SEED PROJECT FHWA NATR BMS FY20(1) NEPA CE.pdf

PDF 2 MB Posted

Attached to
South - Regional Construction MATOC Federal contract opportunity
Solicitation number
693C73-20-R-000010
Issued by
Department of Transportation Federal Highway Administration

About this file

This Categorical Exclusion document describes a bridge maintenance project on the Natchez Trace Parkway. The National Park Service, in cooperation with the Federal Highway Administration, proposes preventative repairs to 20 bridges from milepost 98.95 to 193.8. Work includes replacing deck joints, repairing concrete, and cleaning/painting bearings. The project disturbs no earth. Required mitigations ensure replacement in-kind and avoidance of nesting wildlife. The project qualifies for a Categorical Exclusion under the DOI manual for repair/replacement of existing roads. Agency coordination confirms no extraordinary circumstances or effects to species, habitats, or historic properties.

View the file

Other files for this federal contract opportunity

Other files attached to South - Regional Construction MATOC, newest first.
File Type Posted
Amendment 0003 693C73-20-R-000010.pdf PDF
Amendment 0002 693C73-20-R-000010.pdf PDF
Amendment 0001 693C73-20-R-000010.pdf PDF
SEED PROJECT Plan.pdf PDF
SEED PROJECT J pages.pdf PDF
SOUTH IDIQ RFP 693C73-20-R-000010.pdf PDF
SEED PROJECT B Pages.pdf PDF
SEED PROJECT PERMIT 5-19-40-16-0534.pdf PDF
Technical Information Form 1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NP-NATR BMS FY20(1) Page 1 of 3

Categorical Exclusion Form Natchez Trace Parkway

Choctaw, Attala, Leake, Madison, and Monroe Counties, Mississippi

Project Number: NP-NATR BMS FY20(1) Date: June 4, 2019 Project Name: Perform preventative bridge repairs on 20 bridges on Natchez Trace Parkway

Project Description:

The National Park Service (NPS), in cooperation with the Federal Highway Administration (FHWA), proposes to perform preventative repairs to 20 bridges along Natchez Trace Parkway in Mississippi. The bridges span from Mile Post (MP) 98.95 to MP 193.8. Project work includes removing and replacing deck asphaltic plug joints; replacing deck joints with pre-compressed hybrid seal joints; installing pourable deck joints at both ends of bridges; installing weep hole filters at abutments; repairing concrete spalls in underside slabs, posts, railings, and at abutment bearing seats; and repairing concrete rails and post spalls at deck joint ends. Project work also includes cleaning and painting bearings at abutments; cleaning and resealing approach curb joints, deck joints, roadway joints, slab joints, wingwall vertical joints, and concrete slope protection joints at abutments; cleaning and resealing roadway decks; and cleaning and sealing transverse asphalt cracks at approach roadways. No earth disturbing activities are anticipated.

Mitigation Measures:

For the proposed project actions to be within compliance requirements during construction and/or project implementation, the following mitigations must be adhered to:

- All work shall be replacement in-kind.

- Do not disturb wildlife species found nesting, hibernating, estivating, or otherwise living in, or immediately nearby, work sites.

- All equipment will be maintained in good working order to reduce the possibility of accidental fuel/oil spills.

Category Used to Exclude the Action from Further NEPA Analysis:

23 CFR § 771.117(c)(22) Projects, as defined in 23 U.S.C. 101, that would take place entirely within the existing operational right-of-way. Existing operational right-of-way refers to right-of-way that has been disturbed for an existing transportation facility or is maintained for a transportation purpose. This area includes the features associated with the physical footprint of the transportation facility (including the roadway, bridges, interchanges, culverts, drainage, fixed guideways, mitigation areas, etc.) and other areas maintained for transportation purposes such as clear zone, traffic control signage, landscaping, any rest areas with direct access to a controlled access highway, areas maintained for safety and security of a transportation facility, parking facilities with direct access to an existing transportation facility, transit power substations, transit venting structures, and transit maintenance facilities. Portions of the right-

NP-NATR BMS FY20(1) Page 2 of 3 of-way that have not been disturbed or that are not maintained for transportation purposes are not in the existing operational right-of-way.

The Natchez Trace Parkway, National Park Service found no extraordinary circumstances and, therefore, categorically excluded the project from further NEPA analysis on May 1, 2018 under the categorical exclusion DOI 516 Departmental Manual (DM) 12.5(C)(9): Repair, resurfacing, striping, installation of traffic control devices, repair/replacement of guardrails, etc., on existing roads.

Agency Coordination:

Agency coordination in regards to 23 CFR 771 is complete.

The NPS Superintendent and Interdisciplinary team reviewed the scope of work and supporting documentation provided in the Planning, Environment, and Public Comment (PEPC) system, and all applicable associated compliance documentation and consultation (e.g., National Environmental Policy Act, National Historic Preservation Act (NHPA), Endangered Species Act, Clean Water Act, Clean Air Act, Wilderness Act, Tribal consultation under EO 13175, other related laws and policies). FHWA reviewed species, wetlands, flood zones, and other environmental attributes.

A May 2019 U.S. Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) project planning tool search and U.S. Department of Interior (DOI) FWS letter dated May 15, 2019 identified four (4) threatened species (i.e., Northern Long-eared Bat, wood stork, ringed map turtle, atlantic sturgeon), 16 migratory birds, and 12 wetlands (i.e., Freshwater Emergent Wetland, Freshwater Forested/Shrub Wetlands, Freshwater Pond, Riverines) that may occur within the boundary and/or may be affected by the proposed project. No critical habitats, refuge lands, or fish hatcheries were discovered within the boundaries of the proposed actions. A determination was made in accordance with Section 7 of the Endangered Species Act that project work will have no effect on the Northern Long-eared Bat, as work is anticipated to be confined to existing roadways and replacements will be in-kind.

Environmental Screening Form NP-NATR BMS FY20(1) Page 1 of 2

Appendix A: Environmental Screening Form

Water and Wetlands:

• Section 404 of the Clean Water Act

Impacts to Waters of the US: ☐Yes ☒No If Yes, approval anticipated:

☐Nationwide Permit ☐Regional General Permit ☐Individual Permit

• Section 401 of the Clean Water Act ☐NWP certified by State ☐Individual Certification

• Section 402 of the Clean Water Act (National Pollutant Discharge Elimination System) Disturbance Threshold Exceeded, Permit Required?

☐Yes ☒ No Is Stormwater Management Review/Approval anticipated?

☐Yes ☒No

• ☒Project is consistent with Executive Order 11990, Protection of Wetlands Floodplains:

• ☒ Project is consistent with Executive Order 11988, Floodplain Management Proposed project actions have the potential to occur in FEMA Flood Zones A and AE, areas subject to inundation by the 1-percent-annual-chance flood event, and Zone X, areas subject to inundation by the 0.2-percent-annual-chance flood hazard and area of minimal flood hazard.

Section 4(f) of the USDOT Act:

• Meets Section 4(f) exemption for Federal lands transportation facilities under Section

1119(c)(2) of MAP-21, U.S.C. 138(a)?

☒Yes ☐No

• Is there a Section 4(f) property in the study area?

☐Yes ☒No If Yes, continue:

De Minimis Finding:☐ Programmatic:☐ _______________________________ Individual 4(f): ☐

Section 6(f) of the Land and Water Conservation Fund:

• Was the property purchased with grant funds from the Land and Water Conservation Fund?

☐Yes ☒No

• If Yes, was documentation of approval from National Park Service Director received for the conversion or replacement of 6(f) property? ☐Yes ☐No Coastal Zone Management Act of 1972:

• Not in Coastal Zone ☒

• Concurrence with Federal Consistency Determination ☐

Right of Way:

• Project is completely within Federal right-of-way ☒

• Project involves relocations or easements ☐

Number of Easements________ Number of Relocations________

Environmental Screening Form NP-NATR BMS FY20(1) Page 2 of 2

Hazardous Waste and Materials:

• Are hazardous materials or contamination exceeding regulatory thresholds (as set by U.S.

EPA, County Environmental Health, etc.) present? ☐Yes ☒No

• If Yes, is the nature and extent of the hazardous materials or contamination fully known?☐ If No, briefly discuss the plan for securing information:

FHWA secures any appropriate documentation, approvals, or disapprovals for applicable hazardous materials or contamination regulations and maintains oversight to ensure thresholds are not exceeded.

Section 7(a) of the Wild and Scenic Rivers Act:

• Are there Wild and Scenic Rivers? ☐Yes ☒No

If Yes, review by river-administering agency is required.

Clean Air Act:

• Is the project in a non-attainment area? ☐Yes ☒No If Yes, is the project on the TIP/SIP? ☐ Yes ☐No

Highway Traffic and Construction Noise Regulations:

• ☐ The proposed project is a Type I project (highway on a new location, substantial horizontal or vertical alteration, new through or auxiliary lanes). Noise analysis is required.

• ☐ The proposed project is a Type II project (retrofit for noise abatement).

• ☒ The proposed project is a Type III project (noise analysis not required).

Environmental Justice and Title IV Act:

• Is an Environmental Justice population, as identified in Executive Order 12898, present?

☐Yes ☒No If Yes, briefly explain:

• Will the project induce disproportionately high and adverse impacts to minority, low income or special groups? ☐Yes ☒No If Yes, briefly explain:

Farmland Protection Policy Act for Highway Projects:

• Does the project displace, require acquisition of, or require an easement from farmland?

☐Yes ☒No

Does the project affect any additional resources? If Yes, explain below:

Categorical Exclusion Category Page 1 of 4

NP- NATR BMS FY20(1)

Appendix B: 23 CFR 771.117 FHWA Categorical Exclusions

(c) The following actions meet the criteria for CEs in the CEQ regulations (40 CFR 1508.4) and §771.117(a) and normally do not require any further NEPA approvals by the FHWA:

☐ (1) Activities which do not involve or lead directly to construction, such as planning and research activities; grants for training; engineering to define the elements of a proposed action or alternatives so that social, economic, and environmental effects can be assessed; and Federal-aid system revisions which establish classes of highways on the Federal-aid highway system.

☐ (2) Approval of utility installations along or across a transportation facility.

☐ (3) Construction of bicycle and pedestrian lanes, paths, and facilities.

☐ (4) Activities included in the State's highway safety plan under 23 U.S.C. 402.

☐ (5) Transfer of Federal lands pursuant to 23 U.S.C. 107(d) and/or 23 U.S.C. 317 when the land transfer is in support of an action that is not otherwise subject to FHWA review under NEPA.

☐ (6) The installation of noise barriers or alterations to existing publicly owned buildings to provide for noise reduction.

☐ (7) Landscaping.

☐ (8) Installation of fencing, signs, pavement markings, small passenger shelters, traffic signals, and railroad warning devices where no substantial land acquisition or traffic disruption will occur.

☐ (9) The following actions for transportation facilities damaged by an incident resulting in an emergency declared by the Governor of the State and concurred in by the Secretary, or a disaster or emergency declared by the President pursuant to the Robert T. Stafford Act (42 U.S.C. 5121):

(i) Emergency repairs under 23 U.S.C. 125; and

(ii) The repair, reconstruction, restoration, retrofitting, or replacement of any road, highway, bridge, tunnel, or transit facility (such as a ferry dock or bus transfer station), including ancillary transportation facilities (such as pedestrian/bicycle paths and bike lanes), that is in operation or under construction when damaged and the action:

(A) Occurs within the existing right-of-way and in a manner that substantially conforms to the preexisting design, function, and location as the original (which may include upgrades to meet existing codes and standards as well as upgrades warranted to address conditions that have changed since the original construction); and

(B) Is commenced within a 2-year period beginning on the date of the declaration.

☐ (10) Acquisition of scenic easements.

☐ (11) Determination of payback under 23 U.S.C. 156 for property previously acquired with Federal-aid participation.

☐ (12) Improvements to existing rest areas and truck weigh stations.

☐ (13) Ridesharing activities.

☐ (14) Bus and rail car rehabilitation.

☐ (15) Alterations to facilities or vehicles in order to make them accessible for elderly and handicapped persons.

☐ (16) Program administration, technical assistance activities, and operating assistance to transit authorities to continue existing service or increase service to meet routine changes in demand.

☐ (17) The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by new facilities which themselves are within a CE.

Categorical Exclusion Category Page 2 of 4

☐ (18) Track and railbed maintenance and improvements when carried out within the existing right-of-way.

☐ (19) Purchase and installation of operating or maintenance equipment to be located within the transit facility and with no significant impacts off the site.

☐ (20) Promulgation of rules, regulations, and directives.

☐ (21) Deployment of electronics, photonics, communications, or information processing used singly or in combination, or as components of a fully integrated system, to improve the efficiency or safety of a surface transportation system or to enhance security or passenger convenience.

Examples include, but are not limited to, traffic control and detector devices, lane management systems, electronic payment equipment, automatic vehicle locaters, automated passenger counters, computer-aided dispatching systems, radio communications systems, dynamic message signs, and security equipment including surveillance and detection cameras on roadways and in transit facilities and on buses.

☒ (22) Projects, as defined in 23 U.S.C. 101, that would take place entirely within the existing operational right-of-way. Existing operational right-of-way refers to right-of-way that has been disturbed for an existing transportation facility or is maintained for a transportation purpose. This area includes the features associated with the physical footprint of the transportation facility (including the roadway, bridges, interchanges, culverts, drainage, fixed guideways, mitigation areas, etc.) and other areas maintained for transportation purposes such as clear zone, traffic control signage, landscaping, any rest areas with direct access to a controlled access highway, areas maintained for safety and security of a transportation facility, parking facilities with direct access to an existing transportation facility, transit power substations, transit venting structures, and transit maintenance facilities. Portions of the right-of-way that have not been disturbed or that are not maintained for transportation purposes are not in the existing operational right-of-way.

☐ (23) Federally-funded projects:

(i) That receive less than $5,500,515.05 of Federal funds; or

(ii) With a total estimated cost of not more than $33,003,090.30 and Federal funds comprising less than 15 percent of the total estimated project cost.

☐ (24) Localized geotechnical and other investigation to provide information for preliminary design and for environmental analyses and permitting purposes, such as drilling test bores for soil sampling; archeological investigations for archeology resources assessment or similar survey; and wetland surveys.

☐ (25) Environmental restoration and pollution abatement actions to minimize or mitigate the impacts of any existing transportation facility (including retrofitting and construction of stormwater treatment systems to meet Federal and State requirements under sections 401 and 402 of the Federal Water Pollution Control Act (33 U.S.C. 1341; 1342)) carried out to address water pollution or environmental degradation.

☐ (26) Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (including parking, weaving, turning, and climbing lanes), if the action meets the constraints in paragraph (e) of this section.

☐ (27) Highway safety or traffic operations improvement projects, including the installation of ramp metering control devices and lighting, if the project meets the constraints in paragraph (e) of this section.

Categorical Exclusion Category Page 3 of 4

☐ (28) Bridge rehabilitation, reconstruction, or replacement or the construction of grade separation to replace existing at-grade railroad crossings, if the actions meet the constraints in paragraph (e) of this section.

☐ (29) Purchase, construction, replacement, or rehabilitation of ferry vessels (including improvements to ferry vessel safety, navigation, and security systems) that would not require a change in the function of the ferry terminals and can be accommodated by existing facilities or by new facilities which themselves are within a CE.

☐ (30) Rehabilitation or reconstruction of existing ferry facilities that occupy substantially the same geographic footprint, do not result in a change in their functional use, and do not result in a substantial increase in the existing facility's capacity. Example actions include work on pedestrian and vehicle transfer structures and associated utilities, buildings, and terminals.

(d) Additional actions which meet the criteria for a CE in the CEQ regulations (40 CFR 1508.4) and paragraph (a) of this section may be designated as CEs only after Administration approval unless otherwise authorized under an executed agreement pursuant to paragraph (g) of this section. The applicant shall submit documentation which demonstrates that the specific conditions or criteria for these CEs are satisfied and that significant environmental effects will not result. Examples of such actions include but are not limited to:

☐ (1)-(3) [Reserved] ☐ (4) Transportation corridor fringe parking facilities.

☐ (5) Construction of new truck weigh stations or rest areas.

☐ (6) Approvals for disposal of excess right-of-way or for joint or limited use of right-of-way, where the proposed use does not have significant adverse impacts.

☐ (7) Approvals for changes in access control.

☐ (8) Construction of new bus storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and located on or near a street with adequate capacity to handle anticipated bus and support vehicle traffic.

☐ (9) Rehabilitation or reconstruction of existing rail and bus buildings and ancillary facilities where only minor amounts of additional land are required and there is not a substantial increase in the number of users.

☐ (10) Construction of bus transfer facilities (an open area consisting of passenger shelters, boarding areas, kiosks and related street improvements) when located in a commercial area or other high activity center in which there is adequate street capacity for projected bus traffic.

☐ (11) Construction of rail storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and where there is no significant noise impact on the surrounding community.

☐ (12) Acquisition of land for hardship or protective purposes. Hardship and protective buying will be permitted only for a particular parcel or a limited number of parcels. These types of land acquisition qualify for a CE only where the acquisition will not limit the evaluation of alternatives, including shifts in alignment for planned construction projects, which may be required in the NEPA process. No project development on such land may proceed until the NEPA process has been completed.

(i) Hardship acquisition is early acquisition of property by the applicant at the property owner's request to alleviate particular hardship to the owner, in contrast to others, because of an inability

Categorical Exclusion Category Page 4 of 4 to sell his property. This is justified when the property owner can document on the basis of health, safety or financial reasons that remaining in the property poses an undue hardship compared to others.

(ii) Protective acquisition is done to prevent imminent development of a parcel which may be needed for a proposed transportation corridor or site. Documentation must clearly demonstrate that development of the land would preclude future transportation use and that such development is imminent. Advance acquisition is not permitted for the sole purpose of reducing the cost of property for a proposed project.

☐ (13) Actions described in paragraphs (c)(26), (c)(27), and (c)(28) of this section that do not meet the constraints in paragraph (e) of this section.

(e) Actions described in (c)(26), (c)(27), and (c)(28) of this section may not be processed as CEs under paragraph (c) if they involve:

(1) An acquisition of more than a minor amount of right-of-way or that would result in any residential or non-residential displacements.

Yes ☐ No ☐

(2) An action that needs a bridge permit from the U.S. Coast Guard, or an action that does not meet the terms and conditions of a U.S. Army Corps of Engineers nationwide or general permit under section 404 of the Clean Water Act and/or section 10 of the Rivers and Harbors Act of 1899.

Yes ☐ No ☐

(3) A finding of “adverse effect” to historic properties under the National Historic Preservation Act, the use of a resource protected under 23 U.S.C. 138 or 49 U.S.C. 303 (section 4(f)) except for actions resulting in de minimis impacts, or a finding of “may affect, likely to adversely affect” threatened or endangered species or critical habitat under the Endangered Species Act.

Yes ☐ No☐

(4) Construction of temporary access, or the closure of existing road, bridge, or ramps, that would result in major traffic disruptions.

Yes ☐ No☐

(5) Changes in access control.

Yes ☐ No☐

(6) A floodplain encroachment other than functionally dependent uses (e.g., bridges, wetlands) or actions that facilitate open space use (e.g., recreational trails, bicycle and pedestrian paths); or construction activities in, across or adjacent to a river component designated or proposed for inclusion in the National System of Wild and Scenic Rivers.

Yes ☐ No☐

United States Department of the Interior

FISH AND WILDLIFE SERVICE

Mississippi Ecological Services Field Office

6578 Dogwood View Parkway, Suite A

Jackson, MS 39213-7856

Phone: (601) 965-4900 Fax: (601) 965-4340 http://www.fws.gov/mississippiES/endsp.html

In Reply Refer To:

Consultation Code: 04EM1000-2019-SLI-0593

Event Code: 04EM1000-2019-E-01380

Project Name: NP-NATR BMS FY20(1)

Subject: List of threatened and endangered species that may occur in your proposed project location, and/or may be affected by your proposed project

To Whom It May Concern:

The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the

Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.).

New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the

Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list.

The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the

Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat.

May 15, 2019 http://www.fws.gov/mississippiES/endsp.html

05/15/2019 Event Code: 04EM1000-2019-E-01380 2

A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2)

(c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12.

If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered

Species Consultation Handbook" at:

http://www.fws.gov/endangered/esa-library/pdf/TOC-GLOS.PDF

Please be aware that bald and golden eagles are protected under the Bald and Golden Eagle

Protection Act (16 U.S.C. 668 et seq.), and projects affecting these species may require development of an eagle conservation plan (http://www.fws.gov/windenergy/ eagle_guidance.html). Additionally, wind energy projects should follow the wind energy guidelines (http://www.fws.gov/windenergy/) for minimizing impacts to migratory birds and bats.

Guidance for minimizing impacts to migratory birds for projects including communications towers (e.g., cellular, digital television, radio, and emergency broadcast) can be found at: http:// www.fws.gov/migratorybirds/CurrentBirdIssues/Hazards/towers/towers.htm; http:// www.towerkill.com; and http://www.fws.gov/migratorybirds/CurrentBirdIssues/Hazards/towers/ comtow.html.

We appreciate your concern for threatened and endangered species. The Service encourages

Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Tracking Number in the header of this letter with any request for consultation or correspondence about your project that you submit to our office.

Attachment(s):

▪ Official Species List

▪ USFWS National Wildlife Refuges and Fish Hatcheries

05/15/2019 Event Code: 04EM1000-2019-E-01380 1

Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action".

This species list is provided by:

Mississippi Ecological Services Field Office

6578 Dogwood View Parkway, Suite A

Jackson, MS 39213-7856

(601) 965-4900

05/15/2019 Event Code: 04EM1000-2019-E-01380 2

Project Summary Consultation Code: 04EM1000-2019-SLI-0593

Event Code: 04EM1000-2019-E-01380

Project Name: NP-NATR BMS FY20(1)

Project Type: TRANSPORTATION

Project Description: The National Park Service (NPS), in cooperation with the Federal

Highway Administration (FHWA), proposes to perform preventative maintenance repairs on twenty bridges on Natchez Trace Parkway. Work begins at Middle Byway Creek Bridge #2 (33.423944, -89.2628611) and ends at the White Oak Creek Bridge #1 (32.427472, -90.183278). Work includes repairing deteriorated expansion joints, asphalt pavement crack sealing and filling, concrete repairs, and other miscellaneous work. The project contains zero (0) acres of soil disturbing activities.

Project Location:

Approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/place/32.923343794452805N89.61589671190893W

Counties: Attala, MS | Choctaw, MS | Leake, MS | Madison, MS https://www.google.com/maps/place/32.923343794452805N89.61589671190893W https://www.google.com/maps/place/32.923343794452805N89.61589671190893W

05/15/2019 Event Code: 04EM1000-2019-E-01380 3

Endangered Species Act Species There is a total of 4 threatened, endangered, or candidate species on this species list.

Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species.

IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA

Fisheries , as USFWS does not have the authority to speak on behalf of NOAA and the

Department of Commerce.

See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions.

1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of

Commerce.

Mammals

NAME STATUS

Northern Long-eared Bat Myotis septentrionalis No critical habitat has been designated for this species.

Species profile: https://ecos.fws.gov/ecp/species/9045

Threatened

Birds

NAME STATUS

Wood Stork Mycteria americana Population: AL, FL, GA, MS, NC, SC

No critical habitat has been designated for this species.

Species profile: https://ecos.fws.gov/ecp/species/8477

Threatened

Reptiles

NAME STATUS

Ringed Map Turtle Graptemys oculifera No critical habitat has been designated for this species.

Species profile: https://ecos.fws.gov/ecp/species/2664

Threatened https://www.fisheries.noaa.gov/ https://ecos.fws.gov/ecp/species/9045 https://ecos.fws.gov/ecp/species/8477 https://ecos.fws.gov/ecp/species/2664

05/15/2019 Event Code: 04EM1000-2019-E-01380 4

Fishes

NAME STATUS

Atlantic Sturgeon (gulf Subspecies) Acipenser oxyrinchus (=oxyrhynchus) desotoi There is final critical habitat for this species. Your location is outside the critical habitat.

Species profile: https://ecos.fws.gov/ecp/species/651

Threatened

Critical habitats

THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S

JURISDICTION.

https://ecos.fws.gov/ecp/species/651

05/15/2019 Event Code: 04EM1000-2019-E-01380 1

USFWS National Wildlife Refuge Lands And Fish Hatcheries Any activity proposed on lands managed by the National Wildlife Refuge system must undergo a

'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to discuss any questions or concerns.

THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA.

http://www.fws.gov/refuges/

National Park Service U.S. Department of the Interior

Natchez Trace Parkway

Date: 04/23/2019

Letter of Compliance Completion

To: Kevin Downs

From: Mary Risser

Subject: NEPA and NHPA Clearance: Bridge IDIQ (PEPC: 79695)(PMIS: 251415)

NEPA and NHPA Compliance Complete. For complete compliance information see PEPC Project 79695.

The Superintendent and Interdisciplinary team have reviewed the scope of work and supporting documentation provided in the Planning, Environment, and Public Comment (PEPC) system, and all applicable associated compliance documentation and consultation (e.g. National Environmental Policy Act, National Historic Preservation Act, Endangered Species Act, Clean Water Act, Clean Air Act, Wilderness Act, Tribal consultation under EO13175, and other related laws and policies).

The subject proposed project/action(s), therefore, is/are now cleared for all compliance requirements. Project plans and specifications are approved, project funds may be released, and construction and/or project implementation can commence with the following mitigations and conditions/stipulations.

Required Mitigations - For the proposed project actions to be within compliance requirements during construction and/or project implementation, the following mitigations must be adhered to.

All work shall be replacement in-kind.

There are no NHPA Recommendations for Conditions or Stipulations identified.

National Park Service

U.S. Department of the Interior

6/11/2019 PEPC 79695

https://pepc.nps.gov/projectHome.cfm?projectId=79695 1/2

PEPC Planning, Environment & Public Comment (PEPC) user: Lee Ellen Carter | logout

Home Project / Search Parks Reports Tools Admin

1 Project Setup

2 Funding

3 Internal Scoping / IDT Tasks

4 Natural/Cultural Compliance

5 Internal Documents / Comments

6 Public Communication

7 Public Documents & Comment Analysis

8 Close Project

Print Forms

Project Home NATR > Bridge IDIQ (79695)

Project Home

Bridge IDIQ - Years 2018-2021

Project ID: 79695 Other Project ID:

Project Status: Proposed Compliance Status: Closed Complete

PMIS ID: 251415

Sensitive: No Project Creation Date: Mar 22, 2018

NEPA Status: Project Target Start Date: Aug 5, 2018

Funding: Funded in PMIS

Description:

Of the bridges along the Natchez Trace Parkway, one-third are inspected yearly so that in total they each are inspected at least once every three years. Minor repairs are recommended to protect the asset and to extend the design life of the bridge. This IDIQ project will take place yearly over the next five years starting at the southern terminus of the Parkway. Only the bridges that have been scoped and that are included in the attached report will be included in this project. The attached report has a breakdown of what bridges are included and exactly what work will be performed. The typical type of work includes:

1. Clean and Reseal Joints - Joints are sealed with rubber of a silicon material to prevent water from creeping into the joint. Many of these joints no longer are sealed and are filled with debris, rocks, etc. The foreign material will be removed and the joints will be resealed.

2. Fill voids with flowable fill. Some of our bridges have void areas under the roadway either due to settlement or because foreign material washed through the weepholes, etc. The only way to fill these areas without removing the asphalt roadway is to install flowable fill. Filling the voids is necessary to prevent cave-ins or sinkholes in the Parkway. (These are small voids usually right along the rail under the shoulder).

Flowable fill is essentially a concrete mixture without aggregates with a high amount of water that allows the material to be poured into a hole in the asphalt where it flows freely filling voids, etc. It doesn't require compaction so you are able to make the repairs with the least amount of disturbance.

3. Repair Rails - Some rails have cracks or areas where spalling has occurred on the rails (usually near the expansion joints). Loose concrete is removed at the cracks and the areas are filled or repaired with epoxy or concrete depending on the size of the crack, whether rebar is exposed, and if the area is structural or cosmetic.

Project Leader: Kevin Downs

NEPA Specialist: Deanna Boensch

NHPA Specialist: Christina Smith

Project Type: Repair/Rehabilitation

Project Categories:

Bridge, Road Bridge, Road Paved

External Agency: Admin Record Contact:

Division/Office: Admin Record Location: Central Files, NATR Headquarters

General Notes None

IDT Team

Locations

Filter: IDT Members (found total 6 ) - click headings to sort.

Name Responsibility Phone# Ext

Beth Byrd 106 Coordinator 404-507-5793

Christina Smith NHPA Specialist 662-840-7560

Danita Brown Historical Architect 404-507-5801

Deanna Boensch NEPA Specialist 662-680-1632

Kevin Downs Project Leader 907-781-2143

Susan Hitchcock Landscape Architect 404-213-8244

Glossary Compliance S Decision File External Agen PMIS (Projec Information S

FAQ

How do I dele project?

Links

NPS NEPA H

Supplementa

DO 12

Conservation Environmenta and Decision-

DO 28

Cultural Reso

EDIT

CREATE DUPLIC

HELP: HIDE

https://pepc.nps.gov/userProfile.cfm?mode=view https://pepc.nps.gov/logout.cfm https://pepc.nps.gov/userHome.cfm https://pepc.nps.gov/projects.cfm https://pepc.nps.gov/parks.cfm https://pepc.nps.gov/reportList.cfm https://pepc.nps.gov/tools.cfm https://pepc.nps.gov/adminHome.cfm https://pepc.nps.gov/basicInformation.cfm?projectID=79695& https://pepc.nps.gov/funding.cfm?projectID=79695& https://pepc.nps.gov/idtMembers.cfm?projectID=79695& https://pepc.nps.gov/nepaSummary.cfm?projectID=79695& https://pepc.nps.gov/documents.cfm?audience=internal&projectID=79695& https://pepc.nps.gov/publicSummary.cfm?projectID=79695& https://pepc.nps.gov/documents.cfm?audience=public&projectID=79695& https://pepc.nps.gov/closeProject.cfm?projectID=79695& https://pepc.nps.gov/printAllProjectForms.cfm?projectID=79695& https://pepc.nps.gov/projectHome.cfm?projectId=79695 https://pepc.nps.gov/parkHome.cfm?parkId=396 https://pepc.nps.gov/projectHome.cfm?projectId=79695 https://www.nps.gov/subjects/nepa/policy.htm http://www.nps.gov/policy/DOrders/DO_12.pdf https://www.nps.gov/policy/DOrders/DOrder28.html https://pepc.nps.gov/basicInformation.cfm?mode=edit&projectId=79695 https://pepc.nps.gov/help/pppcStep1.cfm#create https://pepc.nps.gov/basicInformation.cfm?mode=createFromPEPC&projectID=79695

6/11/2019 PEPC 79695

https://pepc.nps.gov/projectHome.cfm?projectId=79695 2/2

PEPC Guide NPS.gov USA.Gov Disclaimer Accessibility Privacy Po

Milestones Target Project Start: Aug 5, 2018 Actual Project Start:

Target Project End: Actual Project End:

Target Agreement: Actual Agreement:

Target Alternatives: Actual Agreement:

Step 1 Basic Information File List

Step 2 Funding File List No files.

Step 3 Internal Scoping / IDT Task File List No files.

Step 4 Natural/Cultural Compliance File List No files.

Step 5 Internal Documents (* indicates peer review required)

Document Title Review Start Review End Peer Review Required

This project has no 'internal documents'.

Step 6 Public Documents

Document Title Review Start Review End TIC ID

This project has no 'public documents'.

Step 8 Project Closing No files.

Filter: Locations (found total 1 ) - click headings to sort.

County, State District, Section Geo. Marker Other Tract ID

Adams, MS 4-204 (Milepost)

File Size Type Uploaded Date

NATR_BMS_Bridge_DSR (Hatcher) (1).pdf 23.4 MB PDF file Mar 22, 2018

NATR BMS FY19(1), Schedule B, Scoping Report (1).pdf 1.8 MB PDF file Aug 22, 2018

EDIT

http://nps.gov/ javascript:openHelpWindow('./help/overviewHome.cfm') javascript:openHelpWindow('http://www.nps.gov/') javascript:openHelpWindow('http://www.usa.gov/') javascript:openHelpWindow('disclaimer.cfm') javascript:openHelpWindow('http://www.doi.gov/accessibility.html') http://www.nps.gov/privacy.htm https://pepc.nps.gov/showFile.cfm?projectId=79695&sfid=319678&documentId=0&docType=internal&MIMEType=application%2Fpdf&filename=NATR%5FBMS%5FBridge%5FDSR%20%28Hatcher%29%20%281%29%2Epdf&clientFilename=NATR%5FBMS%5FBridge%5FDSR%20%28Hatcher%29%20%281%29%2Epdf https://pepc.nps.gov/showFile.cfm?projectId=79695&sfid=339876&documentId=0&docType=internal&MIMEType=application%2Fpdf&filename=NATR%20BMS%20FY19%281%29%2C%20Schedule%20B%2C%20Scoping%20Report%20%281%29%2Epdf&clientFilename=NATR%20BMS%20FY19%281%29%2C%20Schedule%20B%2C%20Scoping%20Report%20%281%29%2Epdf https://pepc.nps.gov/basicInformation.cfm?mode=edit&projectId=79695

FHWA NATR BMS FY20(1) NEPA CE
NEPA CE Signature Page
FHWA NATR BMS FY20(1) NEPA CE
Categorical Exclusion Form
Natchez Trace Parkway
Choctaw, Attala, Leake, Madison, and Monroe Counties, Mississippi
Project Number: NP-NATR BMS FY20(1) Date: June 4, 2019
Species List_ Mississippi Ecological Services Field Office
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Official Species List
Project summary
Endangered Species Act species
Mammals
Birds
Reptiles
Fishes
Critical habitats

USFWS National Wildlife Refuge Lands and Fish Hatcheries

PEPC_79695_LetterOfComp_2019_04_23

PEPC_79695_CE_2018_05_01
PEPC 79695_Project Home

File details come from the government source that posted it. Updated .