SENECA Schedule of Services.xls

XLS spreadsheet 45 KB Posted

Attached to
Dry-Dock (DD):USCGC SENECA REPAIR FY-22
Solicitation number
70Z080-22Q-MECP0015
Issued by

About this file

This document contains a schedule of services and government estimate for the USCGC SENECA dry-dock availability in fiscal year 2022. The Coast Guard requires various hull, mechanical, and electrical work including hull plating renewal, sea strainer overhaul, rudder inspection and repair, cathodic protection renewal, and tank preservation. Optional items include a starboard rudder bore repair and oily water separator potable water supply modification. Pricing is provided for 45 definite line items totaling $0, with optional items priced separately. The related solicitation seeks offers for the dry-dock repair of USCGC SENECA in accordance with the schedule of services, to be awarded on a best value basis by the Department of Homeland Security Coast Guard.

View the file

Other files

File Type Posted
SENECA DD FY-22 Questions Answers.pdf PDF
0002.pdf PDF
905-WMEC_123_3_1_-_B.pdf PDF
0001.pdf PDF
SENECA SOW REV-1.pdf PDF
SENECA Solicitation .pdf PDF
SENECA SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

GOVERNMENT ESTIMATE FOR:Attachment (1)
USCGC SENECA (WMEC-906) DRYDOCK AVAILABILITY FY 2022
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICETypeAFC
D-001Hull Plating, Side Scan, Ultrasonic TestingJOB1$0.00RWI45
D-002Hull Plating, U/W Body, Ultrasonic TestingJOB1$0.00RWI45
D-003U/W Body, Preserve, 100 percentJOB1$0.00RWI45
D-004Hull Plating Freeboard, Preserve, 100 PercentJOB1$0.00RWI45
D-005Appendages (U/W), Preserve (Internal) and Leak TestJOB1$0.00RWI45
D-006Propulsion Shaft Fairwaters And Rope Guards, InspectJOB1$0.00RWI45
D-007Voids (Non-Accessible), Preserve (Internal) and Leak TestJOB1$0.00RWI45
D-008Mast, Preserve, 100 PercentJOB1$0.00RWI45
D-009Propulsion Shafting, Strain Gage Alignment, InspectJOB1$0.00RWI45
D-010Propulsion Propeller Shaft Coating, Inspect and TestJOB1$0.00RWI45
D-011Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect and Repair or RenewJOB1$0.00RWI45
D-012Controllable Pitch Propellers, Clean and InspectJOB1$0.00RWI45
D-013Controllable Pitch Propeller (CPP) System, Inspect and ServiceJOB1$0.00RWI45
D-014Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and ReinstallJOB1$0.00RWI45
D-015Fathometer Transducer, RenewJOB1$0.00RWI42
D-016Sea Strainers, Duplex, All Sizes, OverhaulJOB1$0.00RWI45
D-017Sea Strainers, Simplex, All Sizes, Clean and InspectJOB1$0.00RWI45
D-018Rudder Assemblies, Inspect and RepairJOB1$0.00RWI45
D-019Superstructure, Preserve, 100 PercentJOB1$0.00RWI45
D-020Cathodic Protection, Zinc Anodes, RenewJOB1$0.00RWI45
D-021DrydockJOB1$0.00RWI45
D-022Temporary Services, Provide - CutterJOB1$0.00RWI45
D-023Deep Water Sounder, RemoveJOB1$0.00TCTO42
D-024Doppler Speed Log, ReplaceJOB1$0.00TCTO42
D-025Tank Top and Sea Chest Plating, RenewJOB1$0.00CSMP45
D-026Hull Plating, RenewJOB1$0.00CSMP45
D-027Bulkhead Plating, RenewJOB1$0.00CSMP45
D-028Deck Covering, One-Step Deck, RenewJOB1$0.00CSMP45
D-029Bilge, Auxiliary Machinery Space No 2, Preserve, 100 PercentJOB1$0.00CSMP45
D-030Bilge, Engine Room, Partial PreserveJOB1$0.00CSMP45
D-031Sanitary Space Deck Plating, RenewJOB1$0.00CSMP45
D-032Bilge, JP-5 Pump Room, Preserve, 100 PercentJOB1$0.00CSMP45
D-033Auxiliary Seawater Piping, RenewJOB1$0.00CSMP45
D-034Bilge, Dry Stores, Partial PreserveJOB1$0.00CSMP45
D-035Ventilation Duct, RepairJOB1$0.00CSMP45
D-036Sea Valves and Waster Pieces, Overhaul or RenewJOB1$0.00CSMP45
D-037Tank Bottom Plating, RenewJOB1$0.00CSMP45
D-038Ventilation Duct, RepairJOB1$0.00CSMP45
D-039Tanks, Ballast, Preserve, 100 PercentJOB1$0.00CSMP45
O-040Starboard Rudder Bore, RepairJOB1$0.00CSMP45
D-041Oily Water Separator Potable Water Supply, ModifyJOB1$0.00TCTO45
D-00CTravel and PerdiemJOB$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
THE FOLLOWING RATES USED FOR GROWTH WORK:
Composite Labor RateHourly Rate
Temporary Services, Provide - CutterDaily Rate
LaydayDaily Rate

&C(1/20/2022) Draft-4 - Page &P of &N

File details come from the government source that posted it. Updated .