SELF-PERFORMED CALCULATIONS.pdf

PDF 119 KB Posted

Attached to
Z2DA--Project 674A4-22-807 Upgrade Waco Elevators
Solicitation number
36C25723B0036
Issued by

About this file

This document provides instructions for calculating self-performed work for a federal contract opportunity with the Department of Veterans Affairs. The solicitation is for project 674A4-22-807 to upgrade elevators at the Waco VA facility. Offerors must calculate the percentage of work they estimate will be self-performed versus paid to subcontractors, with different minimum self-performance requirements based on whether the work is for A/E services, general construction, or special trade contracts. For A/E services contracts, offerors must self-perform at least 50% of the work. General construction contracts require 85% self-performance, and special trade contracts 75%. Offerors must include these calculations in their proposals.

View the file

Other files

File Type Posted
36C25723B0036 0006.docx DOCX document
Remaining Answers to RFIs 5-19-2023.pdf PDF
36C25723B0036 0005.docx DOCX document
Answers to RFIs.pdf PDF
36C25723B0036 0004.docx DOCX document
Updated Covid-19 guidance.pdf PDF
36C25723B0036 0003.docx DOCX document
Pre-Bid Site Visit Sign in Sheet 36C25723B0036.pdf PDF
36C25723B0036 0002.docx DOCX document
36C25723B0036 0001.docx DOCX document
11 Second Floor-Plan.pdf PDF
4-BSMT Floor Plan.pdf PDF
4-First Floor Plan.pdf PDF
VA_WACO ELEVATOR 100percent CD Specifications.pdf PDF
94-Second Floor Plan.pdf PDF
92-Second Floor Plan.pdf PDF
OSHA - EMR requirement.pdf PDF
92-BSMT Floor Plan.pdf PDF
7-Second Floor Plan.pdf PDF
7-First Floor Plan.pdf PDF
7-BSMT Floor Plan.pdf PDF
92-First Floor Plan.pdf PDF
94-First Floor Plan.pdf PDF
94-BSMT Floor Plan.pdf PDF
11 BSMT Floor Plan.pdf PDF
11 First Floor Plan.pdf PDF
36C25723B0036.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW

“Limitations on Subcontracting” (VAAR 852.219-10)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Amount projected to be paid to non VIP listed SDVOSBs: $ __________

c) Offeror’s percentage of estimated Non VIP work (b/a X 100 = %) __________%

d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%

A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.

General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)