Answers to RFIs.pdf
PDF 529 KB Posted
- Solicitation number
- 36C25723B0036
About this file
This document contains answers from the Department of Veterans Affairs to questions regarding a federal contract opportunity to upgrade elevators at VA facilities in Waco, Texas. The solicitation number is 36C25723B0036 and seeks to upgrade elevators under Project 674A4-22-807. Acceptable equipment includes either submersible or dry pump units for hydraulic elevators. For traction elevators, modifications to walls to provide crane access during material delivery are allowed if lintels are installed above openings. Contractors should evaluate all rigging and overhead considerations for such modifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25723B0036 0006.docx | DOCX document | |
| Remaining Answers to RFIs 5-19-2023.pdf | ||
| 36C25723B0036 0005.docx | DOCX document | |
| 36C25723B0036 0004.docx | DOCX document | |
| Updated Covid-19 guidance.pdf | ||
| 36C25723B0036 0003.docx | DOCX document | |
| Pre-Bid Site Visit Sign in Sheet 36C25723B0036.pdf | ||
| 36C25723B0036 0002.docx | DOCX document | |
| 36C25723B0036 0001.docx | DOCX document | |
| 11 Second Floor-Plan.pdf | ||
| 4-BSMT Floor Plan.pdf | ||
| 4-First Floor Plan.pdf | ||
| VA_WACO ELEVATOR 100percent CD Specifications.pdf | ||
| 94-Second Floor Plan.pdf | ||
| 92-Second Floor Plan.pdf | ||
| OSHA - EMR requirement.pdf | ||
| SELF-PERFORMED CALCULATIONS.pdf | ||
| 92-BSMT Floor Plan.pdf | ||
| 7-Second Floor Plan.pdf | ||
| 7-First Floor Plan.pdf | ||
| 7-BSMT Floor Plan.pdf | ||
| 92-First Floor Plan.pdf | ||
| 94-First Floor Plan.pdf | ||
| 94-BSMT Floor Plan.pdf | ||
| 11 BSMT Floor Plan.pdf | ||
| 11 First Floor Plan.pdf | ||
| 36C25723B0036.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Listed below are a few RFI’s questions we need to have answered in order to complete our proposal.
Part 32 – Modernization of Hydraulic Elevator Part 2.14 Pump, Motor, and Valve Assembly. Question: Where applicable, will submersible style pump units be acceptable? Or is it required all pump units be “dry” pump units?
VA RESPONSE: EITHER IS ACCEPTABLE.
Traction Elevator – Equipment Rooms Building 7 and Building 11. Question: Will the VA approve modification of one of a wall to provide access to crane material into the equipment room? It appears this was done previously in Building 7 (see picture below). Once complete, wall will be built back.
VA RESPONSE: THIS OPENING HAS A LINTEL ABOVE AND CAN BE REMOVED FOR
ACCESS. PLEASE NOTE: THIS IS AN OPTION THAT THE CONTRACTOR SHOULD
LOOK AT ALL RIGGING, ROOF OVERHANG, TILE ROOF, ETC.
Building 11 is similar to Building 7 except there is a roof deck we can land material. The wall we need to cut has a small door existing we’d like to enlarge and install a standard size door (see image below)
VA RESPONSE: THIS OPENING WOULD NEED A LINTEL SUPPORT ABOVE. WITH
THE STEEL BEAM ON THE OTHER SIDE OF THE WALL, OPENING WOULD BE
LIMITED. PLEASE NOTE; THIS IS AN OPTION THAT THE CONTRACTOR SHOULD
LOOK AT ALL RIGGING, ROOF SUPPORT, ROOF OVERHANG, ETC.