This amendment modifies a solicitation for a South Regional Construction Multiple Award Task Order Contract (MATOC) indefinite delivery/indefinite quantity (IDIQ) vehicle. The Federal Highway Administration seeks proposals for regional construction services in the South region. The amendment extends the proposal due date to April 22, 2020 and provides responses to questions from potential offerors. Services will include asphalt installation, preformed neoprene joint installation, and signs up to 4'x4' in size. Manufacturers' representatives are required during installation of certain materials. The government clarified that epoxy crack injection is not included in this solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003 693C73-20-R-000010.pdf | ||
| Amendment 0001 693C73-20-R-000010.pdf | ||
| Technical Information Form 1.pdf | ||
| SOUTH IDIQ RFP 693C73-20-R-000010.pdf | ||
| SEED PROJECT B Pages.pdf | ||
| SEED PROJECT PERMIT 5-19-40-16-0534.pdf | ||
| SEED PROJECT FHWA NATR BMS FY20(1) NEPA CE.pdf | ||
| SEED PROJECT Plan.pdf | ||
| SEED PROJECT J pages.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7320R000010 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
693C73
STERLING VA 20166-6511
21400 Ridgetop Circle
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
693C73
STERLING VA 20166-6511
21400 RIDGETOP CIRCLE
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
See Block 1003/09/20200002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/09/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project: Regional Construction MATOC IDIQ for the South Region.
The purpose of this amendment is to:
1. Formally address contractors' questions.
The proposal due date has been extended to April 22, 2020 at 2:00 PM EST
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL:
Amendment No. 0002
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
South Regional Construction IDIQ MATOC
Solicitation: 693C73-20-R-000010
The purpose of this Amendment is to:
1) Provide a summary of responses to questions/clarifications asked by potential contractors.
2) Notify offerors that the proposal due date has been extended. Proposals will be due April 22, 2020 at 2:00 PM EST.
Questions / Clarifications:
The following questions were submitted to Eastern Federal Lands Highway Division regarding the South Regional Construction MATOC IDIQ. The Government responses or clarifications are provided. The Government’s responses are as follow:
Question/Comment:
1) What is the contractor testing bid item for?
2) What is required to ensure watertight after joint installation?
3) Installation of the Asphalt and Preformed Neoprene Joint require manufacturer’s rep.
Does the rep need to be on site entire duration of installs or just for first install?
4) Is the epoxy crack injection, part of Repair Concrete? OR, Cracks , Cleaning and Sealing? OR Should there be another Bid Item for it?
5) Mississippi specs mostly 36”x36” or smaller signs. Can we use 4’x4’ signs?
Government’s Response:
1) Refer to Section 154 of the FP-14, Section 552 requires testing.
2) Refer to Section 552.13(g)(4) of the SCRs.
3) Yes, the manufacturer’s representative needs to be present during the installation.
4) There is no epoxy crack injection on this project.
5) Yes.
Bidders are reminded to submit any questions to eflhd.contracts@dot.gov. All questions should be submitted as early as possible so the proposal due date will not be delayed. Questions submitted within 3 days of the proposal due date have the potential of not being answered with enough time for offerors to finalize their proposals.
mailto:eflhd.contracts@dot.gov
| 693C7320R000010 |
| Amendment 2 SOUTH Const IDIQ |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0002 |
| South Regional Construction IDIQ MATOC |
| Solicitation: 693C73-20-R-000010 |