This document is Addendum #1 for the Sedgwick Well Drilling project (Project #22137) issued by the Colorado Department of Transportation (CDOT), dated 07/25/2024. The addendum provides critical details for a well drilling project, including electronic bid submission requirements through CDOT's Procurement Website (BidNet) with electronic bids due on Thursday, August 1, 2024, at 2:00 PM. The project involves drilling a water supply well with specific requirements: a desired flow rate of 65 GPM, 45 PSI building pressure, a pressure switch system, an underground pressure tank, PVC screen, and three-phase power. CDOT has provided three nearby well logs to assist bidders and clarified that the contractor must develop a well plan complying with Colorado Division of Water Resources requirements.
The addendum includes several important contractual notes for potential bidders, such as the requirement of a Bid Bond (as the project exceeds $50,000), Performance Bonds, and Labor and Material bonds (as the estimated project cost exceeds $150,000). State Prevailing Wages are mandatory, and contractors must provide a Wage Compliance Form with each pay application. Contractors are advised to ensure all subcontractors and suppliers receive copies of the addendum and acknowledge its receipt on the Bid Form. The project's General Conditions are available on the electronic bid system, and while Certified Payroll reporting is not required, compliance with Prevailing Wage requirements is mandatory.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Coal Creek Well Drilling Project #24741, Addendum #1 08/24/2023
2829 W. Howard Place, 4th Floor Denver, CO 80204-2305
CDOT
Sedgwick Well Drilling DQ
Project No.: 22137 Date: 07/25/2024
ADDENDUM #1
This Addendum Number One supersedes and/or supplements all portions of the Documents with which it conflicts. Bidders must acknowledge receipt of this Addendum and any future Addenda on the Bid Form.
General Notes:
1. The CDOT contact person for this project is Robert Wilson, Property Management Section, 2829 W. Howard Place, 4th Floor, Denver, CO 80204. Email: robert.L.wilson@state.co.us
2. Bids are to be submitted electronically through CDOT’s Procurement Website; BidNet.
Electronic Bids are due Thursday August 1, 2024 2:00 PM
3. Contractors need to register at CDOT’s new Procurement Website (BidNet) at:
www.bidnetdirect.com/colorado/colorado-department-of-transportation
Once registered, all CDOT State Buildings bidding opportunities are available at the same website.
If you are having issues seeing this electronic site, registering, or up-loading your bid, please e-mail the following address with specifics about your concerns: support@bidnet.com and cc Robert Wilson (e-mail address above). A BidNet representative will contact you with assistance.
Please note: all communication about bid system issues MUST start with an e-mail to the above Help Desk e-mail; a representative will call or e-mail you back, however, there must be a logged e-mail with the issue you’re experiencing. If you call a phone number you have been given in the past and that individual is not available to help, and are unable to upload your bid before the deadline your bid will NOT be accepted. Multiple agents monitor the e-mail, so always e-mail this help desk e-mail with your bidding system issue.
https://urldefense.proofpoint.com/v2/url?u=https-3A__u4966273.ct.sendgrid.net_ls_click-3Fupn-3DxiWZqGvqomvNir1zj7DpETTSEIzvcBwE-2D2F3WBhRekAm7S7CLYUaDL0RfyDY3dSVuy3kBwrBJJQqlL4Dn5TlxweWf9JHQ5JQVQqCjLMGGhv3MUpwHij4lHl4daWGohRPY2cLz-5F-5F62i4ZQidJAut2vx9TYnJ87y-2D2FfEXZVRRDZRAY-2D2FRJY6-2D2BUpjJ-2D2FsOZ3H1hW-2D2FZovrH3uioVkinINGsu1FJtkEQYvkrd7JonUI8N2f-2D2FONs7UJrsvjC63t44M-2D2FsfDYvhy54QOpJPX8idPeYWpieXFWVhxhkq-2D2FzbKHiAwFr3J9-2D2Bv04Fbcc3DC66NqkXgjqlVQcSdiLfI8KPWWWnxrVe5WKLbJSZkAJW3-2D2FvC-2D2BrOqHcnyoDBMEtjw-2D3D&d=DwMGaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=r83Qxyxy0s_QRs-wC_wqJUN5wkQ9fTiLnd2Wy-qwnsc&m=Usy-2wEUxB1OEK8JkaRzufcW2H4LUFAe5teJIiW8PFA&s=6RSKYoQRcLq1rOVFbmw8XstIxW8B6nsURwDvaVgvDYQ&e= mailto:dot_hq_srm_help@state.co.us
08/24/2023
Questions from the Pre-Bid Meeting:
Q1. Does CDOT have the well logs from neighboring wells? It would be helpful to know what to expect for a GPM and anticipated depth.
A1. Yes, attached are three nearby well logs.
Q2. Does CDOT have a proposed well plan in mind? Or is that left for the contractor to determine?
A2. CDOT does not have a well plan for this project. The well must comply with Colorado Division of Water Resources requirements. Other details can be reviewed with CDOT once under contract.
Q3. How many GPM is desired?
A3. 65 GPM
Q4. What PSI is needed in the building?
A4. 45 PSI
Q5. Do you want a constant pressure VFD system or just a pressure switch?
A5. Pressure Switch.
Q6. Will there be a pressure tank in the building or will we need an under ground pressure tank?
A6. An underground tank is required for this project.
Q7. PVC screen or stainless-steel screen?
A7. PVC screen is required for this project.
Q8. Single Phase or 3 phase power?
A8. Three-Phase Power is required for this project.
Notes to Contractors:
1. Make sure that all your Sub-Contractors and Suppliers have copies of Addendum Number One and the Scope of Work.
2. Make sure you acknowledge receipt of Addendum Number One and any future addenda on your Bid Form; all Addenda become part of the contract documents.
3. Note: A Bid Bond is required as the project is over $50,000.
4. Performance Bonds and Labor and Material bonds will be required on this contract as the estimated cost of the project will exceed $150,000.
5. THE GENERAL CONDITIONS OF THE CONTRACT (DESIGN/BID/BUILD) are on the electronic bid system.
6. State Prevailing Wages are required. Contractor must provide Contractor Wage Compliance Form with each pay application certifying that all direct employees and subcontractors are meeting Prevailing Wage requirements. Certified Payroll reporting is not required.
08/24/2023
Attachments:
A. The Mandatory Pre-Bid Meeting Sign-In Sheet is attached (1 page) B. Well Log #1 C. Well Log #2 D. Well Log #3
END OF ADDENDUM NO. ONE