SELF-PERFORMED CALCULATIONS.pdf
PDF 119 KB Posted
- Attached to
- Z2DA--Project 674A4-22-807 Upgrade Waco Elevators Federal contract opportunity
- Solicitation number
- 36C25723B0036
About this file
This document provides instructions for calculating self-performed work for a federal contract opportunity with the Department of Veterans Affairs. The solicitation is for project 674A4-22-807 to upgrade elevators at the Waco VA facility. Offerors must calculate the percentage of work they estimate will be self-performed versus paid to subcontractors, with different minimum self-performance requirements based on whether the work is for A/E services, general construction, or special trade contracts. For A/E services contracts, offerors must self-perform at least 50% of the work. General construction contracts require 85% self-performance, and special trade contracts 75%. Offerors must include these calculations in their proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Remaining Answers to RFIs 5-19-2023.pdf | ||
| 36C25723B0036 0006.docx | DOCX document | |
| 36C25723B0036 0005.docx | DOCX document | |
| Answers to RFIs.pdf | ||
| 36C25723B0036 0004.docx | DOCX document | |
| Updated Covid-19 guidance.pdf | ||
| 36C25723B0036 0003.docx | DOCX document | |
| Pre-Bid Site Visit Sign in Sheet 36C25723B0036.pdf | ||
| 36C25723B0036 0002.docx | DOCX document | |
| 36C25723B0036 0001.docx | DOCX document | |
| 7-Second Floor Plan.pdf | ||
| 7-First Floor Plan.pdf | ||
| 92-BSMT Floor Plan.pdf | ||
| 7-BSMT Floor Plan.pdf | ||
| 4-BSMT Floor Plan.pdf | ||
| 94-Second Floor Plan.pdf | ||
| 94-First Floor Plan.pdf | ||
| 92-Second Floor Plan.pdf | ||
| 92-First Floor Plan.pdf | ||
| 4-First Floor Plan.pdf | ||
| VA_WACO ELEVATOR 100percent CD Specifications.pdf | ||
| OSHA - EMR requirement.pdf | ||
| 94-BSMT Floor Plan.pdf | ||
| 11 First Floor Plan.pdf | ||
| 11 BSMT Floor Plan.pdf | ||
| 36C25723B0036.docx | DOCX document | |
| 11 Second Floor-Plan.pdf |
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW
“Limitations on Subcontracting” (VAAR 852.219-10)
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Amount projected to be paid to non VIP listed SDVOSBs: $ __________
c) Offeror’s percentage of estimated Non VIP work (b/a X 100 = %) __________%
d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%
A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.
General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)
File details come from the government source that posted it. Updated .