Section_J_-_Att_No__002_SOW.pdf
PDF 712 KB Posted
- Attached to
- LANDSCAPING SERVICES IN AQUATIC PARK Federal contract opportunity
- Solicitation number
- 140P8623Q0053
About this file
This document is a scope of work for landscaping services at the Long Bed Area in Aquatic Park for the San Francisco Maritime National Historical Park. The project requires removing existing plants and installing new plants, irrigation, mulch and other landscaping elements in three designated ornamental planting beds. Sixty-six plants will be removed and replaced in one area, and thirty-two dead plants will be removed and replaced in another area. All work must be performed by a licensed California landscape contractor and adhere to specifications provided. The contractor will be responsible for daily cleanup, traffic control, tool storage, and safety plans. A one-year plant guarantee is required. The related federal contract opportunity is solicitation number 140P8623Q0053 for landscaping services in Aquatic Park issued by the National Park Service Pacific West Region of the Department of the Interior.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8623Q0053_Amd_0003.pdf | ||
| Section_J_-_Att_No__007_Photo_0003.pdf | ||
| Sol_140P8623Q0053_Amd_0002.pdf | ||
| Section_J_-_Att_No__006_Site_Visit_Log_0002.pdf | ||
| Sol_140P8623Q0053_Amd_0001.pdf | ||
| Section_J_-_Att_No__004_SCA_WD_2015-5637_Rev_23_12_27_2022.pdf | ||
| Section_J_-_Att_No__003_Planting_Plan_Long_Bed_East_Drawing.pdf | ||
| Section_J_-_Att_No__005_Experience_and_PP_Form.pdf | ||
| Section_J_-_Att_No__001_Quote_Sheet.pdf | ||
| Sol_140P8623Q0053.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
SAN FRANCISCO MARITIME NATIONAL HISTORICAL PARK
Provide Landscaping Services at the Long Bed Area in Aquatic Park
May 3, 2023
PART 1: GENERAL
1.1 DESCRIPTION
This project is required to improve a total of 3 designated ornamental planting beds known as the “Long
Beds” area in Aquatic Park.
This work includes all purchases, delivery, labor, installation, and allied efforts in accordance with this document. Along with this document are two corresponding drawings/specifications to adhere to for this work.
The day-to-day operations and public use within the park will continue during this work. The contractor shall use adequate fencing/barriers to keep the public and employees safe from work activities and to keep public out of these areas until work is complete. This work is to be performed by a landscape contractor licensed in the State of California (www.cslb.ca.gov/About_Us/Library/Licensing_Classifications/C-27_-
_Landscaping.aspx).
1.2 GENERAL CONDITIONS AND INFORMATION
A. Aquatic Park is owned by the Department of the Interior, and its agency the National Park
Service (NPS) and is maintained by San Francisco Maritime National Historical Park (SAFR). Care must be taken to protect the historic fabric that is adjacent to all work sites. Any damage to the historic fabric will be repaired/replaced in-kind and at the Contractor’s expense.
B. The specifications, drawings and particulars described are given for guidance to the Contractor.
However, the Contractor is to take his/her own measurements, dimensions and counts to perform all work indicated, and are responsible for the same.
C. All work described in this specification is for the improvement of the designated ornamental planting beds in Aquatic Park and shall be accomplished in accordance with the provisions of the NPS
Contract, Scope of Work and specifications. Additional work that will result in additional cost shall be carried out only when authorized in writing by the Contracting Officer.
D. On a daily basis, the Contractor shall be responsible for removing and disposing of any debris from the work areas of Park that is generated by the Contractor.
E. All disturbed surfaces shall be cleaned and restored to the original appearance by the Contractor.
F. The Contractor shall immediately notify the Contracting Officer of any ambiguities, inconsistencies and errors discovered in this specification or between contracting documents and existing conditions.
RFQ 140P8623Q0053
Section J - Att No, 002
PART 2: SCOPE OF WORK/ SERVICES, ADDITIONAL RERQUIRMENTS,
CLARIFICATIONS AND INFORMATION
2.1 SCOPE OF WORK/SERVICES
The Contractor must field verify all new and existing dimensions indicted in this contract, the work site(s), the specifications, and the drawings before ordering materials and/or performing work.
For the planting beds listed below, the following work is to be performed in line with this contract, and any specifications and drawings provided.
BASE: Specifications for this pertain only to the drawing entitled, “Long Bed – East”.
Clear, Grub, Stump Grind and Removal: The contractor shall remove and dispose of all trees, stumps, roots, shrubs, grass, weeds, fallen timber and other surface litter, in this planting bed area. In addition to existing visible planting material, the contractor shall remove old stumps and plant material (including roots) prior to installing new plantings.
Grading: After plant material is removed, each area shall be finish graded and made ready for plant installation. The grade shall be minimally higher towards the center and sloped towards all edges to ensure positive drainage and discourage a standing water condition. The contractor may need to add up to five yards of garden soil to create the correct slope. For quality assurance, the contractor must provide a submittal of the material to the COR for inspection/approval, prior to installing. The contractor will summon the Contracting Officer’s Representative (COR) to inspect the grading once completed prior to moving forward.
Weed block/matting/fabric: Landscape weed block/matting/fabric shall installed and be black polypropylene polyester blend, 28 mills, 3.33 ounces/sq. yard, Mullen burst strength: 250 lbs.
Permeability is 28 gals/s.f./min. per fallen head method. Landscape fabric shall be DeWitt Pro 5 Weed
Barrier (1-800-325-0950) or approved equal. Landscape fabric shall be installed per manufacturer’s specifications in this plant bed, and shall be staked at all ends/edges and at a minimum of every three feet on center. Landscape fabric shall not be visible, and all loose ends shall be cut off, tucked under, or otherwise covered with three inches (3") of wood chips by the Contractor. Landscape fabric shall be in direct contact with soil. An “X” pattern will be cut in the fabric for each planting hole, and fabric shall be
“closed” and staked as close to the plant as possible to discourage weed growth. For quality assurance, the contractor must provide a submittal of the material to the COR for inspection/approval, prior to installing.
The contractor will summon the COR to inspect weed block/matting installation before moving forward.
Hardware cloth barrier installation: Contractor shall install ½ hardware cloth on top of the landscape fabric. Hardware cloth shall be a “galvanized after welding” product. Hardware cloth shall be staked at all ends/edges and at a minimum of every three feet on center. An “X” pattern will be cut in the hardware cloth for each planting hole, then “closed” and staked as close to the plant as possible to discourage pest activity. For quality assurance, the contractor must provide a submittal of the material to the COR for inspection/approval, prior to installing. The contractor will summon the COR to inspect hardware cloth barrier installation before moving forward.
Staging/Planting: The contractor must use healthy, pest/disease-free and atheistically pleasing stock to complete this work. The contractor will notify COR after plants are staged, but before planting holes are excavated to ensure plants are arranged in line with specifications. Contractor will amend planting backfill as appropriate for the health of plants and according to plant needs. Contractor will install appropriate fertilizer tablet(s) with each plant. Any excess soils are to be removed and disposed of. For quality assurance, the contractor must provide a submittal of the material to the COR for inspection/approval, prior to installing. The contractor will summon the COR to inspect the planting installation before moving forward.
Irrigation Work: The contractor shall install drip irrigation for all plants. The contractor shall be provided a designated point of connection (POC) to connect the system. The contractor shall install a circulating (grid style) drip irrigation system for each planting area. Product used shall be Netafim
Techline (or similar). From the soil type/texture/structure and plant material the Contractor shall determine the correct irrigation line size, gph and emitter spacing for the planting area. All irrigation tubing shall be staked at a minimum of every three feet. For quality assurance, the contractor must provide a submittal of the material to the COR for inspection/approval, prior to installing. The contractor will summon the COR to inspect the irrigation installation, and test/confirm the system as operational, and before moving forward.
Bark/Mulch: The contractor shall install a 3” layer of bark/mulch as topdressing throughout all planting areas. Screened organic bark/mulch, blond in color shall be used. For quality assurance, the contractor must provide a submittal of the material to the COR for inspection/approval, prior to installing. The contractor will summon the COR to inspect the bark/mulch installation before moving forward.
Daily Clean up: The Contractor shall be responsible for removing and disposing of any debris from the work areas that is generated by the Contractor.
OPTION #A: This work is located in an area directly adjacent to the work designated in the Base work area.
Removal of 66 Plants: These plants are two years old, and due to declining health have not grown in vigorously. 40 of these plants were one gallon size when installed and the other 16 plants were five gallon size when installed. These shall be designated by COR and shall be removed by contractor.
Landscape flags shall be placed at each planting hole after each removal to distinguish the two plant types. Bark shall be raked away from plant before removal takes place to maintain and retain clean/weed free bark/mulch. Care must be taken to keep existing landscape fabric and hardware cloth in good condition while completing removal work and to ensure that loose soil from plant removal does not settle on adjacent bark/mulch areas and/or on the adjacent weed fabric. Before new plants are installed, contractor shall summon the COR to confirm this condition. After COR approves, the contractor can then install new planting material as specified below.
Install 66 New Plants: New plants to be installed are 66 one-gallon size plants. 40 plants shall be Cistus salvifolia 'Prostratus' and 16 shall be Salvia leucantha. The contractor must use healthy, pest/disease-free and atheistically pleasing stock to complete this work. The contractor will notify COR after plants are staged, but before planting holes are excavated to ensure plants are arranged in line with governments wishes. Contractor will install appropriate fertilizer tablet(s) with each plant. Any excess soils are to be removed and disposed of. For quality assurance, the contractor must provide a submittal of the material to the COR for inspection/approval, prior to installing.
Care must taken to ensure: 1) that loose soil from new plant/planting operation does not settle on adjacent bark/mulch area and/or on weed fabric; 2) to keep existing landscape fabric and hardware cloth in good condition; 3) and to ensure existing irrigation tubing is not damaged. Before bark is moved back into place, contractor shall summon COR to inspect to find these conditions. After COR approves, the contractor can then move bark back in place. An additional three yards of bark/much (as specified above) shall be used to renew areas directly adjacent to new plants. The contractor will summon the Contracting
Officer’s Representative (COR) to inspect this work when completed.
OPTION #B: This work is located in an area adjacent to the work designated in the Base work area.
Removal of 32 Plants: These plants are three years old and have died. 32 of these plants were five-gallon size when installed. These shall be designated by COR and shall be removed by contractor. Bark shall be raked away from plant before removal takes place to maintain and retain clean/weed free bark/mulch. Care must be taken to keep existing landscape fabric in good condition while completing removal work and to ensure that loose soil from plant removal does not settle on adjacent the bark/mulch area and/or on weed fabric. Before new plants are installed, contractor shall summon the COR to confirm this condition. After COR approves, the contractor can then install new planting material as specified below.
Install 32 New Plants: New plants to be installed are 32 one-gallon plants. These 32 shall be Salvia clevelandii. The contractor must use healthy, pest/disease-free and atheistically pleasing stock to complete this work. The contractor will notify COR after plants are staged, but before planting holes are excavated to ensure plants are arranged in line with governments wishes. Contractor will install appropriate fertilizer tablet(s) with each plant. Any excess soils are to be removed and disposed of. For quality assurance, the contractor must provide a submittal of the plant material to the COR for inspection/approval, prior to installing.
Care must taken to ensure: 1) that loose soil from new plant/planting operation does not settle on adjacent bark/mulch area and/or on weed fabric; 2) to keep existing landscape fabric in good condition; 3) and to ensure existing irrigation tubing is not damaged. Before bark is moved back into place, contractor shall call COR to inspect to find these conditions. After COR approves, the contractor can then move bark back in place. An additional two yards of bark/much (as specified above) shall be used to renew areas directly adjacent to new plants. The contractor will summon the COR to inspect this work when completed.
2.2 ADDITIONAL RERQUIRMENTS, CLARIFICATIONS AND INFORMATION
1. Plants shall be guaranteed for 1 year. Soil amendments must be submitted for approval.
2. Contractor will be responsible for traffic controls. NPS does will not provide this.
3. Contractor will provide equipment/tool storage area. This must be off site unless the contractor can and is comfortable with keeping tools within one of the work sites.
4. The tasks contained in this project are primarily landscaping oriented tasks, including installation of plants and finish grading. In addition to the requirements contained in the plans and specifications, the NPS expects and will demand a commensurate superior level of quality, standard of care and attention to detail during the performance of this contract.
5. The Contractor is expected to have comprehensive equivalent project experience and demonstrate this experience in the proposal by submitting qualifications attesting to their ability to perform the required tasks.
6. There is no power available on site for the contractors use; provide description of alternative supplies of both for NPS approval with proposal.
7. The contractor shall contact underground Service Alert (USA) (1 800 642 2444) seven (7) calendar days prior to the start of each ground disturbing phase and shall be responsible for maintaining a valid USA location tag through the duration of the work. The majority of utilities within the Park are owned by NPS. As such, very few utilities will actually be marked by USA. It is the Contractor’s responsibility to field locates, verify and mark all utilities within the project area. Contractor shall be responsible for locating and preventing damage to utilities. If damage occurs, Contractor will repair utility at no additional expense to the Government.
8. The Contractor shall submit with proposal, a general schedule and sequence of events, describing dates, durations and resources utilized for the project.
9. A staging and fencing plan is required. The area is highly visited – especially on the weekends.
Public safety for the duration of the project is required. Adequate barriers are required for each area (until each is completed) during the entire project.
10. A site-specific safety plan is required for NPS review and approval.
PART 3: INSPECTION / ACCEPTANCE
CLOSE OUT
A. Remove all tools, equipment, surplus, materials, and rubbish from the worksite.
B. Restore or refinish surfaces that are damaged due to work of this contract to original condition.
C. Remove grease, dirt stains, foreign materials, and labels from finished surfaces.
D. Schedule the final inspection with park point-of-contact, Micah Wright. At time of final inspection, project shall be thoroughly clean and ready for use.