Install Native Plants on Fort Mason Northwest Embankment

GOGA

PMIS 225001

Solicitation # 140P8623Q0011

Specifications

December 22, 2022

RFQ 140P8623Q0011

Section J - Att No. 003

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line-Item No. 1 Delivery of container plants to Golden Gate National Recreation Area

B. Contract Line-Item No. 2 Removal of non-native invasive species

C. Contract Line-Item No. 3 Outplant nursery grown plants, water and mulch

D. Contract Line-Item No. 4 Maintenance watering

1. Option A Installation of erosion control

2. Option B Additional Watering

END OF SECTION 01 27 00

SECTION 011100 - SUMMARY OF WORK

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Government Furnished Materials.

3. Contractor use of the site

4. Contractor access and use of site

5. Work Restrictions.

6. Field Verification

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: The project location is at Fort Mason in San Francisco, CA. The Work consists of the following:

1. The Work includes: delivery of live plants to Fort Mason, mechanically removing non-native, invasive, and undesired species from the planting site prior to planting install erosion control, outplant live plants, install mulch, and provide maintenance watering.

2. A Schedule laying out project start and completion dates along with scope tasks shall be submitted.

1.3 GOVERNMENT-FURNISHED MATERIALS- Government shall provide 5,875 individual plants grown in the Presidio Native Plant nursery, delivered by the contractor.

1.4 CONTRACTOR USE OF SITE

A. The Contractor’s use of the premises is restricted to the designated work area. Materials and equipment must be stored inside the work area.

B. Staging Area: Contractor shall work with NPS to identify an appropriate staging area

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas as directed and approved by the

Contracting Officer, at no additional expense to the Government.

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed on roots and branches that interfere with the project.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Carefully supervise excavating, grading, filling, and other operations near trees to prevent damage.

D. Camp: Establishment of a camp within the park will not be permitted.

E. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

F. Contractor shall provide OSHA and other required postings regard safety at the site.

G. All Contractor employees and subcontractor employees shall be advised of the rules and regulations of the National Park Service.

H. Contractor and subcontractor vehicles not required on the worksite itself shall be parked in a location to be reviewed and approved by NPS.

I. Utilities to support activities by contractor:

1. Water: Contractor to install NPS approved backflow preventer and meter at NPS specified location.

Contractor will be billed monthly at rate of $65 per 1,000 gallons not to exceed 10,000 gallons per day.

Prior to using water, agreement between NPS and contractor must be signed. Billings are sent electronically via email, thus additional information from contractor is point of contact information to send billings and finally company tax ID number.

1.4 CONDUCT OF OPERATIONS

A. Contractor personnel shall comply with all Federal and State law and regulations, including the Golden

Gate National Recreation Area Superintendent’s Compendium. Any exception must be specifically justified and approved in writing by the Contracting Officer.

1. The Superintendent’s Compendium can be found at this internet address:

https://www.nps.gov/goga/learn/management/lawsandpolicies.htm

B. No signs or advertisements (except those specified herein) shall be displayed on the site or within the park unless approved by the Contracting Officer.

1.5 WORK RESTRICTIONS

A. On Site Work Hours: The 40-hour work week shall be generally performed during normal business working hours of 7 a.m. to 5:30p.m., Monday through Friday, except when available daylight does not permit such or otherwise indicated.

1. No onsite work shall be performed during federal holiday periods unless otherwise directed by the Contracting Officer.

2. Water and Wastewater Systems: The Contractor is not authorized to open/close valves, operate pumps and/or de-energize the water or wastewater system; An NPS USRO must do or be onsite to observe

1.6 FIELD VERIFICATION

A. Government provided planting plan layout should be field checked for accuracy of measurements.

SECTION 01 35 23 - SAFETY REQUIREMENTS

A. This section includes establishing an effective accident prevention program and providing a safe environment for all personnel and visitors. Refer to the GOGA Health and Safety Plan review checklist

(Section 2.1) for reference.

B. Site Specific Safety and Health Plan:

1. A Site Specific Safety and Health Plan shall be prepared covering on-site work to be performed by the contractor and all subcontractors.

2. The prime contractor shall be responsible for development, implementation, and oversight of the site specific plan. The site specific safety and health plan shall establish in detail, the protocols necessary for recognition, evaluation, and control of hazards associated with each task performed. The plan shall address site specific safety and health requirements and procedures based upon site specific conditions.

The level of detail provided in the site specific safety and health plan shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. The site specific safety and health plan shall address, in as much detail as possible, anticipated tasks, their related hazards, and anticipated control measures.

3. As work proceeds, the site specific safety and health plan shall be adapted to new situations and new conditions. Changes and modifications to the accepted site specific safety and health plan shall be made with the knowledge and concurrence of the safety office, site superintendent and Contracting Officer's

Technical Representative (COR).

1.2 SUBMITTALS

A. Site Specific Safety and Health Plan (SSSHP): After contract award and before the Pre-Work conference, submit for review a Site Specific Safety and Health Plan. The Contracting Officer (CO) will review the proposed Plan. If the plan requires any revisions or corrections, the Contractor shall resubmit the Plan within 10 days. No field work will be allowed until Plan is accepted.

Two specific areas are highlighted below that must be addressed in the SSSHP and the SSSHP shall address appropriate training for all workers with any potential for exposure to either:

Hazardous Materials: The project site was tested for limited hazardous materials and contaminated soil and the full lab results are included in this package. Highlights of the results include the following:

Both sides of the embankment (west and east of the stairs) had elevated levels of lead for terrestrial receptors but below residential receptors.

Both sides have trace levels of PAHs, all below residential and terrestrial CA ESLs.

The west side of the embankment (sample 001) had elevated levels of dieldrin, a pesticide. There were no detections of dieldrin on the east side (sample 002). Sample 001 had dieldrin detection of 0.046 ppm. CA

ESL for residential receptors is 0.037 ppm and 0.00094 for terrestrial. Dieldrin ESL for "construction worker" is 1.1 ppm

Both samples also had DDT detections above terrestrial ESLs. Samples 001 was at 0.0067 ppm and samples 002 was at 0.0024 ppm. Residential limit is 1.9 ppm and terrestrial is 0.001 ppm.

Steep Site: Grades on the site are quite steep with drop offs adjacent an asphalt parking lot. Use of a temporary sand ladder may be appropriate for the duration of the project.

1.3 QUALITY ASSURANCE

A. Comply with contract clauses entitled "Accident Prevention" and "Permits and Responsibilities". In case of conflicts between Federal, State, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites.

Failure to comply with the requirements of this section and related sections may result in suspension of work.

B. Qualifications of Employees:

1. If hazardous materials or contaminated soils are present, all employees must have the level of HAZWOPER training appropriate for the potential for contact with hazardous materials during the performance of their work.

2. All employees must be physically qualified and able to perform their assigned duties in a safe manner.

3. Do not allow employees to perform work whose ability or alertness is impaired because of prescription or illegal drug use, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

4. Operators of vehicles, hoisting equipment, and hazardous equipment shall be able to understand signs, signals, and operating instructions, and be fully capable of operating such equipment. Provide operating instructions for all equipment. Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.

Retain copies of all operators’ licenses and/or certifications onsite.

1.4 ACCIDENT REPORTING

A. Reportable Accidents: (per OSHA 29CFR 1904) A project reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, fires, and property damage by accident in excess of $100. Notify Park Dispatch at 911 or 415-561-5656 to report the accident and request emergency assistance. In addition, Contractor will notify the Contracting Officer immediately in the event of a reportable accident. Within 7 days of a reportable accident, fill out and forward to Contracting

Officer an Accident/Property Damage Report (Form CM-22). Form may be obtained from the

Contracting Officer.

PART 2 – PRODUCTS

2.1 SITE SPECIFIC SAFETY AND HEALTH PLAN (SSSHP)

A. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:

1. Name of responsible supervisor to carry out the program.

2. Weekly and monthly safety meetings.

3. First aid procedures including location of nearest emergency room / urgent care facility.

4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and

Contractor's employees. Identify the work included under each phase.

5. Training, both initial and continuing.

6. Planning for possible emergency situations, such as floods, fires, cave-ins, slides, explosions, power outages, and wind storms. Such planning shall take into consideration the nature of project, site conditions, and degree of exposure of persons and property.

B. Provide adequate facilities for the number of employees and the hazards associated with the types of ongoing work at the site.

2.2 PERSONNEL PROTECTIVE EQUIPMENT

A. Meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926.95

Subpart E.

PART 3 – EXECUTION

3.1 EMERGENCY INSTRUCTIONS

A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

3.2 FIRE AND LIFE SAFETY

A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and

Demolition Operations).

B. Store hazardous materials in accordance with manufacturer’s and OSHA recommendations. Maintain readily available, on site, MSDS for each chemical.

1. Immediately report all spills of hazardous materials to the park.

2. Maintain a spill emergency response kit.

3. Train employees how to respond to a spill and use the emergency response kit.

3.3 PROTECTIVE EQUIPMENT

A. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair personal items, as appropriate, before issuing them to another individual.

B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation. Retain inspection documentation onsite.

3.4 SAFETY MEETINGS

A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the

Contracting Officer within one day after the meeting.

B. Conduct monthly safety meetings for all levels of supervision. Meetings shall be attended by all contractors and subcontractors performing work on the site. Notify the Contracting Officer of meeting dates and times. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe project activities, and for updating the Site Specific Safety and Health Plan. The Contracting Officer will attend the meeting and enter the results of the meetings into the daily log. These meetings can be incorporated into weekly site meetings with the approval of the CO.

3.5 HARD HATS AND PROTECTIVE EQUIPMENT AREAS

A. A hard hat area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.

B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment at all times.

3.6 TRAINING

A. First Aid: Provide adequate training to an adequate number of personnel to ensure prompt and efficient first aid.

END OF SECTION 01 35 23