Section I. Cover Page.pdf
PDF 353 KB Posted
- Attached to
- License Site Remediation Professional Services
- Solicitation number
- 25-062R
- Issued by
-
Department of Energy
About this file
This document appears to be a title page for a Statement of Work (SOW), which is a standard federal contract document that describes the work to be performed. While the specific details are not visible in this single-page image, the document is formatted with "Section I Statement of Work" centered on the page, suggesting it is the first section of a comprehensive contract solicitation or proposal package. More specific details about the contract's scope, requirements, and objectives would be found on subsequent pages.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section I Statement of Work
STATEMENT OF WORK
FOR
Licensed Site Remediation Professional Services
CAT: □A1 □A2 ⌧A3
Reference Work Planning #: N/A DATED: August 29, 2025
PREPARED BY:_______________________________________________
Mark Hughes, Environmental Compliance Manager
REVIEWED BY: _______________________________________________
Todd Sandt, Head, Environmental Services
APPROVED BY: _______________________________________________
Jonathon LaCarrubba, Deputy Director ES&H
PRINCETON PLASMA PHYSICS LABORATORY
P.O. BOX 451
PRINCETON, N.J. 08543
609-243-2000
RECORD OF CHANGES
Revision Description Affected Section(s)
Date
0 Initial Issue Aug 29, 2025
BACKGROUND/ OBJECTIVE
Beginning in 1993, Princeton Plasma Laboratory (PPPL) conducted a site-wide Remedial Investigation (RI) and Remedial Action Analysis (RAA) to address soil and ground water contamination at its site in Plainsboro Township, New Jersey. The investigation and remediation were conducted under a Memorandum of Understanding between Princeton University and the New Jersey Department of Environmental Protection (NJDEP). Four phases of investigation were conducted to characterize the nature and extent of contamination. Removal actions were completed to address limited soil contamination. No Further Action (NFA) letters were received for soil remediation and underground storage tank (UST) closure activities. Ground water contamination, consisting primarily of tetrachloroethylene (PCE), trichloroethylene (TCE), and their natural breakdown products, is contained on-site by the building foundation drainage system. Ground water is not migrating offsite.
The Remedial Action Selection Report for ground water, approved by NJDEP in March 2000, specifies no active ground water remediation beyond the hydraulic capture and extraction performed by the existing building dewatering system. Natural attenuation processes in the subsurface augment the building dewatering system. The Remedial Action Work Plan (RAWP), outlining the continued operation of the hydraulic control/ground water extraction system and a long-term ground water monitoring program, was approved by NJDEP in June 2000. An Aquifer Classification Exception Area (CEA) designation was approved by NJDEP in August 2002 and identifies approximately 33 acres on the PPPL site where VOC levels exceed the state ground water quality standards. A Ground Water Remedial Action Permit (GWRAP) was issued to PPPL in August 2013 and a modification was issued in March 2018.
This permit supersedes the RAWP. Activities specified in this Statement of Work provided for continuation of the selected ground water remedy under the administrative procedures required by the New Jersey Site Remediation Reform Act.
A New Jersey Licensed Site Remediation Profession (LSRP) to prepare and certify all submittals to the NJDEP, as required by the New Jersey Site Remediation Program, including the Biennial Remedial Action and Aquifer CEA Certification.
SCOPE OF WORK
Provide a New Jersey LSRP to prepare and certify all submittals to the NJDEP as required by the New Jersey Administrative Code (N.J.A.C.), Title 7, Chapters 26C, 26D, and 26E.
TASKS
The subcontractor shall provide the following tasks:
Task 1: Report/Certification/Administrative Submittals to NJDEP
● Biennial Remedial Action and Aquifer CEA Certification, including required well-search and other documentation to be prepared and submitted every two years, occurring on odd numbered years by the permit anniversary date (August 27th of odd years);
● Accurate and complete preparation of all other regulatory submittals which could include Confirmed Discharge Notification, LSRP Retention Form, Annual Remediation Fee Form, Public Notification Form, Remedial Investigation Report/Remedial Action Workplan (RIR/RAW), Quality Assurance Project Plan, Alternative Remediation Standards application, Remedial Action Report (RAR), Unrestricted Use Response Action Outcome (RAO), and etc.;
● Minimum of ten working days for PPPL and/or DOE review and comment for scheduled submittals; and,
● The cost of this scope assumes that one site visit will be required. Prepare Job Hazard Analysis (JHA) for site visit and conduct pre-job brief prior to the start of work, as needed.
Task 2: Investigation and remediation of soil impacts from spill and legacy impacts
● Advising, technical support, evaluation of data and selection of samples for contingent analysis, and investigations of soil impacts from spills and legacy impacts.
● May include, if requested by PPPL, a written summary of the remediation and analytical results, with recommendations for supplemental cleanup, if necessary; and any LSRP-required work products to validate and certify the effectiveness of remediation done by PPPL in response to spills or legacy contamination.
PPPL RESPONSIBILITIES
• Provide relevant documentation and historical reports.
• Review deliverables and provide comments for Subcontractor to address.
SUBCONTRACTOR RESPONSIBILITIES/ QUALIFICATIONS
• The Subcontractor must have a New Jersey LSRP to certify documents.
• The LSRP will serve as the primary contact for coordination and scheduling of all work performed under this SOW. The
• LSRP must have managed at least ten similar investigation/remediation projects in New Jersey in the past five years.
• References for the investigation/remediation projects shall be included with the proposal.
ENVIRONMENTAL, SAFETY, AND HEALTH
PPPL is committed to conducting work efficiently and in a manner that ensures protection of workers, the public, and the environment. As a contractor to the U.S. Department of Energy (DOE), PPPL adheres to the principles and objectives of DOE’s Integrated Safety Management System that is designed to achieve an acceptable level of safety throughout departmental operations. A similar commitment to safety is expected of all PPPL subcontractors and suppliers.
All work shall be done in accordance with a strict interpretation of applicable OSHA regulations. The Subcontractor shall comply with all applicable federal, state, and local laws, regulations, and requirements whether they are specifically listed in the SOW or subcontract.
All safety infractions will require a written notice and signature of the PPPL contact, the Subcontractor technician, and Subcontractor management. Written notices will remain on file.
At the discretion of PPPL, one or more written notices may result in the termination of this agreement.
• All work shall comply with applicable PPPL safety requirements for on-site tasks. The Subcontractor shall be responsible for providing all necessary and appropriate personal protective equipment (PPE) to their personnel for the work being performed and for their use of that equipment.
• Subcontractor must comply with:
A. The specific PPPL documents, requirements, permits, and courses listed in this Statement of Work, B. All applicable federal, state, and local laws, regulations, and requirements whether or not they are specifically listed in the Statement of Work or subcontract.
• All work shall be in accordance with all OSHA, DOE, and PPPL requirements.
Care shall be taken to protect personnel, employees, and surroundings.
• Subcontractor’s personnel working on-site at PPPL for more than 40 hours will be required to successfully complete PPPL’s General Employee Training (GET).
The Subcontractor should allow four hours per employee for GET and the associated test. At the discretion of PPPL, Subcontractor representative(s) may be issued PPPL badges. Badges will be returned by Subcontractor when contract ends or termination of Subcontractor employee.
• Subcontractor shall ensure workers are aware of foreseeable hazards and mitigations as defined by a Job Hazard Analysis (JHA, completed by PPPL) and require that workers acknowledge being so informed.
• All Subcontractor vehicles and equipment must be in good working order with no leaks of any kind. Any spills must be reported immediately to PPPL and work stopped until the spill is addressed. Subcontractor is responsible for remediation costs caused by negligence and/or faulty equipment. PPPL Environmental Services will determine the proper method of remediation.
• All requirements of this Statement of Work apply to all sub-tier contractors.
1.0 DELIVERABLES
The Princeton Technical Representative (PTR) will review all work/deliverables to ensure all requirements of the SOW are met.
Final Report: Subcontractor shall prepare and submit to PPPL the following deliverables:
Document Deliverables Required
(when applicable)
When
Deliverable Is Required
Deliverable format (paper, electronic, etc.)
Storage Location for
Received
1 Documentation of current NJDEP LSRP credentials for designated
LSRP
Submission of Proposal E
Environmental
Records
2 Documentation of 10 investigation/remediation projects in New Jersey in the past 5 years with references.
Submission of Proposal E
3 Biennial Remedial Action Protectiveness/Biennial Certification Form and Aquifer Classification Exception Area Certification, including NJDEP Electronic Data Deliverables (EDDs)
Biennially on the anniversary date of Remedial Action Permit (August 27th)
E
4 All other required or report/certification/administrative documents including NJDEP communications and transmittals.
Prior to Submission to
NJDEP
E Environmental
Exceptions (Add justification for any missing document deliverables that will not be received):
BACKGROUND/ OBJECTIVE
SCOPE OF WORK
TASKS
The subcontractor shall provide the following tasks:
SUBCONTRACTOR RESPONSIBILITIES/ QUALIFICATIONS
ENVIRONMENTAL, SAFETY, AND HEALTH
1.0 DELIVERABLES
2025-08-29T11:14:27-0400
Mark Hughes
2025-08-29T11:34:34-0400
Todd Sandt
2025-09-02T10:03:53-0400
Jonathon LaCarrubba