This document is a Statement of Work (SOW) for the replacement of a 120 Ton Carrier Air-Cooled Scroll Chiller at the Federal Bureau of Investigation (FBI) Criminal Justice Information Services (CJIS) Division in Clarksburg, WV. The SOW requires the contractor to supply and install a new 130 Ton Air-Cooled Scroll Chiller, including demolition of the existing unit, any necessary piping modifications, and system startup/commissioning. Key requirements include compliance with applicable codes/standards, use of the existing electrical disconnect, and providing O&M documentation. The contractor must have a valid WV contractor's license and provide examples of previous similar work. The work shall be performed during off-peak seasons to minimize disruption, with flexibility on the timeline. The contractor will coordinate with the Contracting Officer Representative (COR) on the project schedule, submittals, and monthly status reports. Security and IT requirements are detailed, including personnel clearance and access procedures.

The related federal contract opportunity is for the removal of the existing chiller and installation/replacement of a 130 Ton Air-Cooled Scroll Chiller at the CJIS Division. Proposals are due by 4:00 PM ET on August 26, 2024, and a site visit is scheduled for August 13, 2024, with registration required by August 9, 2024. The solicitation is being issued by the FBI Headquarters Division.

View the file

Other files for this federal contract opportunity

Other files attached to Air Cooled Chiller Replacement, newest first.
File Type Posted
15F06724Q0000231 - SF1449 - 08.23.24.pdf PDF
SF30 - 15F06724Q0000231.pdf PDF
Chiller Replacement Picture 1.jpg JPG image
Questions and Answers.pdf PDF
Chiller Replacement Picture 3.pdf PDF
Chiller Replacement Picture 5.pdf PDF
Chiller Replacement Picture 4.jpg JPG image
Chiller Replacement Picture 2.jpg JPG image
RFQ - Chiller Replacement for CJIS - 08.06.2024.pdf PDF
15F06724Q0000231 - SF1449.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requisition 1 | P a g e Author: Corey Burdette

FEDERAL BUREAU OF INVESTIGATION

CJIS DIVISION | RESOURCES MANAGEMENT SECTION

Service Center Chiller Replacement

For the

CJIS Division

Statement of Work

8/6/2024

Requisition 2 | P a g e

1 Scope

This is a contract for all labor and material to replace the 120 Ton Carrier Air-Cooled Scroll Chiller outside the Service Center Building (Building 1) with a 130 Ton Air-Cooled Scroll Chiller at the Federal Bureau of Investigation (FBI) CJIS Division, Clarksburg, WV. This is a non-personal services contract. The Government shall not exercise any supervision or control over contractor employees performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction

The CJIS Division is requesting a 100% Turnkey Replacement 130 Ton Air-Cooled Scroll Chiller

1.2 Background

An industrial air-cooled chiller is a refrigeration system that cools fluids and works in tandem with a facility's air handler system. A chiller has four main parts: an evaporator, compressor, condenser, and expansion valve.

The industrial air-cooled chiller used for Building 1 works by absorbing the heat from glycol. Once the glycol in the air handler system is used, it becomes warm and is sent back to the chiller. Heat is transferred away from the glycol using the chiller’s evaporator. Liquid refrigerant evaporates as it moves over the evaporator tube, creating a low-pressure gas. Next, the evaporated refrigerant travels to the compressor where the low-pressure gas is compressed into a high-pressure gas. The gas then leaves and goes to the air-cooled condensers. While in the condenser, heat is removed from the chiller by air being blown outside through fans on the top of the condenser coils.

The Carrier Air-Cooled Chiller outside the Service Center Building at the CJIS Division is currently on year 17 of a life expectancy of 20 years. CJIS division facilities believes the condenser coils on this unit are approaching end of service life. The Chilled water at the service center has also been changed to a 40% glycol solution requiring the chiller to be upsized to approximately 130 tons.

This contract is intended to replace the existing unit with a new chiller. The current Chiller does not have a hydronic pump package on it and the chilled glycol pumps are located inside of the building.

Current Chiller Specs:

• Carrier Chiller Model Number:

o 30RBA12066-01-77

• Serial Number:

o 3607Q84087

Current Chilled Glycol Pump Characteristics (QTY:2):

• Peerless Pumps Model Number:

o F1-740M-BF

Requisition 3 | P a g e

2 Applicable Documents

None

3 Requirements The Air-Cooled Scroll Chiller shall be replaced using the below requirements:

1. Contractor shall demo the existing chiller and dispose of it.

2. Contractor shall supply and install a 130-ton air-cooled chiller where current chiller is located.

Unit Shall be Carrier Model: 30RC-1326S61HVD22 or equivalent.

a. Unit construction shall comply with ASHRAE 15 Safety Code, UL (Underwriters

Laboratories) latest edition, and ASME (American Society of Mechanical Engineers) applicable codes (U.S.A. codes).

b. The Chiller shall be 460 Volt 3 Phase 60 Hertz and utilize the existing electrical disconnect

i. If existing disconnect is not utilized contractor shall supply a disconnect with the ability for lock out tag out operation

c. Shall be capable of starting and running at outdoor ambient temperatures from 0°F (–

17.8°C) to 125.6°F (52°C) for units employing variable speed condenser fans and from

32°F (0°C) to 120°F (48.9°C) for units that do not employ variable speed condenser fans

d. Chilled water circuit shall be rated for 300 psig (2068 kPa)

e. Shall be factory or field-installed and mounted with easily accessible 115-v female receptacle and shall include a 4-amp GFI receptacle

f. Unit shall be equipped with factory-installed compressor enclosure as well as sound blankets on each compressor to reduce unit sound levels.

g. The integrated control shall incorporate an integrated user interface that shall provide running and diagnostic information and identify faults and status in clear English language.

Faults shall be logged and/or recorded for review at a later date. It shall be possible to upload parameters from one drive into the non-volatile memory of a computer and download the parameters into other drives requiring the same settings. The keypad shall incorporate Hand-Off-Auto push buttons to enable switching between BMS (Building

Management System) and manual control.

i. The drive shall incorporate a USB port for direct connection for programming changes

ii. The drive shall incorporate BACnet MS/TP for BMS connection to Siemens BMS

h. The control shall have the following additional features: sensor less override for BMS, manual pump control or closed loop PID (proportional/integral/derivative) control, programmable skip frequencies and adjustable switching frequency for noise/vibration control, auto alarm reset, motor pre-heat function, 6 programmable digital inputs, 2 analog inputs, one programmable -analog/digital output, 2 volt-free contacts.

Requisition 4 | P a g e

3. An operational test, in which the chiller is run under load, shall be performed at the factory. This test shall check for proper operation of fans, as well as various controls and safeties, and a

Certificate of Unit Testing, indicating successful end-of-line testing is provided with the unit.

4. Contractor shall utilize the existing glycol inlet and outlet the current chiller utilizes

a. Any piping modifications necessary for install of new chiller shall be covered under this contract

b. Contractor shall remove and reinstall any pipe, insulation, and fittings to replace chiller

5. Contractor shall remove and reinstall any work obstructions required to install the chiller

6. All lifting and rigging equipment shall be provided by contractor

7. Contractor shall refill all glycol lost during demo/install to adequate operating parameters

a. Substances Shall be handled to not harm Health and Safety or Environment

b. Contractor shall complete hydrostatic pressure test at 1.5 times system pressure

8. Contractor shall perform system startup, ensure Siemens communications are correct, and manufacturers recommended commissioning

a. Contractor shall ensure chiller is operating as designed and troubleshoot/repair any issues/faults that occur

b. Contractor shall be responsible for any BMS programming changes necessary to integrate the new chiller

9. Contractor shall have a valid WV contractor’s license

10. Contractor shall install the chiller per Manufacturers specifications to not void any manufacturer warranties and shall provide warranty on all parts, labor, and craftsmanship for a year after completion of install

11. Contractor shall work with owner to establish adequate timeline for chiller install that would occur during off peak load seasons such as spring or fall

12. Chiller shall not be delivered to CJIS facility for long term storage prior to installation

a. Chiller and all required installation components shall be delivered to CJIS facility no sooner than four weeks prior to installation

13. Contractor shall give an estimated time to perform all work covered in this contract

a. Contractor shall allow up to 15 business days for government review of any other deliverable

b. Interruption of service for HVAC, Power, Lighting, Telephone, Fire Protection, Fire Detection, Water, Sewer, Roads, and Parking Lots are considered outages. Outages shall be scheduled at one week prior to the desired time.

14. Contractor shall provide O&M manual documents that contains instructions on proper installation, operation, and maintenance of all new installation.

The contractor is strongly encouraged to visit site and thoroughly investigate existing conditions. The existing dimensions shown on the drawings, if applicable, are for approximation purposes only. Failure to verify the dimensions and locations before commencing work will be at the Contractor’s risk and shall not relieve the Contractor from accomplishing the work required by the contract at the price awarded by the government

4 Key Personnel

Personnel Qualifications shall meet common industry standards to perform work. Certificates for electrical, HVAC, etc. shall be provided to the FBI before starting work. The selected vendor shall

Requisition 5 | P a g e be able to provide examples of previous similar scope type of work at the request of the government.

5 Place of Performance

The primary place of performance will be at the FBI CJIS Division, 1000 Custer Hollow Road, Clarksburg, WV 26306.

6 Deliverables

The contractor shall consult with owner to discuss a timeline, dates of most convenience for the owner (potential weekend work if work is performed in the summer) and provide an estimated project schedule within 30 days of award. The government shall have 10 business days to review and approve the schedule and any updates to the schedule.

If a schedule cannot be submitted within 30 days of award the contractor shall provide the reasons in writing to the CO.

Product submittals, fabrication details, measurements, any alternative methods/materials shall be submitted to the CJIS Division Facilities Management Unit for review and approval prior to beginning fabrication. The government reserves the right to refuse alternative methods or materials. The government shall have 10 business days to review all submittals.

The Contractor shall provide monthly status reports to the Contracting Officer (CO) and the

Contracting Office Representative (COR).

7 Government Furnished Equipment or Information The Government shall provide contractor personnel assigned to this contract with a typical working environment.

The Contractor shall provide their own hand tools and any other equipment.

8 Personnel Availability

The Contractor’s normal workday will typically be within the hours of 7:00 a.m. and 3:30 p.m.

Monday through Friday. Flexibility within the normal workday shall be coordinated with the COR.

The work shall be performed in such a manner that there is little to no interruption with operations. No work within the CJIS Division complex will be performed on Saturdays, Sundays, or Holidays, except as requested by the Government to minimize disruption.

9 Security Requirements

9.1 Safety and Environmental Regulations:

Requisition 6 | P a g e

▪ The Contractor is responsible for following all federal Occupational Safety and Health

Administration (OSHA), state and local regulations, and FBI policies as they pertain to safety and health. The Contractor shall provide any information on their safety programs as requested by the CO or COR. The Contractor shall provide protection for CJIS employees who may be working or walking in the areas where work is performed. This may be through barricades, signs, or other means to inform or redirect employees from the hazards. OSHA procedures for equipment shut down (such as Lock-Out Tag-Out of energized devices) must be followed while on the CJIS Campus. The Contractor is responsible for any Personal Protective Equipment, monitoring devices, or other specialty equipment to perform their job in a safe manner while on FBI CJIS property. The

Contractor is open for inspection, at any time, by the FBI Safety Staff while on site at the

CJIS Division.

▪ The Contractor is responsible for following all federal, state, and local regulations as they pertain to the Environment. All applicable Environmental Protection Agency and West

Virginia Department of Environmental Protection regulations and procedures shall be followed. Any information pertaining to environmental compliance can be requested by the CO or COR. The Contractor shall attempt to reduce any environmental impact due to the procedures and chemicals used while working on CJIS property and determine the need for and provide any personal protective items required for the safe performance of work.

9.2 Clearance Requirement for Personnel Access:

Upon the award of a contract, appropriate contractor individuals will be processed as directed by FBI policies and procedures.

The FBI's CJIS Division requires that access approval and/or security clearance be granted by the

FBI Security Programs Manager (SPM) to all non-FBI and contractor personnel who will have access to: National Security Information; Sensitive but Unclassified (SBU) information; FBI personnel; FBI facilities and/or FBI equipment. The determination of the level of security clearance (Top Secret or Secret) and access level (escorted or unescorted) required are made by the FBI's SPM. The scope of the FBI security clearance background investigation to be conducted is determined by the level of clearance sought.

Contractors should be advised that:

▪ Decisions concerning granting of access to FBI assets are made on a case-by-case basis and access/clearance will be granted only where such access is clearly consistent with the mission and responsibilities of the FBI. If for any reason an individual is denied access/clearance by the FBI, the FBI will not disclose the reason for denial and will only make such disclosure to the affected party pursuant to the provisions of the Freedom of

Requisition 7 | P a g e

Information or Privacy Act. The FBI will not be liable for any expense in the replacement of a denied individual, or any costs incurred by the contractor as a result of such denial.

▪ The Department of Justice (DOJ)/FBI does not permit the use of non-U.S. citizens in the performance of this contract or commitment for any position that involves access to or development of any DOJ Information Technology (IT) system. By signing this contract or commitment document, the contractor agrees to this restriction.

▪ Individuals shall have, for three (3) of the five (5) years immediately prior to working on this effort: (1) resided in the United States; (2) worked for the United States overseas in a federal or military capacity; or (3) be a dependent of a federal or military employee serving overseas.

▪ Individuals with criminal histories, such as arrest records, may be denied access; illegal and/or undocumented aliens will be excluded, and their identities may be referred to other cognizant law enforcement agencies for appropriate action.

▪ Individuals will be interviewed by the FBI (or FBI contract investigators) regarding foreign travel, associates, residences, or other matter of concern to the FBI in deciding whether to grant access to its information, facilities, or property. Individuals may be requested to undergo a polygraph examination to fully resolve any security concerns. Refusal or failure to accurately complete the forms, to be interviewed, or to undergo a polygraph examination will be deemed reasonable cause for denial of access/clearance to FBI information, facilities, or property.

▪ The FBI reserves the right to reinvestigate contract employees on a periodic basis, or where facts or information dictates that continued access may no longer be clearly consistent with the FBI's mission and responsibilities.

▪ When authorized for site access, contractors shall report the following information to the

CJIS Security Access Office: Foreign Travel (thirty days prior to departure); change in marital status; change in status of room/house mates; employment outside of the contracting agency; Court cases involving: divorce, bankruptcy, moving traffic violations

(more than $150), criminal arrests, civil proceedings, tax matters, and failure to honor legitimate debts.

▪ Regardless of a contractor's clearance and access level, the FBI reserves the right to provide an FBI escort, knowledgeable in the tasking area, in situations where contracted services may affect the integrity of existing protection measures (i.e., IT system maintenance activities).

▪ The FBI reserves the right to revoke any contract employee's access to its facilities or property where such access is no longer clearly consistent with the FBI's missions and responsibilities. The contractor agrees to immediately remove that individual from the

FBI facility in such circumstances.

Requisition 8 | P a g e

▪ Access to national security information will be granted only to employees who are United

States citizens for whom an appropriate investigation has been completed and whose personal and professional history affirmatively indicates loyalty to the United States, strength of character, trustworthiness, honesty, reliability, discretion, and sound good judgement, as well as freedom from conflicting allegiances and potential for coercion, and willingness and ability to abide by regulations governing the use, handling, and protection of national security information.

▪ A determination of eligibility for access to such information is a discretionary security decision based on judgments by appropriately trained adjudicated personnel. Eligibility will be granted only where facts and circumstances indicate access to national security information is clearly consistent with the national security interests of the United States, and any doubt will be resolved in favor of the national security.

▪ In determining eligibility for access, agencies may investigate and consider any matter that relates to the determination of whether access is clearly consistent with the interests of national security. This includes random controlled substance testing and, in the future, may include polygraph examinations if dictated by FBI or DOJ security policy directives.

Failure of any part in the background investigation or periodic review will result in further evaluation and any doubt will be resolved in favor of the national security.

▪ At the discretion of the FBI COR, contractor personnel not upholding the FBI standards of conduct, or if creating conflicts with the FBI's interests, shall be removed from all activities on this effort.

▪ The FBI will maintain a listing of contract employees who have been authorized access/clearance. The contractor must provide personnel from this list to perform the requested services.

Access to national security information:

▪ Upon a contract award, the contractor, primary contractor(s), key personnel, and any other non-FBI personnel designated by the FBI, who require access to FBI information, property, or facilities, shall, based upon the length and nature of their assignment, provide the COR the following properly executed forms. Forms shall be submitted sixty

(60) days prior to beginning the stated contract tasks. Incomplete or improperly executed forms will not be considered responsive to this requirement and will be returned to the contractor.

▪ One-day, one-time escorted access with no system access, or escorted access of one to five (1-5) consecutive days only with no returning site visits and requiring no system access:

Requisition 9 | P a g e

(1) CJIS Division Visit Access Request Form

If possible, this paperwork should be provided to the CJIS Security Access

Office by 12:00 p.m. on the day prior to the site visit.

▪ Escorted access requiring no system access of five (5) or more consecutive days, or recurring visits:

(1) CJIS Security Access Office Interoffice Memorandum “Limited

Escorted Access Request Coversheet”

(2) SF-85 “Questionnaire for Non-Sensitive Positions”

(3) FD-857a “Sensitive Information Non-Disclosure Agreement”

(4) Two (2) FD-258 "Applicant Fingerprint Cards" (if fingerprinted at the CJIS WV Facility only one (1) FD-258 is necessary)

▪ More than ninety (90) days access, unescorted access and/or system access:

(1) CJIS Security Access Office Interoffice Memorandum "Cover

Sheet/Preliminary Check for Access"

(2) SF-86 “Questionnaire for Sensitive Positions” (Note: An FD-857a is not used in conjunction with an SF-86)

(3) Two (2) FD-258 “Applicant Fingerprint Cards” (if fingerprinted at the CJIS WV Facility only one (1) FD-258 is necessary)

▪ Additionally, non-FBI personnel requiring IT system access must be indoctrinated, as required, prior to being granted access to any FBI IT system by receiving a Computer

Security Awareness and Policy Briefing, and must execute the following:

(1) FD-868 "Nondisclosure Agreement" and/or an SF-312 "Classified

Information Nondisclosure Agreement"

(2) FD-889 "Notice of Responsibility and Computer Security Awareness

Certification"

▪ The FBI SPM will, within thirty (30) days of receipt of the completed forms, make a preliminary determination as to the eligibility of these employees. These preliminary determinations are termed "interim." Interim clearances are based upon the completion of minimum investigative requirements and granted on a temporary basis pending the

Requisition 10 | P a g e completion of the full investigative requirements, the scope of which will be at the discretion of the FBI.

IT Security Requirements:

▪ The contractor shall present all software and hardware to the FBI for virus scanning prior to entering FBI space and/or use on FBI IT systems. Software use shall be in compliance with software licenses. The use of shareware shall be controlled and/or supplied by the

FBI. Under no circumstances shall the contractor introduce software and/or hardware into an FBI IT system.

▪ Test software used on any FBI IT system shall not be removed from FBI control. Software shall be scanned, write-protected, and retained by the FBI. Only this copy of the software shall be used on the FBI IT system.

▪ Under no circumstances will personally owned or contractor-owned equipment or media be used to process FBI information. Government-furnished equipment (GFE), as specified in a contract or statement of work, will be utilized.

▪ The contractor shall turn over all failed electronic storage and memory devices to designated FBI personnel. The contractor shall not remove any electronic and memory devices that have been connected to or have processed data on an FBI IT system. The FBI reserves the right to procure and to retain any media that had not been successfully sanitized prior to release back to a vendor/contractor.

▪ Storage media and systems with non-removable storage media must only be transferred through maintenance channels approved by the FBI. Only storage media and systems that have been sanitized and declassified (if necessary) can be released from FBI control for maintenance.

▪ To the extent possible, information shall be stored on FBI-owned storage media.

Provisions shall be made which allow for FBI retention of non-removable, non-volatile storage devices (e.g., microcomputer hard drives) if the device cannot be successfully sanitized through disk methodologies approved by the FBI Security Division at the completion of the tasking.

▪ Each contractor-owned device or media (e.g., Personal Digital Assistants, laptops, floppy disks, compact disks, etc.) brought into FBI facilities, regardless of source and prior to use, will be virus scanned. Each device or media that cannot be properly scanned will not be permitted in the facility.

▪ FBI IT policies prohibit access for remote maintenance and diagnostics by non-FBI personnel. Exceptions can only be negotiated with, and granted by, the FBI Security

Requisition 11 | P a g e

Division, and are to be obtained in consultation with the CJIS Contract Administration

Office (CAO), Information Technology Security Program (ITSP).

▪ All connections to non-FBI networks will be approved on a case-by-case basis by the FBI

Security Division and is to be obtained in consultation with the CJIS, CAO, and ITSP. As part of this approval process, supporting documentation must be acquired.

▪ The exchange of data between contractor and/or subcontractor sites or between the contractor/subcontractor and the FBI must be approved on a case-by-case basis by the

FBI Security Division in consultation with the CJIS, CAO, and ITSP.

▪ All maintenance work performed at an FBI site must be supervised by FBI personnel knowledgeable in the operation of the IT system regardless of the classification of the system or its associated media. On-site maintenance personnel shall meet the personnel security requirements.

▪ For security reasons, placement and removal of microcomputers and related media to operational environments where classified information is processed shall be approved by the FBI SPM.

▪ All non-FBI portable devices are prohibited from connectivity to any FBI IT system.

▪ All FBI information made available to or generated by this task shall, at a minimum, be considered FBI sensitive. This includes, but is not limited to, all notes, documents, test data, databases, reports, magnetic media, deliverables (e.g., CDRLs), electronic mail, etc.

All FBI sensitive information shall be protected from unauthorized access and shall be disposed of in accordance with FBI policies.

▪ Any person who knowingly, willingly, or negligently discloses any FBI information (to include, but not limited to data, systems configurations, facilities, personnel, and procedures) to unauthorized persons without prior written FBI approval shall be subject to the appropriate penalties and sanctions under the law (i.e., Privacy Act, Computer

Fraud and Abuse Act, National Security Act, or appropriate espionage statutes).

▪ Non-FBI employees who violate this policy are subject to having their clearance revoked and access to FBI IT systems and facilities terminated.

▪ All reports of computer security-related incidents and/or violations are to be concurrently reported to the CJIS, CAO, ITSP and the FBI COR.

Government Furnished Equipment (GFE)

▪ The contractor will maintain an automated inventory of all GFE, including software, at each contractor site. The inventory shall include the following information:

(1) FBI Property Number

(2) Description

Requisition 12 | P a g e

(3) Type (Hardware or Software)

(4) Manufacturer

(5) Model Number

(6) Serial Number

(7) Software Version

(8) License Description

(9) Expiration Date

▪ The contractor will receive written authorization from the FBI prior to returning GFE, including software, to the vendor for any reason.

▪ The contractor will clearly label all GFE, including software, at each contractor site, as property of the FBI CJIS Division.

▪ The contractor will clearly label all contractor-owned property, as such, when physically located within the same space as GFE, at each contractor site.

▪ The contractor will grant the FBI physical access to the GFE, including software, and contractor inventory records, at each contractor site, for the purpose of assigning FBI property numbers and conducting audits to ensure compliance with FBI requirements.

The frequency, scope, duration, and method for the audits shall be determined by the

FBI.

▪ The contractor will provide the FBI with original copies of all delivery documents (i.e., vendor packing slips) for GFE, including software, delivered directly from the vendor to a contractor site.

▪ The contractor will deliver all GFE and software to the FBI, within thirty (30) days, when no longer serviceable or required for the completion of the contract. The contractor has no authority to donate, destroy, or transfer GFE.

▪ The contractor will notify the FBI, in writing, when GFE, including software, moves from one contractor site to another. The notification must include the following:

(1) FBI Property Number

(2) Description

(3) Type (Hardware or Software)

(4) Manufacturer

(5) Model Number

Requisition 13 | P a g e

(6) Serial Number

(7) Software Version

(8) License Description

(9) Expiration Date

▪ The contractor will provide written notification, at least twenty-four (24) hours in advance, of all deliveries of GFE, including software, to the FBI. The notification shall include an itemized list of all GFE, including software, being returned to the FBI. The itemized list shall include the following information:

(1) FBI Property Number

(2) Description

(3) Type (Hardware or Software)

(4) Manufacturer

(5) Model Number

(6) Serial Number

(7) Software Version

(8) License Description

(9) Expiration Date

10 Government Representatives

The functions inherent to this contract shall be performed by the designated CO. The duly assigned COR shall ensure all actions pertaining to this contract are requested via the CO.

10.1 Contracting Officer Representative

The COR will be identified via letter of COR delegation authority for this contract. The COR is responsible, as applicable, for: receiving all deliverables, inspecting, and accepting the supplies or services provided hereunder in accordance with the terms and conditions of this contract;

providing direction to the Contractor which clarifies the contract effort, fills in details or otherwise serves to accomplish the contractual Scope of Work; evaluating performance; and certifying all invoices/vouchers for acceptance of the supplies or services furnished for payment.

Requisition 14 | P a g e

The COR does not have the authority to alter or modify the Contractor's obligations, contract terms, conditions, specifications, or cost. If as a result of technical discussions, it is in the

Government’s best interest to alter/change contractual obligations or the Scope of Work, the CO shall issue such changes. The COR for this contract is Corey Burdette. He can be reached at 304-

931-8721 and cdburdette@fbi.gov.

10.2 Contracting Officer

This contract will be administered by: Candice Kesselman

11 Travel and Other Direct Costs

When required and authorized by the CO, travel must be conducted in accordance with Federal Travel Regulations.

Other Direct Costs (ODCs) are not authorized. Prior to purchasing any ODCs, approval must be obtained by the CO.