The document provided is the Section J Attachments to a Request for Proposals (RFP) for the repair of three road failure sites located in the Umpqua National Forest in Douglas County, Oregon. The RFP, solicitation number 12048924R0017, is issued by the Department of Agriculture Forest Service.

The required work includes the design and construction of a 20-foot-high, 154-foot-long mechanically stabilized earth retaining wall on National Forest System Road 2700 MP 3.42, the realignment of 360 feet of road on National Forest System Road 3114 MP 1.97, and the construction of a 50-foot-high, 174-foot-long reinforced soil slope on National Forest System Road 3114 MP 2.24. The proposed solution must address all three repair sites. The Schedule of Items and the Statement of Work are provided in Sections B and C of the RFP, respectively.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UMP Disaster Relief Opening Forest Roads- Road Failure Repair Construction Roads (2700 3114) Project Specification List

Standard FP-14 Spec.

or FSSS Number Title

101-109 2014 General Requirements X X X Preface 03-22-2022 Preface X X X

101.01 11-09-2016 Meaning of Terms X X X

101.03 11-09-2016 Abbreviations X X X

101.04 01-22-2020 Definitions X X X

102.00 11-09-2016 Bid, Award and Execution of Contract X X X

103.00 11-09-2016 Scope of Work X X X

104.00 11-09-2016 Control of Work X X X

104.06 11-09-2016 Use of Roads by Contractor X X X

105.02 11-01-2016 Government Provided Sources X X X

105.02 11-01-2016 Contractor-located sources X X X

105.05 06-29-2020 Use of Material Found in the Work X X X

106.01 07-18-2017 Acceptance of Work X X X

106.02 11-09-2016 Visual Inspection X X X

106.07 11-01-2016 Partial and Final Acceptance X X X

107.02 11-01-2016 Protection and Restoration of Property and Landscape X X X

107.05 07-18-2017 Responsibility for Damage Claims X X X

108.00 11-09-2016 Prosecution and Progress X X X

109.00 11-09-2016 Measurement and Payment X X X

109.01 02-22-2019 Measurement and Payment X X X

109.02 11-09-2016 Measurement Terms and Definitions X X X

109.03 11-01-2016 Weighting Procedures and Devices X X

151 2014 Mobilization X X X 152 2014 Construction Survey and Staking X X X

152.00 12-12-2016 Construction Survey and Staking X X X 153 2014 Contractor Quality Control X X X

153.02 11-01-2016 Qualifications X X

153.03 11-01-2016 Quality Control Plan (QCP) X X

153.07 11-01-2016 Records and Control Charts X X

154 2014 Contractor Sampling and Testing X X

155.00 11-09-2016 Schedules for Construction Contracts X X X

156.00 02-05-2019 Public Traffic X X

157 2014 Soil Erosion and Sedement Control X X X

157.04 11-01-2016 Soil Erosion and Sedement Control X X X

201 2014 Clearing and Grubbing X X X

201.04 11-08-2016 Measurement X X

201.06 02-22-2018 Disposal X X X

203 2014 Removal of Structures and Obstructions X X X

203.04 11-02-2016 General X X X

203.05 09-10-2018 Disposing of Material X X X

204.00 11-04-2016 Excavation and Embankment X X X

205 2014 Rock Blasting X

Ro ad

M

P 3.

Ro ad

M

P 1.

Ro ad

M

P 2.

Date

UMP Disaster Relief Opening Forest Roads- Road Failure Repair Construction RoadS (2700 3114) Project Specification List

Standard FP-14 Spec.

or FSSS Number Title

205.00 11-08-2016 Rock Blasting X 207 2014 Earthwork Geosynthetics X X

207.04 11-08-2016 Earthwork Geotextiles X X

208 2014 Structure Excavation and Backfill for Selected Major Structures X X

209 2014 Structure Excavation and Backfill X X X

209.09 07-18-2017 Backfill X X X

209.10 07-17-2017 Compacting X X X

251 2014 Riprap X 255 2014 Mechanically-Stabilized Earth Walls X 257 2014 Contractor-Designed Retaining Walls X 261 2014 Reinforced Soil Slopes X

261.00 - Reinforced Soil Slopes X 301 2014 Untreated Aggregate Courses X X X

301.03 07-17-2017 General X X X

301.05 07-17-2017 Compacting X X

302 2014 Minor Crushed Aggregate X X

302.04 07-18-2017 Placing Crushed Aggregate X X X

302.05 06-11-2020 Compacting and Finishing Crushed Aggregate X X X

314 2014 Stockpiled Aggregates X X X

314.00 07-18-2017 Stockpiled Aggregates X X X

602 2014 Culverts and Drains X X X

602.05 06-11-2020 Laying Metal Pipe X X X

625.00 07-18-2017 Turf Establishment X X X

633.00 11-08-2016 Permanent Traffic Control X X

635 2014 Temporary Traffic Control X X X 703 2014 Aggregate X X X

703.05 07-18-2017 Surface course aggregate X

703.05 03-17-2021 Subbase, Base, Surface Course, and Screened Aggregate X X X

704 2014 Soil X X X

704.02 07-18-2017 Bedding Material X X X

704.08 11-08-2016 Select Granular Backfill X X

705 2014 Rock X X X

705.02 07-18-2017 Riprap X X

707 2014 Metal Pipe X X 708 2014 Plastic Pipe X

708.04 - Plastic Pipe X 713 2014 Roadside Improvement Material X X X 714 2014 Geosynthetic Material X X 720 2014 Structural Wall and Stabilized Embankment Material X X 725 2014 Miscellaneous Material X X X

Ro ad

M

P 3.

Ro ad

M

P 1.

Ro ad

M

P 2.

Date

FOREST LOCATION

United States Department of Agriculture

Forest Service

INDEX OF SHEETS

SHEET SHEET TITLE

1 COVER SHEET

INDEX, LEGEND & ABBREVIATIONS

3 VICINITY MAP

4 SUMMARY OF QUANTITIES & GENERAL NOTES

5 PROJECT CONTROL

6 TYPICAL RETAINING WALL SECTION

7 TYPICAL ROAD SECTION

8 WALL PLAN & PROFILE

9 CULVERT PLAN & PROFILE

10 CULVERT SITE PLAN

11-12

CROSS-SECTIONS

13-14

PIPE CULVERT DETAILS

15-16

SPILLWAY ASSEMBLY DETAILS

17-19

PIPE CULVERT COUPLING DETAILS

PIPE CULVERT INSTALLATION DETAILS

DEWATERING REQUIREMENTS DETAILS

22-24

EROSION CONTROL DETAILS

TEMPORARY TRAFFIC CONTROL DETAILS

USFS UMPQUA NATIONAL FOREST

DISASTER RELIEF PROJECT FR 2700 MP 3.42

NORTH UMPQUA RANGER DISTRICT

UMPQUA NATIONAL FOREST

DOUGLAS COUNTY OREGON

(R06) PACIFIC NORTHWEST REGION

SHEET 1 OF 25

F

O

R

E

S T

SE

R

V

I

C

E

D E

P

A

R

T M

E N

T

OF AGR

I C

U

L

T

U R

E

PROJECT LOCATION

ENGINEERS

PLANNERS

SURVEYORS

N

NOT TO SCALE

PROJECT SITE

REVIEWED BY:

ASSISTANT FOREST ENGINEER DATE

RECOMMENDED BY:

FOREST STAFF OFFICER DATE

TRAVEL DIRECTIONS:

From Glide, travel south on Little River Road for 18.2 miles, continue south on FR 2700 for 1.6 miles to reach the site.

Latitude 43°12'31.36"N and Longitude 122°49'20.19"W

APPROVED BY:

NORTH UMPQUA DISTRICT RANGER DATE

REGION SIX DIRECTOR OF ENGINEERING DATE

Expires: 12-31-2024

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 3/2

3 1 8:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

LE

GE

ND

_2

0.D W

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

INDEX, LEGEND &

ABBREVIATIONS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

2 25

D

DHV

DIA.

DIAG.

DIAPH.

DIST.

DLT

DRWG(S).

E e

EA.

EL. 94.16 FT

ELEV.

EMB.

EP

EQ OR EQ.

ER

EVCE

EVCS

EW

EXC.

EXP. JT.

EAST

SUPERELEVATION RATE

EACH

ELEVATION WITH NUMBER

ELEVATION

EMBANKMENT

EDGE OF PAVEMENT

EQUATION

EDGE OF ROAD

END VERTICAL CURVE ELEV

END VERTICAL CURVE STA

EDGE OF WATER

EXCAVATION

EXPANSION JOINT

DIAMETER

DESIGN HOURLY VOLUME

DIAMETER

DIAGONAL

DIAPHRAGM

DISTANCE

DESIGN LOAD TRANSFER

DRAWING(S)

GA.

GALV.

GAGE (GAUGE)

GALVANIZED

HDWL.

HEX.

HW

H:V

HEADWALL

HEXAGON

HIGH WATER

HORIZONTAL:VERTICAL SLOPE

FIN.

FLG.

FT2

FT3

FTG.

FINISH

FLANGE

SQUARE FOOT

CUBIC FOOT (FEET)

FOOTING

ID

JT.

K

INSIDE DIAMETER

JOINT

RATE OF VERTICAL CURVATURE

L

LAM.

LAT.

LNFT

LONG.

LPSM

LS

LSQ

LT. OR LT

LENGTH OF CURVE

LAMINATION

LATITUDE

LINEAR FOOT (FEET)

LONGITUDINAL

LUMP SUM

LENGTH OF SPIRAL

LUMP SUM QUANTITY

LEFT

R

R.

R/W

RDWY.

REINF.

REQD.

RPC

RSS

RT. OR RT

RTE.

RADIUS

RANGE

RIGHT-OF-WAY

ROADWAY

REINFORCEMENT

REQUIRED

RED PLASTIC CAP

REINFORCED SOIL SLOPE

RIGHT

ROUTE

T

T.

TBM

THD.

TS

TYP.

TANGENT DISTANCE

TOWNSHIP

TEMPORARY BENCH MARK

THREAD

POINT OF TANGENT TO SPIRAL

TYPICAL

V

VPH

VPI

DESIGN SPEED

VEHICLES PER HOUR

VERTICAL POINT OF INTERSECTION

YD2

YD3

SQUARE YARD

CUBIC YARD(S)

S

SADT

SC

SEC.

SHLDR.

SLRY

SPA.

SQFT

SQYD

SRS

SS

ST

STA

STD.

STGR.

STIFF.

STRUC.

STS

SYM.

S

S

SOUTH

SEASONAL AVERAGE DAILY TRAFFIC

POINT OF SPIRAL TO CURVE

SECTION

SHOULDER

SLURRY UNIT

SPACING, SPACES OR SPACED

SQUARE FOOT

SQUARE YARD

POINT OF SPIRAL TO REVERSE SPIRAL

POINT OF SPIRAL TO SPIRAL (NO CURVE)

POINT OF SPIRAL TO TANGENT

STATION

STANDARD

STRINGER

STIFFENER

STRUCTURAL

POINT OF SPIRAL TO TANGENT SPIRAL

SYMMETRICAL

VERTICAL SPACING

HORIZONTAL SPACING

CUFT

CULV.

CUYD

CUBIC FOOT (FEET)

CULVERT

CUBIC YARD(S)

POINT OF CURVE

POINT OF COMPOUND CURVE

POINT OF CURVE TO SPIRAL

POINT OF INTERSECTION

PLATE

POINT NUMBER

POINT ON CURVE

POINT ON SPIRAL

POINT ON TANGENT

POINT OF TANGENT TO SPIRAL

POINT OF SPIRAL TO CURVE

POINT OF SPIRAL TO TANGENT

POINT OF TANGENT

POINT OF VERTICAL CURVE

POUNDS PER SQUARE INCH

PAVEMENT

PC

PCC

PCS

PI

PL.

PN

POC

POS

POT

PS

PSC

PST

PT

PIV

PSI

PVMT.

ON CENTER

OUT TO OUT

OUTSIDE DIAMETER

OFFSET

ORIGINAL GROUND

O. C.

O. TO O.

OD

OFF.

OG

NORTH

NORMAL CROWN

NUMBER

N

NC

NO.

MATERIAL

MAXIMUM

THOUSAND GALLON

MINIMUM

MONUMENT

MECHANICALLY STABILIZED EARTH

MATL.

MAX.

MGAL

MIN.

MON.

MSE

C

Ø

S

Δ α

CURVE CENTRAL ANGLE

DIAMETER

SPIRAL CENTRAL ANGLE

CENTRAL ANGLE OF CURVE

DECLINATION ANGLE

ABUT.

ADT

AH

AQ

APPR.

BK

BM

BP

BR.

BRG.

BVCE

BVCS

ABUTMENT

AVERAGE DAILY TRAFFIC

AHEAD

ACTUAL QUANTITY

APPROACH

BACK

BENCH MARK

BALANCE POINT

BRIDGE

BEARING

BEGIN VERTICAL CURVE ELEV

BEGIN VERTICAL CURVE STA

CC

CLR.

CMP

COL.

CONC.

CONN.

CONSTR. JT.

CONT.

CQ

CP

CS

CTRS.

CENTER TO CENTER

CENTERLINE

CLEAR

CORRUGATED METAL PIPE

COLUMN

CONCRETE

CONNECTION

CONSTRUCTION JOINT

CONTINUOUS

CONTRACT QUANTITY

CONTROL POINT

POINT OF CURVE TO SPIRAL

CENTERS

M.L.

MP

MAIN LINE

MILE POST

MAJOR CONTOUR

MINOR CONTOUR

EDGE OF GRAVEL

EDGE OF ASPHALT

CENTERLINE

EDGE OF STREAM

FLOWLINE

CULVERT

ABBREVIATIONS LEGEND

MAJOR CONTOUR

MINOR CONTOUR

CENTERLINE

CONSTRUCTION LIMITS

DITCH UNDERDRAIN

CULVERT

STREAM/DITCH

AGGREGATE SURFACE COURSE

TOE OF FILL

WALL REINFORCEMENT

GUARDRAIL

SEPARATION STABILIZATION FABRIC

GEOCOMPOSITE DRAIN FABRIC

EXISTING

PROPOSED

LENGTH OF VERTICAL CURVE

LOW WATER

LVC

LW

WEST

W

CL

UD UD UD UD

V

H

X X X X

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 1/2

3 1 4:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

VI

CI

NI

TY

M

AP

_2

0.D

W G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

VICINITY MAP

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

3 25NOT TO SCALE

N

PROJECT

SITE

Coolwater

Staging Area

Glide, OR

10 miles

Black Creek

Quarry

White Creek

Water Source

Pinnacle Creek

Water Source

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 4:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

QU

AN

TI

TI

ES

A

ND

G

EN

ER

AL

N

OT

ES

_2

0.D

W G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

SUMMARY OF

QUANTITIES AND

GENERAL NOTES

01/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

4 25

MOBILIZATION15101 LUMP SUMLSQ

STRUCTURE EXCAVATION20901

CLEARING AND GRUBBING, DISPOSAL METHOD A20101 LUMP SUMLSQ

SOIL EROSION AND POLLUTION CONTROL15713 LUMP SUMLSQ

LUMP SUM

CONTRACTOR TESTING15401 LUMP SUMLSQ

CONSTRUCTION SURVEY & STAKING, METHOD 115221 LUMP SUMLSQ

24-INCH PIPE CULVERT, CMP

60201

CUBIC YARDAQ

SUMMARY OF ESTIMATED QUANTITIES

PLACED RIPRAP, CLASS 2, METHOD A25101 SQUARE YARDCQ

TURF ESTABLISHMENT62512 LUMP SUMLSQ

ALL

ALL

ALL

ALL

ALL

ALL

25701 CONTRACTOR DESIGNED RETAINING WALL, MSE LSQ

*** SELECT GRANULAR BACKFILL, COMPACTION METHOD 1 (SUITABLE EXCAVATION MATERIAL) CQ

CUBIC YARD

LUMP SUM

30112 AGGREGATE SURFACE COURSE, COMPACTION METHOD 1 CQ

CUBIC YARD

60605

24-INCH SPILLWAY PIPE, CMP AQ LINEAR FOOT

ALL

ALL

SPECIFICATIONS: Construct the project in compliance with Federal Highway Administration Standard Specifications for Construction of Road and Bridges on Federal Highway Project (FP-14) and applicable Forest Service Supplemental Specifications (FSSS).

CLEARING AND GRUBBING: Clear and grub up to the construction limits.

DISPOSAL: All materials designated for removal become the property of the contractor upon removal and are to be disposed of by removing from the forest in an environmentally safe manner in accordance with all local, state and federal requirements. Dispose of excess or unsuitable excavated material at the location designated in FSSS, Section 105. Hauling of excess or unsuitable material is incidental to associated work.

DITCH LINE: Recondition existing ditch within the project limits. Work is incidental to the Clearing and Grubbing bid item.

DEWATERING: Project should be constructed the during dry season. If dewatering is required, submit a dewatering plan to the contracting officer for approval at least fourteen (14) days prior to beginning work. Contractor shall be responsible for rerouting any water during removal and construction of culvert pipes and/or ditch lines. All work associated with rerouting surface water is incidental to bid item work.

EROSION CONTROL PLAN: Submit a soil erosion and sediment control plan to the contracting officer for approval at least thirty (30) days prior to beginning work. See Section 157 of the Supplemental Specifications for details. Remove all erosion control material installed on the ground surface that are not biodegradable.

WASTE SITE: A government-provided waste site is available for the disposal of excavated material, refer to FSSS Section 105 for waste site locations. Vegetation, asphalt, and other man-made material may NOT be placed in the pit, except that they may temporarily stockpiled in a designated area if approved by the

CO (obtain written approval). Remove only enough vegetation required to establish slope. Place the excavated waste material in lifts no greater than 4 feet. Compact with hauling and spreading equipment (Compaction Method 4 - 204.11). Construct fill slopes no steeper than 1V:1.5H, maximum fill height of 10 feet or as approved by the CO and graded to match the existing contour of the site. Obtain approval from the CO prior to seeding. Any exposed soil must be seeded, perform seeding either in the fall or the spring.

COORDINATE SYSTEM: The point information shown is based on a local coordinate system for each site. While some coordinates may appear to reflect State Plane, they are all based on a local system. The control points shown are specific to each site, and may not correlate to other sites that have the same control point numbers.

MATERIAL SOURCE: See Section 105 for approved borrow sources. Alternate sources require approval from the CO.

MATERIAL STOCKPILE SITE APPROVAL: Prior to commencing work, all areas designated for stockpiling outside of road prism (stockpile areas) will require approval from the CO. Approval from the adjacent landowner will be required if outside of the road right-of-way.

ROADWAY CLOSURE AND TEMPORARY TRAFFIC CONTROL: A full road closure for FR2700 is permitted. The road must be open to traffic prior to July 1st. Place temporary closure notification at both ends of FR2700, at the FR2703 and FR2800 junctions, and at all adjoining tributary roads with traffic flow from other road system. See Table 156-1 for temporary road closure limits. Refer to temporary traffic control details (sheet 25), FSSS Section 156 and for additional traffic control requirements.

TURF ESTABLISHMENT: Turf establishment is only permitted in the month of October. Coordinate work with CO. Seeds will be provided by the Forest Service.

ROCK EXCAVATION: Based upon the geotechnical investigation, rock is identified as medium-hard (R3) to hard (R4) volcanic tuff. Excavation of (R3-R4) volcanic tuff rock is anticipated to be performed with the use of large excavating equipment utilizing ripper teeth and/or hydraulic rock chipper attachments. It is possible limited hard rock excavation techniques such as rock drilling and use of non-explosive expansion compounds such as Bristar or Ecobust Expansive Mortar may be required. Explosives are not permitted.

SELECT GRANULAR BACKFILL: Select Borrow for wall construction is anticipated to be comprised of (at a minimum) 20% suitable excavated material and 80% imported material. Some hand sorting will be required prior to placement of suitable excavated material. See Section 261.04 for additional requirements of suitable excavated material.

WATER SOURCE: See Section 105 for approved water sources. Obtain approval from the CO for all water sources and drafting sites. Utilize the following best management practices at the water source location: don not construct diversion that exceeds 10% of the available flow and include a fish screen to prevent juvenile fish from swimming or being drawn into the intake that is consistent with current fish passage criteria (NMFS 2001a or most relevant version), place aggregate on the access road into the water source to reduce the potential for sediment to enter stream. See Section 107 for additional requirements.

GENERAL NOTES

SELECT GRANULAR BACKFILL, COMPACTION METHOD 1 (IMPORTED MATERIAL)25502 CUBIC YARDCQ 618

*** FOR INFORMATION ONLY

LSQ

20431 ROCK EXCAVATION CUBIC YARDCQ 545

TEMPORARY TRAFFIC CONTROL63501 LUMP SUMLSQ

ALL

END SECTION FOR 24-INCH PIPE CULVERT

60207

EACHAQ

62102

MARKER, FLEXIBLE

AQ EACH 3

0 1

11+00

12+00

13+00

13+26

P C

P T

S34°20'11"E

16.64'

S29°14'32"E

2.19'

L=306.82'

Δ=5°05'38" R=3451.06

CONTROL POINT TABLE

POINT #

CP-1

CP-2

CP-3

NORTHING

570287.47

570679.66

570984.52

EASTING

4302353.24

4302204.62

4302017.85

ELEVATION

1864.44

1848.67

1837.43

DESCRIPTION

SET 1" RPC WITH 1/2" REBAR

SET 1" RPC WITH 1/2" REBAR

SET 1" RPC WITH 1/2" REBAR

CENTERLINE POINTS

POINT #

NORTHING

570935.2844

570934.4535

570912.7934

570891.8647

570870.8376

570849.7130

570828.4921

570815.7138

570804.6033

570791.7702

570785.7660

570781.4728

EASTING

4302070.8155

4302071.3719

4302085.7537

4302099.4280

4302112.9505

4302126.3202

4302139.5366

4302147.3925

4302154.1611

4302161.9079

4302165.5064

4302168.0692

ELEVATION

1841.19

1841.23

1842.04

1842.81

1843.57

1844.34

1845.11

1845.57

1845.96

1846.44

1846.66

1846.82

DESCRIPTION

STA 10+39 BEGIN CONSTRUCTION

STA 10+49 BEGIN WALL

STA 10+75

STA 11+00

STA 11+25

STA 11+50

STA 11+75

STA 11+90

STA 12+03.01 END WALL

STA 12+18

STA 12+25

STA 12+30 END CONSTRUCTION

Existing surface cracks

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

PROJECT CONTROL

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

5 25

PROJECT CONTROL

SCALE: 1" = 30'

N

Existing culvert

Existing surface cracks

CP-1

~430 ft

CP-2

CP-3

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

TYPICAL RETAINING

WALL SECTION

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

6 25

RETAINING WALL SECTION

NOT TO SCALE

11.5'7.0' 4.0'

20.5'

1.0' min.

ditch

Drive lane

Shoulder

CL

W a l l a l i g n m e n t

3%

Profile grade

Aggregate surface course, 8" compacted depth

3%

Reinforcement length

(see table, this sheet)

H e i g h t v a r i e s

S e e p l a n s h e e t

Select granular backfill

10V:1H batter

Limits of excavation

Wall drain

See detail this sheet

Existing surface

1.5% Min

12"

6" dia. corrugated polyethylene drainage tubing (perforated)

Granular backfill

Separation geotextile, nonwoven, class 2, type A.

Overlap a minimum of 12".

Non-perforated outlet pipe where shown on site profiles or every

100'. Install at the low point.

Slope min. 1.5% to daylight.

Note:

1. Cover the end of the outlet pipe with galvanized No. 17 gage

Hardware Cloth Screen. Secure in place by approved means.

2. All labor, equipment and materials associated with furnishing and installing the wall drain are incidental to item 25701.

3. Place 1/2 cubic yard of riprap at outlet of wall drain for erosion control.

WALL DRAIN DETAIL

NOT TO SCALE

WORK: Under the provisions of Section 257, the contractor has the option of selecting among a variety of Mechanically Stabilized Earth (MSE) systems, subject to the approval of the CO. The design for the project is based on the use of Welded Wire Mesh system (trademark - Hilfiker

Retaining Wall). Design the wall in accordance with Section 257.

MATERIALS: Provide reinforcement for MSE walls meeting the minimum strength requirements specified in Table 714-6, Type I in FP-14.

METHOD OF MEASUREMENT AND BASIS OF PAYMENT: No separate measurement will be made for the structure excavation, foundation construction, backfill, wall drains, geotextile, geogrid or embedment lengths. Payment under Item 25701, at the contract price, shall be full compensation for 1) excavation, 2) furnishing the welded wire and accessories, labor, tools, and equipment, 3) placing the welded wire material and accessories, 4) backfilling, 5) wall drain, and 6) other incidentals necessary to complete the work identified by the plans, specifications, and CO.

Note roadway construction above top of wall will be paid under corresponding roadway bid items.

WALL EXCAVATION: Typical excavation limits are as shown in the plans but will vary depending on contractor design. Slope the excavation to provide safety for construction workers and inspection personnel. Remove boulders, logs, and any other unsuitable materials encountered and dispose of in accordance Section 203.05. Contain all suitable excavation to be used for backfill material (hand sorting may be required) in the work areas or on the adjacent roadway and shall not enter adjacent streams.

FOUNDATION APPROVAL: Prior to structure placement, level and smooth the foundation and compact until unyielding (Section 208.08d), unless otherwise specified. Obtain approval from the

CO before any retaining elements are installed.

RETAINING WALL PLACEMENT: Set the welded wire elements to the lines and grades shown on the drawings or directed by the CO. Batter the wall tiers at 10V:1H. Place wall in accordance with the manufacturer's recommendations. Place the begin and end of the wall within 1 foot of the station and 0.1 foot of the offset identified on the plan and profile sheets, unless otherwise approved by the CO.

BACKFILLING: Backfill simultaneously with the placement of the tiers. Compact each layer of the backfill material to unyielding (Section 209.10, Method 1) unless otherwise specified. Place the backfill material in layers not exceeding 12 inches (loose). The contractor shall decrease this lift thickness, if necessary to obtain compaction. Remove organic material and rocks greater than 6 inches in diameter from the backfill. Exercise care to avoid damaging the wire galvanizing (or other surface treatment, as applicable) during the compaction of the backfill. The CO may direct the contractor to replace wall elements damaged during the backfilling.

CONTRACTOR'S QUALITY CONTROL: Section 106 - Provide a quality control system that will ensure that construction required under this contract conforms to the contract requirements.

· Submit a quality control plan in writing to detail compaction testing on the foundation and the 1st six (6) feet of embankment construction.

· Use a state-certified laboratory for all testing provided under this contract.

· Submit the quality control plan and shop plans to the CO for approval a minimum of

14 days prior to construction. Follow the requirements specified in Section 153.03.

· Work is considered incidental to Item 25701.

RETAINING WALL NOTES

See Cross Sections for elevations

Overlap minimum of 24" at the ends and sides of adjoining sheets.

FOOTNOTES

4H:1V Slope

WALL REINFORCEMENT

Wall Height Min. Reinforcement Length

2.0' to 12.0'

12.1' to 14.0'

14.1' to 16.0'

10'

12'

14'

Min 1'

Native material

Existing bedrock

1.0'

Shoulder

1' Thick drain rock

(open graded)

1.0'

Place a minimum of 6" Foundation Fill

Min. 3-foot vertical/horizontal embedment into rock

3'

3'

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

TYPICAL ROAD SECTION

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

7 25

11.5'7.0'

Varies

0.0' to 4.0'

20.5'

1.0' min.

ditch

Drive lane

Vegetated shoulder

3%

Finished grade

Aggregate surface course, 8" compacted depth

3%

CL

m a x m a x

Existing surface

TYPICAL ROAD SECTION

NOT TO SCALE

1.0'

Shoulder

Recondition ditch

1.0'

Shoulder

Approx. 3'

S l o p e

1"

Bury depth per manufacturer's recommendations

4'±3"

NOTES:

1. Provide markers comprised of flexible, nonwarping, non metallic, durable plastic material that will be resistant to damage due to impact, ultraviolet light, ozone, hydrocarbons and other atmospheric weathering, and is resistant to stiffening with age.

2. Design post system for permanent installation to resist overturning twisting and displacement from wind, snow and impact forces.

3. Provide flexible guide post that is white in color.

4. Provide retro reflective sticker with a minimum width of

3-inches and length of 4-inches.

5. Place retro reflective sticker on front and back side of each marker.

Double unit retro reflective sheeting. White (w-1)

(see notes 5 & 6)

Flexible guidepost (see note 2)

Face of wall

Approx. 1'

FLEXIBLE MARKER DETAIL

NOT TO SCALE

m i n

10+00

11+00 12+00

13+00

13+26

P C

P T

CURVE DATA:

R=3451.06

L=306.82'

Δ =5°05'38"

2+00

3+00 3+53

10+00 11+00 12+00 13+00 13+26

.0

.2

3.96%

S T

A

E L

S T

S T

S T

PROFILE

PLAN

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 D

ES

IG

N.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

WALL PLAN & PROFILE

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

8 25

Finished grade at centerline

Existing surface at centerline

Existing surface at wall alignment

Begin road construction

STA 10+39.00

Match existing

End road construction

STA 12+30.00

Match existing

SCALE IN FEET

0 15 30

N

Wall alignment

Existing edge of gravel

Edge of gravel

Remove 10 feet from end of existing spillway pipe

C

P ft

Recondition ditch

Top of wall

Road STA 10+49 (16.5' RT)

Wall STA 2+00 (0' RT)

EL 1840.31'

Top of wall

Road STA 12+03 (16.5' RT)

Wall STA 3+54 (0' RT)

EL 1845.03'

Wall 2+00

EL 1834.34

Wall 2+26

EL 1830.00

Approx. limits bottom of wall

Min 3' embedment

(field verify)

Placed riprap class 2

See sheet 15

Install 24-inch spillway pipe

Install 24-inch pipe culvert, CMP

See sheet 9

G r a v e l

W i d t h

E x i s t i n g w i d t h

Place aggregate surface course

CP-2

CP-3

Wall 3+24

EL 1831.12

Placed riprap, class 2

See sheet 15

~154 ft, STA 14+80

Install pipe culvert

See sheet 10

Wall 2+51

EL 1830.00

Wall 2+76

EL 1834.05

Wall 3+01

EL 1834.05

Wall 3+54

EL 1841.92

Wall 3+13

EL 1831.12

Construction limits

Protect existing pipe culvert in-place

3' Min

(Typ)

2+00 3+003+03

2+00 3+00

PROFILE

PLAN

Install 24-inch pipe culvert, CMP

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 D

ES

IG

N.

DW

G

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

CULVERT PLAN &

PROFILE

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

9 25

Existing ground at culvert CL

STA 2+12.37

Invert EL 1842.50'

STA 2+47.36 Invert

EL 1840.85'

34' O F 24" C

M P

4.74%

SCALE IN FEET

0 10 20

N

Install spillway assembly

Install spillway assembly

Wall alignment

Edge of gravel

Existing edge of gravel

Placed riprap, class 2

See sheet 15

STA 2+68.27

Invert EL 1826.82'

10'

Finished grade

CL

FG = 1846.44

EG = 1846.45

Ditchline

Cut limits

Construction limits

Placed riprap, class 2

See sheet 15STA 2+25 CL Culvert

STA 12+18 CL FR 2700

Placed aggregate surface course

1M a x

Restrain cut slope face with

RECP, Type 4. Refer to

Section 713.17.

Refer to sheet 20 for treatment of cut slope at culvert inlet

2+00 3+00

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 D

ES

IG

N.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

CULVERT SITE PLAN

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

10 25

Project Site

Approx. STA 14+80 for culvert crossing.

Exact location to be determined by CO.

Estimated 36LF 24-inch pipe culvert, CMP

Estimated 24LF 24-inch spillway pipe, CMP

3 CY, Placed Riprap, Class 2 outfall

N

Not to Scale

Approximate location of culvert

PROFILE

TYPICAL

CULVERT AND SPILLWAY

PROFILE

Existing ground at culvert CL

24" C M

P @ approx. 2% steeper than existing road grade

Install spillway assembly

Placed riprap, class 2

See sheet 15

10'

Finished grade

CL

M a x

Restrain cut slope face with

RECP, Type 4. Refer to section 713.17.

Refer to sheet 20 for treatment of cut slope at culvert inlet

10+39.00

10+49.00

10+75.00

11+00.00

11+25.00

11+50.00

-20 0 20

-20 0 20

-20 0 20

-20 0 20

-20 0 20

-20 0 20

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 D

ES

IG

N.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

CROSS-SECTIONS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

11 25

3.0%

3.0%

7'

(Match existing)

11.7'

(Match existing)

6.2' 11.6'

FG = 1841.23

EG = 1841.23

3.0% 3.0%

(BEGIN WALL)

2.0% 2.0%

1' Typ 1' Typ

FG = 1840.82

EG = 1840.82

FG = 1842.04

EG = 1842.14

7'

Typ

11.5'

Typ

3.0% 3.0%

FG = 1844.34

EG = 1844.42

3.0%

3.0%

FG = 1843.57

EG = 1843.72

3.0% 3.0%

FG = 1842.81

EG = 1842.92

Min. 3'

(Typ)

Min. 3' (Typ)

11+75.00

11+90.00

12+25.00

12+30.00

12+03.01

-20 0 20

-20 0 20

-20 0 20

-20 0 20

-20 0 20

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 D

ES

IG

N.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

CROSS-SECTIONS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

12 25

3.0%

3.0%

FG = 1845.96

EG = 1845.95

7'

Typ

11.5'

Typ

3.0%

3.0%

FG = 1845.87

EG = 1845.87

3.0%

3.0%

FG = 1845.11

EG = 1845.11

3.0%

3.0%

FG = 1846.66

EG = 1846.65

2.0%

2.0%

FG = 1846.81

EG = 1846.81

5.7'

(Match existing)

13.1'

(Match existing)

1' Typ. 1' Typ.

6.1'

12.4'

MINIMUM

COVER

STEEL

FILL HEIGHT AND METAL THICKNESS TABLE

METAL ROUND PIPE CULVERT

MINIMUM

COVER

ALUMINUM

12 12

100 100

74 95

79 97

100 100

"x

" CORRUGATIONS

3"x 1" CORRUGATIONS 5"x 1" CORRUGATIONS

PIPE

SIZE

3"x 1" CORRUGATIONS

HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT

METAL THICKNESS IN INCH/GAGE METAL THICKNESS IN INCH/GAGE

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET

0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.079/14 0.109/12 0.138/10 0.168/80.064/16 0.135/100.105/120.075/140.060/16 0.135/100.105/120.075/140.060/16

INCHES

DIAMETER

INCHES

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET

INCHES

2-

"x

" CORRUGATIONS

NOTES:

1. When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.

2. The fill heights in the table are for helical lockseam and welded seam pipe only. Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe. Obtain approval before furnishing annular corrugated pipe.

3. Measure minimum cover from the top of the pipe culvert to the bottom of the Aggregate Base Course for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

PIPE CULVERT DETAILS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

13 25

Skew #90

90°

Road C

L

Ahead Station

SKEW DETAIL

Not to Scale

MINIMUM

COVER

STEEL

FILL HEIGHT AND METAL THICKNESS TABLE

METAL ROUND PIPE CULVERT

MINIMUM

COVER

ALUMINUM

12 12

100 100

74 95

79 97

100 100

"x

" CORRUGATIONS

3"x 1" CORRUGATIONS 5"x 1" CORRUGATIONS

PIPE

SIZE

3"x 1" CORRUGATIONS

HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT

METAL THICKNESS IN INCH/GAGE METAL THICKNESS IN INCH/GAGE

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET

0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.079/14 0.109/12 0.138/10 0.168/80.064/16 0.135/100.105/120.075/140.060/16 0.135/100.105/120.075/140.060/16

INCHES

DIAMETER

INCHES

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET

INCHES

2-

"x

" CORRUGATIONS

NOTES:

1. When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.

2. The fill heights in the table are for helical lockseam and welded seam pipe only. Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe. Obtain approval before furnishing annular corrugated pipe.

3. Measure minimum cover from the top of the pipe culvert to the bottom of the Aggregate Base Course for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

PIPE CULVERT DETAILS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

14 25

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

SPILLWAY ASSEMBLY

DETAILS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

15 25

1" ID X 2"

Aluminized pipe

7/8" X 3" Aluminized bolt with aluminized nut

1 1/4" Aluminized washers

BOLT DETAIL

5/8" Cable

Pipe anchor assembly plumb on ±12' center p i l l w a y t r a n s i t i o n

D o w n d r a i c o n s t r u c t e r s c t i o

Section 602

V a r i a b o p e

SPILLWAY ASSEMBLY WITH DOWN DRAIN

OUTLET ON NON-ERODIBLE MATERIAL

Existing ground

See bolt detail

1/2" Iron pipe stake

D c t i

D

SPILLWAY ASSEMBLY

D

NOTE:

1. Fabricate spillway assembly from annular or reformed ends. Use 0.064 inch galvanized steel or 0.060 inch of aluminum.

2. Make all banded connections water tight by placing

3/16 inch bead of approved caulking under each half of the band before tightening.

3. Approved alternate designs may be used.

4. See sheet 16 anchor assembly detail.

S p i l l w a y s e m b m i t s

5' (typ.)

(or as shown on plans)

10' (Typ.)

(or as shown on plans)

Centerline of drainage

Diameter of pipe (D)

A

A

1.5'

RIPRAP PLAN

Place riprap, class 2

(or as shown on plans)

18" min.

Anchor riprap into slope

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

SPILLWAY ASSEMBLY

DETAILS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

16 25

5/8" Cable clamp

Steel plate

Coupling band

Collar of 2" pipe or equal

8' X 1 1/2" Iron pipe stakes,

2.72 lbs/ft (min.)

ANCHOR ASSEMBLY

3/16"

NOTES:

1. All pipe stakes and hardware to be aluminized after fabrication.

2. Approved alternative pipe anchor assemblies may be used.

3. Place slope anchor assemblies on 20' max. centers on slopes 20% or greater.

4. Plate material to be ASTM A36. Aluminized after fabrication.

5/8" Cable

Culvert crown

Iron pipe stakes

V a r i a b o p e

METAL PIPE ASSEMBLY

Not to Scale

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

PIPE CULVERT

COUPLING DETAILS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

17 25

Pipe

Band

Pipe

Band

Fillet

Welds

Angle

Fillet Welds

7 per Angle

1/8" x 3/4" long

12"

" Min

" Min

2" Min

1"

12" ±

2" 4" 4" 2"

" Radius

Radius

1"

" x

" Hole

" Radius

93° ± 3°

1"±

" Min.

" Radius

" Radius

" Radius

Angle

Pipe

Band

Band

Pipe

12"

Angle

Flap

Angle

Pipe

Band

4"

" 2"

Max.

Band & Assembly

Tension Straps

Band

C

Pipe

L

1/2" Ø Bolts

1/2" Ø Bolts

3/8" Ø Rivets

1/2" Ø

Bolts

Flat Sheet same

Thickness as tension straps

See Sheet 3 for connection to band.

0.109 Min. thickness of

Zinc Coated Plate

Not to Scale

AMERICAN CULVERT BAND

FOR HELICALLY CORRUGATED STEEL

NORTHWEST CULVERT ANGLE ALTERNATIVE

FOR STEEL PIPE

HUGGER COUPLING BAND

FOR REFORMED END HELICALLY CORRUGATED WELDED SEAM STEEL PIPE

ONE PIECE FLAP BAND

FOR HELICALLY CORRUGATED STEEL OR ALUMINUM

ELEVATION

SECTION

ELEVATION

ELEVATION

ELEVATION

END VIEW

END VIEW

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

PIPE CULVERT

COUPLING DETAILS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

18 25

Pipe

Band

Pipe

Band

Fillet

Welds

1/2" Bolts

Angle

Width

ELEVATION

END VIEW

0.109 Min. thickness of

Zinc Coated Plate

" x

" Slots

(3 ea. required)

" Radius

Min. (Typ.)

Band

Width

Pipe

Rivets or Spot welds

" 2

" 2

" 2

2" 4" 4"

2"

12"

" dia. resistance spot weld (5 ea. piece)

2"

Pipe

Coupling

Coupling ties

Coupling ties

Band

ELEVATION

Pipe

END VIEW

1/2" Bolts

Pipe

Band

Width

Coupling

TOP VIEW

END VIEW

Not to Scale

ALTERNATE FOR 2x2x3/16 ANGLE

FOR STEEL PIPE

SPLIT COLLAR COUPLING

FOR ANNULAR CORRUGATED POLYETHYLENE PIPE

TWO PIECE INTEGRAL FLANGE

FOR HELICALLY CORRUGATED STEEL OR ALUMINUM PIPE

ANNULAR COUPLING BAND

FOR ANNULAR OR REFORMED END HELICALLY CORRUGATED STEEL OR ALUMINUM PIPE

HELICAL COUPLING BAND

FOR HELICALLY CORRUGATED STEEL OR ALUMINUM PIPE

NOTES;

1. Minimum width 4 corrugations, 2 on each culvert segment.

2. The opening of the coupling shall be within 15' of the top of the culvert.

NOTES;

1. Use 2x12x0.15 thickness 5052-H141 aluminum plate washer under bolt head and not on aluminum pipe flange.

2. Use 2x12x0.125 thickness galvanized steel plate washer under bolt head and put on steel pipe flange.

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

PIPE CULVERT

COUPLING DETAILS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

19 25

1. Metal Coupling Bands

These coupling bands meet the strength requirements for special

Joint Types under Non-erodible Soil Conditions, Table 2.23.3 of

AASHTO's "Standard Specifications for Highway Bridges".

For pipe walls and bands, the Specified Thickness for steel is given. For aluminum, the Specified Thickness is that for steel less the allowance for the zinc coating which is 0.003 to 0.004 of an inch per AASHTO M-36, M-196 and M-197.

The minimum specified Thickness for bands is two Specified

Thickness's less than that for the pipe, but in no case thinner than 0.064 inches, (0.060 for aluminum).

For pipe arches, use the same width band as for round pipe of equal periphery.

A two-piece band is required for pipe greater than 42 inches in diameter.

Tension straps may be connected to bands of plates with either spot or fillet welds that develop minimum required strength of strap.

For helically corrugated coupling bands, the connection angles may be oriented parallel to the pipe axis, provided connecting holes are slotted lengthwise sufficiently to allow adjustment for the helix angle.

Use 1 1/4 inch center to center gauge line dimension on attached angle leg for rivets and spot welds.

The Two Piece Integral Flange coupling band shall not be used on pipe arches.

Culvert bands shall be made of the same metal as the culverts being joined.

2. Polyethylene (PE) Couplings

Testing standards for Corrugated Polyethylene (PE) Pipe couplings have not been established nor have couplings been tested for shear or bending moment. Therefore, until further information is available, PE couplings shall be used only where bending moment and shear requirements are minimal. Typical situations are:

Where the slope of the culvert will not be more than 5%.

Where the fill below the culvert is less than 2 feet.

In areas of firm soils. This excludes marshes unless the bedding is specially designed and approved by the engineer.

3. Other

Couplings other than those shown on this drawing may be used upon submission of testing data (see 1-A above) and approval by the Engineer.

COUPLING CORRUGATION PIPE WIDTH SPECIFIED THICKNESS DIMENSION BOLTS ANGLE TO BAND

Annular and

Helical

One Piece

Flap Band &

Two Piece

Integral

Flange

American

Culvert

Band

Northwest

Culvert

Alternative

Hugger

Split

Collar

Thru 36

42-60

42-60

66-84

36-60

42-60

66-120

18-24

Thru 24

30-36

42-48

Thru 84

Thru 54

Thru 42

0.064-0.138

0.064-0.079

0.064-0.168

0.109-0.168

0.064-0.079

0.109

0.064-0.109

0.064-0.079

0.064-0.109

0.064-0.109

0.064-0.079

0.064-0.079

0.109

0.138

0.064-0.079

0.064

0.064-0.109

0.064-0.109

0.064

0.064

0.064

0.064

0.064-0.079

0.064

0.064

0.064-0.109

0.064-0.109

0.064-0.109

2x2x3/16

2x2x3/16

2x2x5/16

2x2x5/16

2x2x3/16

2x2x5/16

2x2x5/16

2x2x0.183

2x2x0.183

2x2x0.183

3-1/2

3-1/2

3-1/2

5-1/2

3-1/2

3-1/2

5-1/2

3-1/2

3-1/2

3-1/2

3-1/2

3-3/8

3-3/8

5-3/8

7-3/8

3-3/8

5-3/8

9-3/8

4-3/8*

7-1/8x3/4

5-1/2

5-1/2

5-1/2

5-3/16x3/4

Long Fillet

Long Fillet

Thru 48

36-48

54-60

66-84

36-66

72-84

61-120

10-1/2

10-1/2

10-1/2

10-1/2

10-1/2

10-1/2

10-1/2

0.064-0.109

0.138-0.168

0.079-0.168

0.109-0.168

0.064-0.109

0.109

0.109

0.064-0.109

0.079-0.109

0.064-0.109

0.109

0.064

0.079

0.109

Thru 24 See

Drawing per

AASHTO

M-294 per

AASHTO

M-294

2-2/3x1/2

(Steel or

Aluminum)

3x1 and 5x1

(Steel Only)

2-2/3x1/2

(Steel or

Aluminum) see Note 1-I

2-2/3x1/2

(Steel Only)

2-2/3x1/2

(Steel Only)

* Flap

Band

Only

Thru 84 12

0.064-0.168 0.064-0.109

5-1/2 Spot

TYPE

Inches

DIAMETER

Inches Inches

Pipe Wall Band

See Note 1-C

NO /

RIVETS

SPOT

DIAMETER

WELDS

BAR AND STRAP

NUMBER/

THICKNESS

BOLT

DIAMETER

BAR

DIAMETER

BAR YIELD

STRENGTH

P.S.I.

ANGLE

- See Note 1-H

One 0.079

One 0.109

Two 0.079

Two 0.109

Two 0.079

Two 0.079

Two 0.109

1/2

1/2

1/2

1/2

1/2

1/2

1/2

7/8

7/8

7/8

7/8

7/8

7/8

7/8

32,000

45,000

32,000

45,000

32,000

32,000

45,000

Metal Pipe

PE Pipe

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

A.

B.

C.

2-2/3x1/2

(Steel Only)

3x1

(Steel Only)

WELDS ANGLE

TO BAND

GENERAL NOTES

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

PIPE CULVERT

INSTALLATION DETAILS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

20 25

0.1 D Min.

12"12"

(D + 4') Minimum

GENERAL NOTES

TREATMENT OF DAMAGED SPELTER:

D

METAL THICKNESS AND GAGE TABLES

Steel

Zinc

Coated

Un-

Coated

Aluminum

Approx.

Gage

Metal Thickness in inches

0.064

0.079

0.109

0.138

0.168

0.188

0.218

0.249

0.0598

0.0747

0.1046

0.1345

0.1644

0.1838

0.2145

0.2451

0.27580.280

0.060

0.075

0.105

0.135

0.164

EMBANKMENT AND FOUNDATION SOIL CONDITION

Existing Fills, Regardless of Foundation Soils

New Embankment

Road

L

C

D

Cover

D

Embankment above this height shall be compacted as specified in spec. 203 or 306.

12"

MIN.

12"

MIN.

Maximum 6-inch compacted layers to density called for in the specifications. Bedding shall be suitable material uniformly compacted and shaped to fit the bottom of the pipe.

12" MIN.

The damaged or corroded ends of metal pipe to be extended shall be removed. If the damaged end is flame cut, the burned spelter on the galvanized pipe shall be wire brushed to clean metal and the area shall be painted with two coats of paint, high in zinc content, for repair of the galvanized surfaces.

Pipes shall be cambered as necessary to compensate for any anticipated settlement in the foundation or bed. Camber shall be on a parabolic curve with no point along the invert being higher than the invert at the inlet.

SETTLEMENT AND CAMBER:

CAMBER

1% of pipe length, not to exceed 3/4 of pipe span

One-half inch per foot of fill above top of pipe, 12" minimum or 3/4 D maximum.

D

D

D

D

12" MIN.

2' ±

Bedding shall be suitable material uniformly compacted and shaped to fit the bottom of the pipe

2 D or

12" MIN.

Embankment above this height shall be compacted as specified in Spec. 204.

Excavation for warping of slope will be included under roadway excavation

Normal cut slope

Original Ground

Slope at culvert station, as staked

As staked

Transition

5' (typ)

Transition

5' (typ)

Shoulder line

Top of cut slope

Normal ditch line

1' MIN.

1' min.

12" MIN.

Compact material placed in all layers to at least 95 percent of the maximum density. See Section 209.

COMPACTION

TYPICAL BACKFILL DETAIL

TREATMENT OF CUT SLOPE AT CULVERT INLET

ROCK FOUNDATION

YIELDING FOUNDATIONTYPICAL BEDDING MATERIAL

Not to Scale

Six inch compacted layers to density called for in the specifications

TYPICAL INSTALLATION OF EMBANKMENT

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

3 1 5:

HU

NT

ER

.E

NZ C

:\U

SE

RS

\H

UN

TE

R.

EN

Z\

DJ

&A , P

C\

AC

TI

VE

P

RO

JE

CT

S

- D

OC

UM

EN

TS

\69

.04 2 U

MP

QU

A

NF

D

IS

AS

TE

R

RE

LI

EF

P

RO

JE

CT

\D

RA

W

IN

GS

\D

W G\

CI

VI

L\ 2 D

ES

IG

N\

.04

2_

FR

M P

3.4 2 T

YP

IC

AL

S

EC

TI

ON

S

AN

D

DE

TA

IL

S.

DW

G

R6

PACIFIC NORTHWEST REGION

UMPQUA

NATIONAL

FOREST

DISASTER RELIEF

PROJECT 2022

UMPQUA NATIONAL

FOREST

FR 2700

MP 3.42

DOUGLAS COUNTY

DEWATERING

REQUIREMENTS DETAILS

03/2023

R. CLAY

H. ENZ

D. LAUTZENHEISER

6960.042

21 25

NOTES:

1. This sheet illustrates the possible dewatering methods and equipment and is not considered adequate or complete for this project.

2. Dewatering is the sole responsibility of the Contractor. Develop and submit to the CO a project-specific Dewatering Plan with the Excavation Plan for approval. At a minimum, the Dewatering Plan must include drawings and a written outline illustrating and describing proposed layout, methods, equipment and anticipated stream flow volume. Approval of the Contractor's Dewatering Plan does not relieve the Contractor from completing the work as required. If the Contractor's methods are not producing adequate results, the Contractor must re-evaluate and submit another Dewatering Plan. Re-submittal of the Dewatering Plan, if required, is incidental to the work.

3. Dewater excavations in accordance with FP-14 Sections 208, 209 and 157 and the requirements shown.

4. Contractor is responsible for sizing all pumps, dams, bypass pipe, open channels, and any other means proposed to divert the stream flow.

5. Soil erosion and sediment control measures specific to the Dewatering Plan must be in conformance with the project permits and shown in the Dewatering Plan.

NOT FOR

CONSTRUCTION

Contractor Submittal Required

SANDBAG DAM DETAILS

Anti-seep collar.

place anti-seep collar over membrane & pipe, then cut membrane to allow water through pipe.

6 mil plastic sheeting minimum

Bypass pipe

Impervious membrane key trench.

key membrane into trench before draping over sandbag dam

DAM PROFILE VIEW

Impervious membrane key trench, fill with clean gravel as needed to control seepage under impervious membrane

Impervious membrane

Sandbags

Bypass pipe 12"…