFS605SW20001067_Jun_9_25_solicitation_doc.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: SFS605SW20001067

LMM Display Modules

MODOT Single Feasible Source (SFSR)

MoDOT - SW

October 31, 2019 - November 06, 2019

Page:2

General Header Information

SFS605SW20001067

No. SFS605SW20001067 Title: LMM Display Modules Start Date: October 31, 2019 at 10:00:00 AM CDT End Date: November 06, 2019 at 11:00:00 AM CST Vendor Q&A Start Date:

Vendor Q&A End Date:

Estimated Total Value:

Who can respond to this bid? : All Vendors Description: The Missouri Department of Transportation has determined that only one source, LedStar Inc., can provide the Department with LMM Display Modules for replacement DMS panels for our LedStar message boards.

The award period is from November 6, 2019 through December 31, 2020.

Delivery Terms: Free On Board Destination Delivery Notes: Deliver Monday through Friday 7:30 am - 3:00 pm

MoDOT SW District/Signal Department 2455 North Mayfair Street Springfield, MO 65803 24-Hours advance notice is requested John Leporte (417) 895-7639

Payment Terms: Vendor Specified Contact Information: MoDOT - SW

Teresa Mitchell 3025 E Kearney St Springfield MO, 65803 United States Tel: 417-895-7645 Fax: 417-895-6704 teresa.mitchell@modot.mo.gov

Contact Details: If you have any questions, please contact:

Teresa Mitchell 3025 E Kearney St Springfield MO, 65803 United States Tel: 417-895-7645 Fax: 417-895-6704 teresa.mitchell@modot.mo.gov

Selected Categories:

Page:3

Header Custom Fields:

SFS605SW20001067

NOTICE

Vendor Responsibility

The vendor is solely responsible for ensuring timely submission of their solicitation response, whether submitting an online response or a hard copy response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.

The State of Missouri's Privacy Policy can be accessed here.

MODOT Section Numbering

Section Numbering All section numbering contained in this solicitation is for the convenience of reference only and is not intended to define or limit the scope of any provision of this solicitation and may not be sequential.

http://www.mo.gov/privacy-policy/

Page:4

Solicitation Requirements:

SFS605SW20001067

MoDOT Instructions for Submitting a Response

Instructions for Submitting a Response

Page:5

The Missouri Department of Transportation is now posting all of its bid solicitation documents on the new

MissouriBUYS Bid Board (https://www.missouribuys.mo.gov). MissouriBUYS is the State of Missouri’s web-based statewide eProcurement system which is powered by WebProcure, through our partner, Perfect

Commerce.

For all bid solicitations, vendors now have the option of submitting their solicitation response either as an electronic response or as a hard copy response. As a means to save vendors the expense of submitting a hard copy response and to provide vendors both the ease and the timeliness of responding from a computer, vendors are encouraged to submit an electronic response. Both methods of submission are explained briefly below and in more detail in the step-by-step instructions provided at https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf

Notice: The vendor is solely responsible for ensuring timely submission of their solicitation response, whether submitting an online response or a hard copy response. Failure to allow adequate time prior to the solicitation end date to complete and submit a response to a solicitation, particularly in the event technical support assistance is required, places the vendor and their response at risk of not being accepted on time.

• ELECTRONIC RESPONSES: To respond electronically to a solicitation, the vendor must first register with MissouriBUYS by going to the MissouriBUYS Home Page (https://missouribuys.mo.gov), clicking the

“Register” button at the top of the page, and completing the Vendor Registration. Once registered the vendor should log back into MissouriBUYS and edit their profile by selecting the organizational contact(s) that should receive an automated confirmation of the vendor’s electronic bid responses successfully submitted to the state.

To respond electronically to a solicitation, the vendor must login to MissouriBUYS, locate the desired solicitation on the Bid Board, and, at a minimum, the vendor must read and accept the Original Solicitation

Documents and complete pricing and any other identified requirements. In addition, the vendor should download and save all of the Original Solicitation Documents on their computer so that they can prepare their response to these documents. Vendors should upload their completed response to these downloaded documents (including exhibits, forms, and other information concerning the solicitation) as an attachment to the electronic solicitation response. Step-by-step instructions for how a registered vendor responds to a solicitation electronically are available on the MissouriBUYS system at:

https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf

Vendors are encouraged to submit their entire proposal electronically; however in lieu of attaching exhibits, forms, pricing, etc. to the electronic solicitation response, a vendor may submit the exhibits, forms, pricing, etc. through mail or courier service. However, any such submission must be received prior to the solicitation’s specified end date and time. Be sure to include the solicitation/opportunity (OPP) number, company name, and a contact name on any hard copy solicitation response documents submitted through mail or courier service.

In the event a registered vendor electronically submits a solicitation response and also mails hard copy documents that are not identical, the vendor should explain which response is valid for the state's consideration. In the absence of such explanation, the state reserves the right to evaluate and award the response which serves its best interest.

https://www.missouribuys.mo.gov https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf https://missouribuys.mo.gov https://missouribuys.mo.gov/sites/missouribuys/files/How_To_Respond_To_A_Solicitation.pdf

Page:6

Addendum Document: If an addendum document is subsequently issued, please follow these steps to accept the addendum document(s).

1. If you have not accepted the original solicitation document go to the Overview page, find the section titled, Original Solicitation Documents, review the solicitation document(s) then click on the box under

Select, and then click on the Accept button.

2. To accept the addendum document, on the Overview page find the section titled Addendum Document, review the addendum document(s) then click on the box under Select, and then click on the Accept button.

Note: If you submitted an electronic response prior to the addendum date and time, you should review your solicitation response to ensure that it is still valid by taking into consideration the revisions addressed in the addendum document. If a revision is needed to your solicitation response and/or to indicate your acceptance of the addendum document, you will need to retract your response and re-submit your response by following these steps:

1. Log into MissouriBUYS.

2. Select the Solicitations tab.

3. Select View Current Solicitations.

4. Select My List.

5. Select the correct Opportunity Number (Opportunity No); the Overview page will display.

6. Click on Review Response from the navigation bar.

7. Click on Retract if your response needs to be revised.

8. A message will come up asking, “Are you sure you want to retract the Bid”. Click on Continue to confirm.

9. Click on Respond and revise as applicable.

10. Click on Review Response from the navigation bar and then click on Submit to submit your response.

• HARD COPY RESPONSES: Be sure to include the solicitation/opportunity (OPP) number, company name, and a contact name on any hard copy solicitation response documents.

MODOT Single Feasible Source

1.2. SFS Determination

Page:7

This Single Feasible Source Determination is made in accordance with the following Code of State

Regulation: 7 CSR 10-11.020 Procedures for Solicitation, Receipt of Bids, and Award and

Administration of Contracts

(4) The division may waive the requirement of competitive bids or proposals for supplies when the division has determined in writing that there is only a single feasible source for the supplies. Immediately upon discovering that other feasible sources exist, the division shall rescind the waiver and proceed to procure the supplies through the competitive processes as described in this rule.

(A) A single feasible source exists when:

1. Supplies are proprietary and only available from the manufacturer or a single distributor; or

2. Based on past procurement experience, it is determined that only one (1) distributor services the region in which the supplies are needed; or

3. Supplies are available at a discount from a single distributor for a limited period of time.

(B) When the Single Feasible Source procurement method is utilized, the division shall use the following guidelines to support the Single Feasible Source determination:

1. The following guidelines may be utilized to determine if supplies can be purchased as a single feasible source due to being proprietary:

A. The parts are required to maintain validity of a warranty;

B. Additions to a system must be compatible with original equipment;

C. Only one (1) type of computer software exists for a specific application;

D. Factory authorized maintenance must be utilized to maintain validity of a warranty;

E. The materials are copyrighted and are only available from the publisher or a single distributor; or

F. The services of a particular provider are unique, e.g., entertainers, authors, etc.

2. The following guidelines may be utilized if past procurement activity indicates that only one (1) bid has been submitted in a particular region. In these situations the division shall monitor the market for developing competition; and

3. The following guidelines may be utilized to determine if supplies may be purchased as a single feasible source due to being available at a discount for a limited period of time:

A. The discounted price must be compared to a price established through a reasonable market analysis; and

B. The discounted price should normally be at least ten percent (10%) less than the current contract or other comparable price. A discount of less than ten percent (10%) may be acceptable under appropriate market conditions. The discount should be compared to a price which, where feasible, should be no more than twelve (12) months old.

Page:8

This quote has no questions defined.

This quote does not have any documents.

(C) On any single feasible source purchase where the estimated expenditure shall be five thousand dollars

($5,000) or over, the division shall post notice of the proposed purchase. Where the estimated expenditure is twenty-five thousand dollars ($25,000) or over, the division shall also advertise its intent to make such purchase in such places as are most likely to reach prospective bidders or offerors and may provide such information through an electronic medium available to the general public at least five (5) days before the contract is to be let. Other methods of advertisement, however, may be adopted by the division when such other methods are deemed more advantageous for the supplies to be purchased. The requirement for advertising may be waived, if not feasible, due to the supplies being available at a discount for only a limited period of time.

Page:9

Item Specifications Solicitation has been designated as having no line items.

Page:10

File details come from the government source that posted it. Updated .