SECTION16230_GENERATOR.pdf
PDF 127 KB Posted
- Solicitation number
- 26-056UM-IFB
- Issued by
- Hillsborough County, Florida
About this file
This specification document outlines the technical requirements for a standby generator system for the City of Plant City, Florida, replacing an existing unit that serves the municipal communication tower supporting critical utility infrastructure including the Water Reclamation Facility, Water Treatment Plant South, and lift stations throughout the city. The project requires furnishing and installing a complete diesel standby generator package rated for continuous electrical service during utility power interruptions, including the generator, prime mover, muffler, exhaust system, cranking battery, battery charger, control panel, sub-base fuel tank, water jacket heater, circuit breaker, and sound-attenuated weatherproof enclosure. The generator must be a 4-wire, single-phase 120/240-volt unit with a Tradewinds manufacturer specification, featuring an EPA Tier 4-Final and Stage IIIB diesel engine with direct injection high-pressure common rail technology. The system must meet comprehensive quality assurance standards including MIL-STD 705B, NEC, NEMA, NFPA, and UL requirements, with all components new and proven in satisfactory service for at least one year under automatic standby conditions. The contractor must provide all diesel fuel for testing and start-up, fill the sub-base tank upon completion, and submit factory prototype test results, shop drawings, and operation and maintenance manuals for approval prior to acceptance.
The contractor must conduct extensive testing including prototype tests certified by an independent laboratory documenting maximum power level, motor starting capacity, voltage dip, fuel consumption, cooling airflow, governor response time, alternator temperature rise, harmonic analysis, and three-phase short circuit testing in accordance with NFPA 110 standards. Factory testing of the supplied generator must include a two-hour load bank test before shipping, and acceptance testing must comprise an eight-hour field demonstration using dry-type load banks at full rated load for four hours, performed by a factory-trained representative with an authorized owner representative witnessing the tests. The generator supplier must be a factory-trained and certified manufacturer's representative with a complete service facility capable of delivering parts within 48 hours and employing a certified technician available for repairs and service calls within 24 hours. The manufacturer must provide a qualified technician to inspect the installation, conduct start-up and performance testing, make operating adjustments, instruct owner personnel, and assist at final inspection. The system requires an automatic microprocessor-based engine controller with analog display, event recording, transfer switch control, comprehensive protection features for alternator and engine systems, metering capabilities, and SCADA interface functionality for remote monitoring of fuel status, battery charging voltage, engine running status, and alarms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16230-1 Standby Generators
SECTION 16230
STANDBY GENERATOR
PART 1 GENERAL
1.01 DESCRIPTION
A. Work Included:
1. Furnish and install diesel standby generator including generator, prime mover, muffler, exhaust system, cranking battery, battery charger, control panel, sub-base fuel tank, water jacket heater, generator mounted circuit breaker, sound attenuated weatherproof enclosure, and all other necessary material required to complete the system, as shown on the Drawings and specified herein.
2. The Contractor shall provide all diesel fuel required for the testing and start-up of each generator. Following the completion of the generator start-up and testing, the Contractor shall fill each generator sub-base tank with diesel fuel.
B. Generator Requirements:
1. The rating of each generator shall be as indicated on the Drawings.
2. Each generator must meet the most current EPA emission requirements for this size generator at the time of manufacturer.
3. The emergency generator manufacturer shall meet the latest EPA emission requirements for this size generator at the time of manufacturer, including the emission standards and certification requirements of 40 CFR 60, Subpart IIII.
Contractor shall be required to provide copies of the manufacturer's certifications to the Engineer in such format as acceptable to EPA and PADEP requirements.
1.02 QUALITY ASSURANCE
A. Standards: The engine generator set, and all accessories, shall meet the requirements of:
MIL-STD 705 B
NEC National Electrical Code NEMA National Electrical Manufacturer's Association NFPA National Fire Protection Association (Pamphlets 30, 31, 37, 110) UL Underwriters' Laboratory
B. Quality Control:
1. All components of the standby generator system shall be new and of the most current and proven design.
2. The complete system shall be of a type, which has been in satisfactory service for at least one year under automatic standby system conditions.
3. This generator set system shall be assembled, tested and shipped by one supplier so that there is one source of supply and responsibility.
4. The Supplier shall be a factory trained and certified manufacturer's representative and shall maintain a complete service facility. The service facility shall be capable of making delivery to the generator site all generator set parts within 48 hours of placing the order. The Supplier shall employ a manufacturer trained and certified technician on a full-time basis at the service facility capable of making repairs and
16230-2 Standby Generators responding to service calls within 24 hours of notice. Certified proof of this requirement shall be available from the Supplier.
C. Testing:
1. Prototype tests performed on a generator set of the same size and type, required by these specifications, shall be submitted and approved with the shop drawings, required below. The test procedures and results shall be certified by an independent testing laboratory. The tests shall be performed in accordance with
NFPA 110 and shall document the following:
a. Maximum power level
b. Maximum motor starting capacity
c. Voltage dip
d. Fuel consumption
e. Engine-generator cooling air flow
f. Governor response time
g. Alternator temperature rise per NEMA MG1-22.40
h. Harmonic analysis and voltage Wave Form Deviation per MIL-STD-705 B, method 601.4
i. Three (3) phase short circuit test for mechanical and electrical strength
2. Factory tests of the generator set to be supplied shall be conducted in accordance with procedures certified by an independent testing laboratory. The manufacturer shall successfully test the generator set to be supplied, document items 1 a-I above and submit the test results for approval before shipping the generator set to the job site. A two-hour load bank test shall be performed and the results submitted before shipping the generator set.
D. Acceptance Tests:
1. Acceptance testing of the installed generator set shall be conducted by a factory-trained representative of the generator set manufacturer. An authorized representative of the Owner shall witness the acceptance tests. The test results shall be submitted to and approved by the Owner before the generator set is accepted. The Supplier shall furnish all testing equipment, materials, etc., including fuel needed to demonstrate the set is in compliance with the specification. Any deficiencies brought to the attention of the Supplier shall be corrected and, if warranted or requested by the Owner, the test shall be reperformed prior to acceptance. Final O&M Manuals shall be submitted before the acceptance tests commence.
2. The acceptance tests shall be performed during an eight-hour field test during which the manufacturer's representative shall demonstrate that the system performs in complete compliance with the specifications. As a minimum, a load bank test, performed in accordance with NFPA 110 section 5-13.2 shall be performed. The load tests shall use dry type load banks specifically utilized for this purpose. The load bank will be capable of definite and precise incremental loading and shall not be dependent on the generator control instrumentation to read voltage and amperage of each phase. The test instrumentation will serve as a check of the generator set meters. Load bank testing shall be performed for a period of four (4) hours at the full rated load of the generator. Salt-water brine
16230-3 Standby Generators tank load banks are not acceptable for this purpose and are disallowed and will not be utilized for this test.
1.03 SUBMITTALS
A. General: Submit in accordance with Section 16000 requirements. Submit in sufficient detail to show full compliance with Contract Documents.
B. Shop Drawings:
1. Shop drawings shall be complete in all respects and shall indicate all dimensions, installation methods, size, weight, capacity, ratings, integral controls and types of materials, elevations, and sections. Shop drawings shall include manufacturer's literature and complete information including the following:
a. Engine generator system plan, elevation and dimensional drawings clearly indicating all aspects of the system including points for each of the inter-connections required.
b. Engine generator/exciter control cubicle layout and component descriptions.
c. Sub-base fuel tank, piping schematic and fuel line connection information.
d. Fuel consumption rate curve at various loads, ventilation and combustion
CFM requirements.
e. Exhaust muffler and vibration isolator.
f. Schematic ladder and control wiring diagrams for the generator system.
g. Printed literature and brochures describing the system including all sizing requirements and components specified.
h. The weight of the engine, generator and complete system.
i. Points of measurement and maximum vibration readings (measured as velocity) for the installed system recommended by the manufacturer.
j. Battery, battery rack and battery charger literature and description.
k. Sound attenuated weatherproof housing.
l. The specified standby KW of the generator shall be for continuous electrical service during interruption of the normal utility power source and this shall be certified to this effect by the manufacturer for the actual unit supplied.
m. Factory prototype test results performed on a unit of this size and type documenting items (a) through (I) listed in 1.02 C above.
C. Operation and Maintenance Manuals:
1. Submit required number of copies of an operation and maintenance manual for the complete emergency generator system. The manual shall be submitted in 3-ring loose-leaf binders, and shall be complete, neat, orderly and indexed. The manual shall include, at the least, all data bearing on the specific generator system necessary for maintenance, operation, parts repair and replacement including all accessories and electrical controls, fire-code safety and operator safety measures, and lubrication schedule. A copy of the approved shop drawings shall be included in the manual. Manual shall be submitted and approved before system will be accepted.
D. Installation Certificate:
1. A factory technician shall inspect the installed generator system and certify in writing to the installer that it is installed in accordance with the manufacturer's
16230-4 Standby Generators recommendations before the system is initially started. The technician shall be present for the initial start-up and make recommendations to resolve any defects experienced. A copy of the installation certificate must be submitted to the Owner before the generator set is conditionally accepted.
PART 2 PRODUCTS
2.01 GENERATOR
A. General
1. Generator shall be 4-wire 1 phase 120/240 volt.
2. Self-contained standby generator packages complete with mounted auto control panel, air cleaners, exhaust silencers, and other accessories mounted on a steel frame, with vertical radiator and exhaust discharge and oil & coolant drain lines.
B. Engine
1. Diesel engine
2. EPA Tier 4 -Final & Stage lllB
3. Direct injection high pressure common rail
4. Heavy duty rated for standby and continuous prime power operation
5. Cooling system capable of operation at 120°F ambient.
6. Naturally aspirated, efficient and compact power.
7. Low noise and vibration due to better combustion and engine balance
8. Cleaner burn no DPF.
C. Alternator
1. brushless, dedicated single phase windings
2. Class H insulation system utilizes an unsaturated polyester varnish
3. A tropical insulation rated
4. Minimal harmonic distortion rated for use with sensitive electronic equipment.
5. Vacuum-impregnated windings with fungus-resistant epoxy.
6. Self-excited main stator.
D. Starting System
1. Engine mounted battery charging alternator.
2. Battery cables and rack along with grounding strap.
E. Enclosure
1. Weather protective enclosure constructed of Marine Grade Aluminum 0.125 thickness, SS Hardware, white powder coat paint finish on both sides, sound
Insulation resistant to high temperatures, fuel and oil, hinged / removable / keyed alike doors, and 175mph wind load rating.
2. Double walled UL142 base mounted daily service fuel tank.
3. Residential rated interior mounted exhaust silencer
F. Controller
1. Automatic engine controller with analog display of all functions
2. Microprocessor Based, Navigation key with large LCD display
3. Event Recording
16230-5 Standby Generators
4. Transfer Switch Control (main failures)
5. Alternator Protection: under/over voltage, under/over frequency
6. Engine Protection: Low oil pressure, High coolant temperature, over speed & over crank, Sender Unit failure, Fuel Failure sensor, Battery Charger Failure
7. Metering: Volts, Current, Hz, Watts, VA, PF, Oil Pressure, Coolant Temperature, RPM, DC Volts, Fuel Level, Engine running time
8. Engine Control with Timers
9. External remote start input (on or off load)
10. 16 programmable contact inputs - 7 Contact outputs
G. SCADA Interface
1. No fuel
2. Low battery charging voltage
3. Engine running
4. Common engine alarm
5. Switch in Emergency Position
H. Manufacturer
1. Tradewinds
PART 3 FIELD SERVICES
3.01 TECHNICAL SERVICES
A. The manufacturer of the emergency generator shall furnish a qualified technician, whose qualifications are acceptable to the Owner, to provide the following services:
1. Inspection of the installation of the emergency generator system
2. Start-up
3. Performance testing
4. Operating adjustments
5. Instruction of Owner's personnel
6. Assistance at final inspection.
END OF SECTION