Section_J_-_Att_No__001_Quote_Sheet.pdf
PDF 644 KB Posted
- Attached to
- SAN JOAQUIN BRIDGE PACK SUPPORT Federal contract opportunity
- Solicitation number
- 140P8623Q0073
About this file
This document is a quote sheet for stock packing support services for a trail bridge demolition project located in Sequoia and Kings Canyon National Park. The contractor will supply all animals, tools, tack, pack equipment, veterinary and farrier care, vehicle transport to and from trailheads, stock packing personnel, livestock feed, and all other items needed to complete 10 mule loads and 2 packers for camp mobilization and demobilization at the beginning and end of the project in August and September. Additionally, the contractor will provide up to 7 mule loads and 2 packers for weekly resupplies from mid-August to mid-September. The quote sheet includes line items for 1 day resupply, 2 days for camp move support, and 9 days for logistical support costs. Interested vendors should submit their total proposed cost and UEI or CAGE code number on the quote sheet. The related federal contract opportunity is solicitation number 140P8623Q0073 for San Joaquin Bridge pack support services through the Department of the Interior National Park Service Pacific West Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Section_J_-_Att_No__003_SCA_WD_2015_-5609_Rev_20_12_27_2022.pdf | ||
| Section_J_-_Att_No__002_SOW.pdf | ||
| Section_J_-_Att_No__004_Experience_and_PP_Form.pdf | ||
| Sol_140P8623Q0073.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quote Sheet
Sequoia and Kings Canyon National Park (SEKI) has a trail bridge demolition project scheduled North of Goddard Canyon at San Joaquin Bridge in 2023. In support of this project, camp gear, food, tools, and other materials will be packed in by mule from Florence Lake trailhead through Sierra N.F. to the san Joaquin Bridge site. The duration of packing needs under this contract will be based on snow levels and access to the backcountry camp locations, weekly crew needs, and project scheduling.
Due to the camp location overnight stay in the wilderness may be required, for each trip vendor must factor this into their bid. 10 mule loads and 2 packers will be needed for camp mobilization and demobilization at the beginning and end of project (approximately August 7th and September 20th). Up to 7 mule loads and 2 packers will be needed for weekly resupplies from approximately Aug4ust 13 to September 11th.
The contractor is to supply all animals, tools, tack, pack equipment, veterinary and farrier care, vehicle transport to and from trailheads, stock packing personnel (packers and assistants), livestock feed, and all other items needed for performing all the work of this contract.
Bid line items
7, 1 day resupply: 2 packers per day and 7 mules per day $
2 days camp move support: 2 packers per day and 10 mules per day $
9 days logistical support cost grocery/mail dropoff, build loads the night before resupply, food storage (estimated 4-8 work hrs)
TOTAL COST
Vendor Name:
Vendor UEI Or CAGE Code Number:
RFQ 140P8623Q0073
Section J -Att No. 001