SESC Plan Review DTMB Approval PSC.pdf

PDF 92 KB Posted

Attached to
751/20043. GSA; Pinckney RA - Treasure Island Bridge Rplcmnt
Solicitation number
RFQ - 171 - 240000000182
Issued by
Livingston County, Pentwater Village, Michigan

About this file

This document is a Soil Erosion and Sedimentation Control (SESC) Plan Review from the Michigan Department of Technology, Management & Budget (DTMB) for the Pinckney Recreation Area Treasure Island Bridge Replacement project. As an Authorized Public Agency, DTMB is responsible for controlling erosion and off-site sedimentation on DTMB construction projects. Following the award of the contract, the contractor shall prepare and submit an "SESC Implementation Plan" for approval, which will be used to issue an "Authorization to Proceed with Earth Change" in lieu of a permit from the county.

The project is located in Livingston County and Pentwater Village, Michigan. No additional details regarding the contract opportunity, such as pricing, set-asides, or funding sources, are provided in this document.

View the file

Other files

File Type Posted
Addendum 1 20043.pdf PDF
846021_COMBINED SET_121323.pdf PDF
Approved EGLE permit.pdf PDF
Advertisement 20043.pdf PDF
Treasure Island Pre-Bid Minutes.pdf PDF
Bidders sign-in sheet.pdf PDF
DCSpec Rev032022 V13 751-20043.GSA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRETCHEN WHITMER

GOVERNOR

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET

LANSING

MICHELLE LANGE

DIRECTOR

DESIGN & CONSTRUCTION DIVISION

3111 W. ST. JOSEPH STREET ● LANSING, MICHIGAN 48917

www.michigan.gov/dtmb ● 517-284-7910

4/5/2023

Fleis & Vandenbrink 2960 Lucerne Drive SE

SUBJECT: File No. 751/20043.BDW

DNR – Pinckney Recreation Area Treasure Island Bridge Replacement Plan Review for Soil Erosion & Sedimentation Control (SESC)

The Dept. of Technology, Management & Budget (DTMB), Design and Construction Division, Soil Erosion and Sedimentation Control Program, has received the project drawings and specifications for the Pinckney Recreation Area Treasure Island Bridge Replacement.

Upon review, the following comments are issued for your consideration.

Project Specifications/Drawings

1. As an Authorized Public Agency (APA), DTMB is responsible for controlling erosion and off-site sedimentation on DTMB construction projects. Following the award of a contract, the contractor shall prepare and issue for approval an “SESC Implementation Plan”, which indicates the contractor’s intended implementation of the SESC on the project, including a schedule. The SESC Program, upon approval of the implementation plan, will issue the contractor an “Authorization to Proceed with Earth Change”, which is to be posted at the jobsite. This document is issued in lieu of a permit from the county.

If you have any questions or concerns, please contact me at (517) 388-3045 or email me at mcgarryc@michigan.gov

Sincerely, Christopher J. McGarry SESC, Health & Safety Administrator

Enclosure

C: Bruce Watkins, DTMB Bronson Clayton, DTMB SESC File mailto:mcgarryc@michigan.gov

File details come from the government source that posted it. Updated .