SESC Plan Review DTMB Approval PSC 17264.pdf
PDF 78 KB Posted
- Attached to
- 751/17264. ABG; Cheboygan Lock Facility Repairs
- Solicitation number
- RFQ - 171 - 230000000746
- Issued by
- Cheboygan County, Chesaning Village, Michigan
About this file
The document is a project plan review for soil erosion and sedimentation control (SESC) for the DNR - Cheboygan Lock Facility Improvements project, managed by the Michigan Department of Technology, Management & Budget (DTMB), Design and Construction Division. The DTMB, as an Authorized Public Agency (APA), is responsible for controlling erosion and off-site sedimentation on DTMB construction projects. The contractor for this project will be required to prepare and submit an SESC Implementation Plan for DTMB's approval prior to commencing work, and the SESC Program will issue the contractor an "Authorization to Proceed with Earth Change" to be posted on-site in lieu of a county permit.
The related state and local contract opportunity is for the Cheboygan Lock Facility Repairs, project number 751/17264.ABG. Bidders are instructed to email questions to the project contact, Kevin Roell, rather than submit them through the vendor system. Bid attachments must be uploaded to the SIGMA VSS system, and bidders experiencing issues with the electronic submission process are advised to contact the SIGMA Help Desk or notify the Office of Design and Construction. Emailed proposals may be accepted on a case-by-case basis with prior approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawings 17264.pdf | ||
| Specifications 17264.pdf | ||
| Addendum 1 17264.pdf | ||
| Advertisement 17264.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRETCHEN WHITMER
GOVERNOR
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET
LANSING
MICHELLE LANGE
ACTING DIRECTOR
DESIGN & CONSTRUCTION DIVISION
3111 W. ST. JOSEPH STREET ● LANSING, MICHIGAN 48917
www.michigan.gov/dtmb ● 517-284-7910
5/19/2022
GEI Consultants of Michigan, PC 109 W. Baraga Ave., Marquette, MI 49855
SUBJECT: File No. 751/17264.TAP
DNR – Cheboygan Lock Facility Improvement Plan Review for Soil Erosion & Sedimentation Control (SESC)
The Dept. of Technology, Management & Budget (DTMB), Design and Construction Division, Soil Erosion and Sedimentation Control Program, has received the project drawings and specifications for the DNR – Cheboygan Lock Facility Improvements
Upon review, the following comments are issued for your consideration.
Project Specifications/Drawings
1. As an Authorized Public Agency (APA), DTMB is responsible for controlling erosion and off-site sedimentation on DTMB construction projects. Following the award of a contract, the contractor shall prepare and issue for approval an “SESC Implementation Plan”, which indicates the contractor’s intended implementation of the SESC on the project, including a schedule. The SESC Program, upon approval of the implementation plan, will issue the contractor an “Authorization to Proceed with Earth Change”, which is to be posted at the jobsite. This document is issued in lieu of a permit from the county.
If you have any questions or concerns, please contact me at (517) 388-3045 or email me at mcgarryc@michigan.gov
Sincerely, Christopher J. McGarry SESC, Health & Safety Administrator
Enclosure
C: Tom Pawlowski, DTMB SESC File mailto:mcgarryc@michigan.gov