This document is a solicitation for the replacement of HVAC equipment in Building 16 at the U.S. National Poultry Research Center in Athens, Georgia. The contractor shall provide all equipment necessary to replace 2 gas furnaces, 2 fan motors, and 2 variable frequency drives. Specific make and model numbers are provided for the required equipment. The period of performance is 90 days from the notice to proceed, and no substitutions are allowed without USDA approval. Quotes must be received by July 25, 2024 at 4:00 PM Central Time. Award will be made to the lowest priced, technically acceptable offer. This is a commercial item acquisition subject to FAR Part 12, with electronic submission preferred to the email address provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Beta Sam Solicitation 12405B24Q0381.docx | DOCX document | |
| Clauses and Provisions.docx | DOCX document | |
| SEPRL Production Building 16 HVAC Replacement.docx | DOCX document | |
| Clauses and Provisions.docx | DOCX document | |
| Beta Sam Solicitation 12405B24Q0381.docx | DOCX document | |
| No Avian Contact Policy.pdf | ||
| Clauses and Provisions.docx | DOCX document | |
| Beta Sam Solicitation 12405B24Q0381.docx | DOCX document | |
| Beta Sam Solicitation 12405B24Q0381.docx | DOCX document | |
| SAM Wage Determination.pdf | ||
| 12405B24Q0381.pdf | ||
| Clauses and Provisions.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
Description of Equipment Need for
SEPRL Building 16 HVAC Furnace Replacement
U.S. National Poultry Research Center 934 College Station Road Athens, Georgia 30605
1. Scope of Work The contractor shall provide all equipment necessary to complete the replacement of 2 heaters and fan motors for buildings 16.
The material needed for this project is as follows:
1. 2 - Gas furnace
a. Sterling Model# QVED400A2N2A
b. Line power: 120 Volts.
c. 409 or 321 Stainless Steel Heat Exchangers
d. 409 Stainless Steel Burners
e. 409 Stainless Steel Induction Fan
f. Modulating Gas Controls
g. 409 Stainless Steel Drain Pans
h. Must be a horizontal flow orientation.
2. 2 – Fan motors
a. Dayton Model# 36VF53
b. 2.0hp
c. 1740 RPM
3. 2– Variable Frequency Drives
a. Borie Dabis - ABB Model# ACH580
i. Line power: 208v/3ph.
ii. NEMA 3R enclosure with bypass.
iii. Circuit breaker disconnect.
iv. BACnet interface
v. Additional filtered ventilation
vi. Strip heater for condensation control.
vii. 5% dual DC link reactor
viii. EMI/RFI filters
No substitutions without approval from the USDA. All processes of this project shall meet or exceed the manufacturers and industry standard requirements.
2. Material Submittals Submittals and O&M documentation must be provided for all materials used on this project.
3. Period of Performance The completion of this project shall not exceed 90 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.