This document outlines a scope of work (SOW) for a roof replacement project at the Satwiwa Cultural Center Building located in Newbury Park, California. The SOW details the requirement to remove and dispose of the existing metal roof and install a new metal roof with similar material and color. Key tasks include removing all existing roofing materials, repairing or replacing any rotten sheathing or decking, installing new felt underlayment and flashing, painting roof vents and jacks to match the new roof, removing and reinstalling gutters and downspouts, and removing and reinstalling any wireless antennas or solar panels. The SOW specifies the period of performance as 35 days after notice to proceed, and allows work to be performed on weekdays between 8:00 am and 5:00 pm. No National Park Service equipment will be provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAMO – RSV Satwiwa Re-Roofing
SOW
Part 1: General Information
A. Introduction
The purpose of this SOW is to perform the re-roofing at one of our building locations. This building unit is considered non-historic.
B. Background
The Satwiwa Cultural Center Building is located at 4132 Potrero Rd, Newbury Park, CA
91320. This building is a 1754 sf wooden frame and stucco non-historic structure built in
1994 with a large wooden deck surrounding 2 sides of the building. This building currently has a metal roof and is to be re-roofed with similar material type replacement.
C. Scope
The overall project purpose is to replace the roof at said locations with similar material and color (metal standing seam, western lock type).
4132 Potrero Rd, Newbury Park, CA 91320 was determined to need the roof replaced based on age and condition of roof. Including the following tasks:
• Remove and dispose of all existing roofing materials, and any rotten sheathing/decking.
• Repair or replace any rotten or damaged sheathing/decking with new in-kind or like material.
• Re-roof with similar roofing material and color.
• Furnish and install 50# or recommended felt over the entire roof area including new drip edge flashing.
• Furnish and install new flashing for all roof penetrations, including curb flashings, chimney flashings, valley flashings, roof jacks and vents etc.
• Paint roof jacks and vents to match color of newly installed roofing material.
• Remove existing gutters and downspouts. Install new gutters and new downspouts.
• Remove and re-install any wireless rooftop internet or communication antennas as well any solar panels must be removed and re-installed.
D. Applicable Documents
None
Part 2: Work Requirements
A. Technical Requirements
The contractor is responsible for taking their own measurements, dimensions, and quantity of materials required to complete the job.
The contractor will be responsible for removing and disposing of any debris generated during the workday. Contractor is to furnish trash/debris receptable and must be approved by the Contracting Officer’s Representative.
The contractor shall immediately notify the Contracting Officer of any ambiguities, inconsistencies, and errors discovered in this specification.
Contractor shall take every precaution to prevent damage to government and personal property and vegetation at the sites. Should any damage result, the contractor shall complete repairs or replacement to the satisfaction of the COR, at no cost to the government.
Storage of materials and equipment shall be limited to areas designated by the COR during contractor’s operations. The contractor is responsible for daily clean-up.
The buildings will be occupied during the performance period of this contract. Provide and maintain adequate egress at all times, in accordance with the Life Safety Code (NEPA 101).
No corridor, aisle, stairway, door, or exist shall be obstructed or used in a manner that interferes with egress.
Part 3: Supporting Information
A. Security
Contractor shall take all precautions to protect the public and all property during performance under this contract. The contractor will ensure buildings are always secure.
The contractor shall coordinate work schedules and locations with the Contracting Officer’s
Representative (COR) and shall erect barricades and appropriate signs while working to prevent harm to persons and property.
The contractor shall be responsible for maintaining an effective accident prevention program and providing a safe environment for all personnel and visitors. The contractor shall ensure that work is accomplished in compliance with Federal, State and local safety and health requirements. The contractor shall comply with all OSHA requirements.
B. Place of Performance
4132 West Potrero Rd.
Newbury Park, CA 91320
C. Period of Performance
The period of performance will be 35 days after NTP.
All work shall be scheduled for weekdays (Monday-Friday) between 8:00 a.m. and 5:00 p.m.
D. Special Considerations
No NPS equipment will be provided.
NPS will provide electrical service via 20-amp duplex outlet as designated by the COR.
Contractor shall use distribution materials provided at Contractor’s expense and installed, used, and removed in compliance with the National Electrical Code. Contractor and employees are expected to conserve energy.