Section F- Annexes 0200000 F.pdf
PDF 300 KB Posted
- Solicitation number
- N40085_23_R_2526
About this file
This document contains a deliverables matrix for a federal facilities maintenance contract. The contract requires the contractor to provide regular maintenance and repair services for railroad trackage and other infrastructure at Naval Weapon Station Earle in New Jersey and other areas of responsibility. The matrix outlines over 50 required deliverables including quality management plans, safety plans, labor reports, and notices. Delivery dates and approval requirements are specified for each deliverable. The related solicitation is for maintenance and repair of railroad trackage at Naval Weapon Station Earle and other areas and was issued by the Department of the Navy Naval Facilities Engineering Command. The deliverables matrix provides details on contractor reporting requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-0200000-05 Attachment Contractor Safety Self-Evaluation Checklist 08-05-22.xlsx | XLSX spreadsheet | |
| J-0200000-09 Attachment Specification Information 08-05-22.xlsx | XLSX spreadsheet | |
| RFP N4008523R2526.pdf | ||
| WD 2015-4195 REV 23.pdf | ||
| Section J- 0200000 _J-1502000_Annexes.pdf | ||
| J-1502000 ELIN.xlsx | XLSX spreadsheet | |
| Section C Annexes -1-2-15.pdf | ||
| J-1502000-03 Turnout Inventory.xlsx | XLSX spreadsheet | |
| J-0200000-10- CHARACTERISTIC METER READING INFORMATION v2 - 2016-09-30.xlsx | XLSX spreadsheet | |
| J-1502000-05A Crossing Inventory.xlsx | XLSX spreadsheet | |
| J-0200000 -07 Attachment Service Provider.xlsx | XLSX spreadsheet | |
| General Decision Number NJ20230058 01-06-2023.pdf | ||
| J-0200000 -08 Attachment Asset Information 08-05-22.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000 Management and Administration
Section F 0200000 Deliveries or Performance
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Sign-in Sheets and
Minutes for Review and Comments
Within two working days
KO, COR
and all attendees
1 As Required
2.3.1 N/A Sign-in Sheets and
Minutes Final Revision
Within two working days
KO, COR
and all attendees
1 As Required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.5 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.3.5 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.6.4 N/A Scheduling and
Work Status Updates
Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As Specified
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.6.4 N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 1 Monthly
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
1 As required
2.6.8.2 N/A Asset and
Specification Data
When an asset is repaired, replaced, installed, or otherwise affected
KO or a representat ive designated by the KO
1 As required
2.6.9.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
2.6.9.3 N/A Contractor Quality
Inspection and Surveillance Report
First work day of each month.
KO and
COR
1 Monthly
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.6.10 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.7.1 N/A List of Key
Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.7.2.6 N/A Proof of United
States of America Citizenship
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.7.3 N/A Service Contract
Reporting (SCR)
No later than 31 October
KO and
COR
1 Annually for labor executed during the period of performanc e during each Governmen t fiscal year
(FY)
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As required
2.9.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.9.3 N/A Activity Hazard
Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.9.4 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4.7 N/A Control of
Hazardous Energy (lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
2.9.6 J-0200000-XX NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
2.9.6 J-0200000-05 Weight Handling
Equipment Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.6 J-0200000-05 Crane and Rigging
Gear Near Miss Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.8 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
2.9.9 N/A OSHA Citations
and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
2.9.10 N/A Safety Inspection
and Monitoring Report
Upon request. KO and
COR
1 As required
2.9.11 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.10.2.1 N/A Sampling Plan Prior to Sampling KO and
COR
1 As required
2.10.2.3 J-0200000-05 Solid Waste
Management and Recycling Reports
First work day of each month.
KO and
1 Monthly
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.10.2.7 N/A Fuel and hazardous
substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill report
Within 48 hours of discovery
KO and
COR
1 As required
2.10.2.8 J-0200000-14 Contractor
Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.10.2.12 N/A Asbestos
Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
COR
1 As specified
2.10.2.13 N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
Installation Environme ntal Division, City, State, and EPA
1 Semi-annually
2.10.2.13 N/A Hazardous Air
Pollutants Monthly Data
First workday of each month.
KO, COR,
Installation Environme ntal Division
1 Monthly
2.10.3 N/A Sustainable
Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and
COR
1 Annually
2.10.3 N/A Sustainable
Delivery of Services Report
Within five calendar days after each contract period.
KO and
1 Annually
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.10.3.2 N/A Recovered
Material Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.14.1 Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
2.14.2 N/A Notification to the
Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO and
COR
1 As required
2.15.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO 1 As required
Deliverables Form Preparation Instructions
Deliverable Title: (Title of Report)
Form Attachment No.:
Government Approval Required: _ X Yes No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s comments and resubmit the request via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.
Deliverable Title: Request to Work Outside Government’s Regular Working Hours
Form Attachment No.: N/A
Government Approval Required: ___ Yes X No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Sign-In Sheets and Minutes
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Final Revision of Minutes
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Permits and Licenses
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Certificate of Insurance
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Work Schedule Form Attachment No.: N/A
Government Approval Required: X Yes No
Media: Hard Copy X Electronic Direct System Input
Instructions:
The schedule shall be prepared using Microsoft Office Word or Excel software.
Submit schedule for approval at least 30 days prior to commencement of services on a semiannual basis.
Submit via email to KO/FMFS PAR for Government review and comment.
Deliverable Title: Quality Management Plan
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: QC Inspection Plan
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Contractor Quality Inspection and Surveillance Report
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Quality Inspection and Surveillance File
Form Attachment No.: N/A
Government Approval Required: X Yes No
Media: Hard Copy X Electronic Direct System Input
Instructions:
To ensure that the work performed conforms to the contract requirements, the Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results and dates and details of corrective and preventative actions. The quality inspection and surveillance file shall be property of the Government and made available during the Government’s regular working hours.
The Quality Inspection and Surveillance file shall be prepared using Microsoft Office Word software.
At the end of each year, the Contractor shall turn over the electronic files to the Government, and they shall become the property of the Government. The file shall be turned over to the KO within five calendar days of completion/termination of the contract.
Deliverable Title: List of Key Personnel and Qualifications
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Organizational Chart
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Proof of Legal Residency
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Contractor Labor Hours (eCRMA) Report
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Employee List
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Passes and Badges
Form Attachment No.: N/A
Government Approval Required: X Yes __ No
Media: X Hard Copy X Electronic Direct System Input
Instructions:
Coordinate with the COR or the Performance Assessment Representative (PAR) to complete the steps below:
1. Assemble the names of all your personnel that need base access.
2. If possible, assure their personnel history will not prohibit base access.
3. Gather their required information and submit it to the PAR and/or Visitor’s Control Center
(VCC) (located at the front gate)
4. Submit applications (completed form SECNAV 5512s) to the Security Department’s Visitor
Control Center and /or PAR.
Ask your COR if an additional Restricted Area Access Request Form is required
You may call the VCC if you have additional questions regarding Bass Access – (732) 866-2214
Deliverable Title: Accident Prevention Plan
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s comments and resubmit the request via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.
The APP shall follow the format and include all elements in Appendix A of the US Army Corps of Engineers, Safety and Health Requirements Manual EM 385-1-1. The APP shall incorporate Activity Hazard Analyses (AHAs) and Occupational Risk and Compliance Plans and Programs that are relevant to the site specific hazards and controls for each activity and type of work that may be encountered in the performance of this contract.
Submit in a tabbed binder following the format/sequence as outlined in Appendix A of EM 385-1- 1, and submit a copy via email and a hard copy to the KO/FMFS PAR for Government review and comment.
1. If the KO/FMFS PAR accepts the Accident Prevention Plan, the Government shall notify the
Contractor of Government acceptance.
2. If the KO/FMFS PAR responds to the Accident Prevention Plan with review comments, then incorporate the Government’s comments and resubmit the Accident Prevention Plan via email and hard copy to the KO/FMFS PAR. Continue this cycle until the Government notifies the Contractor of Government acceptance.
Deliverable Title: Activity Hazard Analysis
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Compliance Plans, Programs, and Procedures
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: NAVFAC Contractor Incident Reporting System (CIRS)
Form Attachment No. J-0200000-05
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Monthly On-Site Labor Report
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: OSHA Citations and Violations Corrective Action Report
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Safety Certifications
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Hazardous Waste Disposal Reports
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Spill Report
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Emergency Planning and Community Right-To-Know Act (EPCRA) Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
2. Include the following:
a. EPCRA Plans and Procedures:
1) Hazardous Materials Planned for Use: Include an inventory of hazardous materials planned for use, including estimated quantities, and a copy of the corresponding material safety data sheets (MSDS) for hazardous materials expected to be used for this contract during each calendar year. The inventory shall include all information required to complete the Contractor Hazardous Material Inventory Log shown in the Form Attachment. This report shall be submitted to the KO and Environmental Compliance Office via the KO.
2) Plan for protecting personnel and property during the transport, storage, and use of the materials.
3) Emergency procedures for spill response and disposal, including a site map with approximate quantities on site at any given time. The site map, showing where the hazardous substances are stored, shall be attached to the inventory.
4) Approved labeling system to identify contents of all containers on-site.
b. Hazardous Materials Actually Used: Include an inventory of the actual hazardous materials used, including include quantities, to the KO and Environmental Compliance Office via the KO. The inventory shall include all information required to complete the Contractor Hazardous Material Inventory Log shown in the Form Attachment.
3. Submit additional information to the Government as requested to support EPCRA reporting requirements.
Deliverable Title: Contractor Hazardous Material Inventory
Form Attachment No.: J-0200000-14
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Detailed Scope of Work and Detailed Estimate
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s
Deliverable Title: Non-Recurring Work Proposals
Form Attachment No.: N/A
Government Approval Required: Yes __X_ No
Media: ___ Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The report shall be prepared using Microsoft Office software.
Submit a copy via email to recipients on the distribution list for Government review and comment.
1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.
2. If the KO responds to the request with review comments, then incorporate the Government’s comments and resubmit the request via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.
Submit Detailed Work Proposal
Submit Non-recurring work proposal to the KO within 2 working days which includes:
Complete list of all tasks necessary to perform the required scope of work
Number of direct labor hours to perform each task
Projected quantity and cost of materials and equipment to perform the scope of work
Detailed Estimate The estimate shall be prepared using Microsoft Office Excelâ software.
The estimate shall include:
Separately priced labor for each laborer including management
Separately priced material
Separately priced equipment
Itemized additional other cost for consideration
The total cost.
In addition:
Clearly show the deductions for the applicable recurring work limit of liability.
The resultant proposed price shall be for the portion of the work exceeding the recurring work limit of liability
Deliverable Title: Service Program Plan Form Attachment No.: N/A
Government Approval Required: X Yes No
Media: Hard Copy X Electronic Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Wordâ and shall be submitted within 30 calendar days after contract award, and annually thereafter.
Submit a copy of the report via email to KO/FMFS PAR for Government review and comment.
Deliverable Title: Service Work Schedule Form Attachment No.: N/A
Government Approval Required: X Yes No
Media: Hard Copy X Electronic Direct System Input
Instructions:
The schedule shall be prepared using Microsoft Office Wordâ or Excel software.
Submit schedule for approval at least 30 days prior to commencement of services on a semiannual basis.
Submit via email to KO/FMFS PAR for Government review and comment.
Deliverable Title: Service Report Form Attachment No.: N/A
Government Approval Required: X Yes No
Media: Hard Copy X Electronic Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Wordâ or Excel or other approved software and submitted to the KO/FMFS PAR for Government review and comment.
The Service Report shall be submitted to the KO/FMFS PAR electronically via email within 5 days after the completion of services.
The Contractor shall develop a report that contains the following information (report format is subject to review and approval by the Government prior to the start of work, and shall be subject to modification by the direction of the Government):
a. Detailed description of work actually completed, problems encountered and recommended follow-up actions required.
b. Brief description of material and parts used.
c. Date and time work began.
d. Date and time work was completed.
e. Total hours of labor (by craft) expended, including travel time.
f. Name of person accepting the work.
g. Last name and first initial of the Contractor employee(s) performing the work.
Submit a copy of the report via email to KO/FSCM PAR for Government review and comment.
File details come from the government source that posted it. Updated .