This is a Statement of Work (SOW) for repair services on TF33 Work Platforms at Tinker Air Force Base, prepared by OC-ALC/OBCA and dated February 12, 2026. The contractor must deliver, install, and perform verification testing on replacement parts for two TF33 Work Platforms (OC20529 and OC20530) located in Building 9001 at Tinker AFB, Oklahoma. The work involves replacing 16 line items on OC20529, including guide assemblies, sprockets, chains, limit switches, counterweights, and a control panel (Part Number 35176000). On OC20530, the contractor must replace only the control panel after completing all work on OC20529. The contractor must provide advance notification of five business days prior to beginning installation, perform work Monday through Friday from 0600 to 1600 hours, and ensure full operational status per Original Equipment Manufacturer specifications before departure. The contractor is also required to redesign the counterweight limit switch for easier preventative maintenance and provide updated maintenance instructions enabling functional testing of safety features and structural inspections.
The SOW includes extensive on-base requirements covering environmental protection, hazardous materials management, safety compliance, and specialized training. The contractor must obtain approval for any hazardous materials, maintain usage logs, comply with Tinker AFB waste management procedures, and report environmental discharges. Personnel must complete FOD/DOP training, obtain visitor passes seven business days before arrival at Building 6611 (Tinker Gate), and comply with AFMAN 31-116 regarding privately owned vehicles. The government will provide power, water, and compressed air within 25 feet of the installation area, with the contractor responsible for final connections per facility standards. All work must comply with federal, state, and local environmental laws, OSHA regulations, AFI 91-203, and specific Tinker AFB procedures. Emergency procedures, housekeeping standards, and safety communication protocols must be followed throughout contract performance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Commander’s Safety Intent
The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each Contractor and Government employee.
1 SCOPE. This Statement of Work (SOW) defines the effort required for the purchase of replacement parts for the TF33 Work Platforms to include Delivery, Installation and Performance Verification.
The Contractor shall travel to Tinker Air Force Base to install the replacement parts on the two (2) TF33 Work Platforms OC20529 and OC20530 in Building 9001, at Tinker Air Force Base, OK.
2 REQUIREMENTS
2.1 General. The Contractor shall provide to the Government Point of Contact (GPOC) the date that the Delivery, Installation and Performance Verification will begin five (5) business days prior to installation beginning. The Contractor shall be responsible for ensuring all services, parts and components provided under this contract are in accordance with (IAW) the terms and conditions outlined in this SOW.
2.2 Item Description: 76th MXSG is requesting the purchase of replacement parts for the TF33 Work Platforms. The Contractor shall replace the following parts on OC20529:
Part Number Description Quantity
62822941
TOP GUIDE ASSEMBLY, LEFT HAND, HARD, 1-3/8"MOD,
PAINTED AQ BLACK 1
62822951
TOP GUIDE ASSEMBLY, RIGHT HAND, HARD, 1-3/8"MOD,
PAINTED AQ BLACK 1
20053435KT
SPROCKET, #120 CHAIN, 12 TEETH, 2.75" BORE 120B12,
STANDARD KEYWAY & SET SCREW KEYED ON TOOTH 2
28001311
#120 ROLLER CHAIN W/ COTTERED MASTERLINK, UOM: 15
FEET EACH 2
60810454 LIFTING CHAIN KIT, CHAIN, #120 1
50810290 WHEEL, CHAIN IDLER, #120 AND #140 CHAIN, 40 UHMWPE 2
35100960
SLACK CHAIN LIMIT SWITCH KIT, FOR LIFTING CHAINS, FLM
AND FLMC 2
35100910 COUNTERWEIGHT LIMIT SWITCH KIT, FM4, FLM, FLMC 1
60810785 COUNTERWEIGHT, #60 CHAIN - #120 CHAIN 2
60810074
ADJUSTABLE LIMIT SWITCH KIT, W/ADJUSTABLE ARM, AND
MOUNTING HARDWARE 3
20052924 TENSIONER LJOY SE27 2
62822960
LOWER GUIDE ASSEMBLY, LEFT HAND, HARD, 1-3/8", PAINTED
AQ BLACK 3
62822970
LOWER GUIDE ASSEMBLY, RIGHT HAND, HARD, 1-3/8",
PAINTED AQ BLACK 1
35176000
CONTROL PANEL, 6-30 AMPS, 5HP/7.5HP/10HP, 208V/230V/460V,
60HV, 3 PH, 24VDC, N4/N12, UL, JAM PROT, ANTI-CHAT, 28
INPUTS, 20 OUTPUTS, 4" HMI SCREEN, PROGRAMMED WITH
"MECHANICAL-R00"
2.3 Contractor Requirements
• The Contractor shall deliver replacement parts for the TF33 Work Platforms.
• The Contractor shall provide Delivery, Offloading, Installation and Performance
Verification.
• The Contractor shall make all necessary adjustments to the TF33 Work Platforms until the item is fully operational IAW to the Original Equipment Manufacturer (OEM) specifications and to what is stated in this SOW.
• The Contractor shall redesign the counterweight limit switch to allow for easier preventative maintenance.
• The Contractor shall provide updated preventative maintenance instructions that enable a technician to:
Complete a functional test on all safety features.
Inspect all structural elements of the equipment.
2.4 Installation: The Contractor shall be responsible for delivery and installation required to provide the Government with full operational TF33 Work Platforms that are ready for immediate operation. This shall include the following:
2.4.1 The Contractor shall be responsible for equipment delivery to Building 9001 at Tinker AFB, OK 73145 (FOB Destination), to include all required permits in accordance with (IAW) DOT standards, to the installation area Building 9001, . Contractor shall be responsible for offloading equipment, including any special equipment and/or rigging needed to remove the equipment from the transport vehicle/trailer and placement in the designated installation area Building 9001, .
2.4.2 The Contractor shall replace the control panel on OC20530. The Contractor shall not begin work on OC20530 until all work on OC20529 is complete and OC20529 is back in service.
The Contractor shall use the following control panel:
Part Number: 35176000
Description: CONTROL PANEL, 6-30 AMPS, 5HP/7.5HP/10HP, 208V/230V/460V, 60HV, 3
PH, 24VDC, N4/N12, UL, JAM PROT, ANTI-CHAT, 28 INPUTS, 20 OUTPUTS, 4" HMI
SCREEN, PROGRAMMED WITH "MECHANICAL-R00"
2.4.3 The Government will provide power, water and compressed air within 25 feet of the TF33 Work Platforms installation area. The Contractor shall be responsible for final connection of power, water, and compressed air (as applicable) IAW Tinker Facility Standards and Tinker Electrical Standards.
2.4.4 The Contractor shall verify to the Government SME that installation has been completed IAW standards listed in 2.4.3. and IAW the OEM’s specifications. In addition, the Contractor shall demonstrate to the Government SME that the TF33 Work Platforms are fully operational before leaving the facility.
2.4.5 The government shall provide power, water and air within 25 feet of the TF33 Work Platforms.
2.5 TF33 Work Platforms Performance Verification
After installation, the Contractor shall demonstrate that the TF33 Work Platforms meet or exceeds all OEM specifications and the requirements listed in section 2.2 of this SOW. Contractor shall be present for entirety of acceptance testing.
2.6 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0600 - 1600. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the CO. Upon approval from the CO, the SME or GPOC escort Contractor personnel at all times.
2.7 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.
3.0 On-Base Requirements
3.1 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state, and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions, or regulation changes during the term of this contract.
Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.
3.1.2 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the Contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.
The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFI 32-7086, “Hazardous Materials Management”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the COR monthly, the last business day of each month, or when the required work is completed. The COR will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.
3.1.3 Safety Data Sheet (SDS) and Labeling: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.
The Contractor shall not transport, ship, or use any chemical, material or substance used in the performance of this SOW on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the COR, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs) and a completed OC-ALC Form 152, SDS Information Sheet. The Contractor shall receive approval from the COR prior to shipping any chemical, material, or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part
1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s); pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The COR will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the COR if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.
3.1.4 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the Contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.
The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the COR if the required waste containers are not available on site.
3.1.5 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Wastewater Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the COR within ten (10) days after award. The COR will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.
3.1.6 Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure wastewater discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide official correspondence ten (10) calendar days after contract award date to the COR from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.
3.1.7 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the COR and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:
One (1) copy to CO, two (2) copies to the COR, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:
1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved
7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.
3.1.8 Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.
Contractor personnel performing duties in the service of this SOW shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;
http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this SOW to the COR, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFB HWMP, “Hazardous Waste Management”.
3.2 Reserved
3.3 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this SOW.
3.4 Foreign Object Damage (FOD) and Dropped Object Prevention: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the GPOC or the You Tube site, http://www.youtube.com/watch?v=tYcbodjFPnM.
b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.
c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.
d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip
3.11 Speak up for safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with Contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.
A safe workplace is everyone's business. As part of the contract team, military, civilian and Contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act. Events that present imminent danger to personnel or catastrophic damage to property we empower our employees to intercede to ensure continued safe operations.
3.12 Communicating Hazards Of Workplace (CHOW): Contractor’s onsite representative communicates all hazards being introduced to the worksite by the Contractor. This is accomplished prior to commencement of work and refreshed daily during performance, IAW Contractor’s Site Safety Plan.
3.13 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.