The file's text, extracted by GovTribe without its formatting.
1 Asset File Info Attachment J-0200000-08 Asset Information
| Interface: Asset Information |
| VERSION #: V2 |
| Current as of: 26 Apr 2017 |
| Version History |
| V1 - Updated to reflect current interface in MAXIMO |
| V2 - Added 3 additional fields (OPT): Asset Comment, PM Program & PM Plan |
| TABS |
| 1-Asset File Info - This Sheet |
| 2-Asset File Field List - Asset Template Data Format Information |
| 3-Asset File Template - Sample Excel Format |
2 Asset File Field List Attachment J-0200000-08 Asset Information
| Interface: Asset Information |
| VERSION #: V2 |
| Current as of: 26 Apr 2017 |
| Position | Name | Required | Length | | | |
| Limit | Data Format Note | Content Notes | MAXIMO Field Name | | | | |
| 1 | AssetNum | Y | 25 | | | ASSETNUM |
| 2 | Changed Date | N | | MM/DD/YYYY | | CHANGEDATE |
| 3 | Description | Y | 100 | | | DESCRIPTION |
| 4 | Long Description | N | 1,000 | | | LONGDESCRIPTION |
| 5 | Master System | Y | | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. | |
| POSITIONs 5,6,and 7 should not only be on the value list but be related in the UNIFORMAT Hierarchy: D30, D3010, D3010100 etc… | MASTERSYSTEM | | | | |
| 6 | System | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. |
| POSITIONs 5,6,and 7 should not only be on the value list but be related in the UNIFORMAT Hierarchy: D30, D3010, D3010100 etc… | SYSTEM | | | | |
| 7 | Sub-System | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET. |
| POSITIONs 5,6,and 7 should not only be on the value list but be related in the UNIFORMAT Hierarchy: D30, D3010, D3010100 etc… | SUBSYSTEM | | | | | |
| 8 | Location | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | LOCATION |
| 9 | Site ID | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET -or- | |
| For this contract only: XXXXX | SITEID | | | | | |
| 10 | Work Center (Person Group) | Y | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET -or- | |
For this contract:
| - use the following identifier "XXXX" | PERSONGROUP | | | | | | |
| 11 | Asset Type | Y | | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | ASSETTYPE |
| 12 | Asset Quantity | N | | Integer | | QUANTITY |
| 13 | Inventory Category | Y | | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | INVENTORYCATEGORY |
| 14 | Purchase Price | N | | Integer | | PURCHASEPRICE |
| 15 | Budgeted Cost | N | | Integer | | BUDGETCOST |
| 16 | Replacement Cost | Y | | Integer | | REPLACECOST |
| 17 | Meter Group | N | | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | GROUPNAME |
| 18 | Belongs To (Parent) | N | | Must match an existing ASSETNUM in Maximo. | Asset Number of Parent. The asset and its parent can't be created in the same file | PARENT |
| 19 | Contract Number | N | 25 | | | Appended to LONGDESCRIPTION |
| 20 | Task/Delivery Order Number | N | 25 | | | Appended to LONGDESCRIPTION |
| 21 | Drawing Reference ID | N | 25 | | | Appended to LONGDESCRIPTION |
| 22 | Warranty Expiration Date | N | | MM/DD/YYYY | | Appended to LONGDESCRIPTION |
| 23 | Status Date | N | | LEAVE BLANK | Leave blank/Do Not Use | STATUSDATE |
| 24 | Installation Date | Y | | MM/DD/YYYY | | INSTALLDATE |
| 25 | Asset Status | N | | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET -or- | |
| "Operating" for NEW and "Decommissioned or DEA" for removed equipment | STATUS | | | | | | |
| 26 | CLASSSTRUCTUREID | N | | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | CLASSSTRUCTUREID |
| 27 | Job Plan Code | N | 25 | | | Appended to LONGDESCRIPTION |
| 28 | Equipment Tag Number | N | 25 | | | Appended to LONGDESCRIPTION |
| 29 | Additional Loc Info | N | 250 | | | ADDLOCINFO |
| 30 | Manufacturer | N | | Must match Value List in Maximo | Value list in REFERENCE SPREADSHEET | MANUFACTURER |
| 31 | Model Number | N | 25 | | | MODEL |
| 32 | Serial Number | N | 25 | | | SERIALNUM |
| 33 | Asset Comment | N | 100 | | | ASSETCOMMENT |
| 34 | Standard Eval Results | | | | | |
| (PM Plan) | N | 15 | Values Depend on Asset Type (i.e. UTILITIES, FACILITIES) | Not required, but will default to N/A or NTE if left blank. Valid values determined by Asset Type (Position 11) | STANDARDEVAL | | |
| 35 | PM Standard Applies | | | | | |
| (PM Program) | N | 15 | Values Depend on Asset Type (i.e. UTILITIES, FACILITIES) | Not required, but will default to N/A or NTE if left blank. Valid values determined by Asset Type (Position 11) | PMSTANDARD | | |
| N/A | | | | | | |
3 Asset File Template Attachment J-0200000-08 Asset Information
| Interface: Asset Information |
| VERSION #: V2 |
| Current as of: 26 Apr 2017 |
| Position | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| Name | AssetNum | Changed Date | Description | Long Description | Master System | System | Sub-System | Location | Site ID | Work Center (Person Group) | Asset Type | Asset Quantity |
| Required Field(s) | | | | | | | | | | | | |
| (on new Asset) | Y | N | Y | N | Y | Y | Y | Y | Y | Y | Y | N | |
| Position | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 |
| Name | Inventory Category | Purchase Price | Budgeted Cost | Replacement Cost | Meter Group | Belongs To (Parent) | Contract Number | Task/Delivery Order Number | Drawing Reference ID | Warranty Expiration Date | Status Date | Installation Date |
| Required Field(s) | | | | | | | | | | | | |
| (on new Asset) | Y | N | N | Y | N | N | N | N | N | N | N | Y | |
| Position | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 |
| Name | Asset Status | CLASSSTRUCTUREID | Job Plan Code | Equipment Tag Number | Additional Loc Info | Manufacturer | Model | Serial # | Asset Comment | PM Plan | PM Program |
| Required Field(s) | | | | | | | | | | | |
| (on new Asset) | N | N | N | N | N | N | N | N | N | N | N | |
| •ONLY COLUMNs 1-35, and rows containing data should be be included in the FLAT-FILE SUBMISSION; |
| •Pipe Delimited (.txt) - | (Pipe is at the end of the column, before the return. Must have 35 PIPEs per row.) |
| •New assets & asset updates (to different assets) can be completed at the same time. An asset can't be created and updated at the same time. |