The document is a project plan review for soil erosion and sedimentation control (SESC) for the DNR - Cheboygan Lock Facility Improvements project, managed by the Michigan Department of Technology, Management & Budget (DTMB), Design and Construction Division. The DTMB, as an Authorized Public Agency (APA), is responsible for controlling erosion and off-site sedimentation on DTMB construction projects. The contractor for this project will be required to prepare and submit an SESC Implementation Plan for DTMB's approval prior to commencing work, and the SESC Program will issue the contractor an "Authorization to Proceed with Earth Change" to be posted on-site in lieu of a county permit.

The related state and local contract opportunity is for the Cheboygan Lock Facility Repairs, project number 751/17264.ABG. Bidders are instructed to email questions to the project contact, Kevin Roell, rather than submit them through the vendor system. Bid attachments must be uploaded to the SIGMA VSS system, and bidders experiencing issues with the electronic submission process are advised to contact the SIGMA Help Desk or notify the Office of Design and Construction. Emailed proposals may be accepted on a case-by-case basis with prior approval.

View the file

Other files

File Type Posted
Drawings 17264.pdf PDF
Specifications 17264.pdf PDF
Addendum 1 17264.pdf PDF
Advertisement 17264.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRETCHEN WHITMER

GOVERNOR

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET

LANSING

MICHELLE LANGE

ACTING DIRECTOR

DESIGN & CONSTRUCTION DIVISION

3111 W. ST. JOSEPH STREET ● LANSING, MICHIGAN 48917

www.michigan.gov/dtmb ● 517-284-7910

5/19/2022

GEI Consultants of Michigan, PC 109 W. Baraga Ave., Marquette, MI 49855

SUBJECT: File No. 751/17264.TAP

DNR – Cheboygan Lock Facility Improvement Plan Review for Soil Erosion & Sedimentation Control (SESC)

The Dept. of Technology, Management & Budget (DTMB), Design and Construction Division, Soil Erosion and Sedimentation Control Program, has received the project drawings and specifications for the DNR – Cheboygan Lock Facility Improvements

Upon review, the following comments are issued for your consideration.

Project Specifications/Drawings

1. As an Authorized Public Agency (APA), DTMB is responsible for controlling erosion and off-site sedimentation on DTMB construction projects. Following the award of a contract, the contractor shall prepare and issue for approval an “SESC Implementation Plan”, which indicates the contractor’s intended implementation of the SESC on the project, including a schedule. The SESC Program, upon approval of the implementation plan, will issue the contractor an “Authorization to Proceed with Earth Change”, which is to be posted at the jobsite. This document is issued in lieu of a permit from the county.

If you have any questions or concerns, please contact me at (517) 388-3045 or email me at mcgarryc@michigan.gov

Sincerely, Christopher J. McGarry SESC, Health & Safety Administrator