Section_J_-_Att_No__002_SOW.pdf
PDF 18 MB Posted
- Attached to
- GOGA INSTALL NATIVE PLANTS AT FORT MASON
- Solicitation number
- 140P8623Q0011
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Golden Gate National Recreation Area
PMIS 225001
Install Native Vegetation on Fort Mason Northwest Embankment
Scope: In accordance with the terms and conditions of the contract, the contractor shall perform the work of this contract for the National Park Service (NPS) for work conducted in Golden Gate National Recreation Area (GOGA) as described below. The contractor will be asked to perform all the following tasks: delivery of live plants to Fort Mason, mechanically removing non-native, invasive, and undesired species from the planting site prior to planting, install erosion control, install mulch, out plant live plants, and provide maintenance watering.
Confidentiality: The information developed under this contract is the property of the U.S.
government and shall be kept in strict confidence.
Performance Period: From time of award to July 30, 2023.
Project Identification: The work of this contract shall consist of the services described below for the project referred to as Install Native Vegetation on Fort Mason Hillside for Improved Viewshed.
Contacts:
• Contracting Officer (CO): Patty Payne, patty_payne@nps.gov 559.730.6435
• Contracting Officer’s Representative (COR): Amy Hoke, amy_hoke@nps.gov
415.622.6511
1.0 GENERAL DESCRIPTION OF WORK
This contract will provide the delivery of 5,875 native containerized plants; install 5,530 plants, mulch and watering; mechanical removal of non-native, invasive, and/or undesired species; maintenance watering; Option A installation of erosion control material (wattles and blankets), and Option B additional maintenance watering of installed plants.
Out planting of containerized plants is expected to occur in a time window of January 16, 2023 to March 31, 2023 based on weather condition. Non-native, invasive, and/or undesired species removal by mechanical means will occur prior to installation of container plants. Maintenance watering of plants will occur a total of four times within 60 days of planting, based on weather conditions. Maintenance Watering should occur approximately 15, 30, 45 and 60 days after planting is completed. If Option B is awarded, watering will occur at approximately 75, 90, 105, and 120 days following planting, depending on weather conditions.
Due to high use of the adjacent areas, all work must be conducted Monday through Friday;
no work on weekends or holidays.
RFQ 140P8623Q0011
Section J - Att No. 002 mailto:amy_hoke@nps.gov
SCOPE OF SERVICE
TASK 1. Delivery of container plants to Golden Gate National Recreation Area
The contractor will pick up 5,875 live plants at Presidio Nursery, 1249 Appleton St, San Francisco, CA 94129, and deliver to the planting site at Fort Mason, San Francisco in Golden Gate National Recreation Area. There are 125 6.5 cubic-inch leach tubes (SC7) and 5,850 16 cubic-inch deep pots (DP16). Plants shall not be damaged in transport.
Planting and Storage Specifications:
• Delivery and planting will occur between.
• Delivery date(s) must be the same as installation date(s). Dates will be based on weather conditions and agreed upon by the COR and contractor.
• Plants cannot be delivered prior to the date of planting; delivery trips on multiple days might be required.
• Plants must be kept in shaded area out of wind at planting site until time of installation.
TASK 2. Removal of non-native, invasive species
The contractor shall remove all non-native, invasive plant species from approximately 86,500 square feet of area before planting live plants. The contractor will remove vegetation of non-native species using only mechanical means (e.g., hand pull, hoe, shovel, chopper, string trimmer).
Non-native, invasive plants shall be:
• Removed no more than 7 days prior to planting of nursery grown materials on a date to be determined by the contractor and COR based on plant phenology and weather.
• Work shall occur prior to seed set for all species.
• All plant material removed by the contractor shall be removed from the park. The
Presidio Green Waste yard may be utilized for free to low-cost disposal.
Arrangements must be made by COR.
Target species to be removed; other species may be added to the removal list based on which species are present at the time of treatments:
Tall fescue (Festuca arundinaceae) Fennel (Foeniculum vulgare) Poison hemlock (Conium maculatum) Wild carrot (Daucus carota) Kikuyu grass (Pennisetum clandestinum) Panic veldt grass (Ehrharta erecta) Purple velvet grass (Holcus lanatus) Himalayan blackberry (Rubus discolor) Field marigold (Calendula arvensis) Harding grass (Phalaris aquatica)
RFQ 140P8623Q0011
Wild radish (Hirschfeldia sp.)
Wild mustard (Brassica sp.)
Thistle species (Cirsium vulgare, Silybum marianum, Carduus pycnocephalus) Bermuda buttercup (Oxalis pes-caprae)
TASK 3. Outplant nursery grown plants, water, and mulch
The contractor shall outplant 5,530 government provided, nursery grown plants. Planting locations will be according to the provided written plan (Table 1) and map (Attachment 1). Wood chip mulch shall be applied at a depth of 2-3". Contractor to provide planting, watering and mulch plans.
Table 1
LOCATION
Sq Ft
# of plants
LC
LA
EE
BP
AM
EL
FC
DA
EG
LC
A 1348 86 65 9 13
B 1210 68 68
C 1224 68 41 27 41 D 1023 52 36 16
E 1119 68 51 7 10
F 1047 68 68 68 G 1202 68 68
H 1269 75 45 30 45 I 1252 76 53 23
J 2694 161 161 161 K 1448 86 65 9 13
L 1426 85 51 34 51 M 1784 114 80 34
N 4329 279 279 279 O 2766 188 19 56 113
P 1406 86 65 9 13
Q 1630 105 105
R 1848 114 57 57
S 2050 126 50 76
T 1744 105 42 63
U 2605 161 81 81
V 2780 188 113 75 113 W 1976 127 95 13 19
X 1840 114 80 34
Y 2728 188 188 188 Z 1351 85 85
AA 1495 86 65 9 13
BB 3565 230 161 69
CC 4424 295 177 118 177
DD 2495 161 121 16 24
EE 1962 126 126
FF 3893 247 247 247
GG 2985 188 113 75 113
HH 2314 150 105 45
II 2117 137 96 41
JJ 14028 969 194 775 194
TOTAL 86377 5530 1676 1135 1156 525 226 299 113 262 139 1676
Excess plants delivered, but not planted, shall be turned over to the Project Manager at the end of the planting phase.
Planting requirements:
• Plant in weed-free prepared planting beds.
• Over-excavate each planting hole by at least 1.5 times the width of the plant and 3 inches deeper than the depth of the plant to be planted.
• Assure planting holes accommodate the full depth of the root mass, no “J-root” planting or twisting of the root mass to accommodate small holes is allowed.
• Pre-water hole to pack and moisten soil before planting plant (per the Quality
Standards below).
• Backfill holes after planting. Pack soils around plants to minimize air pockets.
• Within 6 hours or less after planting, apply water to each plant to provide moisture and to ensure no macro or micro air pockets exist in the planting hole. Watering should be done with three gallons of water per plant, spaced over several time intervals to allow water to penetrate and fill in around the newly planted plant.
• Park provided water may be obtained on site.
• Create a “shelf” at each plant so that the downhill and uphill edges of the plant are equally covered with soil.
• All empty planting containers shall be returned to Presidio Nursery.
• No additional soil can be brought into the park.
• After nursery grown plants have been install, a 2-3-inch layer of mulch wood-chips will be evenly distributed over the entire planting area to aid with moisture retention and wind damage to plants.
The species of nursery grown plants, with abbreviations used in Figure 1:
AM Achillea millefolium BP Baccharis pilularis DA Diplacus aurantiacus EE Ericameria ericoides EG Erigeron glaucus EL Eriogonum latifolium FC Fragaria chiloensis LA Lupinus arboreus LC Lupinus chamissonis
SEE Attachment 1 Planting Plan layout to be field verified by contractor for accuracy of measurements.
Discrepancies to be brought to the attention of the COR.
TASK 4. Maintenance watering
The contractor will water the plants four additional times after planting. Watering will occur approximately 15,30, 45 and 60 days after planting, depending on local weather. Park staff will monitor weather conditions and provide contractor with 2-weeks’ notice of desired watering date.
• The Contractor shall submit a watering plan for COR approval as part of the bid proposal. The plan shall include method of transporting water from fill location, and method for watering individual plants, and estimated gallons per plant.
• Each plant must be watered using enough water to reach the lowest roots.
• Water shall be applied in short intervals to allow water to move through the soil column and prevent washing topsoil away from root crown.
• Each plant must be individually using hose or bucket. Flood and broadcast irrigation or use of a lawn-type sprinkler is not permitted.
Water will be provided by the government at a location near the planting site, $65/1,000 gallons. The contractor shall use clean equipment free from herbicides, pesticide residue, and soils/ invasive plants seeds.
Option A Installation of erosion control
The contractor shall install weed free fiber rolls according to the specifications found in Attachment 2, SE-5 Fiber Rolls and erosion control blanket found in Attachment 3, Geotextiles and Mats.
Option B Additional watering
Following specifications for Maintenance watering, contractor shall provide a unit price for additional watering.
3.0 Schedule / Order of Operations
• Removal of Invasive Plants
• Installation of erosion control if awarded
• Delivery of Plants to GOGA
• Plant, mulch, water
• Ongoing Maintenance Watering if awarded
4.0 QUALITY STANDARDS
Quality standards shall be in accordance with the base contract and as described below.
GENERAL REQUIREMENTS
All equipment shall be clean, free from soils and invasive species seeds.
Includes all gloves, hand tools, tanks, hoses, and truck beds. Vehicles and equipment may be inspected by COR prior to entry to the work site.
Contractor shall be responsible for any damage to government property.
Contractor is responsible for employee safety. The project areas are adjacent to public roads. Signage will be required to alert the public to work zones. When signage is used, it will be relocated as the work site changes.
Safety practices and signage will conform to state and federal regulations.
Contractor is responsible for a clean worksite. Any debris or garbage generated on site is to be removed each day.
1. Delivery Timing: The Contractor shall work in conjunction with the COR and park staff to ensure that the delivery date/timing is agreeable to all parties.
2. Conformance with State Law: The Contractor shall follow state plant transfer laws and assure safe, legal, and prompt delivery of the container plants to Golden Gate National Recreation Area.
3. Transport Vehicle: Vehicles and equipment used to transport the container plants shall be clean (i.e., free of soil, plant parts, and pests) prior to loading plants to prevent the spread of disease/pathogens and non-native plants. The transport vehicles shall also provide protection for the plants to prevent any damage or dehydration.
4. Transport Handling: During transport from the nursery to the planting site the containers will be handled carefully, not dropped, tossed, or otherwise roughly handled. Do not stack plants on top of other plants.
5. Temporary Storage: The Contractor shall ensure that plants are stored in areas protected from wind and full sun and that container soil is thoroughly moistened. Plants should not be delivered to site prior to day of planting. Plants cannot be returned to nursery once removed.
CONTAINER PLANT INSTALLATION
1. Weed Prevention Protocol: Ensure all vehicles, gear, tools, equipment, personnel (e.g., clothing, boots, laces) Personal Protective Equipment, etc.
involved with or otherwise used. in project installation arrive to the project site clean and free of off-site soil and organic debris.
2. Planting Specifications: All container plants shall be planted in accordance with the following specifications:
• Immediately prior to planting plants shall have thoroughly moistened soil.
• All planting holes shall have vertical sides with roughened surfaces and be a minimum of one and one-half (1.5) times the diameter and a minimum of 3 inches deeper than the depth of the plant’s container.
• Damage to surrounding native plants shall be minimized.
Excessive digging, trampling and piling soil removed from planting holes is not allowed.
• Any roots wrapped around the sides of the containers shall be pulled loose from the root balls. Plants shall be planted with the roots untangled and laid out in the planting holes to promote good root growth and prevent the plants from becoming root bound.
• Roots shall be adequately protected from the sun and/or drying winds. Plants shall not be removed from their containers until immediately before planting. The container shall be removed in a manner that does not damage the root ball or plant.
• After excavation and before planting, the planting holes shall be filled with water. Holes shall be allowed to drain thoroughly before planting to reduce settling.
• Plants shall be set in the thoroughly drained planting holes so that the crowns of the root balls are flush with finished grade when backfilled with soil. The soil around the planting shall be tamped down sufficiently to eliminate any air pockets in the soil. The crowns of the plants shall not be depressed.
• A watering basin 3-5 inches in diameter shall be constructed around each plant in a manner that causes the least amount of disturbance to the surrounding area.
• Each plant shall be individually watered at the time of planting with sufficient water to reach the lower roots. Special care must be taken to prevent the soil from washing away from the roots and the root crown from being buried with soil.
WATERING
1. Damage Control: The Contractor shall ensure that watering efforts shall not damage or destroy native vegetation, nor create/lead to erosion impacts in either the planting or surrounding areas.
2. Methods: If the Contractor wishes to deviate from the watering plan, the changes must be submitted in writing to the COR for approval. Note:
Contractor to install NPS approved backflow preventer and meter at NPS specified location. Contractor will be billed monthly at rate of $65 per 1,000 gallons. Prior to using water, agreement between NPS and contractor must be signed. Billings are sent electronically via email, thus additional information from contractor is point of contact information to send billings and finally company tax ID number.
EQUIPMENT CLEANING AND PHYTOPHTHORA PREVENTION STANDARDS
Clean all vehicles, equipment and tools before entry into the park at the beginning of the project and after any time vehicles, equipment or tools have been used at any other project site. All vehicles, equipment and tools shall be free of mud, weeds, weed seed, plant materials and other harmful substances upon entry into Golden Gate National Recreation Area. All vehicles, equipment and tools will be inspected before their entry into Golden Gate National Recreation Area. Contractor must provide Park staff with 24 hours’ notice of need for inspection.
Shoes must be cleaned and sanitized upon arrival at, and departure from, the Marin Headlands Native Plant Nursery. Any tools brought into the nursery must also be sanitized. Materials to sanitize boots will be provided by the Marin Headlands Nursery.
REMOVAL OF NON-NATIVE, INVASIVE, AND/OR UNDESIRED PLANT SPECIES
Mechanical removal is the appropriate use of “weed wrenches”, shovels, picks, Pulaskis, saws, machetes, or similar hand tools or, with approval from the Project Manager, brushcutters, chainsaws, string trimmers or similar hand-operated machinery to treat invasive plants. Care should be taken to minimize soil disturbance beyond extracting the target plants.
AMac Line
AMac Text Box
AMac Text Box
HILLSIDE PLANTING PLAN
SHEET 1 OF 2
11/30/2022
AMac Area Measurement 1,348 sf
AMac Area Measurement 1,210 sf
AMac Area Measurement 1,224 sf
AMac Area Measurement 1,023 sf
AMac Area Measurement 1,119 sf
AMac Area Measurement 1,047 sf
AMac Area Measurement 1,202 sf
AMac Area Measurement 1,269 sf
AMac Area Measurement 1,252 sf
AMac Area Measurement 2,694 sf
AMac Area Measurement 1,448 sf
AMac Area Measurement 1,426 sf
AMac Area Measurement 1,784 sf
AMac Area Measurement 2,766 sf
AMac Area Measurement 1,406 sf
AMac Area Measurement 1,630 sf
AMac Area Measurement 1,848 sf
AMac Area Measurement 1,744 sf
AMac Area Measurement 2,605 sf
AMac Area Measurement 2,780 sf
AMac Area Measurement 1,976 sf
AMac Area Measurement 1,840 sf
AMac Area Measurement 2,728 sf
AMac Area Measurement 1,351 sf
AMac Area Measurement 1,495 sf
AMac Area Measurement 3,565 sf
AMac Area Measurement 4,424 sf
AMac Area Measurement 2,495 sf
AMac Area Measurement 1,962 sf
AMac Area Measurement 3,893 sf
AMac Area Measurement 2,985 sf
AMac Area Measurement 4,329 sf
AMac Area Measurement 2,050 sf
AMac Text Box
PLANTING LEGEND:
AMac Text Box 100% Chamisso's bush lupine (Lupinus chamissonis)
60% Chamisso's bush lupine (Lupinus chamissonis) 40% Yellow Bush Lupine (Lupinus arboreus)
100% Mock Heather (Ericameria ericoides)
75% Coyote Brush (Baccharis pilularis) 15% Coast Buckwheat (Eriogonum latifolium) 10% Yarrow (Achillea millefolium)
50% Yarrow (Achillea millefolium) 50% Coast Buckwheat (Eriogonum latifolium)
60% Beach Strawberry (Fragaria chiloensis) 30% Coast Buckwheat (Eriogonum latifolium) 10% Yarrow (Achillea millefolium)
70% Mock Heather (Ericameria ericoides) 30% Orange Bush Monkeyflower (Diplacus aurantiacus)
60% Seaside Daisy (Erigeron glaucus) 40% Mock Heather (Ericameria ericoides)
AMac Rectangle
AMac Rectangle
AMac Rectangle
AMac Rectangle
AMac Rectangle
AMac Rectangle
AMac Rectangle
AMac Rectangle
AMac Image
AMac Area Measurement 2,314 sf
AMac Area Measurement 2,117 sf
AMac Text Box
TRIANGLE PLANTING PATTERN:
AMac Text Box A
AMac Text Box B
AMac Text Box C
AMac Text Box D
AMac Text Box E
AMac Text Box F
AMac Text Box G
AMac Text Box H
AMac Text Box I
AMac Text Box J
AMac Text Box K
AMac Text Box L
AMac Text Box M
AMac Text Box N
AMac Text Box O
AMac Text Box P
AMac Text Box Q
AMac Text Box R
AMac Text Box S
AMac Text Box T
AMac Text Box U
AMac Text Box V
AMac Text Box W
AMac Text Box X
AMac Text Box Y
AMac Text Box Z
AMac Text Box
AA
AMac Text Box
BB
AMac Text Box
CC
AMac Text Box
DD
AMac Text Box
EE
AMac Text Box
FF
AMac Text Box
GG
AMac Text Box
HH
AMac Text Box
II
AMac Text Box +0
AMac Text Box W+20
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Ellipse
AMac Text Box W+80
AMac Text Box W+130
AMac Text Box W+153
AMac Text Box W+192
AMac Text Box W+232
AMac Text Box W+272
AMac Text Box W+312
AMac Text Box W+352
AMac Text Box W+392
AMac Text Box E+20
AMac Text Box E+46
AMac Text Box E+72
AMac Text Box E+112
AMac Text Box E+144
AMac Text Box E+178
AMac Text Box E+161
AMac Ellipse
AMac Text Box E+221
AMac Text Box E+272
AMac Text Box E+321
AMac Text Box E+367
AMac Text Box E+424
AMac Length Measurement 35 ft
AMac Length Measurement 26 ft
AMac Length Measurement 31 ft
AMac Length Measurement 31 ft
AMac Area Measurement 14,028 sf
AMac Text Box
PLANTING LEGEND:
AMac Text Box 80% Chamisso's bush lupine (Lupinus chamissonis) 20% Yellow Bush Lupine (Lupinus arboreus)
AMac Rectangle
AMac Text Box
HILLSIDE PLANTING PLAN
SHEET 2 OF 2
11/30/2022
AMac Text Box
JJ
Appendix C - BMP Handbook
RFQ 140P8623Q0011
Section J - Att No. 002
Fibre Rolls GOGA Changes and Additions to BMP Fiber rolls must be made of clean, weed- and seed-free biodegradable material. Products marketed as "photodegradable" are generally not biodegradable, and are not allowed within the park.
The disposition of removed sediment must be approved by GGNRA.
Fiber Rolls GOGA Changes and Additions to BMP Fiber rolls must be made of clean, weed- and seed-free biodegradable material. Products marketed as "photodegradable" are generally not biodegradable, and are not allowed within the park.
The disposition of removed sediment must be approved by GGNRA.
RFQ 140P8623Q0011
Section J - Att No. 002
Fiber Rolls GOGA Changes and Additions to BMP Temporary soil stabilization such as fiber rolls filled with seed free rice straw or other similar materials shall be used to protect slopes prior to installation of permanent slope planting, as shown on the Contract Documents. Plastic netting is not allowed. Trenching for installation of fiber rolls shall be limited to a maximum depth of 2-inches. No field assembly of fiber rolls will be allowed. Roll sections will be overlapped by no less than 18-inches. Where large diameter fiber rolls are required stacks of smaller rolls will not be used. See BMP SE-5 (fiber rolls) in Section IX for additional information. Temporary soil stabilization practices must be in place or available on site to be put in place at any time, even during the dry season to protect the water quality in the San Francisco Bay. The Contractor will be responsible for repairing the ground where temporary soil stabilization practices cause rills or gullies.
Fiber Rolls GOGA Changes and Additions to BMP Temporary soil stabilization such as fiber rolls filled with seed free rice straw or other similar materials shall be used to protect slopes prior to installation of permanent slope planting, as shown on the Contract Documents. Plastic netting is not allowed. Trenching for installation of fiber rolls shall be limited to a maximum depth of 2-inches. No field assembly of fiber rolls will be allowed. Roll sections will be overlapped by no less than 18-inches. Where large diameter fiber rolls are required stacks of smaller rolls will not be used. See BMP SE-5 (fiber rolls) in Section IX for additional information. Temporary soil stabilization practices must be in place or available on site to be put in place at any time, even during the dry season to protect the water quality in the San Francisco Bay. The Contractor will be responsible for repairing the ground where temporary soil stabilization practices cause rills or gullies.
| Statement of Work221221 |
| Contacts: |
| 1.0 GENERAL DESCRIPTION OF WORK |
| SCOPE OF SERVICE |
| TASK 1. Delivery of container plants to Golden Gate National Recreation Area |
| TASK 2. Removal of non-native, invasive species |
| TASK 3. Outplant nursery grown plants, water, and mulch |
| Table 1 |
| TASK 4. Maintenance watering |
| Option A Installation of erosion control |
| Option B Additional watering |
| 3.0 Schedule / Order of Operations |
| 4.0 QUALITY STANDARDS |
| GENERAL REQUIREMENTS |
| CONTAINER PLANT INSTALLATION |
| WATERING |
| EQUIPMENT CLEANING AND PHYTOPHTHORA PREVENTION STANDARDS |
| REMOVAL OF NON-NATIVE, INVASIVE, AND/OR UNDESIRED PLANT SPECIES |
| Attachment 1 FOMA Planting Plan FINAL |
| Attachment 2 SE-5 Fiber_Rolls_FINAL_Handbook_Stormwater Management_021210 |
| Attachment 3 Geotextiles and Mats |
File details come from the government source that posted it. Updated .