SESC Plan Review DTMB Approval PSC.pdf
PDF 92 KB Posted
- Solicitation number
- RFQ - 171 - 240000000182
- Issued by
- Livingston County, Pentwater Village, Michigan
About this file
This document is a Soil Erosion and Sedimentation Control (SESC) Plan Review from the Michigan Department of Technology, Management & Budget (DTMB) for the Pinckney Recreation Area Treasure Island Bridge Replacement project. As an Authorized Public Agency, DTMB is responsible for controlling erosion and off-site sedimentation on DTMB construction projects. Following the award of the contract, the contractor shall prepare and submit an "SESC Implementation Plan" for approval, which will be used to issue an "Authorization to Proceed with Earth Change" in lieu of a permit from the county.
The project is located in Livingston County and Pentwater Village, Michigan. No additional details regarding the contract opportunity, such as pricing, set-asides, or funding sources, are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 20043.pdf | ||
| 846021_COMBINED SET_121323.pdf | ||
| Approved EGLE permit.pdf | ||
| Advertisement 20043.pdf | ||
| Treasure Island Pre-Bid Minutes.pdf | ||
| Bidders sign-in sheet.pdf | ||
| DCSpec Rev032022 V13 751-20043.GSA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRETCHEN WHITMER
GOVERNOR
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET
LANSING
MICHELLE LANGE
DIRECTOR
DESIGN & CONSTRUCTION DIVISION
3111 W. ST. JOSEPH STREET ● LANSING, MICHIGAN 48917
www.michigan.gov/dtmb ● 517-284-7910
4/5/2023
Fleis & Vandenbrink 2960 Lucerne Drive SE
SUBJECT: File No. 751/20043.BDW
DNR – Pinckney Recreation Area Treasure Island Bridge Replacement Plan Review for Soil Erosion & Sedimentation Control (SESC)
The Dept. of Technology, Management & Budget (DTMB), Design and Construction Division, Soil Erosion and Sedimentation Control Program, has received the project drawings and specifications for the Pinckney Recreation Area Treasure Island Bridge Replacement.
Upon review, the following comments are issued for your consideration.
Project Specifications/Drawings
1. As an Authorized Public Agency (APA), DTMB is responsible for controlling erosion and off-site sedimentation on DTMB construction projects. Following the award of a contract, the contractor shall prepare and issue for approval an “SESC Implementation Plan”, which indicates the contractor’s intended implementation of the SESC on the project, including a schedule. The SESC Program, upon approval of the implementation plan, will issue the contractor an “Authorization to Proceed with Earth Change”, which is to be posted at the jobsite. This document is issued in lieu of a permit from the county.
If you have any questions or concerns, please contact me at (517) 388-3045 or email me at mcgarryc@michigan.gov
Sincerely, Christopher J. McGarry SESC, Health & Safety Administrator
Enclosure
C: Bruce Watkins, DTMB Bronson Clayton, DTMB SESC File mailto:mcgarryc@michigan.gov
File details come from the government source that posted it. Updated .